307013-W JOB HAZARD ANALYSIS WORKSHEET

PROJECT B11LQ HUC PROJECT


MAJOR WORK
COLD CUTTING IN OPEN AREA B11 LQ JHA 23
ACTIVITY
LOCATION B11 - LQ B11DR-A
SIMOPS Production Online Shut down but pressurised Shut down but not pressurised
DESCRIPTION OF MECHANICAL EQUIPMENT & ASSOCIATE PIPING INSTALLATION, CABLES PULLING, GLAND & TERMINATION
CONCURRENT SCAFFOLDING WORKS & COMMISSIONING WORKS
ACTIVITIES
BEFORE AFTER ACTION
NO GUIDEWORD CAUSES CONSEQUENCES CONTROLS, BARRIERS RECOMMENDATION
P A E R P A E R PARTY/DATE
1. Increased ingition Euipment over heated, Fire, explosion, personnel Fire Extinguishers & Firewatcher The machine is fitted wirh spark Huc Team /
sources Welding, Cutting & Grinding injury on standby, Welding habitat to arrestor,Moving parts fitted with Welders /Millwrights
3B 3B 3B 2B contain all sparks Guard,M-oil at the right and Pipe Fitters
1B 1B 0 0 level,Machine properly
grounded
Fire extinguisher & Fire watcher
on standby

2. Unignited HC
release N/A
Toxic/Asphyxiatin
g Release

3. High Pressure Actylene & oxy hoses parted 3B 2B 2B 2B Explosion , Personnel injuries Properly secured all fitting and 1B 0 0 0 Properly Secure all fitting Huc Team / Riggers
Liquid / Gas or burst,Defective cutting or Fire, Clear Accessway & connection, Clear Accessway & &hoses connections, Clear Welders & Pipe
Release torch, Equipments failure, gas Escape Route, Escape Route,Gas test before Accessway & Escape Route Fitters
leak from existing piping start any works,Fire PTW Gas test before start any
system extingusher,Firewatcher on works, Fire
standby extinguisher,Firewatcher on
stadby
4. High / Low Hot Surface, Weather, Air Personnel injuries, Wear proper PPE, Fire Always be alert of your Huc Team / Riggers
Temperature supply hoses parted,Oxy & Extinguisher, Firewatcher on surrounding, Proper PPE, Keep / Welder &
Liquid / Gas Actylene parted 3B 3B 3B 2B standby & Obey Safety signage 1B 1B 0 0 walkway clear & Escape Clear pipefitter
at all time

5. Dropped Fualty Lifting Equipment, 3B 3B 2B 2B Personnel injury, Properties & Inspect all lifting equipment prior 1B 1B 0 0 Proper job planning, Huc Team / Rigging
Objects/Swinging Crane Operation & Capacity, Equipment Damage to use, Clear Communication coordination, Communication Team/Boat / Crane
loads Loose Materials , Weather between crane operator & rigging between all parties operator
supervisor & signalman, tag line in
place
place, Secure all loose materials
6. Ship Impact N/A

7. Structural Weldings and Cutting 2B 2B 2B 1B Structure damage Welding Procedures in place 1B 1B 0 0 Proper Welding Procedures Huc Team/
Failure / Regular inspection & QC/Structural
Buoyancy Loss Supervision Welders & fitters
307013-W JOB HAZARD ANALYSIS WORKSHEET
PROJECT B11LQ HUC PROJECT
MAJOR WORK
COLD CUTTING IN OPEN AREA B11 LQ JHA 23
ACTIVITY
LOCATION B11 - LQ B11DR-A
SIMOPS Production Online Shut down but pressurised Shut down but not pressurised
DESCRIPTION OF MECHANICAL EQUIPMENT & ASSOCIATE PIPING INSTALLATION, CABLES PULLING, GLAND & TERMINATION
CONCURRENT SCAFFOLDING WORKS & COMMISSIONING WORKS
ACTIVITIES
BEFORE AFTER ACTION
NO GUIDEWORD CAUSES CONSEQUENCES CONTROLS, BARRIERS RECOMMENDATION
P A E R P A E R PARTY/DATE
8. Manual Handling Incorrect handling Technique 2B 2B 2B 1B Personnel injury, Slip , Trip & Proper Handling Techniques, 1B 0 0 0 Proper Handling Techniques, Huc Team / Riggers
Lifting Equipment Failure Fall
Fall Housekeeping, Clear accessway , Housekeeping,Clear / Scaffolders
Escape Route Use correct tool accessway , Escape Route,Use
9. Chemical N/A correct tool
Handling
10. Access / Egress Poor housekeeping, blocked 2B 2B 2B 1B Personnel injury , slip ,Trip, Fall Good Housekeeping , Clear 1B 0 0 0 Good Housekeeping, Clear Huc Team / riggers/
accessways / escape route Accessway , Escape Route Accessway & Escape Route pipe fitters

11. Escape/Evacuatio Poor housekeeping, blocked 2B 2B 2B 2B Personnel injury, trap, Good Housekeeping , Clear 1B 0 0 0 Good Housekeeping, Clear Huc Team / riggers/
n accessways/ escape route Slip , Trip and Fall Accessway , Escape Route Accessway & Escape Route fitters

12. Location / H2S area, weather, Congested 3B 0 3B 3B Personnel injury & Slip , Trip Proper H2S detection & escape 1B 0 0 0 Proper training & provision of Huc Team /
Escalation area and Fall. equipments, Clear Accessway & equipments , Clear Accessway Riggers/ fitters
Escape Route & Escape Route

13. Electricity Source from welding machine, 2B 2B 2B 2B Personnel injury ,electric Grounding in place,personnel 1B 0 0 0 Proper training & provsision of Huc Team /
grounding & live equipment at shock, death competency,PTW equipment, Dont repair any electrician
vicinity,damage equipment electrical equipment if you are
qualified

14. Working H2S Area , Direct Sunlight , 3B 0 3B 3B Personnel injuries , Heat Proper H2S detector & Escape 1B 0 0 0 Proper H2S Detector, Escape Huc Team / riggers/
Conditions, e.g. Congested Area, Noise from Stroke, Hearing lose & Health Equipment , Ear plug & Proper equipment, TBM, Proper PPE, fitters
heat, noise, bad Running Equipments , Bad Problem PPE Obey Safety Signages Obey Safety Signage
weather etc Weather
15. Cold cutting in Broken hacksaw blade or 3B 2B 1B 1B Personnel injury Wear safety glasses/face shield, 1B 0 0 0 Wear safety glasses/face Huc Team / riggers
open area cutting machine bits handglove shield,handgloves

Concurrent Activities Not Permitted/Restricted:


1) Restrict rigging and lifting activities when divers are in water.
2) Hot works will be restricted during operation activities which results in hydrocarbon release to atmosphere.