THANDALAM P.O.OSRIPERUMBUDUR.
LOAD BREAKSWITCH
TYPE I LDFT
HORIZONTALNE,RTICAL
INSTRUCTIOI\ FOR
MOUNTING/INSTALLATION OF
LOAD BREAKSWITCH
;
OUTDOORTYPE
PAGE I
DETAILED INSTRUCTION FOR MOUNTING / INSTALLATION
OF THE LOAD BREAK SWITCH- HORIZONTALA/ERTICALTYPE
STAGE.l
[Assemblvfor Switch and Operating Handlel
HORIZONTAL MOUNTING:-
33KV SWITCH
llKV SWITCII 22I(v SWITCH
TING CTIANNEL - BI
TING CHANNEL - 82
VERTICAL MOTINTING:-
NOTE:-
MOUNTING CHANNELS A1,A2,81&82 OR NOT IN OIJRSCOPE.
PAGE 2
DETAILED INSTRUCTION FOR MOUNTING / INSTALLATION
OF THE LOAD BREAK SWITCH- HORIZONTALA/ERTICALTYPE
1) Take the switch from the wooden casecarefully by using Fork Lift.
[for lifting the switch, don't use contact blade, quenching chamber or arcing
pin for handling the switch.l
NOTE:-- The channelsAl ,A2 & B1,82 give only the details of holes
and not the channelssize & length, the mounting channels
length and size can be calculated incorporating the tixing
hole details.
4) Drill the hole as 18O in the channelsB1rB2 and maintain the distance
betweenthe fwo holes as 260mm.
6) There are three pair of holes in the operating handle, First pair is already
revited the handle with handle base.One end of the operating pipe is
connectedto secondpair of holes,the third pair is already welded on either
sidesof the handle grip.
PAGE 3
DETAILED INSTRUCTION FOR MOUNTING / INSTALLATION
OF THE LOAD BREAK SWITCH- HORIZONTALA/ERTICALTYPE
STAGE-2
[Pipe Guide Assemblyl
HORIZONTAL MOUNTING:-
33KV SWITCH
I1KV SWITCH 22KY SWITCH
VERTICAL MOTJNTING:-
ol
lr) rql rrl
14 Ell rI]
F. FI F
<1
g
A
o &
xA
A
o{
PAGE 4
DETAILED INSTRUCTION FOR MOUNTING / INSTALLATION
OF THE LOAD BREAK SWITCH. HORIZONTALA/ERTICALTYPE
10) In the pipe guide, there are four pairs of holes.Two cylindrical pins are
fixed to any two pair of the above holes.
13) In the pipe guide in addition to two nA holes are present which is used
for clamping the pipe guide to the mounting channel (C1).
14) Now, switch is ready with crank and mounting assemblyis ready
separately.
PAGE 5
DETAILED INSTRUCTION FOR MOUNTING / INSTALLATION
OF THE LOAD BREAK SWITCH- HORIZONTALA/ERTICALTYPE
STAGE-3
lFinal Assemblvl
IIORIZONTAL MOUNTING:-
33KV SWITCH
llKV SWITCH 22I(\I SWITCH
VERTICAL MOUNTING:.
PAGE 6
DETAILED INSTRUCTIONFOR MOUNTING / INSTALLATION
OF THE LOAD BREAK SWITCH- HORIZONTALA/ERTICALTYPE
16) The crank is already fitted to the operating shaft of the switch at
suitable angle. (Angle can be changedby just looseningthe bolts.)
17) Thesetwo are connectedby matching, the only hole in the pipe clamp
with any of the six holes in the crank and tightened.
18) Pad lock arrangement is provided in the assemblyof handle and handle
base.
PAGE 7
DETAILED INSTRUCTIONFOR MOUNTING / INSTALLATION
OF THE LOAD BREAK SWITCH. HORIZONTALA/ERTICALTYPE
STAGE-4
lSwitch Function I
PAGE 8
DETAILED INSTRUCTIONFOR MOUNTING / INSTALLATIQN
OF THE LOAD BREAK SWITCH- HORIZONTALA/ERTICALTYPE
21) The Opening and Closing Contacts of the switch is satisfactory' the
switch is ready to use.
22) The main contact releasefirst followed by a Click Sound from the
Chamber I The breaking of current path inside Arcing Chamber, at this
point the current path will be through arcing contactl. After the Arcing
Contact releases,the switch openedslowly.
23) If all the above setting are found satisfactory, the switch can be
commissioned.
24) Atter the commissioning then given Supply from the Top fixed contacts,
and then operate the switch fast.
PANICKKER SWITCHGEARPRTVATELIMITED,
THANDALAM POST,
SRIPERUMBUDUR.6OZ 105,
TAMIL NADU, INDIA.
Phone: 5
+91-44-2715624512715617
Fa>r: +91-44-2715617 54596
61247
E-mail: info@panickker.com
Web: www.panickker.com
PAGE 9