Project Name : RAPID PROJECT / PKG #6A Report Date : Friday, September 29, 2017
Total Working
AM 07:00 AM 08:00 AM 10:30 AM 11:30 PM 13:00 PM 16:30 PM 18:00 Temperature Working Hour Rainy Hour
Hour
Start - End
32 10.00 0.00
7.30 - 18.30
1. Work Summary
Description
6A MATERIAL
Lot-64b
1)Return empty container and skids 1)Return empty container and skids
Lot 53b
2)Unload structure KC-092(steel structure) and KC-095(steel structure) 2)Unload structure KC-092(steel structure) and KC-095(steel structure)
UG PIPING
Project Name : RAPID PROJECT / PKG #6A
Job No. : SC 2861
Subcontractor : Petrovietnam Engineering (Malaysia) SDN BHD SAMSUNG ENGINEERING
Weather SI SI FCM CM PM
AM 07:30 AM 09:30 PM 10:30 PM 12:00 PM 13:00 PM 16:00 PM 18:30 Temperature
32
Description
Today's Activities (Sep 29)
PKG Area Discipline
1.) Site Survey of site condition only.
2.) Preparation of GRE pipe spool
3.) Dewatering of rain water inside manhole/trench.
2017
Description This
Discipline Prev. Aug Accum.
Month
Items Capa. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Mobile crane 120 ton
Mobile crane 145ton (SECL)
Mobile crane 160 ton 1 1 1
Roller Compactor
Bulldozer
MATERIAL Fork lift 7 ton (red) 1
Fork lift 20 ton 1 1 1 1 1 1 1 1
Low loader 1 1 1 1 1 1 1 1
Boom truck 15ton 1 1 1
Mobile crane 30ton
Mobile crane 50 ton 1
Crawer crane 50ton
Mobile crane 70ton 1 1 1 1