: SPCT/Eng/SOP/035
Version: 2.1
ENGINEERING
PROCEDURE
DEPARTMENT Name: OTR TIRE INSPECTION,
INFLATION & REPLACEMENT
Uncontrolled document when printed, check SPCT Eng. Dept. for latest version if available.
STANDARD OPERATING Ref. No.: SPCT/Eng/SOP/035
Version: 2.1
ENGINEERING
PROCEDURE
DEPARTMENT Name: OTR TIRE INSPECTION,
INFLATION & REPLACEMENT
Table of contents
Page No.
Uncontrolled document when printed, check SPCT Eng. Dept. for latest version if available.
STANDARD OPERATING Ref. No.: SPCT/Eng/SOP/035
Version: 2.1
ENGINEERING
PROCEDURE
DEPARTMENT Name: OTR TIRE INSPECTION,
INFLATION & REPLACEMENT
Revision Date/ Ngy Description / Prepared By/ Reviewed By/ Approved By/
/ Hiu
M t Chnh sa bi Xem xt bi Ph chun bi
chnh
Thanh V Mohammed
1.0 15-Oct-2010 Initial issue Nguyn Xun Huy
(Chief Mechanic Engineer) (Engineering Manager) Dowidar (Engineering
Director)
Uncontrolled document when printed, check SPCT Eng. Dept. for latest version if available.
STANDARD OPERATING Ref. No.: SPCT/Eng/SOP/035
Version: 2.1
ENGINEERING
PROCEDURE
DEPARTMENT Name: OTR TIRE INSPECTION,
INFLATION & REPLACEMENT
2.0 PURPOSE/ MC CH
Comply with DPW Engineering Policy & SPCT Engineering Management System.
Set up regulation to inspect, inflate and replace the off-the road tires.
Guide staff clearly the way to complete the task quickly & safely
Uncontrolled document when printed, check SPCT Eng. Dept. for latest version if available.
STANDARD OPERATING Ref. No.: SPCT/Eng/SOP/035
Version: 2.1
ENGINEERING
PROCEDURE
DEPARTMENT Name: OTR TIRE INSPECTION,
INFLATION & REPLACEMENT
Off-The-Road Tire V xe chuyn dng cho xe chy trong ng ni b, khng s
OTR Tire
dng chy trn ng giao thng cng cng.
Lng bo v an ton khi bm v xe, phi chc chn & chu c va p trong
Safety Cage
trng hp king mm b bung ra.
Tm chn bo v khi bm hi v xe ti v tr cu xe, phi chu & chuyn hng
Safety Shield
c va p trong trng hp king mm b bung ra.
Uncontrolled document when printed, check SPCT Eng. Dept. for latest version if available.
STANDARD OPERATING Ref. No.: SPCT/Eng/SOP/035
Version: 2.1
ENGINEERING
PROCEDURE
DEPARTMENT Name: OTR TIRE INSPECTION,
INFLATION & REPLACEMENT
Uncontrolled document when printed, check SPCT Eng. Dept. for latest version if available.
STANDARD OPERATING Ref. No.: SPCT/Eng/SOP/035
Version: 2.1
ENGINEERING
PROCEDURE
DEPARTMENT Name: OTR TIRE INSPECTION,
INFLATION & REPLACEMENT
I.1 Where a seriously flat tire Confirm the incident status & the Operator/ Shift
or any incident occurs history record of the tire Engineer/ WS &
Equipment Manager
I.4 Ditto
Apply the parking brake and
chock the wheels that are not
being worked upon
I.5 Ditto
Release the wheel nuts partially
with the wheel still on the ground
Uncontrolled document when printed, check SPCT Eng. Dept. for latest version if available.
STANDARD OPERATING Ref. No.: SPCT/Eng/SOP/035
Version: 2.1
ENGINEERING
PROCEDURE
DEPARTMENT Name: OTR TIRE INSPECTION,
INFLATION & REPLACEMENT
Uncontrolled document when printed, check SPCT Eng. Dept. for latest version if available.
STANDARD OPERATING Ref. No.: SPCT/Eng/SOP/035
Version: 2.1
ENGINEERING
PROCEDURE
DEPARTMENT Name: OTR TIRE INSPECTION,
INFLATION & REPLACEMENT
II.A.8 Ditto
II.B.3 Safely lift the wheel by forklift, align Ditto. Safely strap the
then install it into the axle hub. Install wheel to the forklift
wedge band & push it to inside carriage.
Uncontrolled document when printed, check SPCT Eng. Dept. for latest version if available.
STANDARD OPERATING Ref. No.: SPCT/Eng/SOP/035
Version: 2.1
ENGINEERING
PROCEDURE
DEPARTMENT Name: OTR TIRE INSPECTION,
INFLATION & REPLACEMENT
II.B.6 Install remained wheel clamps & nuts. Ditto. Refer torque
Crosswise tighten all wheel nuts to value 35 Nm (26 lbf
10% of rated torque ft)
Not OK
OK
Uncontrolled document when printed, check SPCT Eng. Dept. for latest version if available.
STANDARD OPERATING Ref. No.: SPCT/Eng/SOP/035
Version: 2.1
ENGINEERING
PROCEDURE
DEPARTMENT Name: OTR TIRE INSPECTION,
INFLATION & REPLACEMENT
III.2 Ditto
In most cases, rim inspection shall be Create WO for Rim
performed via an independent Inspection & repair
approved third party contractor
III.3 Ditto
Clean all parts. Check for signs of
corrosion, wear, buckling, rust,
breakage or cracks
III.4 Ditto
Yes.
Check with a Dye Damaged Is critical part and/or
Penetrant if cracks are area?
suspected Is serious damage?
Uncontrolled document when printed, check SPCT Eng. Dept. for latest version if available.
STANDARD OPERATING Ref. No.: SPCT/Eng/SOP/035
Version: 2.1
ENGINEERING
PROCEDURE
DEPARTMENT Name: OTR TIRE INSPECTION,
INFLATION & REPLACEMENT
SPCT/Eng/WI_041 - Safety Precaution in Inspection & MNR under vehicle frame_V 1.0
Uncontrolled document when printed, check SPCT Eng. Dept. for latest version if available.