Check List

Job: Expansion below changing


MSGM/BFSP/QCL/SP3/35
S. No. Check Points Actual

mentioned in required drawing


1 check the dimension of the bellow

mentioned in required drawing


3 check the pitch distance of new expansion bellow
manual checking
4 check the cloth condision of the new bellow
by checking the spere
5 check the flow direction of the bellow
rope dia mm (As per site requirement)
6 check the insertsion of the asbestos rope
manual checking
7 tight all the bolts of the bellow
8 remove all locking of the bellow manual checking
Check List

Responsibility

Contractor MSG
Dept. Remarks
MSG
When To Check Superviso Supervis
Representativ Officer
r or
e
during job.before fixing the bellow

during job.before fixing the bellow

during job.before fixing the bellow

during job.before fixing the bellow

during job.after fixing the bellow

during job.after fixing the asbestos


rope
during job.after fixing the bellow