The Democratic
Democratic Socialist
Socialist Republic
Republic of of
SriSri Lanka
Lanka
MINISTRY
MINISTRY OFOF SUSTAINABLE
SUSTAINABLE DEVELOPMENT
DEVELOPMENT & WILDLIFE
& WILDLIFE
DEPARTMENT
DEPARTMENT OFOF WILDLIFE
WILDLIFE CONSERVATION
CONSERVATION
Bidding Document
Bidding Document for
for
REPAIRING OF GINIHIRIYA CIRCUIT BUNGALOW AT
CONSTRUCTION OF VISITOR'S
HORTON PLAINSCENTER AT KIRIOYA
NATIONAL PARK WASGAMUWA
NATIONAL PARK
Contract No :WL/02/20/W/B-13-2017
Chairman
Department Procurement Committee (Major)
Department of Wildlife Conservation
811/A, Jayanthipura Rd,
Battaramulla.
Chairman,
Department Procurement Committee
Department of Wildlife Conservation
811/A, Jayanthipura Rd, Battaramulla.
1
Invitation for Bids (IFB)
DEPARTMENT OF WILDLIFE CONSERVATION
1. The Chairman of the DPC on behalf of the Director General, Department of Wildlife
Conservation invites sealed bids from eligible and qualified bidders for CONSTRUCTION OF
VISITOR'S CENTER AT KIRIOYA WASGAMUWA NATIONAL PARK estimated to cost of
Rs. 12 Million (without vat)
Detailed description of the requirement and functional specification of the above are given in the
bidding document.
3. To be eligible for contract award, the successful bidder shall not have been blacklisted and shall meet
the Grade C6 ICTAD registration or above.
Average annual volume of construction work performed in last five years shall be at least
Rs.20 million.
The minimum amount of liquid assets and/or credit facilities after setting apart for the other
contractual commitments and exclusive of any advance payments which may be made under
the contracts shall be not less than Rs.5 million.
5. Interested bidders may obtain further information from The Director (Engineering), Engineering
Division, Department of Wildlife Conservation, 811/ A ,Jayanthipura Road, Battaramulla, and
inspect the bidding documents in the Finance Division at above address during the office hours
(9.00 a.m.- 4.00 p.m.) on week days (excluding national holidays) until 06thNovember 2017.
Telephone numbers are: 011-2868323, 011-2 888585
6. A complete set of Bidding Documents in English language may be purchased by interested bidders on
the submission of a written request with ICTAD registration book (Original copy) until
06thNovember 2017 from 09.00a.m to 2.00p.m. Upon payment of a non-refundable fee
of Rs. 4000/. The method of payment will be in cash paid to the Shroff/DWC.
I. forwarded under the registered post (by marking the CONSTRUCTION OF VISITOR'S
CENTER AT KIRIOYA WASGAMUWA NATIONAL PARK top left hand corner of the
envelop) to the Chairman of Procurement committee to the address mentioned below on or
before 07thNovember 2017 at 2.30 p.m. OR
2
II. Deposited in the Tender Box kept at the Finance Division in the Department of Wildlife
Conservation, on or before 07thNovember 2017 at 2.30 p.m. Late bids will be rejected.
8. Bid will be opened soon after the closing in the presence of the Bidders and/or their authorized
representatives, who choose to attend in person at the address stated in below.
10. All Bids shall be accompanied by a" Bid Security" in the form of bank guarantee or refundable cash
deposit. Refundable cash deposit of Rs.91,000/- paid to the Shroff/DWC or bank guarantee should be
in the format attached in the Bidding Document for the Sri Lankan Rupees 182,000/. Bid Security shall
be valid until 19th February 2018. Any bid not accompanied by a valid Bid Security will be rejected.
Further information regarding the submission of bids is contained in the bidding documents.
11. Department of Wildlife Conservation will not be responsible for any cost or any expense incurred by
the bidders in connection with the preparation or delivery of the bids.
Chairman,
Department Procurement Committee,
Department of Wildlife Conservation,
811 / A ,Jayanthipura Road,
Battaramulla.
03.10.2017
3
THE DEMOCRATIC SOCIALIST REPUBLIC OF SRI LANKA
BIDDING DOCUMENT
Section 06 - Specifications
Section 08 - Drawing
4
Volume 1
Contents
5
Section -01
INSTRUCTIONS TO BIDDERS
Notes:
Instructions to Bidders shall be read in conjunction with Bidding data under
Section 05 (Volume 2). Matters governing the performance of the contractor, payment
under the Contract, or matters affecting the risk, rights, and obligations of the parties
under the Contract are included under section 3 - Conditions of Contract (Volume 1).
However, some information is reproduced in this section to facilitate the bidders to
price their bids.
Instructions to Bidders will not be a part of the Contract and will cease to have
Effect once the Contract is signed.
6
SECTION 02
Letter of Acceptance
Agreement
Performance Security
7
Notes on Standard Forms:
Bidders should not complete the Form of Agreement at the time of
preparation of bids.
8
Notes on Form of Letter of Acceptance
The Letter of Acceptance will be the basis for formation of the Contract as described in Clause 33 of the
Instructions to Bidders. This Form of Letter of Acceptance should be filled in and sent to the successful
bidder only after evaluation of Bids and after obtaining approval from the relevant authority.
............. [Date]
To:
This is to notify you that your bid dated . [date] for the
CONSTRUCTION OF VISITOR'S CENTER AT KIRIOYA WASGAMUWA NATIONAL PARK for
the Contract price of Rupees
.
.[amount in figures and words] as
corrected in accordance with Instructions to Bidders, is hereby accepted.
You are hereby instructed to precede with the execution of the said Works in accordance with the
Contract documents.
The Start Date shall be: ..(Fill the date as per Clause 6.1 of
Conditions of Contract).The amount of Performance Security is: (Fill as per
Clause 4.4 of Conditions of Contract).The Performance Security shall be submitted on or
before ..(Fill the date as per Clause 4.4 of Conditions of Contract).
Authorized Signature : .
Name of Agency
.........................................................................................................................................
9
STANDARD FORM: AGREEMENT
This AGREEMENT made the .. [date] of [month] 2017, between
The Director General of Department of Wildlife Conservation (hereinafter called and referred to as the
Employer),of the one part, and ...
[name and address of Contractor] (hereinafter called and referred to as the Contractor), of the
other part:
WHERE AS the Employer desires that the Contractor executes CONSTRUCTION OF VISITOR'S
CENTER AT KIRIOYA WASGAMUWA NATIONAL PARK( hereinafter called and referred to as
the Works) and the Employer has accepted the Bid by the Contractor for the execution and
completion of such Works and remedying of any defects therein.
NOW THIS AGREEMENT WITNESSETH as follows:
1. In this Agreement words and expressions shall have the same meanings as are respectively assigned
to them in the Condition of Contract hereinafter referred to, and they shall be deemed to form and be
read and construed as part of this Agreement.
3. The Employer hereby covenants to pay the Contractor in consideration of the execute and complete
the Works and remedy any defects therein, the Contract Price or such other sum as may become
payable under the provisions of the Contract at the times and in the manner prescribed by the
Contract.
In Witness whereof the parties hereto have caused this Agreement to be executed the day and year
aforementioned, in accordance with laws of Sri Lanka.
. .
Witnesses:
10
FORM OF PERFORMANCE SECURITY
(Unconditional)
Battaramulla.
Date:
This guarantee shall expire, no later than the ..day of ----------, 2017[insert date, 28
days beyond the Intended Completion Date] and any demand for payment under it must be
received by us at this office on or before that date.
_____________________
[signature(s)]
11
FORM OF ADVANCE PAYMENT SECURITY
..[ Name and address of Agency, and Address of Issuing Branch or Office]
Battaramulla.
Date: .
Furthermore, we understand that, according to the conditions of the Contract, an advance payment in the sum
. [amount in figures] (
..) [amount in words] is to be made against an advance payment
guarantee.
The maximum amount of this guarantee shall be progressively reduced by the amount of the advance
payment repaid by the Contractor.
This guarantee shall expire on [Insert the date, 28 days beyond the Intended Completion
Date]
Consequently, any demand for payment under this guarantee must be received by us at this office on or
before that date.
___________________
[signature(s)]
12
FORM OF RETENTION MONEY GUARANTEE
Battaramulla.
Date: .
Furthermore, we understand that, according to the conditions of the Contract, when the works have being
taken over and the first half of the Retention Money has been certified for payment, payment of the second
half of the Retention Money may be made against a Retention Money guarantee.
This guarantee shall expire, at the latest, .. [insert 28 days after the end of the defects
liability period].
Consequently, any demand for payment under this guarantee must be received by us at this office on or
before that date.
___________________
[signature(s)]
13
SECTION - 03
CONDITIONS OF CONTRACT
Conditions of Contract shall be read in conjunction with the Section 5 Contract Data in Volume 2,
Which shall take precedence over the Conditions of Contract.
14
Volume - 11
Form of Bid 17
Section 06 - Specification 27 - 28
Bill of Quantities 32 - 41
Section 08 - Drawing 42
15
Section 04
FORM OF BID
AND
QUALIFICATION INFORMATION
Note:
The Form of Bid and Qualification Information included in this publication are
samples. The Procuring Entity may modify the Qualification Information and
include the Form of Bid and Qualification Information as Section 4 in Volume
2 before issuance of the Bidding Documents.
16
FORM OF BID
Gentleman,
1. Having examined the Standard Bidding Document - Procurement of Works [ICTAD/ SBD/ 01 -
Second Edition, January 2007], Specifications, Drawings and Bills of Quantities and addenda for the
execution of the above-named Works, we/I the undersigned, offer to execute and complete such
Works and remedy any defect therein in conformity with the aforesaid Conditions of Contract,
Specifications, Drawings, Bill of Quantities and Addenda for the sum of Sri Lankan Rupees
.....................................................................................
......................(Rs. ........................................) or such other sums as may be
ascertained in accordance with the said Conditions.
2. We/I acknowledge that the Contract Data forms part of our Bid.
3. We/I undertake, if our Bid is accepted, to commence the Works as stipulated in the Contract Data,
and to complete the whole of the Works comprised in the Contract within the time stated in the
Contract Data.
4. We agree to abide by this Bid for the period of* ........................... ................ (insert number of Days
in accordance with Sub-Clause 15.1 of Instructions to Bidders) Days from the date fixed for
receiving or any extended period and it shall remain binding upon us and may be accepted at any
time before the expiration of that period.
5. Unless and until a formal agreement is prepared and executed this Bid, together with your written
acceptance thereof, shall constitute a binding contract between us/me.
7. We/I understand that you are not bound to accept the lowest or any Bid you may receive.
Dated this .......... day of ...........2017 in the capacity of ......................... duly authorized to
Sign tenders for and on behalf of .........................................................................
Signature : ........................................................
Name : ..............................................................................................................
Designation : ..............................................................................................................
Address : ..............................................................................................................
Witness : ....................................................
17
Qualification Information
(To be completed and submitted by the bidder, with the Bid)
( if requested only)
ICTAD Registration
Registration number (attach copies of relevant pages from the registration book)
Grade
Speciality
Expiry Date
Backlisted Contractors
Have you been declared as a defaulted contractor by NPA or any other Agency? (Yes/No)
IF yes provide details
VAT Registration Number
3. Value Year .
4. type Capacity .
5. type Capacity .
Managerial:
1.
2.
3.
Other information requested under
ITB Clause 4.1
18
SECTION 05
Note:
The Bidding Data and Contract Data included herein are Specimen. The
Procuring Entity may fill the necessary information and include them as
section 5 in Volume 2 before issuance of the Bidding Documents.
19
Bidding Data
Instructions to Bidders
Clause Reference
Director General,
(1.2) Intended Completion Date is 210 Days from the Start Date
The Bid form will be issued until 02.00 p.m. on 06thNovember 2017
Grade : C6 or above
20
(4.3) The following information shall be provided in Section 4:
* ICTAD Registration;
Registration number
Grade
Specialty
Expiry Date
* Construction Programme
* Total monetary value of construction work performed for each of the last five years;
* Experience in works of a similar nature and size for each of the last ten years;
* any other.
(4.4) * Average of the annual volume of construction work performed in the last five years
shall be at least Rs. 20 Million (state the amount)
* Proposals for the timely acquisition (own, lease, hire, etc.) of the essential equipment
listed in the Bidding Data clause 4.1;
Concrete mixture, Concrete vibrator, Bache loader
* The minimum amount of liquid assets and/or credit facilities net of other contractual
commitments and exclusive of any advance payments which may be made under the
contract shall be not less than Rs. 5 Million
21
(9.1) Employers address for the purpose of clarification is ;
(13.3) VAT component shall not be included in the rates. The amount written in the Form
of Bid shall be without VAT. However VAT component shall be shown separately
at the end of the BOQ.
(13.4) The Contract is/is not subjected to price adjustment in accordance with Clause 47 of
the Conditions of Contract.
(14.1) Deleted
(16.1) Option 1
Bid shall include a Bid Security using the form included in Section 9.
Chairman,
Department Procurement Committee
Department of Wildlife Conservation,
(19.2) b 811/A, Jayanthipura Road,
Battaramulla.
Contract name: CONSTRUCTION OF VISITOR'S CENTER AT KIRIOYA
WASGAMUWA NATIONAL PARK
22
(20.1) The deadline for submission of Bids shall be 07thNovember 2017 2.30p.m..
(28.1) Deleted
(30.0) Deleted
After evaluation of Bids in accordance with the procedures described under Clauses 25, 26, 27,
28, 29, and 30, the Employer will inform to all the bidders in writing the the selection of the
successful bidder and the intention of contract award to such bidder. The unsuccessful bidders
if they so wish, within one week of such notice may make representation to the Secretary to
the Line Ministry at the address given below. Such representation shall be self-contained to
enable the Secretary to arrive at a conclusion and a cash deposit to amount given below shall
be made. The Employer may request the bidder who had made representation to submit further
evidence during the investigation of such representation. The cash deposit will be forfeited
unless the Employer change the original contract award decision in favour of the bidder who
has made such representation.
Address : _________________________
Cash Deposit : Rs. 25,000.00
(34.0) The amount of Performance Security is 5% of the Initial Contract Price.
Fees and types of reimbursable expenses to be paid to the Adjudicator shall be on a case to
case basis and shall be shared by the Contractor and the Employer.
23
Contract Data
(Please note that the Clause nos. given hereunder are that of Conditions of Contract)
Director General,
(1.1) The Start Date shall be 14 Days from the Letter of Acceptance.
2. ______________________________
Name Period
_________________________________ ___________
_________________________________ ___________
_________________________________ ___________
_________________________________ ___________
(a) Technical
NDT 01 Equalent
(b) Manager
Civil Engineer with 5 years experience
24
(13.1) The minimum insurance covers shall be :
(a) The minimum cover for insurance of the Works and of Plant and Materials
is 110% of initial contract price
The maximum deductible for insurance of the Works and of Plant and
Materials is 5% of initial contract price
(b) The minimum cover for loss or damage to Equipment is replacement cost
(c) The minimum cover for insurance of other property (other than the Site) is
Rs. 20,000/-
for third party and employees of the Employer and other persons engaged by the
Employer in the Works is Rs. 10,000/- per event
Appendix 1 -
Appendix 2 -
(state the title of reports, eg: Contour Plan, Soil Investigation Reports etc.)
(17.1) The Intended Completion Date for the whole of Works shall be 210 days from the
start date.
(21.1) The Site Possession Date shall be 14 Days from Letter of Acceptance
(27.1) The Contractor shall submit a programme for the Works within14 Days of delivery
of the Letter of Acceptance.
(27.4) The amount to be withheld for late submission of a Programme is Rupees 2% of the
initial contract price
(39.2) Engineer may order variations up to a total cumulative value of not exceeding
Rs. 1 Million
25
(44.1) The following events shall also be Compensation Events:
1. ___________-_________________
2. ___________-_________________
(46.1) Deleted
Weightings of Inputs
......... .
. .
. . .
. . .
Total 90%
(48.1) The retention from each payment shall be 10% of the certified work done.
(49.1) The liquidated damages for the whole of the Works shall be 0.05% per Day.
(50.1) The maximum amount of liquidated damages for the whole of the Works shall be
10% percent of the Initial Contract Price
(60.1) The percentage to apply to the value of the work not completed, representing the
Employer's additional cost for completing the Works, is 25% .
26
SECTION - 06
SPECIFICATIONS
27
TECHNICAL SPECIFICATIONS
The works under this Bid shall be executed in accordance with the Specifications given in the following
documents issued by the Institute for Construction Training and Development (ICTAD), Savsiripaya,
Wijerama Mawatha, Colombo 07 and as specified.
Publication No : Description
SCA/4 (Vol .i ) Specifications for Building Works,
Vol, (i) Sri Lanka
3rd Edition (Revised) July 2004
It is implied that the Bidders are acquainted with the above documents and therefore, those will not be
included in the bidding document
However the Bidders may purchase the same if necessary from ICTAD - Savsiripaya
WijeramaMawatha.
Colombo 07.
28
SECTION - 07
BILL OF QUANTITIES
29
PREAMBLE TO THE BILL OF QUANTITIES
1 The Conditions of contract, the Specifications are to be read in conjunction with the Bill of
Quantities.
2 The cost of complying with all conditions. Obligations and liabilities described in the
conditions of contract and the specifications and the Bill of Quantities including all overhead
charges (excluding VAT) , profit and cost of preliminaries and carrying out the work as
described shall be deemed to be spread over and included in the prices or sums stated by the
Bidder in the Bill of Quantities . VAT should be separately added.
3 If the bidder failed to price any Items in the Bill of Quantities then the cost of the work under
such Item shall be held to be spread over and included in the prices given against other items
of work.
4 When trade names, brand and / or catalogue numbers are referred to, sole preference to any
material or equipment is not intended. Any other material or equipment may be used,
provided that the characteristics of type, quality, appearance, finish, method of construction
and/ or performance in equal to or superior to specify.
5 Whenever the method of measurement is not clear from documents available, the principles as
given in the Sri Lanka Standard 573, 1999 method of Measurement of Road Work Shall is
applicable.
6 All items of work shall comply exactly with the Contract unless otherwise approved by the
Engineer and the rates and sums inserted in the Bill of Quantities shall be deemed to apply to
the work as specified. If for his convenience or reasons of availability, the Contractor
proposes and the Engineer approves the use or provision of alternative items, materials or
method of working or equivalent or superior quality to those specified in the Contract. The
rates and sums inserted in the Bill of Quantities shall not in any case be increased as a result.
7 The quantities set out in the Bill of Quantities are provisional and cover the approximate scope
of the work which is anticipated to be performed by the Contractor, The actual quantities used
for final measurement purposes will be determined by the TA / Engineer by measurement of
the work completed by; the Contractor.
30
8 where, for his own purposes or due to his own default, the contractor carries out the Works in
such a manner that the quantity of any item of work in particular component to be measured for
payment purposes differs from that directed by the Engineer, then payment shall be made
according to the lesser of the actual quantity and that directed. An excess quantity in one part
of the component shall not, however, be allowed to offset a deficit elsewhere in the same
component for measurement purposes.
9 Where the determination for payment determination for payment purposes of the quantity of
any item of work depends upon the measurement of existing features or ground levels and the
like. Then prior to carrying out any operations which might affect such measurement, the
Contractor shall first take such levels and measurements as the Engineer may direct and, after
the Engineer has had the opportunity to check the same, they shall be certified as agreed by
both the Engineer and the Contractor
10 In the event that the Contractor fails to observe the above procedure, the Engineer shall
determine the quantity to be assumed for payment purposes using the best information
available to him, and his decision in the matter shall be final.
11 Except where specifically stated, all costs associated with provision of all holes, openings.
Chases and ducts in other builders work required for installation and make them good. Shall
be included in the rates.
12 The Bills of Quantities should Therefore, be priced to reflect all Factors that would affect the
bid and the progress of the works.
13 Metric units are used throughout the Bill of Quantities for measurement purposes unless
otherwise indicated. Abbreviations used the Contract are as follows.
m - Linear meter
m2 - Square meter
m3 - Cubic meter
Nr - Number
Rs - Sri Lankan Rupees
Cts. - Cents
P.S. - Provisional Sum
31
B.O.Q. FOR PROPOSED CONSTRUCTION OF VISITOR'S CENTER AT KIRIOYA
WASGAMUWA NATIONAL PARK
Item
Description Unit Qty Rate Amount
no
A-Preliminaries
Construt,furnish and maintain contractors site
A-1 Item Allow
office
Supply electricity and water for consrtution
A-2 Item Allow
work
Provition of Insurance,performance bond and
A-3 Item Allow
Advance bond gurantee
B--Excavation
Clearing site vegetation, including bushes,
B-01 removing shrubs and removing away the debris Item Allow
from the site by using maching
Excavation for Foundation in any material except
rock requiring blasting, part return fill in and ram
B-03 Cube 31.00
and depositing surplus materials within the site as
directed -Depth 0~1.5m (Bank volume).
Filling under floors by spreading, watering and
compacting with approved quality Earth imported
B-04 Cube 2.00
from outside in 75mm layers by manually as
directed
C- Concrete
Cement concrete 1:3:6(1 1/2")in foundation
C-01 under column footing(lean concrete ) Rate Cube 1.90
including shuttering
lintols size 9" x 6" deep in Grade 20 concrete,
reinforced with 2 nos of 10mm dia. tor steel
C-02 bars and 6mm mild steel stirrups @ 6" c/c L.ft. 161.00
including necessary formwork in ground floor
with curing continously for 5 days.
Mixing, placing, vibrating and curing 1:2:4(20mm)
C-03 concrete in columnfooting & column shafts Cube 8.10
(Machine mixing).
Mixing, placing, vibrating and curing 1:2:4(20mm)
C-04 Cube 31.00
concrete in beams & slab (Machine mixing).
1:2:4(3/4")cement concrete in plinth beam12"x
9"with 02 Nos 12 mm TS &02 Nos 16mm
C-05 Lft
rods, MS stirrups at 0-6"c/c rate including
shuttering
Supplying and placing 75mm thick Slab pantry,
fire place, over drains in 1:2:4(20mm) concrete
C-06 reinforced with Y10@ 150mm c/c both ways. Rate Sq.ft 88.00
shall include reinforcement and necessary
formwork.
32
E-Form Work
Supplying, fabricating, fixing and removing
formwork using 25mm thick local timber
E-01 Sqr 105.00
planks for Column Footings ,column shaft,slab
& beam
F- Reinforcement
Supplying, cutting, bending, laying and binding
(with 16 BWG binding wires) Mild Steel
F-01 Kg 438.00
Reinforcement to slabs, beams, lintels, columns,
stair cases, etc ( Diameter greater than 6mm).
Supplying, cutting, bending, laying and binding
(with 16 BWG binding wires) Tor Steel
F-02 Kg 9,263.00
Reinforcement to slabs, beams, lintels, columns,
stair cases, etc.
G-Brick Masonry
225mm thick brick work in 1:5 cement and
G-01 sq 14.40
sand mortarwith wire cut tbrick
I-Rubble Masonry
Random Rubble Masonry work for
I-01 foundations in 1:5 cement, sand mortar using Cube 3.00
150mm x 225 mm approved quality rubble.
J-Flooring
Cement concrete drains of internal size 9"
wide and depth varies from 6" - 9" ,consist of
3" thick base and side walls in Grade 20
J-03 concrete including 1/2" thick 1:3 rendering L.ft 58.00
with 3" thick & 2'-6" width concrete amp,
including necessary formwork with curing
continously for 5 days.
K-Tiling
Supplying and laying 200mmx300mm Glazed
Ceramic Wall Tiles with exceptional quality,
including 12mm thick tile bedding in 1:3 cement
K-01 Sqr 5.00
sand mortar and pointing with tile grout similar to
the colour of tiles.(Colour, pattern and the quality
should be approved by the engineer).
Supplying and laying 300mmx300mm Non Skid
Ceramic Floor Tiles with exceptional quality,
including 12mm thick tile bedding in 1:3 cement
K-02 Sqr 45.00
sand mortar and pointing with tile grout similar to
the colour of tiles.(Colour, pattern and the quality
should be approved by the engineer).
Supply and laying of 4" high skirting including
K-03 tile grout to match the tile of tiling confirming to Sqr 184.00
items
33
L-Plastering
20mm thick plinth plaster in 1:3 cement sand
L-01 Sqr 0.40
mix finished smooth with red cement floating
16mm thick smooth plaster for walls in 1:1:5
L-02 cement lime sand mix finished smooth with lime Sqr 12.00
putty
15mm thick plaster to R.C.C. columns, beams 35.00
and soffit of slab in cement - sand 1:3 mix
L-03 Sqr
including floating with lime putty - up to first
floor level
M-Color washing ,painting and polishing
Applying one coat of approved quality wall
primer and two coats of approved quality weather
M-01 shield paint to new walls after applying lime Sqr 23.00
putty and sand papering, applying plaster of Paris
and preparing surface as directed.
Applying one coat of approved quality wall
primer and two coats of approved quality
M-02 emulsion paint to new walls after applying lime Sqr 12.00
putty and sand papering, applying plaster of Paris
and preparing surface as directed.
Applying one coat of approved quality wood
primer and two coats of approved quality enamel
M-03 Sqr 0.84
paint to new wood work after preparing surface
as directed.
Applying two coats of approved quality floor
M-04 Sqr 43.00
paint after preparing surface as directed.
Waterproofing treatment by using flexible
polymer cement slurry according to
M-05 Manufacturers specification's. ("Masterseal Sqr 26.80
540"(Barralastic) or equivalent approved product
includingpreparation of surface)
N- Roofing and ceiling
Supplying and roofing with 0.47mm thick colour
coated Zink Aluminum metal roofing sheets on
special class timber frame consist of
100mmx50mm rafters and 50mmx50mm bearers
N-01 Sqr 33.00
with maximum spacing of 1200mm centre to
centre. ( Quality of timber and Brand, Profile and
Colour of the sheets should be approved by the
engineer).
Supplying and fixing 100x75 mm special class
N-02 timber as directed including treating with Lft 218.00
approved quality wood preservative
Supplying and fixing 125x75 mm class I timber
N-03 as directed including treating with approved Lft 192.00
quality wood preservative
Supplying and fixing 125x50 mm class I timber
N-04 as directed including treating with approved Lft 110.00
quality wood preservative
34
Supplying and fixing 0.47mm thick Zink
Aluminum ridge capping of girth 470mm to
N-05 Lft 109.00
match the colour of the roof. Rate shall include all
necessary fasteners, etc.
Barge board, Valance, facia, 20mm thick
225mm high, GINISAPU local timber fixed
N-08 complete with necessary screws, preparing and Lft 266.00
painting with one coat of primer and two coats
of enamel paint
U-Partition Wall
Supplying, and Installing of Laminated
U-01 Tempered Glass with2*2stainless steel frame Sq.ft 1,240.00
work Rate shall include for fixing
Supplying, and Installing of Laminated
Tempered Glass door with frame rate
U-02 Sq.ft 154.00
including with nut &approved quality
hingers,door handle with cap nut
Supplying, Fabricating and Installing 3mm
thick Fully PVC board ( bothsides)
ALUMINIUM PARTITION consist of 1.2mm
thick, 76mm depth(max. width 23.0mm)
Aluminium extrusions and GI channel stiffene
rframe work enclosed in Aluminium frame
work with an appropriate gridpattern, span not
U-03 exceeding 1200mm in both vertical & Sq.ft 158.00
horizonta ldirections suited to the available
space and additional GI channel bracing
splaced in 600mm centers at vertical direction.
Rate inclusive of Aluminium beadings
(including necessary rubber beadings)
necessary fasteners etc.( Matt finished
aluminium
O-Gutters and down pipes
Supplying and fixing approved quality 150x100
mm PVC square type eave gutters with brackets
O-01 Lft 205.00
at 300mm centers, running heads, end caps, etc as
directed
Supplying and fixing approved quality 87.5 mm
O-02 dia. PVC down pipes with PVC clips at 1000mm Lft 16.00
centers and all specials as directed
P-Doors & Windows
Supplying and fixing 31mm thick approved
quality plywood door sash with 100x75mm frame
in special class timber complete with oxidized
brass or equivalent approved quality furniture
P-02 Sq.ft 42.00
including one coat of wood primer and two coats
of enamel painting to wood work. ( Type and
brand of door lock to be decided according to type
of work and to be paid separately)
35
Supplying, Fabricating and Installing 12mm thick
Laminated Tempered Glass Door Aluminium
framed Double door sashes with 5mm thick glass
Sq.ft 154.00
pans, suitable rubber beadings, necessary fastners,
rollers &etc.(door locks and door handles paid
separately)
Doors or Windows, glazing and/or paneling with
100mm x 75mm frames and 28mm to 32mm
sashes in (Group 2,Category B) local timber Sq.ft 5.00
supplying and fixing complete with brass
furniture.
Natural aluminum single sash with frame
fixed with butt hinges open able door with
middle rail and gauge 24 aluminum sheet,
P-03 neoprene and wooled beading, gaskets, pop Sq.ft 105.00
rivets, threaded bar with nut and approved
quality lock,butt hinges, door handle with cap
nut. ( for toilet)
Supplying and fix mortise lock - Union 678-
24-95CH or equivalent, with 1 years
P-04 No. 7.00
guarantee. (guarantee certificate should be
submitted with bills)
Supplying and fixing Night - latch lock of
Union Brand & Model No. 1022 SEPL or
P-05 No. 7.00
approved equivalent.-(No2242), (Imported,
British or south African make).
SANITARY FITTINGS
Supply and fix white vitreous china floor
standing wash basin and pedestal with
overflow hole and single tap hole in center of
"Rocell" brand & model "Urban D "
complete to working order inclusive of the 1
Q-01 Nos 5.00
1/4" chromium plated waste outlet of "Rocell"
brand & model "A706" and 1 1/4" chromium
plated siphon cleanable bottale trap of
"Rocell" brand & model "A186"or approved
equivalent
Supply and fix white vitreous china floor
standing close coupled semi back to wall
water closet suite with wash down flushing
with 6/3 liters dual flushing has horizontal
outlet with vario drain bend and two lateral
Q-02 Nos 4.00
holes for bottom water connection , cistern
with water inlet from rear of "Rocell" brand &
model "Urban D" complete to working order
inclusive of universal bend of "Rocell" brand
& model "Vario Joint"or approved equivalent
36
Supplying & fixing Bowl type approved urinal
with trap and urinal flush valve complete to Nos 3.00
working order.
Supplying & fixing mirror for bathroom 450mm x
600mm size approved quality with screws, plugs Nos 5.00
etc.
Supply and fix plastic bidet spray - with 1
Q-03 Nos 4.00
years guarantee with all necessities.
Supply and fix chromium plated 600mm long
Q-04 Single Towel Bar of Rocell brand & model Nos 1.00
"Charming" or approved equivalent
Q-06 Supplying and fixing gully (plastic) Nos 8.00
Supply and fix Plastic Shower rose, with
Q-07 Nos 1.00
guarantee
Supply and fix chromium plated Soap Basket
of "Rocell" brand &model "Charming" or Nos 1.00
approved equivalent. (Semi-luxuary range )
R- Plumbing
Supplying and laying 20mm (1/2") Type 1000
R-01 Lft 250.00
PVC pipes with all specials
Supplying and laying 25mm (3/4") Type 1000
R-02 Lft 50.00
PVC pipes with all specials
Supplying and laying 32mm (1") Type 1000 PVC
R-03 Lft 50.00
pipes with all specials
Supplying and laying 40mm (1 1/4") Type 600
R-04 Lft 150.00
PVC pipes with all specials
Supplying and laying 50mm (1 1/2") Type 600
R-05 Lft 50.00
PVC pipes with all specials
R-06 Supplying and fixing 12mm (1/2") bib tap - PVC Nos 10.00
Supplying and fixing 12mm (1/2") gate valve -
R-07 No 4.00
PVC
Supplying and fixing 20mm (3/4") gate valve -
R-08 Nos 1.00
PVC
R-09 Supplying and fixing 25mm (1") gate valve - PVC No 1.00
Supplying and fixing 38mm (1 1/4") gate valve -
R-10 No 5.00
PVC
Supplying and fixing 38mm (1 1/2") gate valve -
R-11 No 1.00
PVC
Supplying and fixing 1/2" Angle valve of "S-
R-12 Nos 12.00
Lon" brand & or approved equivalent.
Supplying and laying 110mm (4") Type 400 PVC
R-13 Lft 50.00
pipes with all specials
Soakage pit with internal dia. 1200mm and
depth 3000mm, all complete including
excavation, ring beam with 4 Nos. 10 mm bars
R-14 & 6 mm dia. stirrups at 225mm spacing at No 2.00
bottom of wall, 225mm brick work and 75mm
thick cover slab with 12mm bars in 150mm c/c
both way (as per detail drawing)
37
Gulley pit with internal dimension
300x300x300mm deep, 150mm thick
1:3:6(40mm) concrete foundation, 225mm
R-15 thick brick work in 1:5 ct. sand, 12mm thick No 2.00
cement sand rendering in 1:2 with forming
canals and 75mm thick R.C.C. slab as per
Drawings
Supplying and fixing "Plastishel"water
R-16 tank1000 Ltr capacity Including bolve valve,!" No 2.00
gate valve ,and other necessary specials
T - Electricity
Supply and install Earth electrode copprer rod,
T-1 No 1.00
1800mm long fixed on ground with connection
Supply and install 65x65x6 mm angle iron,
service bracket, D bracket and Insulator with
T-2 No 1.00
necessary nuts and bolts for main wire fixed to
wall or roof frame - Single Phase
Supply install MCB 10 way, 40A, 2 pole
T-3 Isolator, 40A RCCB 2-pole and box fixed with No 2.00
7/1.35mm single core cable - Single Phase
Supply and install Ceiling fan 56",(230V,
80W) according to Engineers Approval & SLS
T-4 Nos 7.00
certificate complete with regulator and other
fittings (Warranty period of 2 Years)
Supply and install Pendant lamp with CFL
T-5 bulb - 20w ( spiral or globe) - with guarantee - Nos 56.00
including switch and necessary wiring
Supply and install 5A Switch Socket outlet
T-6 Nos 13.00
including necessary wiring
Supply and install 15A Switch Socket outlet
T-7 No 2.00
including necessary wiring
Supply and fix 7/1.35 mm main wire -
T-8 L.Ft 50.00
(Double)
V-Pump
Supplying and fixing water pump single phase
manufactured by " Jinasena" Model no:- N110T/1
,size 1" x 1" , 0.75 H.P. , total head 80'-0" , output
1000 I.g/hr. as per manufacturer's specifications.
Rate include for fixing 1" dia. Foot valve approved
make, Positioning and mount the pump on a
V-1 No 1.00
concrete bed 9" x 9" x 3" thick in 1:2:4(3/4") with
10mm dia. hexagonal bolts to required lengh , Nuts
& Washers 1/16" thick complete in working order
using necessary P.V.C. pipes, specials...etc. &
electrical supply from the closest DB. Pipes,
specials & electricity connection paid separatly.
38
Construction of Generator House No 1.00
Construction of well (Detail estimate annexed)
No 1.00
Construction of Pump House (Detail estimate
annexed) No 1.00
TOTAL COST
Discount if any
..........................
Total After Discount
...........................
VAT
...........................
Total
...........................
....................................................................................................................................................
....................................................................................................................................................
....................................................................................................................................................
Signature
Date
39
B.O.Q. FOR CONSTRUCTION OF 4'.0" DIA WELL - 20 FT DEEP
Item
No
Unit Qty Rate Amount
Description
1 Excavation well 4' 0" dia 0' 0" to 5' 0"deep Cube 0.63
2 Excavation well 4' 0' dia 5' 0" to 10' 0" deep Cube 0.63
3 Excavation well 4' 0' dia 10' 0" to 15' 0" deep Cube 0.63
4 Excavation well 4' 0' dia15' 0" to 20' 0" deep Cube 0.63
40
B.O.Q. FOR CONSTRUCTION PUMP HOUSE
Item
Description Unit Qty. Rate Amount
No
Site preparation including clearing site
vegetation, removing bushes, shrubs & top soil
1 Sqr 0.60
to a depth not exceeding 6" and removing all
debriS away from site.
Excavation in foundation in normal earth up to
2 a depth of 1.5m inclusive of backfilling, Cube 0.80
compacting and disposal of surplus earth.
Mixing and placing in concrete grade 15,
3 Cube 0.20
1:3:6 (1 1/2") 6" thick for wall foundation
R.R masonry in 1:5 cement and sand motar in
4 Cube 0.90
foundations.
Filling earth and compacting 150mm layers.
5 Cube 0.40
Rate includes for transport of 30m.
3/4" thick D.P.C. in cement sand 1:3 finished
6 with 2 coats of D.P.C. tar and blinded with Sqr 0.20
sand.
Floor concrete 1:2 4(3/4") cement concrete
slab roof with 10mm TS rods r/f in6" c/c
7 including shuttering (rate including 1:2 Cube 0.20
cement and sand rendering finished smooth
with cement slurry
Masonry block work 100mm thick in walls in
8 cement and sand 1:5 motar using hollow Sqr 0.75
blockS.
16mm thick 1:1:5 cement, lime and sand
9 plastering to walls finished smooth with lime Sqr 0.80
putty.
16mm thick plastering to plinth walls in
10 Sqr 1.25
cement and sand 1:3 including cement floating
Fioor cement concreete in1:2 1/2:5( 1") 3"
11 thick with 1/2"rendering 1:2with expantion Sqr 0.20
joints & field with red cement
Door ledged & braced 1" thick single sash
hung on 3 3/4"*2 3/4" frame in class 1 timber
12 Sq.ft 12.00
& brass furniture and lock with two coats of
enamel painting
Painting walls with weather shield paint.two
13 coats with primer including preparation of Sqr 0.80
surface
Prepare and apply one coat of Alkali resistant
14 primer and two coats of Emulsion paint to Sqr 0.52
walls
COST
41
SECTION - 08
Drawing
42
SECTION - 09
Bid Security
Bid Securing Declaration
43
Notes on Standard Forms:
44
FORM OF BID SECURITY
--------------------------------------------------------------------------------------------------------- [insert issuing
agencys name, and address of issuing branch or office]
Beneficiary:
Director General,
Department of Wildlife Conservation,
811/A, Jayanthipura Road,
Battaramulla
Date: .
BID GUARANTEE No.:..
Consequently, any demand for payment under this Guarantee must be received by us at the office on or
before that date.
.