Excavation
Earth work in excavation in foundation trenches in all
types of soil upto a desired depth, dressing of sides, ramming
of bottoms, getting out the excavated soil, stacking
of excavated soil within plot boundary as directed
including all leads and lifts.
Piling-
Providing and laying, Dia of Bore is 230 mm and depth is 1.8 m to 2.0 mtr
appro, Reinforcement use in vertical bar is 10 mm dia in 04 nos. & Rings are
placing 200 mm C/C in 08 mm dia of bar, Pouring of Concrete is M25 in use
including all lead and lift.
PCC 1:4:8
Providing and laying Plain Cement Concrete 1:4:8 (1
cement: 4 coarse sand: 8 graded stone aggregate
20mm nominal size) in footings and bases for
columns, pile caps, plinth beam excluding the cost of
centring and shuttering & all leads and lifts.
RCC M20
Providing and laying Reinforcement Cement concrete at all levels using graded
stone aggregate 20 mm nominal size and coarse sand as per approved mix
design including curing and all leads and lifts.
Reinforcement
Providing and laying HYSD Reinforcement as specified for RCC work in
substructure and superstructure including cost of binding wire, cover blocks,
streightening, cutting, bending, shifting,and placing in correct position &
allingment all complete at all level.
Painting Walls
Painting-steel (Gate ,Picket Fence)-Providing and applying synthetic enamel
paint two or more coats on steel work to given an even shade including
cleaning of surface all complete to the satisfactio of Engineer in charge
including final.
1.13 shuttering for plinth beam and column
Providing and fixing in position railing (staircase, balcony, terrace, boundry wall,
window grill wherever required) etc made of MS pipe,MS square bar, MS flats,
MS shoes welded as per design and drawing including bending to profile as per
drawing, grinding, cutting holes in RCC/ stone work, grouting the balustrades in
position etc. complete including providing two coats of red oxide primer.
2 Structural Steel
Picket Fence
Staircase Railing
Balcony Railing
Terrace Railing
Window Grill
Gate
Providing and applying 12mm thick cement plaster on internal wall/
columns in cement mortar 1:6 (1 cement : 6 fine sand)
Plastering Work finished smooth in line & level including hacking of RCC
surfaces and curing, all lead and lifts complete to the
satisfaction of the Engineer.
GF
Ff
Internal
3 Terrace
Mumty Room
3
Shaf
Providing & applying approved brand and shade with two or more coatsto give
an eve shade including cleaning and preparation of surface, applying putty and
Painting Work one coat of primer inclding erection and dismentling of scafolding, working
platforms as necessary complete to the satisfaction of the Engineer.
Primer
GF-Putty
Internal FF-Putty
OBD-1st coat
OBD-2nd coat
Providing & applying 2 coats of Exterior Paint, ICI Weather-shield/Asian Paints
Apex/ Berger Weather-coat, over a coat of primer on External surface at all
levels of approved shade , to give an even shade including surface cleaning /
preparation, as per instructions of the Engineer / Recommendation by
4 manufacturer including erection and dismantling of scaffolding ,working
External platform etc.
Primer
Weather Shield-1 coat
Weather Shield-2nd coat
Enamel Paint-Providing and applying synthetic enamel paint two or more coats
on wood work to given an even shade including cleaning of surface all complete
Doors to the satisfactio of Engineer in charge including final.
Structural Steel Enamel painting (Windows gril,Stair case railing ,Balcony & Terrace Raling)
Providing and laying tile flooring of approved make, shade and pattern as
approved by Architect laid over 20/12mm average thick bed of cement mortar
1:4 (1 cement : 4 coarse sand),grooves using 2/ 3mm PVC spacers and epoxy
Tile Work grouted with tile Grout of matching shade of tile including cutting, grouting the
joints with white cement and pigment to match the shade of tile including
cutting, etc. complete in all respects as per pattern and drawing.
Vitrified
5 Skirting
GF Ceramic
Skirting
Dado
Vitrified
FF
5
Skirting
FF Ceramic
Skirting
Dado
Providing and laying Stone Flooring using stone slab of approved quality in
specified size of stone slab as per drawings and pattern in flooring/ landing
bands ]with cement mortar 1:4 (1 cement : 4 coarse sand) of adequate
thickness to match the total thickness of 50mm and joint to be filled with
cement slurry mixed with pigment to match the shade of stone including
surfaces pointing, curing etc. complete as per specification, pattern and
6 Marble drawing.
Staircase Steps-
With 18 to 20mm thick Marble stone and joint to be filled with white cement
slurry mixed with pigment to match the shade of stone including
rubbing,nosing,chamfering and mirror polishing etc all complete.
With 17 to 20mm thick Granite stone counter top and joint to be filled with
white cement slurry mixed with pigment to match the shade of stone (base rate
of Pre-polished Granite stone work.
7 Granite
Kitchen PF
Counter Basin
Counter Basin RCC slab
Door Frame
Providing, making and fixing in position selected woods in frames etc. of doors,
windows, ventilators made to size and shape as shown in drawing, with mitered
joints fixed with 40x3mm flat iron hold fast 400mm long embedding bricks
Doors masonry work/ concrete work in cement concrete 1:2:4 by approved dash
fastener in contact with RCC, as directed including making necessary grooves,
chamfering etc. including applying water proof wood primer and 2 coats of
termite proof paint on concealed surfaces, etc. complete as per detailed
8 drawings. (all item described above are to be included in the quoted price).
Section as per drawing.
Door Shutter
Providing and fixing BST/OST Flush Door Shutters of approved quality and make
including fixing and position with 4no hinges 125 mm long with necessary
screws and 6mm thick Ghana teak wood lipping all round as per Drawings and
directionsof Project In Charge
MS Door-as per above Spec
Providing and fixing Windows as approved make and design as per drawing
approved by Engineer -in-Charge,with Aluminium Extrusions, confirming to
IS:875 part 3, grade 6063 temper T5/ T6 with powder coating of 50 microns
thickness of approved shade with sliding rollers and sliding handle (Star lock)
9 Aluminium Windows for sliding windows with hinges and aluminium Stay for windows with EPDM
rubber etc. all complete. glass would be Aashi/Saint Gobin/ Modi Guard all
clear, annealed glass from SGG of thickness as mentioned in drawings. The
hardware of EBCO/Pulse or other Indian Good Quality makes as approved 4
mm thick pinhead glass in ventillators.
IPS-Providing and laying of 40 mm thick cement concrete flooring 1:2:4 (1 is
cement, 2 is Coarse sand and 4 is stone aggregate 12.5 mm nominal size) The
surface will be finished with nylon brush and flooring shall be in required slope.
Shaft BW 4" thk-Providing and laying in CM 1:4 (1:cement 4:Coarse sand) curing
11 Block work etc complete as per Engineer -in-charge
Shaft Foundation EW
PCC
RCC Rft in beam and Lintel
CENTRING & SHUTTERING
Centring and Shuttering including Strutting, Propping etc.
and removal of formwork after specified period has elapsed
after concreting, hacking of concrete wherever applicable
with prior approval of the Engineer including all leads & lifts
12 Miscellaneous work
at all levels, tools & tackles, nails and other consumables.
Shuttering in Raft
Shuttering in beam
Shuttering in lintel
Shuttering in Pergola,shaft &Mumty
Reinforcement Pergola,Shaft& mumty
RCC Pergola,Shaft& mumty
External Leveling Work(This rate is Per Villa)
ELECTRICAL
GF
Ff
13
Wiring
GF
13
FF
Supply, installation, testing and commissioning the switches for light point 6A 5
Switch Box Fixing pin and power point 16-25A 5 pin, fan regulator with 360 degree roation, TV,
Telephone as per drawing, approved makes and complete in all respect.
GF
Ff
TNEB Meter Box Fixing Fixing and testing of TNEB merter box as per TNEB details and design.( material
& Termination to be supplied by SARE)
Cable Laying from Mbox Fixing, laying, termination and testing and commissioning of required size of
to F-Pillar cable as per drawing and material to be supplied by SARE.
External Earthing Fixing, laying, testing and commissioning of required earthing as per drawing
Including Chamber and material to be supplied by SARE.
300x300
Testing & Commisioning
Extra Changes Work
Supply, fixing, testing and commissioning the internal plumbing, sewer and
waste piping works with CPVC for water and UPVC for sewer and waste as per
PLUMBING drawing and design and approved makes including all necessory fixtures &
fittings with Dr. Fixit Solvent annd complete in all respect.
14
GF Toilets
FF Toilets
Kitchen
Internal Wall CPVC Pipe
works Supply, fixing, testing and commissioning the plumbing, sewer and waste piping
works with UPVC for sewer and waste as per drawing and design and approved
makes including all necessory fixtures & fittings with Dr. Fixit Solvent annd
complete in all respect.
GF Toilets
14
FF Toilets
Front Side Vertical Piping
Back Side Vertical Piping
Water Line Testing
Terrace GI Piping & Valve Fixing
Tank proving and Fixing
Floor PVC Pipe & Trap
External Sewer Pipe & Gully Trap
External Champers 300 x 300
External Champers 600 x 600
Ext Rain Water Piping & Balcany RW Pipe SpoutConnecting Pipe to RWH Pit &
Pit to SWD
Cp fitting & Sanitory Fixtures
Testing & Commisioning
Note: All waterproofing works shall be carried out by
specialist waterproofing agencies approved by theEngineer
GF Toilets
15 Water Proofing
FF Toilets
Terrace & Mumty Slab
Planter Box
Spaak Purchased materials
Total Value of work done
Service Tax @5.6%
Grand Total
Deduction
Retention@2%
WCT@2%
TDS@2%
Materials Recovery supplied by SARE
Cement and Steel, Structural steel ,Door and Painting ,Electricals & Plumbing
Materials
Net Payable Amount
FRA INDIA PVT LTD
S (P) LTD
ST - Chennai
Tax Invoice
Cumulative Previous Present
Unit BOQ Qty Previous Present Qty Rate
Qty Amount Amount(in Rs.)
CuM 151.00 63.36 35.20 98.56 197.00 12,481.92 6,934.40
0.00
0.00
0.00
0.00
0.00
Nos 400.00 144.00 80.00 224.00 722.00 103,968.00 57,760.00
0.00
0.00
0 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Sft 50,540.00 14,553.00 0.00 14,553.00 70.30 1,023,075.90 0.00
Sft 43,120.00 14,553.00 0.00 14,553.00 49.40 718,918.20 0.00
0.00
0.00
SET 36.00 6.00 0.00 6.00 13,920.00 83,520.00 0.00
SET 100.00 13.00 0.00 13.00 12,586.00 163,618.00 0.00
SET 64.00 7.00 0.00 7.00 2,153.00 15,071.00 0.00
0.00
-8,857,905.62 -113,708.39
4,048,534.27 1,918,452.58
Cumulative
Amount(in Rs.)
19,416.32
161,728.00
24,715.68
109,060.00
274,251.41
86,074.32
50,775.24
12,822.60
51,782.55
54,348.71
28,813.00
0.00
382,829.13
93,393.08
163,931.38
275,848.93
0.00
83,861.83
102,546.46
13,882.99
0.00
84,836.65
0.00
5,310.69
48,595.96
86,001.98
219,545.10
125,968.50
3,270.98
0.00
159,191.10
33,971.76
324,145.80
48,276.54
279,582.03
39,915.85
85,140.60
9,067.52
135,443.22
138,503.68
31,726.50
103,087.53
10,147.09
182,496.26
681,253.33
80,088.12
61,184.34
60,814.44
1,075,344.00
1,448,200.00
0.00
436,686.00
124,758.48
0.00
0.00
0.00
72,701.55
4,692.74
3,557.56
17,753.82
233.89
3,433.97
2,502.51
2,163.50
33,365.69
2,537.08
98,550.00
186,763.50
184,338.00
1,023,075.90
718,918.20
240,124.50
129,521.70
0.00
15,000.00
105,030.00
19,404.00
54,000.00
83,520.00
163,618.00
15,071.00
0.00
6,897.00
49,346.00
140,574.00
20,160.00
1,946,880.00
569,400.00
0.00
0.00
0.00
247,968.00
608,472.00
18,000.00
0.00
0.00
0.00
0.00
98,385.46
14,998,595.25
839,921.33
15,838,516.58
-299,971.90
-299,971.90
-299,971.90
-8,971,614.01
5,966,986.86
Plumbing Materials Cost
Plumbing Amount
Electrical Amount
Electrical Cost
Sand
Sl.No. Item Unit Total Qty
CA
1 Excavation cum 98.56
Piling Nos 224.00 87.09 14.40 21.6
PCC 1:4:8 cum 5.28 17.11 3.17 4.75
RCC M25 cum 19.00 123.12 11.40 17.10
Reinforcement Kg 4,477.57
Blockwork cum 17.88 14.30 3.33 947.64
Plastering sqm 228.46 15.35 3.43
Painting -walls sqm 567.48
Plaster band Rm 90.30 6.07
Painting-steel sqm 321.59
2 Picket Fence Kg 0.00
Staircase Railing Kg 4,584.78
Balcony Railing Kg 1,118.48
Terrace Railing Kg 1,963.25
Window Grill Kg 3,303.58
Gate Kg 0.00
3
GF 377.76 25.39 5.67
Ff sqm 461.92 31.04 6.93
Terrace 62.54 4.20 0.94
Mumty Room 0.00 0.00 0.00
Front sqm 354.22 42.51 5.31
Shaft 0.00 0.00 0.00
4
Primer sqm 279.51
GF-Putty sqm 1,418.86
FF-Putty sqm 2,529.47
OBD-1st coat sqm 7,198.20
OBD-2nd coat sqm 7,198.20
Primer sqm 242.30
Weather Shield-1 coat sqm 0.00
2 coat sqm 4,361.40
Enamel paint sqm 292.86
Polish Work sqm 654.84
Enamel painting sqm 285.66
5
Vitrified sqm 341.37 75.10 8.53
Skirting Rm 307.05 27.63
Ceramic sqm 138.44 27.69 2.77
Skirting Rm 80.96 7.29
Dado sqm 219.52 52.68 3.29
Vitrified sqm 167.68 40.24 4.19
Skirting Rm 244.05 21.96
Ceramic sqm 167.62 33.52 3.35
Skirting Rm 90.60 8.15
Dado sqm 295.78 26.62 4.44
6 Staircase Steps sqm 287.57 57.51 7.19
7 Kitchen PF sqm 31.26 6.25 0.78
Counter Basin sqm 20.58 4.94 0.68
Counter Basin / Kit. RCC slab sqm 58.14 126.44 2.62 3.92
8 Door Frame Nos 258.00
Door Shutter Nos 325.00
MS Door Nos
9 Frame sqm 119.64
10 IPS sqm 397.32 102.91 7.15 10.73
Wooden flooring sqm 0.00
Skirting Rm 0.00
End profile Rm 0.00
11 Paver Block sqm 0.00 0.00
Kerb Stone Rm 0.00 18.90 28.35
12 Shaft BW 4" thk sqm 82.90 6.63 1.16
Other Work 0.00
13 Shaft Foundation EW cum 23.82
PCC cum 0.76 2.46 0.46 0.68
cum 2.02 13.10 1.21 1.82
cum 0.58 3.76 0.35 0.52
RCC Rft,Beam ,Lintel cum 0.40 2.59 0.24 0.36
Shuttering in Raft sqm 0.71 0.43 0.6408
Shuttering in beam sqm 10.45 6.27 9.40815
Shuttering in lintel sqm 7.62 4.57 6.8562
External Leveling Work Nos 12.43 7.46 11.1834
14
9,702.00 8.74 84,795.48
GF Sft
Ff Sft 9,702.00 8.27 80,235.54
GF Sft 14,553.00 50.00 727,650.00
Ff Sft 14,553.00 33.24 483,698.82
GF Sft 14,553.00 11.50 167,287.90
Ff Sft 14,553.00 3.24 47,123.03
0.00 7,310.17 0.00
NO
250.00 343.98 85,994.72
MTR
18.00 5,601.38 100,824.81
NO
sft 19,404.00
no 18.00
15
GF Toilets SET 6.00 3,990.83 23,944.99
FF Toilets SET 13.00 3,927.54 51,058.01
Kitchen SET 7.00 205.59 1,439.10
GF Toilets SET 0.00 442.21 0.00
FF Toilets SET 1.00 575.89 575.89
Kitchen SET 0.00 28.32 0.00
SET 2.00 34,648.85 69,297.71
SET 7.00 34,277.52 239,942.66
SET 18.00 0.00 0.00
SET 39.00 32,910.80 1,283,521.03
NO 100.00 4,489.16 448,915.50
SET 0.00 32,526.19 0.00
NO 0.00 471.28 0.00
NO 0.00 1,927.97 0.00
Paver
Kerb
Wooden Flooring
Skirting
End profile
Maindoor (msd)
Doors (BST)
Doors (OST)
Doors (comm.)
3981.5 475 48.175
384.375 103.0125
0
0.00
0.00
0
0
1077.67
1077.67 0.00 0.00 0.00 0.00 0.00 3981.50 475.00 48.175 384.375 103.0125 0
1185.44 0.00 0.00 0.00 0.00 0.00 3981.50 475.00 48.175 384.375 103.0125 0
36.00 50.00 75.00 75.00 175.37 203.78 172.90 1,957.48 1,698.13 2,201.00
42,675.89 - - - 698,235.66 96,793.13 89,624.96 752,404.45 174,928.10 -
22.00
16,596.18
Doors (Acc.)
Vitrified 2'x2'
creamic
dado
Marble
Granite black
Putty
31.62
17.74
OBD
42.34
42.34
341.37
30.70
138.44
8.10
219.52
167.68
24.41
167.62
9.06
295.78
287.57
31.26
20.58
25 300
25 300 564.16 323.2179 515.299 287.57 31.26 20.58 6.61 49.35 84.68
25 300 564.16 323.22 515.30 345.08 34.39 22.638 6.61 49.35 84.68
1,162.00 303.00 39.00 23.42 23.42 100.00 124.00 153.00 4,713.00 894.00 1,188.00
29,050.00 90,900.00 236,743.89 81,450.65 129,854.94 371,310.38 45,879.18 37,268.49 31,176.14 44,122.59 100,605.43
30.00 20.00 20.00
5,077.44 1,105.41 1,762.32
29,050.00 90,900.00 236,743.89 81,450.65 129,854.94 371,310.38 45,879.18 37,268.49 31,176.14 44,122.59 100,605.43
Weather shield L156
0.00
6.76
24.53
Weather shield 8586
2.73
0.00
0.91
Enamel Black
2.90
Enamel white
2.90
7.07
Enamel ivory 0135
0.00
Enamel moonlite L121
2.15
Turpentine
1.49
1.63
Primero
0.98
1.12
0.28
1.76
Wood Primer
1.9524
Chalk Powder
2.9286
Sprit Polish
131.07
31.29 3.63 2.90 9.97 0.00 2.15 3.12 0.00 4.14 1.95 2.93 131.07
31.29 3.63 2.90 9.97 0.00 2.15 3.12 0.00 4.27 2.05 3.08 137.63
2,641.00 2,855.00 4,157.00 4,614.00 4,517.00 4,390.00 1,717.50 860.00 3184.00 3215.00 378.00 185.00
82,633.16 10,372.66 12,072.88 46,007.64 - 9,437.03 5,364.57 - 13,581.63 6,590.81 1,162.36 25,460.90
82,633.16 10,372.66 12,072.88 46,007.64 - 9,437.03 5,364.57 - 13,581.63 6,590.81 1,162.36 25,460.90
Sealer
87.30
Thinner
87.30
Sand paper
54.54
Cotton cloth
131.07
structural steel(railing)
10970.09
Reinforcrmrnt steel
4477.57
Alu.windows
Total
87.30 87.30 54.54 131.07 10970.09 0 4477.574 0
91.67 91.67 59.99 131.07 11299.1927 0 4611.90122 0
250.00 130.00 45.00 30.00 49,891.00 49,891.00 44,583.00 320.00
22,916.34 11,916.50 2,699.64 3,932.19 563,728.02 - 205,612.39 - 4,433,501.47
32,000.00 32,000.00 30,000.00
202,153.86 - 67,255.36 405,638.83
1 Boundry wall Excavation cum - - - - - - - - - 3.52 3.52 3.52 3.52 3.52 3.52 3.52 3.52 3.52 3.52 3.52 3.52 3.52 3.52 3.52 3.52 3.52 3.52 3.52 3.52 3.52 3.52 3.52 3.52 3.52 3.52 3.52 3.52
Piling Nos - - - - - - - - - 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00
PCC 1:4:8 cum - - - - - - - - - 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53
RCC M25 cum - - - - - - - - - 1.90 1.90 1.90 1.90 1.90 1.90 1.90 1.90 1.90 1.90
Reinforcement Kg - - - - - - - - - 241.64 241.64 241.64 241.64 241.64 241.64 241.64 241.64 241.64 241.64 241.64 241.64 241.64 241.64 241.64 241.64 241.64 241.64
Shuttering for PB and Column sqm - - - - - - - - - 19.36 19.36 19.36 19.36
Blockwork cum 1.92 1.92 1.92 1.92 1.92 1.92 1.92
Plastering sqm 30.82 30.82 30.82 30.82 30.82 30.82 30.82
Painting -walls sqm
Plaster band Rm 8.58 8.58 8.58 8.58 8.58 8.58 8.58 8.58 8.58 8.58
Painting-steel sqm
2 Structural Steel Picket Fence Kg
Staircase Railing Kg 149.56 149.56 - - - - - - - - 149.56 149.56 149.56 149.56 149.56 149.56 149.56 149.56 149.56 149.56 149.56 149.56 149.56 149.56 149.56 149.56 149.56 149.56 149.56 149.56 149.56 149.56 149.56 149.56 149.56 149.56 149.56 149.56
Balcony Railing Kg - - - - - - - - - 38.50 38.50 38.50 38.50 38.50 38.50 38.50 38.50 38.50 38.50 38.50 38.50 38.50 38.50 38.50 38.50 38.50 38.50 38.50 38.50 38.50 38.50 38.50 38.50 38.50 38.50 38.50 38.50
Terrace Railing Kg - - - - - - - - - 67.50 67.50 67.50 67.50 67.50 67.50 67.50 67.50 67.50 67.50 67.50 67.50 67.50 67.50 67.50 67.50 67.50 67.50 67.50 67.50 67.50 67.50 67.50 67.50 67.50 67.50 67.50 67.50
Window Grill Kg 241.36 241.36 241.36 241.36 241.36 241.36 241.36 241.36 241.36 241.36 241.36 241.36 241.36
Gate Kg
3 Plastering Work
Internal GF 10.211 10.211 10.21 10.21 10.21 10.21 10.21 10.21 10.21 10.21 10.21 10.21 10.21 10.21 10.21 10.21
Ff sqm 7.81 7.81 7.81 7.81 7.81 7.81 7.81 7.81 7.81 7.81 7.81 7.81 7.81 7.81 7.81 7.81 7.81 7.81 7.81 7.81 7.81 7.81 7.81 7.81 7.81 7.81 7.81 7.81 7.81 7.81 7.81 7.81 7.81 7.81 7.81 7.81 7.81 7.81
Terrace - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Mumty Room - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
External Front sqm 24.39 24.39 24.39 24.39 24.39 24.39 24.39 24.39 24.39 24.39
Shaft - - - - - - - - - - - - - - - - - - - - - - - - - - -
4 Painting Work
Internal Primer sqm 39.93 39.93 39.93 39.93 39.93 39.93 39.93
GF-Putty sqm 161.26 161.30 161.30 161.30 161.30 161.30 161.30
FF-Putty sqm 238.67 238.70 238.70 238.70 238.70 238.70 238.70
OBD-1st coat sqm
OBD-2nd coat sqm
External Primer sqm 24.225 24.23 24.23 24.23 24.23 24.23 24.23 24.23 24.23 24.23
Weather Shield-1 coat sqm
2 coat sqm
Doors Enamel paint sqm
Polish Work sqm
Structural Steel Enamel painting sqm
5 Tile Work
GF Vitrified sqm 34.080 34.08 34.08 34.08 34.08 34.08 34.08 34.08 34.08
Skirting Rm 30.145 30.15 30.15 30.15 30.15 30.15 30.15 30.15 30.15
Ceramic sqm 10.710 10.71 10.71 10.71 10.71 10.71 10.71
Skirting Rm 10.290 10.29 10.29 10.29 10.29 10.29 10.29
Dado sqm 17.625 17.63 17.63 17.63 17.63 17.63 17.63
FF Vitrified sqm 17.950 17.95 17.95 17.95 17.95 17.95 17.95 17.95 17.95
Skirting Rm 25.780 25.78 25.78 25.78 25.78 25.78 25.78 25.78 25.78
Ceramic sqm
Skirting Rm
Dado sqm
6 Marble Staircase Steps sqm 9.140 9.14 9.14 9.14 9.14 9.14 9.14 9.14 9.14 9.14 9.14 9.14 9.14
7 Granite Kitchen PF sqm 3.240 3.24 3.24 3.24 3.24 3.24 3.24 3.24 3.24
Counter Basin sqm 1.050 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05
Counter Basin / Kit. RCC slab sqm 4.290 4.29 4.29 1.05 1.05 1.05 1.05 1.05 1.05 4.29 4.29 4.29 4.29 4.29 4.29
8 Doors Door Frame Nos 2 7.00 5.00 4.00 2.00 2.00 2.00 13.00 13.00 13.00 13.00 13.00 13.00 13.00 13.00 13.00 13.00 13.00 13.00 13.00 13.00 13.00 13.00 13.00 13.00
Door Shutter Nos 13.00 13.00 13.00 13.00 13.00 13.00 13.00
9 Aluminium Windows Frame & Shutter sqm 17.84 17.84 17.84
10 Wooden flooring IPS sqm 18.22 18.22 18.22 18.22 18.22 18.22 18.22 18.22 18.22 18.22 18.22 18.22 18.22 18.22 18.22 18.22 18.22 18.22
End profile Rm
11 Car Parking Area Paver Block sqm
Kerb Stone Rm
12 Block work Shaft BW 4" thk sqm 7.24 7.24 7.24 7.24 7.24 7.24 7.24 7.24 7.24 7.24
Other Work - - - - - - - - - - - - - - -
13 Miscellaneous work Shaft Foundation EW cum - - - - - - - - - 1.30 1.30 1.30 1.30 1.30 1.30 1.30 1.30 1.30 1.30 1.30 1.30 1.30 1.30 1.30 1.30 1.30 1.30
PCC cum - - - - - - - - - 0.11 0.11 0.11 0.11 0.11 0.11
RCC Rft cum - - - - - - - - - 0.30 0.30 0.30 0.30 0.30 0.30
Beam cum 0.058 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06
Lintel cum 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04
Shuttering in Raft sqm - - - - - - - - -
Shuttering in beam sqm 1.01 1.01 1.01 1.01 1.01 1.01 1.01 1.01 1.01 1.01
Shuttering in lintel sqm 0.63 1.63 0.63 0.63 0.63 0.63 0.63 0.63 0.63 0.63
External Leveling Work Nos
Earth Filling with internal earth cum
Reinforcement for paragola Kg - - - - - - - - - - - - - - -
Reinforcement for shaft kg 48.62 48.62 48.62 48.62 48.62 48.62 48.62 48.62 48.62
Reinforcement for head room Kg - - - - - -
Concrete for paragola beam cum - - - - - - - - - - - - - - -
Concrete for Head room cum - - - - - - - - - - - - - - -
Shuttering for paragola beam Sqm - - - - - - - - - - - - - - -
Shuttering for head room Sqm - - - - - - - - - - - - - - -
14 ELECTRICAL
External Earthing
Including Chamber
300x300 NO
Testing & Commisioning sft
Extra Changes Work no
15 PLUMBING
Internal Wall CPVC Pipe wGF Toilets SET - - - - - - - - - - 1.00 1.00 1.00 1.00 1.00 1.00
FF Toilets SET - - - - - - - - - - 2.00 2.00 2.00 2.00 2.00 2.00
Kitchen SET - - - - - - - - - - 1.00 1.00 1.00 1.00 1.00 1.00
Floor PVC Pipe & Trap GF Toilets SET - - - - - - - - - -
FF Toilets SET - - - - - - - - - -
Kitchen SET - - - - - - - - - -
Front Side Vertical Piping SET - - - - - - - - - - 1.00
Back Side Vertical Piping SET - - - - - - - - - - 1.00 1.00 1.00 1.00 1.00 1.00
Water Line Testing SET
Terrce GI Piping & Valve Fixing SET 1 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Tank Fixing NO 2 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00
External Sewer Pipe & Gully Trap SET
External Champers 300 x 300 NO
External Champers 600 x 600 NO
Invoice
Sl No Date Description Unit Qty
No
1 4/18/2015 4268 3/4" CPVC Elbow Nos 50
2 4/18/2015 4268 PVC Connection Hose Nos 40
3 4/18/2015 4268 CPVC Solution 237ml Nos 12
4 4/18/2015 4268 3/4" CPVC Coupler Nos 25
Project : SARE Homes / Kolathur
SPAAK Super Infra India Pvt Ltd
Invoice
Sl No Date Description Unit Qty
No
1 5/14/2015 1543 Socket Nos 72
2 5/14/2015 1543 Fan Sheet 5" Nos 100
3 3/13/2015 1527 25 mm Screw Nos 1000
4 3/13/2015 1527 32 mm Screw Nos 1000
5 3/13/2015 1527 50 mm Screw Nos 1000
6 3/13/2015 1527 62 mm Screw Nos 500
7 3/13/2015 1527 75 mm Screw Nos 100
8 3/13/2015 1527 19 mm Screw Nos 1000
9 3/13/2015 1527 25 mm flexible Hose Mtr 100
10 3/13/2015 1527 Tape Nos 500
11 3/13/2015 1527 4 Module Metal Box Nos 10
12 4/18/2015 4255 8Module Plate Nos 80
13 4/18/2015 4255 Dummy Nos 800
14 4/18/2015 4255 PVC Round Sheet Nos 40
15 4/18/2015 4255 Fan Round Sheet Nos 100