to Wegberg-Wildenrath,
Siemens’ Test Center for Railway Systems
> References
© Siemens AG 2006
Department: TS IS IR PCW Transportation Systems
One Test Center for Everything –
Rolling Stock and Infrastructure
Locomotives
Electrification
TS LM
TS EL
Rail Automation Mass Transit
TS RA TS MT
Integrated Services
TS IS
Trains Turnkey Systems
TS TR TS TK
> References
© Siemens AG 2006
Department: TS IS IR PCW Transportation Systems
Get a Bit More from Wegberg-Wildenrath
> References
© Siemens AG 2006
Department: TS IS IR PCW Transportation Systems
One Test Center for Everything –
Rolling Stock and Infrastructure
> References
© Siemens AG 2006
Department: TS IS IR PCW Transportation Systems
Get a Bit More – The Test Center
Employees (average):
- Siemens 250
- non-Siemens (consortiums, suppliers) 100
> References
© Siemens AG 2006
Department: TS IS IR PCW Transportation Systems
Siemens Points the Way
> References
© Siemens AG 2006
Department: TS IS IR PCW Transportation Systems
Siemens Points the Way
Test oval T1
Length 6 082 m
Max. speed 160 km/h
Test oval T2
Length 2 485 m
Max. speed 100 km/h
Test track T3
Length 1 400 m
Max. speed 80 km/h
Test track T4
Length 553 m
Radii 50/25/15 m
Test track T5
Length 410 m
Max. gradient 40/70 ‰
> References
© Siemens AG 2006
Department: TS IS IR PCW Transportation Systems
Optimum Performance Range for Optimum
Results
Test area Test area Test oval T2 Test track T3 Test track T4 Test track T5 Train formation buildings
Technical data 1 2
Contact wire
Third rail *)
Traction supply,
selectable
15 kV/16.7Hz
25 kV/50 Hz
12 kV/25 Hz
25 kV/60 Hz
= 750 V
= 400–2 000 V
= 2 000–4 000 V
Stationary tests
Mechanical part of vehicle
Stationary tests
Mechanical part of vehicle
Stationary tests
Electrical part of vehicle
Insulation test
EMC measurement
Measurements of on-board power systems
Testing of safety and information systems
Testing of diagnostic systems
Measurement of heating, ventilation and
air-conditioning systems
Testing of grounding and protective measures
Tests of auxiliaries (direction of rotation,
starting)
Dynamic tests
Mechanical part of vehicle
Dynamic tests
Electrical part of vehicle
Up-to-date testing
Power supply for all standard systems,
including third rail for metros
Possibility of regenerative braking
Safety and signaling systems
Electronic interlockings for ETCS Level 1 and 2
GSM-R
Indusi
FTGS track vacancy detection,
LZB automatic train control
Noise measurement in accordance with technical
specifications for interoperability (TSI)
Internal
Test of products and systems from
Siemens Transportation Systems
External
The test center carries out tests on
behalf of external customers
> References
© Siemens AG 2006
Department: TS IS IR PCW Transportation Systems
More advantages for the customer
© Siemens AG 2006
Department: TS IS IR PCW Transportation Systems
More for the manufacturers/designers
© Siemens AG 2006
Department: TS IS IR PCW Transportation Systems
Expansion and plans
© Siemens AG 2006
Department: TS IS IR PCW Transportation Systems
Thank you for your
attention!
Wegberg-Wildenrath,
Siemens’ Test Center for Railway Systems