"SELECCIN" Cdigo Descripcin Unid. Costo 1
EQ. Y HERRAMIENTA BAI0001 COMPACTADOR BAILARINA HR $0.00 2
EQ. Y HERRAMIENTA EAN0001 ANDAMIO METALICO DE 2 X 2 PZA $0.00 3
EQ. Y HERRAMIENTA EQGA003 REVOLVEDORA MIPSA-KOHLER 1 SACO HR $6.62 4
MAAR0016 ARMADURA SOLDADA CASTILLO ARMEX 15X15-4 MT $4.20
MATERIALES 5
MAAR0017 ARMADURA SOLDADA CASTILLO ARMEX 15X20-4 MT $4.43
MATERIALES
MATERIALES MAGU0010 AGUA M3 $2.21
MATERIALES MALA0180 ALAMBRE RECOCIDO No. 18 KG $2.52
MATERIALES MALA0190 ALAMBRON LISO DEL No.2, DIAM. 1/4"(6MM.) TON $2,000.00 *
MARM0018 ARMADURA SOLDADA CASTILLO ARMEX 15X25-4 MT $4.65
MATERIALES
MATERIALES MBAR0009 VARILLA No.2.5 (5/16") FY=4200KG/CM2. TON $1,250.10
MATERIALES MCEM0010 MORTERO HIDRAULICO TON $245.46
MATERIALES MCEM0050 CALHIDRA TON $241.82
MATERIALES MCEM0060 CEMENTO GRIS EN SACOS TON $350.00
MATERIALES MCLA0021 CLAVO DE 2 1/2" A 3 1/2" KG $2.87
MATERIALES MCOM0010 DIESEL LT $0.78
MATERIALES MDUE0001 DUELA 3/4" X 4" X 8 PT $3.90
MATERIALES MEZ0002 MORTERO MORTERO - ARENA PROPORCION 1:5 M3 $339.18
MATERIALES MEZ0005 MORTERO CEMENTO-ARENA 1:6 M3 $165.89
MATERIALES MEZ0011 MEZCLA MORTERO-ARENA 1:5 M3 $355.96
MATERIALES MHIL0001 HILO DE PLAST.P/TRAZO EN CARRETE CAL.10 ML $0.00
MIMP0001 IMPERMEABILIZANTE AISLAFLEX 5 A, MARCA LT $0.00
MATERIALES PASA.
MJUNT0001 JUNTEADOR GRIS CON ARENA MARCA SACO $37.39
MATERIALES PERDURA STONE, SACO DE 10 K
MATERIALES MMAD0044 MADERA PINO DE 3a.EN TABLON DE 11/2"X12" PT $2.86
MATERIALES MMAD0045 MADERA PINO DE 3a. EN BARROTE DE 2"X4" PT $2.86
MATERIALES MMAD0047 MADERA PINO DE 3a. EN POLN DE 4"X4" REG PT $2.86
MATERIALES MMAD0049 MADERA DUELA DE PINO DE 1a. EN CONTACTO PT $0.00
MMAL0050 MALLA ELECTROSOLDADATECNOMALLA 6X6- M2 $3.32
MATERIALES 10/10
MMAL0080 MALLA ELECTROSOLDADA TECNOMALLA 6X6-6/6 M2 $5.96
MATERIALES
MMAL0090 MALLA ELECTROSOLDADA TECNOMALLA 6X6-8/8 M2 $4.43
MATERIALES
MMEM0001 MEMBRANA DE FIBRA DE POLIESTER#5 PARA M2 $0.00
MATERIALES IMPERMEABILIZACIN
MATERIALES MMOR0060 MORTERO TOLTECA TON $1,043.47
MANO DE OBRA. MOMM01 PEON JOR $217.50
MANO DE OBRA. MOMM30 OFICIAL ALBANIL JOR $362.50
MANO DE OBRA. MOMM32 OFICIAL PINTOR JOR $290.00
MATERIALES MPET0040 ARENA P/CONCRETOS M3 $45.46
MATERIALES MPET0170 GRAVA P/CONCRETOS 3/4" M3 $45.46
MATERIALES MPGP0001 PEGAPISO GRIS MARCA PERDURA STONE SACO $40.87
MATERIALES MPIN0001 PINTURA ESMALTE CUB $1,089.56
MATERIALES MPIN0060 PINTURA COLOR BLANCA BERLINTE CUB $668.69
MATERIALES MPIN0069 SELLADOR VINILICO LT $473.91
MATERIALES MPIS0240 PISO VITROMEX BCO. 2 AMERICAS 33X33 CM M2 $96.52
MATERIALES MRES0051 YESO DE RESANADOR KG $0.00
MATERIALES MSEL0001 SELLADOR PASA AISLAFLEX SELLO LT $0.00
MATERIALES MTAB0070 TABIQUE COMUN BARRO R.R. DE 7X14X28 CM. MILL $1,800.00
MATERIALES MTAB0090 TABICON DE CEMENTO VIBRO BLOCK MILL $1,280.10
MATERIALES MVAR0009 7X14X28CM
VARILLA No.3 (3/8") FY=4200 KG/CM2. TON $1,409.09
MATERIALES MVAR0012 VARILLA No.4 (1/2") FY=4200 KG/CM2 TON $1,595.00
MATERIALES MVAR0013 VARILLA No.5 (5/8") FY=4200 KG/CM2. TON $1,413.63
MATERIALES MVAR0014 VARILLA No.6 (3/4") FY=4200 KG/CM2. TON $1,404.54
MATERIALES MVAR0015 VARILLA No.8 (1") FY=4200 KG/CM2. TON $1,395.45
MATERIALES MVAR0016 VARILLA No.10(11/4") FY=4200KG/CM2. TON $1,395.45
MATERIALES MVAR0017 VARILLA NO.12(11/2") FY=4200KG/CM2. TON $1,395.45
MATERIALES PUR0001 PUERTA METALICA 0.70 X 2.10 PZA $0.00
EQ. Y HERRAMIENTA VAGA001 VIBRADOR PARA CONCRETO DYNAPAC INC.OP. HR $0.00
LISTA DE ELEMENTO CONST.
TIPO
MATERIALES
MANO DE OBRA.
EQ. Y HERRAMIENTA
SUBCONTRATOS
* Al seleccionar la celda de
"SELECCIN" B5, Se muestra la
cejilla del FILTRO, para verificar el
tipo de elemento constructivo.
CATLOGO DE CONCEPTOS CON RENDIMIENTO POR ETAPA
DEMOLICIONES
DEM0001 DEM. CIMIENTOS DE PIEDRA. DEMOLICIONM3
DEM0002 DEM. CIM. CONC. ARM. S/REC. ACERO. DEMOLICIONM3
DEM0004 DEM. MUROS DE ADOBE Y TEPETATE DEMOLICIONM3
DEM0009 DEM. MURO TAB/BLOCK 14 CM. SIN/REC. DEMOLICIONM2
DEM0010 DEM. MURO TAB/BLOCK 14 CM. CON/REC. DEMOLICIONM2
DEM0014 DEM. CONC. ARMADO EN ESTRUCTURA. DEMOLICIONM3
DEM0020 DEM. PISO CONC. SIMPLE 8-10 CM. ESP. DEMOLICIONM2
DEM0022 DEM. PISO CONC. ARMADO 8-10 CM. ESP. DEMOLICIONUnidad
DEM0028 DEM. APLANADOS MURO/PLAFN 2.5 CM. ESP. DEMOLICIONM2
DEM0029 DEM. FALSO PLAFN DE YESO. DEMOLICIONM2
DEM0043 DEM. CONC. ASFLTICO 5-7 CM. ESP. DEMOLICIONM2
PRELIMINARES
LTZ0001 LIMPIEZA DEL TERRENO A MANO. LIMPIEZA DE M2
EXC0001 EXCAV. MANUAL CEPAS SUELO TIPO II EXCAVACINM3
LTZ0005 TRAZO Y NIVELACIN MANUAL TRAZO Y NI M2
CIMENTACIN
CIM0001 CIM. MANPOSTERIA 60,30 X 80 CM. MORT.1:5 CIMENTACION
M3
RELL01CC RELLENO CIM. COMP. BAILARINA 90% RELLENO ENM3
RELL01CM RELLENO CIM. COMP. MANUAL RELLENO DEM3
CASTILLOS Y COLUMNAS
CAST001V CASTILLO 15X15 , FC=150, 4 VARS. #3, 2 C CASTILLO COM
CAST002V CASTILLO 15X15 , FC=200, 4 VARS. #3, 2 C CASTILLO COM
CAST003V CASTILLO 15X15 , FC=250, 4 VARS. #3, 2 C CASTILLO COM
CAST004V CASTILLO 15X20 , FC=150, 4 VARS. #3, 2 C CASTILLO COM
CAST005V CASTILLO 15X20 , FC=200, 4 VARS. #3, 2 C CASTILLO COM
CAST010V CASTILLO CON SECCION DE 15X30 CM DE CONC CASTILLO COM
CAST006V CASTILLO 15X20, FC=250, 4 VARS. #3, 2 C CASTILLO COM
CAST007V CASTILLO 20X20 , FC=150, 4 VARS. #3, 2 C CASTILLO COM
CAST008V CASTILLO 20X20 , FC=200, 4 VARS. #3, 2 C CASTILLO COM
CAST009V CASTILLO 20X20, FC=250, 4 VARS. #3, 2 C CASTILLO COM
FIRMES
PLA05-100 PLANTILLA CONC. SIMPLE F`C =100 KG/CM2 PLANTILLA DM2
PIS05-100 FIRME 5 CM, FC 100, RN, AGR. 3/4". FIRME DE COM2
PIS05-150 FIRME 5 CM, FC 150, RN, AGR. 3/4". FIRME DE COM2
PIS08-150 FIRME 8 CM, FC 150, RN, AGR. 3/4". FIRME DE COM2
PIS08-200 FIRME 8 CM, FC 200, RN, AGR. 3/4". FIRME DE COM2
PIS10-150 FIRME 10 CM, FC 150, RN, AGR. 3/4". FIRME DE COM2
PIS10-200 FIRME 10 CM, FC 200, RN, AGR. 3/4". FIRME DE COM2
PIS15-150 FIRME 15 CM, FC 150, RN, AGR. 3/4". FIRME DE COM2
PIS15-200 FIRME 15 CM, FC 200, RN, AGR. 3/4". FIRME DE COM2
MUROS
MURLAD7 MURO TRR, 7 CM, MOR 1:5, JUNTA 1.5, AC. MURO DE TAB
M2
MURLAD14 MURO TRR, 14 CM, MOR 1:5, JUNTA 1.5, AC. MURO DE TAB
M2
MURLAD28 MURO TRR, 28 CM, MOR 1:5, JUNTA 1.5, AC. MURO DE TAB
M2
MURTAB10 MURO TAB, 10 CM, MOR 1:5, JUNTA 1.5, AC. MURO DE TAB
M2
MURTAB14 MURO TAB, 14 CM, MOR 1:5, JUNTA 1.5, AC. MURO DE TAB
M2
MURTAB28 MURO TAB, 28 CM, MOR 1:5, JUNTA 1.5, AC. MURO DE TAB
M2
MURPRET15 MUR. PRETIL PERIM. 7X14X28, 15 CM. MURO DE PRM
MUROS ESPECIALES
MURTABI1 MURO LAMBRN DE TABLAROCA TIPO INTERIOR M2
MURTABE1 MURO LAMBRN DE TABLAROCA TIPO INTEMPERI M2
MURTABI2 MURO DE TABLAROCA A 2 CARAS TIPO INTERIO M2
MURTABE2 MURO DE TABLAROCA A 2 CARAS TIPO INTEMPE M2
MURMIXID MURO MIXTO TABLAROCA TIPO INTERIOR - DUR M2
MURMIXED MURO MIXTO TABLAROCA TIPO INTEMPERIE - D M2
MURMIXIE MURO DE TABLAROCA TIPO INTERIOR - INTEM M2
MURDUR2 MURO A 2 CARAS DE DUROK. M2
PLATAB001 PLAFN DE TABLAROCA M2
PLAPOLI001 PLAFN DE POLIESTIRENO DE 1" DE ESP. CON M2
DETTAB001 FABRICACIN DE DETALLES DE TABLAROCA (EN M2
DETTAB002 FABRICACIN DE BOQUILLAS. ML
MDURINT MURO LAMBRIN DE DUROK M2
ENTREPISOS Y CUBIERTAS
LOSA10-200 LOSA TECHO 10 CM, VAR. #3, FC=200 LOSA DE 10 M2
LOSA10-250 LOSA TECHO 10 CM, VAR. #3, FC=250 LOSA DE 10 M2
HERRERA Y CANCELERA
ACABADOS
PIS0080 PISO DE CERMICA VITROMEX 33X33 CM. SUMINISTROM2
PIN0001 PINTURA VINILICA EN MUROS Y PLAFONES SUMINISTROM2
PIN0002 SUMINISTRO Y APLICACIN DE PINTURA ESMAL SUMINISTROM2
IMP0001 IMPERMEABILIZACIN DE LOSA DE AZOTEA SUMINISTROM2
APL0025 EMBOQ. REPELLADO C/CEMENTO Y ARENA 1:6 EMBOQUILLAM
APL0022 APLANADO PLAFONES C/MORTERO Y ARENA 1:5 APLANADO EM2
PSO0001 ACABADO ESCOBILLADO INTEGAL PSO CONC. ACABADO ESM2
PSO0002 ACABADO PULIDO INTEGRAL PISO CONC. ACABADO PUM2
ACARREOS
ACR0009 ACARREO CARR. SACOS: CEM. MORT. CAL. ACARREO ENM3
ACR0012 ACARREO CARR. AGREGADOS MORT. CONCRETOS. ACARREO ENM3
ACR0013 ACARREO CARR. PIEDRA BRAZA. ACARREO ENM3
ACR0037 ACARREO A MANO MADERA P/CIMBRA. ACARREO A MIL
ACR0082A ACARREO EN CAM. A PRIM. KM. VOL. MED. M3
CUADRILLAS
CUAD001 CUADRILLA 001(1 PEON) JOR
CUAD005 CUADRILLA 005(5 PEONES) JOR
CUAD040 CUADRILLA 040(1ALBANIL+1PEON) JOR
CUAD060 CUADRILLA 060 (1 PINTOR) JOR
CIMBRAS
CFZAP CIMB./DESCIM, ACAB. COMN FRONTERAS/ZAP. CIMBRA Y D M2
CDADO CIMB./DESCIM, ACAB. COMN CONTRATRABES CIMBRA Y D M2
CCADE CIMB./DESCIM, ACAB. COMN CADENAS. CIMBRA Y D M2
CCAST CIMB./DESCIM, ACAB. COMN CASTILLOS. CIMBRA Y D M2
CCOL30X30 CIMB./DESCIM, ACAB. COMN COLUMNAS 30X30 CIMBRA Y DEM2
CCOL50X50 CIMB./DESCIM, ACAB. COMN COLUMNAS 50X50 CIMBRA Y DEM2
VACIADOS
VDACAS150 VAC. DALA Y CAST, FC=150, RN. AGR. 3/4" VACIADO DE M3
VDACAS200 VAC. DALA Y CAST, FC=200, RN. AGR. 3/4" VACIADO DE M3
VDACAS250 VAC. DALA Y CAST, FC=250, RN. AGR. 3/4" VACIADO DE M3
VCL200 VAC. COLUMNAS P.B, FC=200, RN, AGR 3/4" VACIADO DE M3
VCL250 VAC. COLUMNAS P.B, FC=250, RN, AGR 3/4" VACIADO DE M3
VZTL150 VAC. ZAP. CIM, FC=150, RN. AGR. 3/4" VACIADO DE M3
VZTL200 VAC. ZAP. CIM, FC=200, RN. AGR. 3/4" VACIADO DE M3
VZTL250 VAC. ZAP. CIM, FC=250, RN. AGR. 3/4" VACIADO DE M3
VCOL150 VAC, COLUMAS S/E, FC=150, RN, AGR. 3/4" VACIADO DE M3
VCOL200 VAC, COLUMAS S/E, FC=200, RN, AGR. 3/4" VACIADO DE M3
VCOL250 VAC, COLUMAS S/E, FC=250, RN, AGR. 3/4" VACIADO DE M3
VTRABE200 VAC. TRABES S/E, FC=200, RN, AGR.3/4" VACIADO DE M3
VTRABE250 VAC. TRABES S/E, FC=250, RN, AGR.3/4" VACIADO DE M3
VLOSA150 VAC.. LOSAS S/E, FC=150, RN, AGR.3/4" VACIADO DE M3
VLOSA200 VAC.. LOSAS S/E, FC=200, RN, AGR.3/4" VACIADO DE M3
VLOSA250 VAC., LOSAS ,S/E, FC=250, RN. AGR.3/4" VACIADO DE M3
VCIM100R VAC.. CIMENTACIN, FC=100, RN, AGR.3/4" VACIADO DE M3
VCIM150R VAC.. CIMENTACIN, FC=150, RN, AGR.3/4" VACIADO DE M3
VCIM200R VAC.. CIMENTACIN, FC=200, RN, AGR.3/4" VACIADO DE M3
VCIM250R VAC.. CIMENTACIN, FC=250, RN, AGR.3/4" VACIADO DE M3
N RENDIMIENTO POR ETAPA
FCO100R CONCRETO F'C=100 KG/CM2, RESISTENCIA NORMAL, AGR.MAX. 3/4, FABRICADO EN OBRA M3
EN REVOLVEDORA DE 1 SACO; ACARREO MATERIAL PRIMERA ESTACION 20.00 M.
FCO150M CONCRETO F'C=150 KG/CM2, RESISTENCIA NORMAL, AGR.MAX. 3/4, FABRICADO EN OBRA M3
POR MEDIOS MANUALES; ACARREO MATERIAL PRIMERA ESTACION 20.00 M.
FCO150R CONCRETO F'C=150 KG/CM2, RESISTENCIA NORMAL, AGR.MAX. 3/4, FABRICADO EN OBRA M3
EN REVOLVEDORA DE 1 SACO; ACARREO MATERIAL PRIMERA ESTACION 20.00 M.
FCO200M CONCRETO F'C=200 KG/CM2, RESISTENCIA NORMAL, AGR.MAX. 3/4, FABRICADO EN OBRA M3
POR MEDIOS MANUALES; ACARREO MATERIAL PRIMERA ESTACION 20.00 M.
FCO200R CONCRETO F'C=200 KG/CM2, RESISTENCIA NORMAL, AGR.MAX. 3/4, FABRICADO EN OBRA M3
EN REVOLVEDORA DE 1 SACO; ACARREO MATERIAL PRIMERA ESTACION 20.00 M.
FCO250M CONCRETO F'C=250 KG/CM2, RESISTENCIA NORMAL, AGR.MAX. 3/4, FABRICADO EN OBRA M3
POR MEDIOS MANUALES; ACARREO MATERIAL PRIMERA ESTACION 20.00 M.
FCO250R CONCRETO F'C=250 KG/CM2, RESISTENCIA NORMAL, AGR.MAX. 3/4, FABRICADO EN OBRA M3
EN REVOLVEDORA DE 1 SACO; ACARREO MATERIAL PRIMERA ESTACION 20.00 M.
AREF2 HABILITADO Y ARMADO DE ACERO DE REFUERZO EN ESTRUCTURA, FY=3000 KG/CM2, No. 2 TON
DIAMETRO 1/4" (ALAMBRN), SIN INCLUIR TRASLAPES; ACARREO MATERIAL PRIMERA
ESTACION = 20.00 M
AREF2 HABILITADO Y ARMADO DE ACERO DE REFUERZO EN ESTRUCTURA, FY=3000 KG/CM2, No. 2 TON
DIAMETRO 1/4" (ALAMBRN), SIN INCLUIR TRASLAPES; ACARREO MATERIAL PRIMERA
ESTACION = 20.00 M
AREF3 HABILITADO Y ARMADO DE ACERO DE REFUERZO EN ESTRUCTURA, FY=4200 KG/CM2, No.3 TON
DIAMETRO 3/8", SIN INCLUIR GANCHOS, TRASLAMPES NI ANCLAJES,ACARREO MATERIAL
PRIMERA ESTACION =20.00 M
AREF5 HABILITADO Y ARMADO DE ACERO DE REFUERZO EN ESTRUCTURA, FY=4200 KG/CM2, No.5 TON
DIAMETRO 5/8", SIN INCLUIR GANCHOS, TRASLAMPES NI ANCLAJES,ACARREO MATERIAL
PRIMERA ESTACION =20.00 M
AREF6 HABILITADO Y ARMADO DE ACERO DE REFUERZO EN ESTRUCTURA, FY=4200 KG/CM2, No.6 TON
DIAMETRO 3/4", SIN INCLUIR GANCHOS, TRASLAMPES NI ANCLAJES,ACARREO MATERIAL
PRIMERA ESTACION =20.00 M
Subtotal: MATERIALES
Subtotal: MANO DE OBRA $3.76
Costo directo $6.69
INDIRECTO $0.00
UTILIDADES $0.00
COSTO TOTAL $6.69
Subtotal: MATERIALES
Subtotal: MANO DE OBRA $4.77
Costo directo $5.46
INDIRECTO $10.23
UTILIDADES $1.02
COSTO TOTAL $1.02
Subtotal: MATERIALES
Subtotal: MANO DE OBRA $5.03
Costo directo $5.46
INDIRECTO $0.00
UTILIDADES $0.00
COSTO TOTAL $5.46
CCAST CIMBRA Y DESCIMBRA ACABADO COMN EN CASTILLOS DE SECCIN MAYOR A 0.020 M2, M2
INCLUYE: MATERIALES Y MANO DE OBRA.
DEM0001 DEMOLICION A MANO DE CIMIENTOS DE PIEDRA BRASA, SIN INCLUIR ACARREOS, HASTA m3
1.50 M DE PROFUNDIDAD.
Cdigo Concepto Unidad Rend. Cantidad Costo Importe
MANO DE OBRA
CUAD001 CUADRILLA 001 (1 PEON) JOR 1.50 0.666667 $245.78 $163.85
DEM0029 DEMOLICION A MANO DE FALSO PLAFON DE YESO, SIN INCLUIR ACARREOS, HASTA 2.50 M2
M DE ALTURA.
LTZ0001 LIMPIEZA DEL TERRENO PLANO A MANO, INCLUYE: APILE DEL MATERIAL EN EL LUGAR Y M2
ACARREO DEL MISMO A 1a. ESTACIN DE 20 M.
EXC0001 EXCAVACIN A MANO DE CEPAS PARA CIMENTACIN, EN SUELO TIPO II, HASTA UNA M3
ALTURA DE CEPA DE 2.00 M. NO INCLUYE ACARREO.
LTZ0005 TRAZO Y NIVELACIN POR MEDIOS MANUALES DEL TERRENO PLANO, PARA DESPLANTE M2
DE ESTRUCTURAS, ESTABLECIENDO EJES AUXILIARES, PASOS Y REFERENCIAS.
INCLUYE:MATERIALES Y MANO DE OBRA.
CAST001V CASTILLO CON SECCION DE 15X15 CM DE CONCRETO F'C=150 KG/CM2, R. N. AGR. MAX. M
3/4, REFORZADO CON 4 VARILLAS DE 3/8" DIAM. Y ESTRIBOS DE 1/4" DIAM. A CADA 20
CM, CON CIMBRA COMN 2 CARAS.
AREF2 HABILITADO Y ARMADO DE ACERO DE REFUERZO EN TON 0.00 0.001000 ### $8.78
ESTRUCTURA, FY=3000 KG/CM2, No. 2 DIAMETRO 1/4"
(ALAMBRN), SIN INCLUIR TRASLAPES; ACARREO
MATERIAL PRIMERA ESTACION = 20.00 M
CCAST CIMBRA Y DESCIMBRA ACABADO COMN EN CASTILLOS M2 0.00 0.300000 $65.92 $19.78
DE SECCIN MAYOR A 0.020 M2, INCLUYE: MATERIALES
Y MANO DE OBRA.
VDACAS150 VACIADO DE CONCRETO HECHO EN OBRA CON M3 0.00 0.022500 $759.21 $17.08
REVOLVEDORA 1 SACO, EN DALAS Y CASTILLOS DE
SECCIN >0.02 M2, FC=150 KG/CM2, RESISTENCIA
NORMAL, TAMAO MXIMO DE AGREGADO 20 MM. (3/4"),
INCLUYE: VIBRADO, CURADO, ACARREO A UNA 1a.
ESTACIN A 20 M. MATERIALES Y
CAST002V CASTILLO CON SECCION DE 15X15 CM DE CONCRETO F'C=200 KG/CM2, R. N. AGR. MAX. M
3/4, REFORZADO CON 4 VARILLAS DE 3/8" DIAM. Y ESTRIBOS DE 1/4" DIAM. A CADA 20
CM, CON CIMBRA COMN 2 CARAS.
AREF2 HABILITADO Y ARMADO DE ACERO DE REFUERZO EN TON 0.00 0.001000 ### $8.78
ESTRUCTURA, FY=3000 KG/CM2, No. 2 DIAMETRO 1/4"
(ALAMBRN), SIN INCLUIR TRASLAPES; ACARREO
MATERIAL PRIMERA ESTACION = 20.00 M
CCAST CIMBRA Y DESCIMBRA ACABADO COMN EN CASTILLOS M2 0.00 0.300000 $65.92 $19.78
DE SECCIN MAYOR A 0.020 M2, INCLUYE: MATERIALES
Y MANO DE OBRA.
VDACAS200 VACIADO DE CONCRETO HECHO EN OBRA CON M3 0.00 0.022500 $773.81 $17.41
REVOLVEDORA 1 SACO, EN DALAS Y CASTILLOS DE
SECCIN >0.02 M2, FC=200 KG/CM2, RESISTENCIA
NORMAL, TAMAO MXIMO DE AGREGADO 20 MM. (3/4"),
INCLUYE: VIBRADO, CURADO, ACARREO A UNA 1a.
ESTACIN A 20 M. MATERIALES Y
CAST003V CASTILLO CON SECCION DE 15X15 CM DE CONCRETO F'C=250 KG/CM2, R. N. AGR. MAX. M
3/4, REFORZADO CON 4 VARILLAS DE 3/8" DIAM. Y ESTRIBOS DE 1/4" DIAM. A CADA 20
CM, CON CIMBRA COMN 2 CARAS.
AREF2 HABILITADO Y ARMADO DE ACERO DE REFUERZO EN TON 0.00 0.001000 ### $8.78
ESTRUCTURA, FY=3000 KG/CM2, No. 2 DIAMETRO 1/4"
(ALAMBRN), SIN INCLUIR TRASLAPES; ACARREO
MATERIAL PRIMERA ESTACION = 20.00 M
CCAST CIMBRA Y DESCIMBRA ACABADO COMN EN CASTILLOS M2 0.00 0.300000 $65.92 $19.78
DE SECCIN MAYOR A 0.020 M2, INCLUYE: MATERIALES
Y MANO DE OBRA.
VDACAS250 VACIADO DE CONCRETO HECHO EN OBRA CON M3 0.00 0.022500 $773.81 $17.41
REVOLVEDORA 1 SACO, EN DALAS Y CASTILLOS DE
SECCIN >0.02 M2, FC=250 KG/CM2, RESISTENCIA
NORMAL, TAMAO MXIMO DE AGREGADO 20 MM. (3/4"),
INCLUYE: VIBRADO, CURADO, ACARREO A UNA 1a.
ESTACIN A 20 M. MATERIALES Y
CAST004V CASTILLO CON SECCION DE 15X20 CM DE CONCRETO F'C=150 KG/CM2, R. N. AGR. MAX. M
3/4, REFORZADO CON 4 VARILLAS DE 3/8" DIAM. Y ESTRIBOS DE 1/4" DIAM. A CADA 20
CM, CON CIMBRA COMN 2 CARAS.
MATERIALES
MALA0180 ALAMBRE RECOCIDO No. 18 KG 0.00 0.130000 $2.52 $0.33
MANO DE OBRA
CUAD040 CUADRILLA 040 (1ALBANIL+1PEON) JOR 9.79 0.102145 $655.40 $66.95
SUBCONTRATOS
EAN0001 ANDAMIO METALICO DE 2 X 2 PZA 0.00 0.102145 $0.00 $0.00
BASICOS
AREF3 HABILITADO Y ARMADO DE ACERO DE REFUERZO EN TON 0.00 0.002520 ### $15.82
ESTRUCTURA, FY=4200 KG/CM2, No.3, DIAMETRO 3/8",
SIN INCLUIR GANCHOS, TRASLAPES NI ANCLAJES,
ACARREO MATERIAL PRIMERA ESTACION = 20.00 M
AREF2 HABILITADO Y ARMADO DE ACERO DE REFUERZO EN TON 0.00 0.001680 ### $14.76
ESTRUCTURA, FY=3000 KG/CM2, No. 2 DIAMETRO 1/4"
(ALAMBRN), SIN INCLUIR TRASLAPES; ACARREO
MATERIAL PRIMERA ESTACION = 20.00 M
CCAST CIMBRA Y DESCIMBRA ACABADO COMN EN CASTILLOS M2 0.00 0.350000 $65.92 $23.07
DE SECCIN MAYOR A 0.020 M2, INCLUYE: MATERIALES
Y MANO DE OBRA.
VDACAS150 VACIADO DE CONCRETO HECHO EN OBRA CON M3 0.00 0.030000 $759.21 $22.78
REVOLVEDORA 1 SACO, EN DALAS Y CASTILLOS DE
SECCIN >0.02 M2, FC=150 KG/CM2, RESISTENCIA
NORMAL, TAMAO MXIMO DE AGREGADO 20 MM. (3/4"),
INCLUYE: VIBRADO, CURADO, ACARREO A UNA 1a.
ESTACIN A 20 M. MATERIALES Y
AREF2 HABILITADO Y ARMADO DE ACERO DE REFUERZO EN TON 0.00 0.001680 ### $14.76
ESTRUCTURA, FY=3000 KG/CM2, No. 2 DIAMETRO 1/4"
(ALAMBRN), SIN INCLUIR TRASLAPES; ACARREO
MATERIAL PRIMERA ESTACION = 20.00 M
CCAST CIMBRA Y DESCIMBRA ACABADO COMN EN CASTILLOS M2 0.00 0.350000 $65.92 $23.07
DE SECCIN MAYOR A 0.020 M2, INCLUYE: MATERIALES
Y MANO DE OBRA.
VDACAS200 VACIADO DE CONCRETO HECHO EN OBRA CON M3 0.00 0.030000 $773.81 $23.21
REVOLVEDORA 1 SACO, EN DALAS Y CASTILLOS DE
SECCIN >0.02 M2, FC=200 KG/CM2, RESISTENCIA
NORMAL, TAMAO MXIMO DE AGREGADO 20 MM. (3/4"),
INCLUYE: VIBRADO, CURADO, ACARREO A UNA 1a.
ESTACIN A 20 M. MATERIALES Y
CAST010V CASTILLO CON SECCION DE 15X30 CM DE CONCRETO F'C=200 KG/CM2, R. N. AGR. MAX. M
3/4, REFORZADO CON 4 VARILLAS DE 3/8" DIAM. Y ESTRIBOS DE 1/4" DIAM. A CADA 20
CM, CON CIMBRA COMN 2 CARAS.
CSAT006V CASTILLO CON SECCION DE 15X20 CM DE CONCRETO F'C=250 KG/CM2, R. N. AGR. MAX. M
3/4, REFORZADO CON 4 VARILLAS DE 3/8" DIAM. Y ESTRIBOS DE 1/4" DIAM. A CADA 20
CM, CON CIMBRA COMN 2 CARAS.
AREF2 HABILITADO Y ARMADO DE ACERO DE REFUERZO EN TON 0.00 0.001680 ### $14.76
ESTRUCTURA, FY=3000 KG/CM2, No. 2 DIAMETRO 1/4"
(ALAMBRN), SIN INCLUIR TRASLAPES; ACARREO
MATERIAL PRIMERA ESTACION = 20.00 M
CCAST CIMBRA Y DESCIMBRA ACABADO COMN EN CASTILLOS M2 0.00 0.350000 $65.92 $23.07
DE SECCIN MAYOR A 0.020 M2, INCLUYE: MATERIALES
Y MANO DE OBRA.
VDACAS250 VACIADO DE CONCRETO HECHO EN OBRA CON M3 0.00 0.030000 $773.81 $23.21
REVOLVEDORA 1 SACO, EN DALAS Y CASTILLOS DE
SECCIN >0.02 M2, FC=250 KG/CM2, RESISTENCIA
NORMAL, TAMAO MXIMO DE AGREGADO 20 MM. (3/4"),
INCLUYE: VIBRADO, CURADO, ACARREO A UNA 1a.
ESTACIN A 20 M. MATERIALES Y
CAST007V CASTILLO CON SECCION DE 20X20 CM DE CONCRETO F'C=150 KG/CM2, R. N. AGR. MAX. M
3/4, REFORZADO CON 4 VARILLAS DE 3/8" DIAM. Y ESTRIBOS DE 1/4" DIAM. A CADA 20
CM, CON CIMBRA COMN 2 CARAS.
AREF2 HABILITADO Y ARMADO DE ACERO DE REFUERZO EN TON 0.00 0.001800 ### $15.81
ESTRUCTURA, FY=3000 KG/CM2, No. 2 DIAMETRO 1/4"
(ALAMBRN), SIN INCLUIR TRASLAPES; ACARREO
MATERIAL PRIMERA ESTACION = 20.00 M
CCAST CIMBRA Y DESCIMBRA ACABADO COMN EN CASTILLOS M2 0.00 0.400000 $65.92 $26.37
DE SECCIN MAYOR A 0.020 M2, INCLUYE: MATERIALES
Y MANO DE OBRA.
VDACAS150 VACIADO DE CONCRETO HECHO EN OBRA CON M3 0.00 0.040000 $759.21 $30.37
REVOLVEDORA 1 SACO, EN DALAS Y CASTILLOS DE
SECCIN >0.02 M2, FC=150 KG/CM2, RESISTENCIA
NORMAL, TAMAO MXIMO DE AGREGADO 20 MM. (3/4"),
INCLUYE: VIBRADO, CURADO, ACARREO A UNA 1a.
ESTACIN A 20 M. MATERIALES Y
CAST008V CASTILLO CON SECCION DE 20X20 CM DE CONCRETO F'C=200 KG/CM2, R. N. AGR. MAX. M
3/4, REFORZADO CON 4 VARILLAS DE 3/8" DIAM. Y ESTRIBOS DE 1/4" DIAM. A CADA 20
CM, CON CIMBRA COMN 2 CARAS.
AREF2 HABILITADO Y ARMADO DE ACERO DE REFUERZO EN TON 0.00 0.001800 ### $15.81
ESTRUCTURA, FY=3000 KG/CM2, No. 2 DIAMETRO 1/4"
(ALAMBRN), SIN INCLUIR TRASLAPES; ACARREO
MATERIAL PRIMERA ESTACION = 20.00 M
CCAST CIMBRA Y DESCIMBRA ACABADO COMN EN CASTILLOS M2 0.00 0.400000 $65.92 $26.37
DE SECCIN MAYOR A 0.020 M2, INCLUYE: MATERIALES
Y MANO DE OBRA.
VDACAS200 VACIADO DE CONCRETO HECHO EN OBRA CON M3 0.00 0.040000 $773.81 $30.95
REVOLVEDORA 1 SACO, EN DALAS Y CASTILLOS DE
SECCIN >0.02 M2, FC=200 KG/CM2, RESISTENCIA
NORMAL, TAMAO MXIMO DE AGREGADO 20 MM. (3/4"),
INCLUYE: VIBRADO, CURADO, ACARREO A UNA 1a.
ESTACIN A 20 M. MATERIALES Y
CAST009V CASTILLO CON SECCION DE 20X20 CM DE CONCRETO F'C=250 KG/CM2, R. N. AGR. MAX. M
3/4, REFORZADO CON 4 VARILLAS DE 3/8" DIAM. Y ESTRIBOS DE 1/4" DIAM. A CADA 20
CM, CON CIMBRA COMN 2 CARAS.
AREF2 HABILITADO Y ARMADO DE ACERO DE REFUERZO EN TON 0.00 0.001800 ### $15.81
ESTRUCTURA, FY=3000 KG/CM2, No. 2 DIAMETRO 1/4"
(ALAMBRN), SIN INCLUIR TRASLAPES; ACARREO
MATERIAL PRIMERA ESTACION = 20.00 M
CCAST CIMBRA Y DESCIMBRA ACABADO COMN EN CASTILLOS M2 0.00 0.400000 $65.92 $26.37
DE SECCIN MAYOR A 0.020 M2, INCLUYE: MATERIALES
Y MANO DE OBRA.
VDACAS250 VACIADO DE CONCRETO HECHO EN OBRA CON M3 0.00 0.040000 $773.81 $30.95
REVOLVEDORA 1 SACO, EN DALAS Y CASTILLOS DE
SECCIN >0.02 M2, FC=250 KG/CM2, RESISTENCIA
NORMAL, TAMAO MXIMO DE AGREGADO 20 MM. (3/4"),
INCLUYE: VIBRADO, CURADO, ACARREO A UNA 1a.
ESTACIN A 20 M. MATERIALES Y
DALA001A DALA CON SECCION DE 15X15 CM DE CONCRETO F'C=150 KG/CM2, R. N. AGR. MAX. 3/4" M
REFORZADA CON ARMADURA ELECTROSOLDADA ARMEX 15X15-4, CON CIMBRA COMN
2 CARAS.
DALA002A DALA CON SECCION DE 15X15 CM DE CONCRETO F'C=200 KG/CM2, R. N. AGR. MAX. 3/4" M
REFORZADA CON ARMADURA ELECTROSOLDADA ARMEX 15X15-4, CON CIMBRA COMN
2 CARAS.
DALA003A DALA CON SECCION DE 15X15 CM DE CONCRETO F'C=250 KG/CM2, R. N. AGR. MAX. 3/4" M
REFORZADA CON ARMADURA ELECTROSOLDADA ARMEX 15X15-4, CON CIMBRA COMN
2 CARAS.
DALA004A DALA CON SECCION DE 15X20 CM DE CONCRETO F'C=150 KG/CM2, R. N. AGR. MAX. 3/4" M
REFORZADA CON ARMADURA ELECTROSOLDADA ARMEX 15X20-4, CON CIMBRA COMN
2 CARAS.
VDACAS150 VACIADO DE CONCRETO HECHO EN OBRA CON M3 0.00 0.030000 $759.21 $22.78
REVOLVEDORA 1 SACO, EN DALAS Y CASTILLOS DE
SECCIN >0.02 M2, FC=150 KG/CM2, RESISTENCIA
NORMAL, TAMAO MXIMO DE AGREGADO 20 MM. (3/4"),
INCLUYE: VIBRADO, CURADO, ACARREO A UNA 1a.
ESTACIN A 20 M. MATERIALES Y
DALA005A DALA CON SECCION DE 15X20 CM DE CONCRETO F'C=200 KG/CM2, R. N. AGR. MAX. 3/4" M
REFORZADA CON ARMADURA ELECTROSOLDADA ARMEX 15X20-4, CON CIMBRA COMN
2 CARAS.
DALA006A DALA CON SECCION DE 15X20 CM DE CONCRETO F'C=250 KG/CM2, R. N. AGR. MAX. 3/4" M
REFORZADA CON ARMADURA ELECTROSOLDADA ARMEX 15X20-4, CON CIMBRA COMN
2 CARAS.
VDACAS250 VACIADO DE CONCRETO HECHO EN OBRA CON M3 0.00 0.030000 $773.81 $23.21
REVOLVEDORA 1 SACO, EN DALAS Y CASTILLOS DE
SECCIN >0.02 M2, FC=250 KG/CM2, RESISTENCIA
NORMAL, TAMAO MXIMO DE AGREGADO 20 MM. (3/4"),
INCLUYE: VIBRADO, CURADO, ACARREO A UNA 1a.
ESTACIN A 20 M. MATERIALES Y
DALA007A DALA CON SECCION DE 20X20 CM DE CONCRETO F'C=150 KG/CM2, R. N. AGR. MAX. 3/4" M
REFORZADA CON ARMADURA ELECTROSOLDADA ARMEX 15X20-4, CON CIMBRA COMN
2 CARAS.
DALA008A DALA CON SECCION DE 20X20 CM DE CONCRETO F'C=200 KG/CM2, R. N. AGR. MAX. 3/4" M
REFORZADA CON ARMADURA ELECTROSOLDADA ARMEX 15X20-4, CON CIMBRA COMN
2 CARAS.
VDACAS200 VACIADO DE CONCRETO HECHO EN OBRA CON M3 0.00 0.040000 $773.81 $30.95
REVOLVEDORA 1 SACO, EN DALAS Y CASTILLOS DE
SECCIN >0.02 M2, FC=200 KG/CM2, RESISTENCIA
NORMAL, TAMAO MXIMO DE AGREGADO 20 MM. (3/4"),
INCLUYE: VIBRADO, CURADO, ACARREO A UNA 1a.
ESTACIN A 20 M. MATERIALES Y
DALA009A DALA CON SECCION DE 20X20 CM DE CONCRETO F'C=250 KG/CM2, R. N. AGR. MAX. 3/4" M
REFORZADA CON ARMADURA ELECTROSOLDADA ARMEX 15X20-4, CON CIMBRA COMN
2 CARAS.
PLA05-100 PLANTILLA DE CONCRETO SIMPLE F`C =100 KG/CM2, RESISTENCIA NORMAL, DE 5 CM. M2
ESPESOR, AGREGADO MAXIMO 3/4" (20 MM.) INCLYE: MATERIALES Y MANO DE OBRA.
PIS05-100 FIRME DE CONCRETO SIMPLE F`C =100 KG/CM2, RESISTENCIA NORMAL, DE 5 CM. M2
ESPESOR, AGREGADO MAXIMO 3/4" (20 MM.) ACABADO ESCOBILLADO. INCLYE:
MATERIALES Y MANO DE OBRA.
FCO100R CONCRETO F'C=100 KG/CM2, RESISTENCIA NORMAL, M3 0.00 0.051500 $236.89 $12.20
AGR.MAX. 3/4, FABRICADO EN OBRA EN REVOLVEDORA
DE 1 SACO; ACARREO MATERIAL PRIMERA ESTACION
20.00 M.
PSO0001 ACABADO ESCOBILLADO INTEGAL PSO CONC. M2 0.00 1.000000 $14.98 $14.98
PIS05-150 FIRME DE CONCRETO SIMPLE F`C =150 KG/CM2, RESISTENCIA NORMAL, DE 5 CM. M2
ESPESOR, AGREGADO MAXIMO 3/4" (20 MM.) ACABADO ESCOBILLADO. INCLYE:
MATERIALES Y MANO DE OBRA.
FCO150R CONCRETO FC=150 KG/CM2, RESISTENCIA NORMAL M3 0.00 0.051500 $254.12 $13.09
AGREGADO MAXIMO 3/4", FABRICADO EN OBRA CON
REVOLVEDORA DE 1 SACO, ACARREO DE MATERIALES A
1a ESTACION A 20 M.
PSO0001 ACABADO ESCOBILLADO INTEGAL PSO CONC. M2 0.00 1.000000 $14.98 $14.98
PIS08-150 FIRME DE CONCRETO SIMPLE F`C =150 KG/CM2, RESISTENCIA NORMAL, DE 8 CM. M2
ESPESOR, AGREGADO MAXIMO 3/4" (20 MM.) ACABADO ESCOBILLADO. INCLYE:
MATERIALES Y MANO DE OBRA.
FCO150R CONCRETO FC=150 KG/CM2, RESISTENCIA NORMAL M3 0.00 0.082400 $254.12 $20.94
AGREGADO MAXIMO 3/4", FABRICADO EN OBRA CON
REVOLVEDORA DE 1 SACO, ACARREO DE MATERIALES A
1a ESTACION A 20 M.
PSO0001 ACABADO ESCOBILLADO INTEGAL PSO CONC. M2 0.00 1.000000 $14.98 $14.98
PIS08-200 FIRME DE CONCRETO SIMPLE F`C =200 KG/CM2, RESISTENCIA NORMAL, DE 8 CM. M2
ESPESOR, AGREGADO MAXIMO 3/4" (20 MM.) ACABADO ESCOBILLADO. INCLYE:
MATERIALES Y MANO DE OBRA.
FCO200R CONCRETO F'C=200 KG/CM2, RESISTENCIA NORMAL, M3 0.00 0.082400 $268.29 $22.11
AGREGADO MAXIMO 3/4", FABRICADO EN OBRA EN
REVOLVEDORA DE 1 SACO, ACARREO MATERIAL
PRIMERA ESTACION=20.00M
PSO0001 ACABADO ESCOBILLADO INTEGAL PSO CONC. M2 0.00 1.000000 $14.98 $14.98
Subtotal: MATERIALES $0.16
Subtotal: MANO DE OBRA $43.69
Subtotal: BASICOS $41.02
Costo directo $84.87
INDIRECTO $0.00
UTILIDADES $0.00
COSTO TOTAL $84.87
PIS10-150 FIRME DE CONCRETO SIMPLE F`C =150 KG/CM2, RESISTENCIA NORMAL, DE 10 CM. M2
ESPESOR, AGREGADO MAXIMO 3/4" (20 MM.) ACABADO ESCOBILLADO. INCLYE:
MATERIALES Y MANO DE OBRA.
FCO150R CONCRETO FC=150 KG/CM2, RESISTENCIA NORMAL M3 0.00 0.103000 $254.12 $26.17
AGREGADO MAXIMO 3/4", FABRICADO EN OBRA CON
REVOLVEDORA DE 1 SACO, ACARREO DE MATERIALES A
1a ESTACION A 20 M.
PSO0001 ACABADO ESCOBILLADO INTEGAL PSO CONC. M2 0.00 1.000000 $14.98 $14.98
PIS10-200 FIRME DE CONCRETO SIMPLE F`C =200 KG/CM2, RESISTENCIA NORMAL, DE 10 CM. M2
ESPESOR, AGREGADO MAXIMO 3/4" (20 MM.) ACABADO ESCOBILLADO. INCLYE:
MATERIALES Y MANO DE OBRA.
FCO200R CONCRETO F'C=200 KG/CM2, RESISTENCIA NORMAL, M3 0.00 0.103000 $268.29 $27.63
AGREGADO MAXIMO 3/4", FABRICADO EN OBRA EN
REVOLVEDORA DE 1 SACO, ACARREO MATERIAL
PRIMERA ESTACION=20.00M
PSO0001 ACABADO ESCOBILLADO INTEGAL PSO CONC. M2 0.00 1.000000 $14.98 $14.98
Subtotal: MATERIALES $0.16
Subtotal: MANO DE OBRA $43.69
Subtotal: BASICOS $47.43
Costo directo $91.28
INDIRECTO $0.00
UTILIDADES $0.00
COSTO TOTAL $91.28
PIS15-150 FIRME DE CONCRETO SIMPLE F`C =150 KG/CM2, RESISTENCIA NORMAL, DE 15 CM. M2
ESPESOR, AGREGADO MAXIMO 3/4" (20 MM.) ACABADO ESCOBILLADO. INCLYE:
MATERIALES Y MANO DE OBRA.
FCO150R CONCRETO FC=150 KG/CM2, RESISTENCIA NORMAL M3 0.00 0.153000 $254.12 $38.88
AGREGADO MAXIMO 3/4", FABRICADO EN OBRA CON
REVOLVEDORA DE 1 SACO, ACARREO DE MATERIALES A
1a ESTACION A 20 M.
PSO0001 ACABADO ESCOBILLADO INTEGAL PSO CONC. M2 0.00 1.000000 $14.98 $14.98
PIS15-200 FIRME DE CONCRETO SIMPLE F`C =200 KG/CM2, RESISTENCIA NORMAL, DE 15 CM. M2
ESPESOR, AGREGADO MAXIMO 3/4" (20 MM.) ACABADO ESCOBILLADO. INCLYE:
MATERIALES Y MANO DE OBRA.
FCO200R CONCRETO F'C=200 KG/CM2, RESISTENCIA NORMAL, M3 0.00 0.153000 $268.29 $41.05
AGREGADO MAXIMO 3/4", FABRICADO EN OBRA EN
REVOLVEDORA DE 1 SACO, ACARREO MATERIAL
PRIMERA ESTACION=20.00M
PSO0001 ACABADO ESCOBILLADO INTEGAL PSO CONC. M2 0.00 1.000000 $14.98 $14.98
MURLAD7 MURO DE TABIQUE ROJO RECOCIDO DE 71428 CM. DE 7 CM. DE ESP. (CAPUCHINO), M2
ASENTADO CON MEZCLA MORTERO-ARENA 1:5, JUNTAS DE 1.5 CM. DE ESP. ACABADO
COMN HASTA UNA ALTURA DE 3.5 M.
MURLAD14 MURO DE TABIQUE ROJO RECOCIDO DE 71428 CM. DE 14 CM. DE ESP. ASENTADO M2
CON MEZCLA MORTERO-ARENA 1:5, JUNTAS DE 1.5 CM. DE ESP. ACABADO COMN
HASTA UNA ALTURA DE 3.5 M.
MURLAD28 MURO DE TABIQUE ROJO RECOCIDO DE 71428 CM. DE 28 CM. DE ESP. ASENTADO CON M2
MEZCLA MORTERO-ARENA 1:5, JUNTAS DE 1.5 CM. DE ESP. ACABADO COMN HASTA
UNA ALTURA DE 3.5 M.
LOSA10-200 LOSA DE 10 CM. DE PERALTE EN TECHO DE CUBIERTA, FABRICADA CON CONCRETO F`c M2
= 200 KG/CM2 AGREGADO MAXIMO 3/4" INCLUYE CIMBRA ,DESCIMBRA, KG. DE ACERO
DE REFUERZO X M3 DE CONCRETO, MATERIALES MANO DE OBRA Y EQUIPO
AREF3 HABILITADO Y ARMADO DE ACERO DE REFUERZO EN TON 0.00 0.022330 ### $140.20
ESTRUCTURA, FY=4200 KG/CM2, No.3, DIAMETRO 3/8",
SIN INCLUIR GANCHOS, TRASLAPES NI ANCLAJES,
ACARREO MATERIAL PRIMERA ESTACION = 20.00 M
CLOSA HAB. Y COL. DE CIMBRA CON TARIMAS DE DUELA PARA M2 0.00 1.000000 $62.40 $62.40
LOSA DE CONCRETO.
LOSA10-250 LOSA DE 10 CM. DE PERALTE EN TECHO DE CUBIERTA, FABRICADA CON CONCRETO F`c M2
= 250 KG/CM2 AGREGADO MAXIMO 3/4" INCLUYE CIMBRA ,DESCIMBRA, KG. DE ACERO
DE REFUERZO X M3 DE CONCRETO, MATERIALES MANO DE OBRA Y EQUIPO
CLOSA HAB. Y COL. DE CIMBRA CON TARIMAS DE DUELA PARA M2 0.00 1.000000 $62.40 $62.40
LOSA DE CONCRETO.
PTA0001 SUMINISTRO Y COLOCACIN DE PUERTA DE 0.70 X 2.10 M. INCLUYE: CHAPA MODELO 715 PZA
Y PINTURA BASE.
APL0022 APLANADO EN PLAFN DE LOSA, PULIDO A LLANA CON MEZCLA DE MORTERO Y ARENA M2
PROPORCION DE 1:5, DE 2.5 CM. DE ESPESOR PROMEDIO.
LC LL
MEDIDA ZAPATA 1.20 1.20 M LC = LADO CORTO FC = FACTOR DE CONTACTO
SECCIN CIMBRADA DE DADO 0.50 0.50 M LL = LADO LARGO FD = FACTOR DE DESPERDICIO
PT = PIE TABLN FU = FACTOR DE USOS
PERALTE DE ZAPATA 0.30 M
ALTURA DE DADO 0.80 M PZAS = CANT. DE PIEZAS UTILIZADAS DE ESA MADERA
ESP.Y ANCHO = ESPESOR Y ANCHO DE LA MADERA
FACTOR DE DESPERDICIO 20.00 % MTS. = LONGITUD O LARGO DE LA MADERA
PROFUNDIDAD DE ESTACA 0.15 M DATOS QUE SE PUEDEN PROPONER O DEJAR EN CERO
HOLGURA YUGO 1 EXTREMO 0.05 M
SEPARACIN YUGO 0.50
LC LL
CARAS CIMBRADAS DE ZAPATA 2 2
CARAS CIMBRADAS DE DADO 2 2
CONTRATRABE (DADO)
CONTACTO LADO CORTO DUELA 5 2 1 20 0.80 2
0.80 17.50 1.60 10.94 13.13 5 2.63 1.26
CONTACTO LADO LARGO DUELA 5 2 1 20 0.80 2
CANT. DE YUGOS EN DADO BARROTE 5 2 4 3 3.42 22.42 1.60 14.01 16.81 5 3.36 5.38
CLCULO DE PIE TABLN PARA CIMBRA DE UN CASTILLO, COLUMNA, TRABE, DALA O CADENA
ELEMENTO CONSTRUCTIVO 2
Elemento Horizontal
TOTAL Y1 (DIAS)= 296.00 Factor para Salario Integrado X1/Y1 1.4122 Suma en % de prestaciones del IMSS 17.62 %
- - - - - - - - - - -
1 CABO 125.32 8.63 - 1.19 1.79 9.51 2.98 5.36 1.25 6.27 1.8289 229.20
2 ALBAIL 109.92 8.63 - 1.04 1.57 8.34 2.61 4.70 1.10 5.50 1.8425 202.53
3 CARPINTERO 109.92 8.63 - 1.04 1.57 8.34 2.61 4.70 1.10 5.50 1.8425 202.53
4 PINTOR 109.92 8.63 - 1.04 1.57 8.34 2.61 4.70 1.10 5.50 1.8425 202.53
5 PLOMERO 109.92 8.63 - 1.04 1.57 8.34 2.61 4.70 1.10 5.50 1.8425 202.53
6 ELECTRICISTA 109.92 8.63 - 1.04 1.57 8.34 2.61 4.70 1.10 5.50 1.8425 202.53
7 PEON 56.67 8.63 - 0.54 0.81 4.30 1.35 2.42 0.57 2.83 1.9467 110.32
8 AYUDANTE EN GRAL. 83.44 8.63 - 0.79 1.19 6.33 1.98 3.57 0.83 4.17 1.8777 156.68
9 HERRERO 109.92 8.63 - 1.04 1.57 8.34 2.61 4.70 1.10 5.50 1.8425 202.53
10 CHOFER 109.92 8.63 - 1.04 1.57 8.34 2.61 4.70 1.10 5.50 1.8425 202.53
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
PERSONAL TCNICO ADMINISTRATIVO - - - - - - - - - - -
A1 SECRETARIA - - - - - - - - - - -
A2 DIBUJANTE - - - - - - - - - - -
A3 BODEGUERO - - - - - - - - - - -
A4 SUPERVISOR - - - - - - - - - - -
A5 CONTADOR - - - - - - - - - - -
A6 ADMINISTRADOR - - - - - - - - - - -
A7 - - - - - - - - - - -
*Dererminacin del FSR analizando la cuota fija por separado y calculando en porcentaje
SALARIO PRESTACIONES EN % SALARIO
No. CATEGORA DIARIO CUOTA IMSS INFONAVIT FSR INTEGRADO
NOMINAL FIJA
- - - - -
1 CABO 125.32 6.89 17.62 5.00 1.8289 229.20
2 ALBAIL 109.92 7.86 17.62 5.00 1.8425 202.53
3 CARPINTERO 109.92 7.86 17.62 5.00 1.8425 202.53
4 PINTOR 109.92 7.86 17.62 5.00 1.8425 202.53
5 PLOMERO 109.92 7.86 17.62 5.00 1.8425 202.53
6 ELECTRICISTA 109.92 7.86 17.62 5.00 1.8425 202.53
7 PEON 56.67 15.24 17.62 5.00 1.9467 110.32
8 AYUDANTE EN GRAL. 83.44 10.35 17.62 5.00 1.8777 156.68
9 HERRERO 109.92 7.86 17.62 5.00 1.8425 202.53
10 CHOFER 109.92 7.86 17.62 5.00 1.8425 202.53
- - - - -
- - - - -
- - - - -
PERSONAL TCNICO ADMINISTRATIVO - - - - -
A1 SECRETARIA - - - - -
A2 DIBUJANTE - - - - -
A3 BODEGUERO - - - - -
A4 SUPERVISOR - - - - -
A5 CONTADOR - - - - -
A6 ADMINISTRADOR - - - - -
A7 - - - - -
ANLISIS, CLCULO E INTEGRACIN DE LOS COSTOS HORARIOS ANIEXO 29
DE LA MAQUINARIA Y EQUIPO DE CONSTRUCCIN
I CARGOS FIJOS
I.1 Depreciacin D= (Vm-Vr)/Ve = 4.93
I.2 Inversin Im= (Vm+Vr) i /2Hea = 49.28
I.3 Seguros Sm= (Vm+Vr) s /2Hea = 49.28
I.4 Mantenimiento Mn= Ko x D = 9.85
(1) SUMA CARGOS FIJOS = 113.34
II. CONSUMOS
II.1 Combustibles CO= Gh x Pc = 16.00
II.2 Otras fuentes de energa =
II.3 Lubricantes Lb= (Ah+Ga) x Pa = 1,200.00
II.4 Llantas N= Pn/Vn = 240.00
II.5 Piezas Especiales Ae= Ppe/Vpe 0.90
(2) SUMA CONSUMOS = 1,456.90
III. OPERACIN
CATEGORAS CANTIDAD SALARIO REAL IMPORTE
OPERADOR 001 1 $10.00 10
$0.00 0
$0.00 0
$0.00 0
$0.00 0
(Po)= $10.00
III.1 OPERACIN Po=Sr/Ht
(3) SUMA OPERACIN
(1)+(2)+(3)= 1,580.24
ANIEXO 29
PROGRAMA MONTOS MENSUALES DE UTILIZACIN DE PERSONAL TCNICO, ADMINISTRATIVO Y DE SERVICIOS ENCARGADOS DE LA DIRECCIN,
SUPERVISIN Y ADMINISTRACIN DE LOS TRAAJOS
* Aqu, se muestra un ejemplo sencillo y comn del desglose y factor de Indirectos
MONTO DE LA OBRA ACTUAL (C. D.) $71,740.80 Ttulo del periodo SEM1 SEM2
MONTO DE CONTRATOS VIGENTES (AO) $400,000.00 Ao 2005 2005
PERIODICIDAD SEMANAL Das naturales 7 7 7 7 4
Fecha de Inicio: 6/1/2005 Das por periodo 7 7 7 7 7
Fecha de terminacin: 6/20/2005 Factor 1.0000 1.0000 1.0000 1.0000 0.5714 0.0000 0.0000 0.0000 0.0000 0.0000
Duracin en Dias: 20.00
MONTO DE LA OBRA ACTUAL (C. D.) $71,740.80 MONTO DE CONTRATOS VIGENTES (AO) ### PERIODICIDAD SEMANAL
III.- SERVICIOS
3.1 $ - $ -
3.2 $ - $ -
3.3 $ - $ -
EJEMPLO
PERSONAL ADMINISTRATIVO $ 83.00
Cant. Categora Salario TOTAL
1 ADMINISTRADOR DE OBRA $ 35.00 $ 35.00
2 AUXILIAR CONTABLE $ 20.00 $ 40.00
1 auxiliar a $ 8.00 $ 8.00
TOTAL $ 83.00
UTILIDAD PROPUESTA POR EL LICITANTE
CARGOS ADICIONALES
FC=100, (GUARNICIONES, BANQUETAS Y FIRMES.) 1 7.50 8.00 3.00 0.175 FC=100, RN., AGR. MAX. 20 MM.
FC=150, (PISOS, CADENAS Y CASTILLOS.) 1 5.50 6.50 2.50 0.151 FC=150, RN., AGR. MAX. 20 MM.
FC=200, (LOSAS, TRABES, ZAPATAS Y MUROS.) 1 4.00 6.00 2.00 0.133 FC=200, RN., AGR. MAX. 20 MM.
FC=250, (COLUMNAS Y LOSAS ESPECIALES.) 1 3.50 5.00 1.75 0.120 FC=250, RN., AGR. MAX. 20 MM.
FC=300, (CONCRETO DE ALTA RESISTENCIA) 1 2.50 4.50 1.25 0.103 FUENTE: BIMSA
% DESPERDICIO DURANTE LA FAB. Y COLOCACIN. 3% 10% 10% 30% 5% % DESPERDICIO DURANTE LA FAB. Y COLOCACIN.
No. pulg. mm. Kg/m. mm2 pulg. 2 No. pulg. mm. Kg/m. mm2 pulg. 2 (M2)
0.0143 ALAMBRE #18 7 (7/8") 22.2 3.034 387 0.6 TRR 71428 CM. DE 7CM. ESP. (CAPUCHINO), MORTERO CON JUNTAS DE 1.5 CM
2.5 (1/4") 6.35 0.251 ALAMBRN 8 (1") 25.4 3.975 507 0.79 TRR 71428 CM. DE 14CM. ESP. (A SOGA), MORTERO CON JUNTAS DE 1.5 CM.
3 (3/8") 9.5 0.557 71 0.11 9 (1 1/8") 28.6 5.033 642 0.99 TRR 71428 CM. DE 28CM. ESP. (A TIZN), MORTERO CON JUNTAS DE 1.5 CM.
4 (1/2") 12.7 0.996 127 0.2 10 (1 1/4") 31.8 6.225 794 1.23 TABICN 101428 CM. DE 10CM. ESP. (CAPUCHINO), MORT CON JUNTAS DE 1.5
5 (5/8") 15.9 1.56 199 0.31 11 (1 3/8") 34.9 7.503 957 1.48 TABICN 101428 CM. DE 14CM. ESP. (A SOGA), MORT. CON JUNTAS DE 1.5 CM.
6 (3/4") 19.1 2.25 287 0.44 12 (1 1/2") 38.1 8.938 1140 1.77 TABICN 101428 CM. DE 28CM. ESP. (A TIZN), MORT. CON JUNTAS DE 1.5 CM.
MORTERO - ARENA 1.:4 (PISOS Y FIRMES) 1 4.00 3.00 0.095 MORTERO - ARENA 1.:4
MORTERO - ARENA 1.:5 (APLANADOS: ENJARRE, SARPEO) 1 5.00 2.50 0.110 MORTERO - ARENA 1.:5
MORTERO - ARENA 1.:6 (PEGADO DE BLOQUES) 1 6.00 2.00 0.127 MORTERO - ARENA 1.:6
MORTERO - ARENA 1.:8 (CIMIENTOS DE MAMPOSTERA) 1 8.00 1.25 0.168 MORTERO - ARENA 1.:8
% DESPERDICIO DURANTE LA FABRICACIN Y COLOC. 3% 3% 10% 30% % DESPERDICIO DURANTE LA FABRICACIN Y COLOC.
GANCHOS Y DOBLECES (cm) EMPALME "e" (cm) DETALLE GANCHOS Y DOBLECES (cm) EMPALME "e" (cm)
(1/4") 4 9 3 7 40 25 60 40 b a (7/8") 14 30 9 13 90 70
NERVADURA
d c
FC=150 FC=200
135 100 b a
150 115
5
170 130
190 145
230 170 e