Sei sulla pagina 1di 4

PMT & MATERIAL

Project Name : RAPID PROJECT / PKG #6A Report Date : Friday, September 29, 2017

Job No. : SC 2861 Submission Date :


Subcontractor : Petrovietnam Engineering (Malaysia) SDN BHD PVE SAMSUNG ENGINEERING
Weather PIC Mgr SI FCM CM PM

Total Working
AM 07:00 AM 08:00 AM 10:30 AM 11:30 PM 13:00 PM 16:30 PM 18:00 Temperature Working Hour Rainy Hour
Hour
Start - End
32 10.00 0.00
7.30 - 18.30

A. Manpower Status (MD) B. Safety Mileage (MH) C. Major Areas of Concern


Final
Category Prev. Today Accum. Category Prev. Today Accum.
Goal
PMT 3,308 Err:508 Err:508 PMT 33,080 Err:508 Err:508
Material Material
Indirect RAPID Site 364 Err:508 Err:508 3,640 Err:508 Err:508
RAPID Site
Sub Total 3,672 Err:508 0 Sub Total 36,720 Err:508 Err:508
Material Material
2,103 Err:509 Err:509 21,030 Err:509 Err:509
Direct RAPID Site RAPID Site
Sub Total 2,103 Err:509 Err:509 Sub Total 21,030 Err:509 Err:509
Grand Total 5,775 Err:509 Err:509 Grand Total 57,750 Err:509 Err:509

1. Work Summary

Description

Today's Activities (Sep 29) Tomorrow's Activities (Sep 30)

PVE Area Discipline

1)Checking and arrange spare parts material(piping) in warehouse


1)Checking and arrange spare parts material in warehouse
Lot 141 2) Provide P-405 pump and A-675 equipment to mechanical team at 64B.
2)Unload shipment Piping EC-005
3)Unload shipment Mechanical EC-019

Lot 60A 1)Inspection the package of mechanical EC-010

6A MATERIAL
Lot-64b

1)Return empty container and skids 1)Return empty container and skids
Lot 53b
2)Unload structure KC-092(steel structure) and KC-095(steel structure) 2)Unload structure KC-092(steel structure) and KC-095(steel structure)
UG PIPING
Project Name : RAPID PROJECT / PKG #6A
Job No. : SC 2861
Subcontractor : Petrovietnam Engineering (Malaysia) SDN BHD SAMSUNG ENGINEERING
Weather SI SI FCM CM PM
AM 07:30 AM 09:30 PM 10:30 PM 12:00 PM 13:00 PM 16:00 PM 18:30 Temperature

32

A. Manpower Status (MD B. Safety Mileage (MH)


Category Prev. Today Accum. Category Prev.

UG Piping 1,719 6 1,725 Piping 17,190


Indirect
Sub Total 1,719 6 1,725 Sub Total 17,190
UG Piping 2,885 13 2,898 Piping 28,850
Direct
Sub Total 2,885 13 2,898 Sub Total 28,850
Grand Total 4,604 19 4,623 Grand Total ###

Description
Today's Activities (Sep 29)
PKG Area Discipline
1.) Site Survey of site condition only.
2.) Preparation of GRE pipe spool
3.) Dewatering of rain water inside manhole/trench.

Lot 64b UG Piping

1.) Preparation Activity of Trench Bedding check elevation and


coordinates for ACC line.

2.) Internal Cleaning of GRE pipe spool.


3.) Lifting activity of GRE pipe. for pre fabrication.
4.) Pre fabrication of ACC line pipe spool include cutting, sanding, Fit
up, bonding, lamination and final curing using heating blanket.
Lot 53b UG Piping Lamination: P2823-ACC-3200-10505-01 JT-01, 02, 03 and 04
8"
P2823-ACC-3200-10506-01 JT-01, 02, 03 and 04
8"

5.) Pre-Fabrication and Bonding of GRE pipe spool Puddle Flange.


A Line no. 500-ACC-5295-10210 JT-01 and 12 20"
cti 500-ACC-5295-10209 JT-04 20"
vit
y
2. Work Done Status
D
es
cr Activity Description Total Accum.
Unit Work Progress REMARK
ip Q'ty QTY
ti Discipline Work Item
o TOTAL UG PIPING Dia-inch 14,474.0 9,362.0 64.68%
n
Total Dia-inch 5,958.5 1612.5 27.06%

UNDER CWS/CWR Dia-inch 840.5 840.5 100.00%


PIPING GROUND FIELD CS
PIPING VA line Dia-inch 60.0 4.0 6.67%
INTALLATION
FW line Dia-inch 802.0 28.0 3.49%
GRE
ACC line Dia-inch 4,256.0 740.0 17.39%
Manpower Mobilization Status (In Detail)
2017
This Month
Discipline Description Detail Nation Prev. Aug
Total
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Foreman VN 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Helper Pakistan 5 6 6 6 6 1 4 7 8 8 7 8 8 7 8 8
Helper India 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Helper Bangladesh 2 1 3 3 3 3 3 3 3 3 3 3 3 3 3 3
Helper Store Keeper VN 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Rigger Pakistan 1 1 1 1 1 3 1 1 1 1 1 1 1 1 1 1
Electrician VN 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Material
Direct Scaffolder LV1 Malay
Operator Low loader Malay 1 1 1 1 1 1 1
Operator Crane 70ton Malay 1 1 1 1 1 1 1 1 1
Operator Crane 30ton Malay 1 1
Operator Crane 50ton Malay 1
Operator Crane 160ton Malay 1 1 1
Operator Boomtruck Malay 1 1 1
Sub Total Operator Folklift 7 ton Malay 1 1 1 1 1 1
Operator Folklift 20 ton Malay 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
MATERIAL & PMT

Operator Bulldozer Malay


Operator Roller Compactor Malay
15 16 17 17 16 9 13 0 0 0 0 0 0 0 0 0 0 0 103
Project Mgr VN
Construction Mgr VN
Project Control Mgr VN
Project Planner VN
Document Officer VN
PMT
Project Co-ordinator VN
Admin Executive VN
QA/QC Mgr VN
Indirect
QC Leader VN
QC DC VN
Site Accountant VN
Camp Mgr VN
Contract Executive VN
Procurement Team VN
Equipment Coodinator VN
HSE Mgr VN
Material
HSE Officer VN
Cost Controller VN
Material Mgr VN 1
Sub Total Material Deputy Mgr VN 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Material Controller VN 1 2 2 2 2 2 2 2 1 1 1 1 1 1 1 2 3
Warehouse Keeper VN 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Machinery Mobilization Status (In Detail)
SUBCONTRACTOR : PVE

2017
Description This
Discipline Prev. Aug Accum.
Month
Items Capa. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Mobile crane 120 ton
Mobile crane 145ton (SECL)
Mobile crane 160 ton 1 1 1
Roller Compactor
Bulldozer
MATERIAL Fork lift 7 ton (red) 1
Fork lift 20 ton 1 1 1 1 1 1 1 1
Low loader 1 1 1 1 1 1 1 1
Boom truck 15ton 1 1 1
Mobile crane 30ton
Mobile crane 50 ton 1
Crawer crane 50ton
Mobile crane 70ton 1 1 1 1