From,
TEL: 00966543545026
: 00919441472451
: 091-8912526069
: 0096643922578
mvbm31@yahoo.co.in
maddalavbm@hotmail.com
maddalavbm@gmail.com
Dear Sir:
Highlights;
Regards,
Maddala.V.Bhanu Murty
Senior Process Engineer
Saudi Aramco
Place; Yanbu, Saudi Arabia
Date; 30-September-2007
Bhanu Murty
Serial No: 1 POSITION APPLIED FOR: SUITABLE MANAGEMENT POSITION
(MIE-CHEMICAL) ENGINEERSINDIA
Engineer Complex,Merox,Ener
WORKING
gy
DGM ESSAROIL LIMITED 1 DGM
SUPERVISOR QATAR PETROLEUM, QATAR, 5 Plus UOP RESID
CRACKER,
SUPERVISOR HINDUSTANPETROLEUM 15 plus Refinery(FCC &CDU )
(HPCL)
Name: V.S. Rao Name: I.B.Singh
CHARACTER
REFERENCES
DUTIES:
PERSONAL SKILLS:
M.V.BhanuMurty
Place; Saudi Arabia
Date; 30-Sep-2007
I lead a team of operators in my group and area .i trained field operators in such away that they
become familiar with plant and punch deviations from P&I.D in piping, mechanical, operations view.
Train them on new equipment where they lack like pilot operated solenoids, critical systems like main
column bottoms in RFCC for blinding/flushing, to solve problems with ease and stabilize without
shutdown.
Established operating procedures for RFCC commissioning to overcome heavy catalyst carryover
and resulting shutdown by several steps;( 1) Avoid Pressure Surge In System With Gradual Loading
Of Wet Gas Compressor Along With Feed Rate Rise (2) Make available sufficient manpower to
switch, clean main column bottoms pump (3) Diluting the stock just to see the initial cat carryover to
be pushed off. (4) Varied catalyst bed levels and bed densities to reduce carry over (.5) Adjustment
of load on MCB circulation and product pumps and recycle (6)·Conversion of control from
temperature to pressure to run a condensing turbo generator. 7) Loop and interlock checking’s of
critical equipment 8) Trail runs with vendors
Trainings undergone
Experience at HPCL
Got appreciation letter from DGM-Operations for saving plant and create a precedence to avoid minor
shutdowns and help stabilize the unit overcoming teething troubles.
Pre-commissioning and commissioning in 2 FCCUs (UOP FCC+ EXXON Flexi cracker) and 1 crude
distillation complex.
Operated the DCS panels (Distributed Control System), according to the operations limits established
in procedures with the best technical, economical, safety and environmental conditions.
1. - Operated the Plant in accordance with the design, coordinating the operations performance with
the Field Operators/Technical staff.
2. - Manage and control the start up, shut down and functioning of the Plant installations,
3. - Control the correct functioning of the DCS instruments and all equipments in charge, making
corrective actions
4. - To keep the operating parameters into the established limits
5-To make the data gathering and interpret the indicators, as well as to compile the necessary
information for the development of reports, statistical documents.
6. -To study and to propose operations ways to avoid incidents and anomalies, optimizing the
processes
7. - To perform the necessary maneuvers for the protection of the installations, personnel and
environment in case of emergency according to approved operations procedures.
8. - To collaborate in the studies and analysis of incidents and the reports development.
EMERGENCIES HANDLING Like Utilities, Feed, Pumps & Equipment failure, check valve passing, main
column bottom return control valve plug gave away etc
Pressure survey to identify problems across columns /absorbers and heat exchangers.
Avoided blast in regenerator-reactor due to passing of slide valves by following positive isolation, quick de-
pressuring and preventing backup of hydrocarbons from relief header
A Shut Down cause rectified but experience shows a new problem rising during startup.
EQUIPMENT HANDLED:
Absorbers (primary, sponge oil and amine)· settlers, Heat exchangers (shell and tube, spiral,
thermo-syphon reboilers) · Compressors (multistage axial wet gas compressor)· Pumps
(centrifugal with primary & secondary seals with buffer fluid) · Condensers (Air and water
cooled), coolers· knockout pots, Motor operated valves, pilot operated safety valves
M.V.BhanuMurty
SENIOR PROCESS ENGINEER
SAUDI ARAMCO
Place; YANBU,SAUDI ARABIA