Power Supply Testing


Forcing on the Power Supply
Ultra High Def Model

Testing the Power Supply


Testing
T i the
h BBacklights
kli h
Testing the T-CON (Panel Test)

Produced 07-07-2016
07 07 2016 (ver. 1)

1
Read First Before Beginning the Power Supply Testing Procedure
When servicing an LCD TV and you need to Test the Power Supply, due to the symptoms the TV Wont
Come On or
TV Intermittent Powers Off, before beginning the Power Supply Testing READ THE BELOW FIRST.

Check the Front Power Indicator:


This may give some indication as to status of the power supply. If the Power LED is red, it indicates
Stand By voltage is available
Stand-By available. When you press the Power button
button, does the Power LED slowly blink off off.
This should indicate the TV is receiving the power on command and is responding.
Caveat: The Power LED can be turned off via the Customers Menu. If it has been sut off, then the Power
LED cant be used for diagnosis.

The SMPS Must be producing Stand-By voltage when AC is applied. Examine the Voltage Label to see
what the voltage should be. In this TV, Stand-By is 7.8V and when the TV comes on, it jumps up to 18V.
Remember that the Main board and the Front IR/Joy Stick utilizes Stand-By voltage. They could be the
reason if Stand-By isnt coming up.

TV Intermittent Powers Off: When the TV is turned on, bring up the IN-START Menu and go to the
Power On/Off History screen. The top (number 1) indicates the most recent reason the TV turned off.
Look for anything uncommon. Common entries are Off-By: Local_Key, Remote_Key, SW_Update (Not
normal in web-OS models).
Abnormal: Power_Off_By: AC_DET (indicates a loss of AC power).

You can look at almost any Training Manual from the last several years and find the section on In-Start
Menu. A list of Power Off reasons are listed.
You can also look for Article 8860 Power Off Status on TechAssist.com.

2
TEST 1 65UH9500 Power Supply Board 18V to Main Voltage Check
Note: The numbers in Fig 1 refer to the Main board connector (from the SMPS TEST 1 P1001
SMPS) that has been unplugged. Use this end for easy insertion of Top Row pins
are Odd numbers 1 2
connections.
ti N
Numbers
b shown
h iin b
brackets
k t [ ] are SMPS connector
t pins.
i
AC Should not be applied at any time while adding connectors or while Fig 1 3 4
unplugging connectors, damage to the circuit Board may occur.
DRV_ON 5 6
I) When AC is applied, the SMPS MUST be producing STBY 7.8V on pins 11,
12, 14, 21 and 22 of P1001. [Pins 7, 8, 16, 17 and 18 on SMPS P201]. 7 8

18V(A) 9 10 18V(A)
If STBY is missing, STBY voltage may be loaded down by the Main Board or the
Joy Stick/IR Board. Remove connector P1001 on Main board from SMPS. If 18V 11 12 18V
STBY is still missing, SMPS is defective but make sure AC is arriving at the
connector SK100. 2 (1.5V Batteries) 13 14 18V
PWR_ON
II) With P1001 on the Main Board unplugged, it will make insertion of the 1 16
15
Connectors easier. Use P1001 (Main Board side) to insert connections during
17 18
these tests.
A
Size: AA 19 20
TEST 1: TESTING THE POWER SUPPLY TURN-ON CIRCUIT. (See Fig 1)
18V 21 22 18V
(1) Using two AA 1.5V batteries hooked in series (3V supply) jump the negative
lead to ground (pin 23) [SMPS pin 5] and the positive lead to PWR-ON (pin WARNING: Gnd 23 24 Gnd
15) [SMPS 13] as shown in example (A) in Fig 1 on the right. Do not to let the leads touch
positive (+) to negative () at 18V(A) 25 26 18V(A)
Apply AC, this will turn on the SMPS. No Relay click will be heard. any time as this will cause
Check that the 18V supplies to the Main board turn on; battery to overheat creating a 18V(A) 27 28 18V(A)
To Main Board Power: fire hazard.
(P1001 18.14V pins 9-12, 14, 21-22, 25-28)
[P201 18.14V 1-4, 7,8, 16, 17-20] Pin 1 Bottom Front on SMPS
Pin 1 is Top Front on Main
(2) Remove AC Power (Leave Battery connected in this configuration).
STAND-BY VOLTAGE:
7.8V in STBY, 18.14V Run

TIP: If you want to use Resistors instead of the 3V Jig, see last page.

3
TEST 2 65UH9500 Backlight Check
Continue if Test 1 was OK. Leave jumpers (A) in place. SMPS TEST 2 P1001
AC Power is removed at this time. Top Row pins
are Odd numbers 1 2
TEST 2: BACKLIGHT SECTION TEST: Fig 2 3 4
DRV_ON
(3) Add another jumper (B) between (Battery +3V) and pin (5) (DRV_ON) 5 6
[SMPS Pin 23].
(See Fig. 2), Simulating PWR_ON, and DRV_ON commands. B 7 8

(4) Apply AC Power. 18V(A) 9 10 18V(A)

18V 11 12 18V
(5) Check the Backlights. They should be On. (Note, you may need to turn off
the lights (if TV is laying face down) to see the backlights. Look across the 2 (1.5V Batteries) 13 14 18V
bottom. There are several holes in the metal back when the backlights can PWR_ON
be seen. 15 16

Backlights Normal:
A 17 18
a) If normal, Backlight Power will be (105V), see image on the right. Use
Size: AA 19 20
Test Point P211 LED+, bottom right of the SMPS.
18V 21 22 18V
Backlights Abnormal:
a) Recheck all connections. WARNING: Gnd 23 24 Gnd
b) Confirm the DRV_ON line pulling up to at least Do not to let the leads touch
2.5V. positive (+) to negative () at 18V(A) 25 26 18V(A)
any time as this will cause
c) Check the LED+ Test point. If the Power jumps battery to overheat creating a 18V(A) 27 28 18V(A)
upp to 120V,, the falls back to about p power. fire hazard.
Expect some Backlight abnormality. Look at
LED701 (just under the Top right heat sink). Pin 1 Bottom Front on SMPS
If its blinking it indicates abnormality. Pin 1 is Top Front on Main
See next page for possibilities.

See Next Page for Voltage Readings during Test 1 and 2.


See Page 6 to Test the Power Supplys 18V line using a light bulb test jig.

TIP: If you want to use Resistors instead of the 3V Jig, see last page.

4
65UH9500 Power Supply Test 1 and 2 Voltage Checks
MAIN Label SMPS TEST1 TEST2

1 VSYNC 27 0V 0V

2 SIN 28 0V 0V

3 Gnd 25 Gnd Gnd

4 SCLK 26 0V 0V

5 DRV-ON 23 0V 2.65V

6 PDIM 24 0V 0V

7 GND(A) 21 Gnd Gnd

8 GND(A) 22 Gnd Gnd

9 18V(A) 19 18.14V 18.14V

10 18V(A) 20 18.14V 18.14V

11 18V 17 18.14V 18.14V

12 18V 18 18.14V 18.14V

13 Gnd 15 Gnd Gnd


Backlight Voltage is 82.1V during Test 1

14 18V 16 18.14V 18.14V Backlight Ground Return lines are 5.60V in Test 1
15 PWR-ON 13 2.65V 2.65V Backlight Voltage is 105V during Test 2
16 PDIM2 14 0V 0V Backlight Ground Return lines are 1.7V ~ 2V in Test 2
17 Gnd 11 Gnd Gnd Backlight Ground Return lines are 20.40V when TV in Normal
18 Gnd 12 Gnd Gnd
Mode (Energy Saver On)

19 Gnd 9 Gnd Gnd

20 Gnd 10 Gnd Gnd

21 18V 7 18.14V 18.14V

22 18V 8 18.14V 18.14V

23 GND(A) 5 Gnd Gnd

24 GND(A) 6 Gnd Gnd

25
5 18V(A)
8 ( ) 3 18.14V
8 18.14V
8

26 18V(A) 4 18.14V 18.14V

27 18V(A) 1 18.14V 18.14V

28 18V(A) 2 18.14V 18.14V

5
TEST 3: (2016 65UH9500) Power Supply Board 18V Power Load Test
In this case, the Power Supply needs to be tested to see if it can supply 18V when loaded.

TEST 3:
3 18V POWER LOAD CHECK
CHECK:

(1) Leave all Jumpers in place on P1001 to P201 of the Power Supply.

(2) Make a 24V load test jig by using a standard 1157 automobile light bulb, (dual element). Solder two wires from the buttons
on the bottom of the bulb
bulb. Do not solder any wire to the actual ground of the bulb
bulb. (See Fig 4)
4).

(3) Testing 18V Line: Attach one end of the Jig to the 18V line from:
(P1001 pins 11, 12 or 14) [P201 SMPS pins 16, 17 or 18.
Fig 4
(4) Attach the other wire from the Jig to Chassis Ground.
Tip: Cut the sharp end of a safety pin off and solder it to
each end of the wires coming from the light bulb Jig. Push one
needle end into any pin 8-15 of CN5 side. Push the other needle
end of the other wire into any pin 1-7 of CN5 or go to Chassis Ground.

(5) Apply
A l AC power, the th lilight
ht b
bulb
lb should
h ld lilight
ht and
d remain
i lit
lit. M
Measure th
the 18V liline tto
confirm its correct. The bulb should be very bright. Let the SMPS run for several
minutes to confirm its operating correctly.
(Do not let wires or light bulb touch any metal parts).
Note: You can also use two single element automotive bulbs (each 6W) tied in series.

a: If the Light Bulb remains lit, the SMPS 18V line is OK.
b: If the SMPS shuts off, Replace the Power Supply.

(6) Testing the 18V(A) Line: You should test the other 18V output from the power supply the same way as above using
different pins; (P1001 pins 9, 10 or 25 28) [P201 SMPS pins 19, 20 or 1 4.

6
2016 65UH9500 Alternative Power Supply Test and Panel Test
ALTERNATIVE METHOD (without using the two AA Batteries):

For Test 1 Step (A): Use a 10K resistor between Stand By : (P1001 pins 11
Stand-By 11, 12 or 14) [SMPS 16
16, 17 or 18] and
PWR_ON (P1001 pin 15) or [SMPS pin 13].

For Test 2 Step (B): Use a 50K resistor between Stand-By : (P1001 pins 11, 12 or 14) [SMPS 16, 17 or 18] and
DRV_ON (P1001 pin 5) or [SMPS pin 23].

Note: At the top right of the Power Supply there are Test
Points that can also be used for Jumpers and Checks.
See next page for a blow up picture.

PANEL TEST:
If the Main board still functions in relationship to turning on and supplying 12V to the T-CON, when Power is Off, unplug the Vx1 cables
(LVDS). Then turn the TV on. A pattern of Black, White, Gray, Red, Green and Blue should cycle on the screen.

2nd Choice: If you have a 12V supply, you can disconnect the Vx1 Cables, jump 12V to the T-CON fuse, place the SMPS into the Test 2
mode and apply power. Patterns should appear on the panel.

7
Blow Up of the Power Supply Top Right Side

Backlight Ground
Return lines. There
are 12 total.