T1 OM Function
Prerequisites
1. The BTS system is running properly.
2. The BSC6000 is running properly.
Procedure Expected Result
1 On the BSC6000 LMT, choose BTS The queried state of the resources is updated in
Maintenance > Maintenance Site > real time in the Monitor BTS Resource dialog
Monitor BTS Resource. box.
2 In the displayed Monitor BTS Resource
dialog box, select the site for acceptance
and set the resource type.
Remarks
The query result indicates the resources utilization of each board configured.
The level 3 BTS reset loads the configuration data instead of program during initialization.
T2 Services
T3 RF Specifications
T3.1 RF Specifications
Prerequisites
(1) The BTS system works normally.
(2) The antenna test device is available.
Procedure Expected Result
(1) Power off all the GRFUs in the test cell. (1) The connection between the feeder and
Disconnect the feeder from the BTS and the device is proper.
connect the feeder to the antenna test
device. (2) The VSWR is less than or equal to 1.5. In
the case of a swapped site, the new
(2) Record the measured VSWR into VSWR is less than or equal to the original
Attached Table 1 of Part 4 Acceptance VSWR.
Result.
(3) The test result is the same as that in step
(3) Measure the VSWRs of all the 2.
components in the antenna system by
using the preceding method. Restore the
original connections after the test.
Remarks
None.
3. On the SMT, lock the TCHs on the other (4) The measured power value is equal to
TRXs. the preset transmit power of the TRX for
test.
4. Record the measured power into Attached
DBS3900 Acceptance Manual (Extended Part)
Remarks
To ensure that a call is processed by a specific TCH, you must block all the other TCHs on the basic
maintenance console.
T4.2 IPCLK