Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Filter installation Filter rough side up Visual check each Void the filter;
centered on screen, filter install substitute
edges parallel to filter
edges of screen to
faceplate gasket
Gasket tightened
carefully to prevent
leakage and not to
damage filter paper
i
Operational checks Stabilised initial flow Visual check of each Perform steps in
rate = established filter and Timing order until flow rate
initial flow rate + device is within limits or
10% for pressure cause of discrepancy
transducer* or + is identified;
15% for rotameter; measure line
Sampling time 24 + voltage, change the
1h filter, check
calibration, and
calibrate sampler
void the sample
Filter condition condition for >24 h, For each sample Repeat conditioning
under constant observe the room or after >48 h at
humidity, RH chamber conditions ambient conditions
/v-cpozv o n / ^ +V10.
U H U i n v
nliKro+ir%n
vvjcmiiyi
Filter handling Filter handling filter Visual check of each Discard damaged
in protective folder; filter filters
envelopes
undamaged