Wu= 22.46 Wu = + Ws + Wp
Beam RB-1:
Line of symmetry
Wu
L = 7.60 m L = 7.60 m
Shear Diagram:
Moment Diagram:
Mu=15 KN-m
Design For Flexure:
b = 0.0421753
b = 0.851 (f^ c)/fy (600/
(desired) = 0.0253052 (600+fy))
desired =0.6b
Cross Section of Beam: Nominal Moment:
bd2=Mu/R
Mn = 28.89 Kn-m Mn = Mu/
bd2 = 5018688.488 mm3
b= 250 mm Fexural Resistance factor
d= 141.69 mm
h' = 141.69 mm R= 5.75626
h (assume) > h', ok! R = fy(1-0.59 fy/(f^ c))
Final:
b= 250 mm
d= 330 mm
h= 400 mm
Area of Steel:
Mu = Mn= fybd^2 (1-0.59 fy/(f^ c)) Roots:
a^2+b+c=0
=(-b(b^2-4ac))/2a
a = 46793235022 1 = 0.14046
b = -6757789500 2 = 0.00396
c= 26000000 new = 0.00396 choose the smaller
rho new < rho min, use rho min
Mu=Mn
Mn = 46.915 Kn-m Mu=Mn
Mn > Mu, ok (safe)
Design Moment:
Area of Steel:
Mu = Mn= fybd^2 (1-0.59 fy/(f^ c)) Roots:
a^2+b+c=0
=(-b(b^2-4ac))/2a
a = 46793235022 1 = 0.14216
b = -6757789500 2 = 0.00225
c= 15000000 new = 0.00225 choose the smaller
rho new < rho min, use rho min
First Stirrup:
s1= 85 mm
Stirrups:
1 @ 0.085 m
Rest @ 0.170 m
Moment Diagram:
Theoritical Bar Cut-off Graph: Wight & macGregor "Reinforced Concrete",6th edition, pp.1102
Bar Cut-off (1/3 and 2/3 of bars that satisfy the ACI code)
1 @ 0.085 m
say: 1
Volume of Gravel:
Vgravel= 0.34 m3 Vol=Vgravel x Factor
say: 1 Use sm
Reinforcing Bars:
Top bars: 2 bars (16mm)
Bot. bars: 2 bars (16mm) Direct Counting Method
Stirrups: 4 bars (8mm)
Summary: 4 RB-1
Item Quantity Unit Cost Total
Concrete Cement 16 220 3520
Works Sand 4 600 2400
Gravel 4 600 2400
Total 8320
16 mm x 6m DSB 16 368 5888
Rebar 8 mm x 6m DSB 16 73 1168
Works #16 Tie Wire (Kls) 4 58 232
Total 7288
*Verify actual to minimize cost
Two-Story office Building Date Prepared:
A. Design of Beams Checked By:
Beam RB-2 - Roof Deck Framing Plan Rating:
Service Loads:
Dead loads: KN/m3 KN/m2 KN/m
Weight of beam (Wb) Wb =
24.00 ---- 1.80
Weight of Slab (Ws) 24.00 ---- 11.4 Ws = (1+2)
Beam RB-2:
Line of symmetry
Wu
L = 7.60 m L = 7.60 m
Shear Diagram:
Moment Diagram:
Mu=84 KN-m
Design For Flexure:
= 0.851 (^ )/ (600/
b = 0.0421753 (600+))
Final:
b= 250 mm
d= 340 mm
h= 400 mm
Area of Steel:
Mu = = ^2 (10.59 /(^ Roots:
)) =((^24))/2
a^2+b+=0
a = 49672157654 1 = 0.11571
b = -7173558000 2 = 0.02871
c = 165000000 new = 0.02871 choose the smaller
rho new > rho min, use rho new
= (0.25(^ ))/
min = 0.00508 1.4/ 0.00439 0.00508 (governs)
rho actual > rho min, ok!
rho max> rho actual, ok!
Mu=
Mn = 168.811 Kn-m Mu=
Mn > Mu, ok (safe)
Design Moment:
Area of Steel:
Mu = = ^2 (10.59 /(^ Roots:
)) =((^24))/2
a^2+b+=0
a = 49672157654 1 = 0.13156
b = -7173558000 2 = 0.01285
c= 84000000 new = 0.01285 choose the smaller
rho new > rho min, use rho new
= (0.25(^ ))/
min = 0.00508 1.4/ 0.00439 0.00508 (governs)
rho actual > rho min, ok!
rho max > rho actual, ok!
Use smax
Design For Shear: Shear Diagram:
At Right Support:
= 8 mm
= 0.75 ACI CODE 2010
Factored Shear Force:
Vu= 123.10 KN
Smax = 170 mm
First Stirrup:
s1= 50 mm
Stirrups:
1 @ 0.05 m
23 @ 0.100 m
Rest @ 0.170 m
Smax = 170 mm
Theoritical Bar Cut-off Graph: Wight & macGregor "Reinforced Concrete",6th edition, pp.1102
Bar Cut-off (1/3 and 2/3 of bars that satisfy the ACI code)
Beam Details:
Beam Sections Stirrups
Lef Midspan Right Lef Right
8mm 8mm
1 @ 0.065 m 1 @ 0.075 m
15 @ 0.125 m 23 @ 0.150 m
Reinforcing Bars:
Top bars: 7 bars (20mm)
Bot. bars: 5 bars (20mm) Direct Counting Method
Stirrups: 10 bars (8mm)
Summary: 2 RB-2
Item Quantity Unit Cost Total
Concrete Cement 14 220 3080
Works Sand 2 600 1200
Gravel 2 600 1200
Total 5480
20mm x 6m DSB 24 605 14520
Rebar 8mm x 6m DSB 20 73 1460
Works #16 Tie Wire (Kls) 4 58 232
Total 16212
*Verify actual to minimize cost
Two-Story office Building Date Prepared:
A. Design of Beams Checked By:
Beam RB-3 - Roof Deck Framing Plan Rating:
Service Loads:
Dead loads: KN/m3 KN/m2 KN/m
Weight of beam (Wb) Wb =
24.00 ---- 1.80
Weight of Slab (Ws) 24.00 ---- 5.7 Ws =
Parapet (Normal weight concrete,Wp1) 21.20 ---- 1.91 Wp1 =( )
Parapet (Decorative Tile Finished, Wp2) ---- 0.77 0.77 Wp2= 1
Wu= 19.51 Wu = + Ws + Wp
Beam RB-3:
Wu
L = 3.80 m
Shear Diagram:
Moment Diagram:
Mu=8 KN-m
Design For Flexure:
= 0.851 (^ )/ (600/
b = 0.0421753 (600+))
Final:
b= 250 mm
d= 340 mm
h= 400 mm
Area of Steel:
Mu = = ^2 (10.59 /(^ Roots:
)) =((^24))/2
a^2+b+=0
a = 49672157654 1 = 0.13614
b = -7173558000 2 = 0.00828
c= 56000000 new = 0.00828 choose the smaller
rho new > rho min, use rho new
= (0.25(^ ))/
min = 0.00508 1.4/ 0.00439 0.00508 (governs)
rho actual > rho min, ok!
rho max> rho actual, ok!
Mu=
Mn = 63.441 Kn-m Mu=
Mn > Mu, ok (safe)
Design Moment:
Area of Steel:
Mu = = ^2 (10.59 /(^ Roots:
)) =((^24))/2
a^2+b+=0
a = 49672157654 1 = 0.14329
b = -7173558000 2 = 0.00112
c= 8000000 new = 0.00112 choose the smaller
rho new < rho min, use rho min
= (0.25(^ ))/
min = 0.00508 1.4/ 0.00439 0.00508 (governs)
rho actual > rho min, ok!
rho max > rho actual, ok!
First Stirrup:
s1= 85 mm
Stirrups:
1 @ 0.085 m
Rest @ 0.170 m
Moment Diagram:
Theoritical Bar Cut-off Graph: Wight & macGregor "Reinforced Concrete",6th edition, pp.1102
Bar Cut-off (1/3 and 2/3 of bars that satisfy the ACI code)
1 @ 0.085 m
Reinforcing Bars:
Top bars: 3 bars (16mm)
Bot. bars: 3 bars (16mm) Direct Counting Method
Stirrups: 4 bars (8mm)
Summary: 2 RB-3
Item Quantity Unit Cost Total
Concrete Cement 8 220 1760
Works Sand 2 600 1200
Gravel 2 600 1200
Total 4160
16 mm x 6m DSB 12 368 4416
Rebar 8 mm x 6m DSB 8 73 584
Works #16 Tie Wire (Kls) 2 58 116
Total 5116
*Verify actual to minimize cost
Vol.conc
Two-Story office Building Date Prepared:
A. Design of Beams Checked By:
Beam RB-3A - Roof Deck Framing Plan Rating:
Service Loads:
Dead loads: KN/m3 KN/m2 KN/m
Weight of beam (Wb) Wb =
24.00 ---- 1.80
Weight of Slab (Ws) 24.00 ---- 5.7 Ws = 1
Parapet (Normal weight concrete,Wp1) 21.20 ---- 1.91 Wp1 =( )
Parapet (Decorative Tile Finished, Wp2) ---- 0.77 0.77 Wp2= 1
Wu= 19.51 Wu = + Ws + Wp
Beam RB-3A:
Wu
L = 7.60 m
Shear Diagram:
= 0.851 (^ )/ (600/
b = 0.0421753 (600+))
Final:
b= 250 mm
d= 340 mm
h= 400 mm
Area of Steel:
Mu = = ^2 (10.59 /(^ Roots:
)) =((^24))/2
a^2+b+=0
a = 49672157654 1 = 0.13139
b = -7173558000 2 = 0.01302
c= 85000000 new = 0.01302 choose the smaller
rho new > rho min, use rho new
= (0.25(^ ))/
min = 0.00508 1.4/ 0.00439 0.00508 (governs)
rho actual > rho min, ok!
rho max> rho actual, ok!
Mu=
Mn = 91.836 Kn-m Mu=
Mn > Mu, ok (safe)
Design Moment:
Area of Steel:
Mu = = ^2 (10.59 /(^ Roots:
)) =((^24))/2
a^2+b+=0
a = 49672157654 1 = 0.13614
b = -7173558000 2 = 0.00828
c= 56000000 new = 0.00828 choose the smaller
rho new > rho min, use rho new
= (0.25(^ ))/
min = 0.00508 1.4/ 0.00439 0.00508 (governs)
rho actual > rho min, ok!
rho max > rho actual, ok!
Use smax
Design For Shear: Shear Diagram:
At Right & Lef Support:
= 8 mm
= 0.75 ACI CODE 2010
Factored Shear Force:
Vu= 74.10 KN
Smax = 170 mm
First Stirrup:
s1= 85 mm
Stirrups:
1 @ 0.085 m
Rest @ 0.170 m
Theoritical Bar Cut-off Graph: Wight & macGregor "Reinforced Concrete",6th edition, pp.1101
Bar Cut-off (1/3 and 2/3 of bars that satisfy the ACI code)
Beam Details:
Beam Sections Stirrups
Lef Midspan Right Lef Right
8mm 8mm
1 @ 0.085 m
Reinforcing Bars:
Top bars: 5 bars (16mm)
Bot. bars: 5 bars (16mm) Direct Counting Method
Stirrups: 8 bars (8mm)
Summary: 1 RB-3A
Item Quantity Unit Cost Total
Concrete Cement 7 220 1540
Works Sand 1 600 600
Gravel 1 600 600
Total 2740
16 mm x 6m DSB 10 368 3680
Rebar 8mm x 6m DSB 8 73 584
Works #16 Tie Wire (Kls) 2 58 116
Total 4380
*Verify actual to minimize cost
Two-Story office Building Date Prepared:
A. Design of Beams Checked By:
Beam RB-4 - Roof Deck Framing Plan Rating:
Service Loads:
Dead loads: KN/m3 KN/m2 KN/m
Weight of beam (Wb) Wb =
24.00 ---- 1.80
Weight of Slab (Ws) 24.00 ---- 5.7 Ws =
Parapet (Normal weight concrete,Wp1) 21.20 ---- 1.91 Wp1 =( )
Parapet (Decorative Tile Finished, Wp2) ---- 0.77 0.77 Wp2= 1
Beam RB-4:
Line of symmetry
Wu
L = 3.80 m L = 3.80 m
Shear Diagram:
Moment Diagram:
Design For Flexure:
= 0.851 (^ )/ (600/
b = 0.0421753 (600+))
Final:
b= 250 mm
d= 340 mm
h= 400 mm
Area of Steel:
Mu = = ^2 (10.59 /(^ Roots:
)) =((^24))/2
a^2+b+=0
a = 49672157654 1 = 0.14040
b = -7173558000 2 = 0.00401
c= 28000000 new = 0.00401 choose the smaller
rho new < rho min, use rho min
= (0.25(^ ))/
min = 0.00508 1.4/ 0.00439 0.00508 (governs)
rho actual > rho min, ok!
rho max> rho actual, ok!
Mu=
Mn = 48.412 Kn-m Mu=
Mn > Mu, ok (safe)
Design Moment:
Area of Steel:
Mu = = ^2 (10.59 /(^ Roots:
)) =((^24))/2
a^2+b+=0
a = 49672157654 1 = 0.14215
b = -7173558000 2 = 0.00227
c= 16000000 new = 0.00227 choose the smaller
rho new < rho min, use rho min
= (0.25(^ ))/
min = 0.00508 1.4/ 0.00439 0.00508 (governs)
rho actual > rho min, ok!
rho max > rho actual, ok!
First Stirrup:
s1= 85 mm
Stirrups:
1 @ 0.085 m
Rest @ 0.170 m
Moment Diagram:
Theoritical Bar Cut-off Graph: Wight & macGregor "Reinforced Concrete",6th edition, pp.1102
Bar Cut-off (1/3 and 2/3 of bars that satisfy the ACI code)
1 @ 0.085 m
Reinforcing Bars:
Top bars: 2 bars (16mm)
Bot. bars: 2 bars (16mm) Direct Counting Method
Stirrups: 4 bars (8mm)
Summary: 2 RB-4
Item Quantity Unit Cost Total
Concrete Cement 8 220 1760
Works Sand 2 600 1200
Gravel 2 600 1200
Total 4160
16 mm x 6m DSB 8 368 2944
Rebar 8mm x 6m DSB 8 73 584
Works #16 Tie Wire (Kls) 2 58 116
Total 3644
*Verify actual to minimize cost
Two-Story office Building Date Prepared:
A. Design of Beams Checked By:
Beam RB-5 - Roof Deck Framing Plan Rating:
Service Loads:
Dead loads: KN/m3 KN/m2 KN/m
Weight of beam (Wb) Wb =
24.00 ---- 1.80
Weight of Slab (Ws) 24.00 ---- 11.4 Ws = (1+2)
Beam RB-5:
Wu
L = 7.60 m
Shear Diagram:
Moment Diagram:
Design For Flexure:
= 0.851 (^ )/ (600/
b = 0.0421753 (600+))
Final:
b= 250 mm
d= 340 mm
h= 400 mm
Area of Steel:
Mu = = ^2 (10.59 /(^ Roots:
)) =((^24))/2
a^2+b+=0
a = 49672157654 1 = 0.12395
b = -7173558000 2 = 0.02046
c = 126000000 new = 0.02046 choose the smaller
rho new > rho min, use rho new
= (0.25(^ ))/
min = 0.00508 1.4/ 0.00439 0.00508 (governs)
rho actual > rho min, ok!
rho max> rho actual, ok!
Mu=
Mn = 134.726 Kn-m Mu=
Mn > Mu, ok (safe)
Design Moment:
Area of Steel:
Mu = = ^2 (10.59 /(^ Roots:
)) =((^24))/2
a^2+b+=0
a = 49672157654 1 = 0.12861
b = -7173558000 2 = 0.01581
c = 101000000 new = 0.01581 choose the smaller
rho new > rho min, use rho new
= (0.25(^ ))/
min = 0.00508 1.4/ 0.00439 0.00508 (governs)
rho actual > rho min, ok!
rho max > rho actual, ok!
Smax = 170 mm
First Stirrup:
s1= 57.5 mm
Stirrups:
1 @ 0.055 m
18 @ 0.115 m
Rest @ 0.170 m
Smax = 170 mm
Theoritical Bar Cut-off Graph: Wight & macGregor "Reinforced Concrete",6th edition, pp.1102
Bar Cut-off (1/3 and 2/3 of bars that satisfy the ACI code)
Beam Details:
Beam Sections Stirrups
Lef Midspan Right Lef Right
8mm 8mm
1 @ 0.055 m 1 @ 0.055 m
19 @ 0.110 m 18 @ 0.155 m
Reinforcing Bars:
Top bars: 5 bars (20mm)
Bot. bars: 6 bars (20mm) Direct Counting Method
Stirrups: 10 bars (8mm)
Summary: 1 RB-5
Item Quantity Unit Cost Total
Concrete Cement 7 220 1540
Works Sand 1 600 600
Gravel 1 600 600
Total 2740
20 mm x 6m DSB 11 605 6655
Rebar 8mm x 6m DSB 10 73 730
Works #16 Tie Wire (Kls) 2.5 58 145
Total 7530
*Verify actual to minimize cost
Two-Story office Building Date Prepared:
A. Design of Beams Checked By:
Beam RB-6 - Roof Deck Framing Plan Rating:
Service Loads:
Dead loads: KN/m3 KN/m2 KN/m
Weight of beam (Wb) Wb =
24.00 ---- 1.80
Weight of Slab (Ws) 24.00 ---- 11.4 Ws = (1+2)
Beam RB-6:
Wu
L = 3.80 m L = 3.80 m
Shear Diagram:
Moment Diagram:
Mu=25KN-m
Design For Flexure:
= 0.851 (^ )/ (600/
b = 0.0421753 (600+))
Final:
b= 250 mm
d= 340 mm
h= 400 mm
Area of Steel:
Mu = = ^2 (10.59 /(^ Roots:
)) =((^24))/2
a^2+b+=0
a = 49672157654 1 = 0.13785
b = -7173558000 2 = 0.00657
c= 45000000 new = 0.00657 choose the smaller
rho new > rho min, use rho new
= (0.25(^ ))/
min = 0.00508 1.4/ 0.00439 0.00508 (governs)
rho actual > rho min, ok!
rho max> rho actual, ok!
Mu=
Mn = 48.412 Kn-m Mu=
Mn > Mu, ok (safe)
Design Moment:
Area of Steel:
Mu = = ^2 (10.59 /(^ Roots:
)) =((^24))/2
a^2+b+=0
a = 49672157654 1 = 0.14084
b = -7173558000 2 = 0.00357
c= 25000000 new = 0.00357 choose the smaller
rho new < rho min, use rho min
= (0.25(^ ))/
min = 0.00508 1.4/ 0.00439 0.00508 (governs)
rho actual > rho min, ok!
rho max > rho actual, ok!
At Lef Support:
Ultimate Shear Moment (Vu)= 64.10 KN/m
Shear Strenght by Concrete (Vc) = 70.05 KN/m =0.17(^ ) bwd
Vc= 52.54 KN/m
Vu > 0.5Vc, Stirrups are needed!
Vu > Vc, calculate Shear Strenght of steel!
Design For Shear: Shear Diagram:
At Lef Support:
= 8 mm
= 0.75 ACI CODE 2010
Factored Shear Force:
Vu= 64.00 KN
Smax = 170 mm
First Stirrup:
s1= 85 mm
Stirrups:
1 @ 0.085 m
Rest @ 0.170 m
= 8 mm
= 0.75 ACI CODE 2010
Factored Shear Force:
Vu= 52.00 KN
First Stirrup:
s1= 85 mm
Stirrups:
1 @ 0.085 m
Rest @ 0.170 m
Bar cut-off and Development Length:
Moment Diagram:
Theoritical Bar Cut-off Graph: Wight & macGregor "Reinforced Concrete",6th edition, pp.1102
Bar Cut-off (1/3 and 2/3 of bars that satisfy the ACI code)
Beam Details:
Beam Sections Stirrups
Lef Midspan Right Lef Right
8mm 8mm
1 @ 0.085 m
Same
Rest @ 0.170 m
O.C.
Reinforcing Bars:
Top bars: 2 bars (16mm)
Bot. bars: 2 bars (16mm) Direct Counting Method
Stirrups: 4 bars (8mm)
Summary: 2 RB-6
Item Quantity Unit Cost Total
Concrete Cement 8 220 1760
Works Sand 2 600 1200
Gravel 2 600 1200
Total 4160
16 mm x 6m DSB 8 368 2944
Rebar 8 mm x 6m DSB 8 73 584
Works #16 Tie Wire (Kls) 2 58 116
Total 3644
*Verify actual to minimize cost
Two-Story office Building Date Prepared:
A. Design of Beams Checked By:
Beam B-1 - 2nd Floor Framing Plan Rating:
Service Loads:
Dead loads: KN/m3 KN/m2 KN/m
Weight of beam (Wb) Wb =
24.00 ---- 1.80
Weight of Slab (Ws1 + Ws2 ) Ws = (1+2)
24.00 ---- 7.20
Wall (Normal weight concrete, Ww1) Ww1 =( )
21.20 ---- 6.36
Wall (Foam/Plastered Finished, Ww2) ---- 0.48 0.024 Ww2= 1
Wu1 Wu1
Wu2
L = 7.60 m L = 7.60 m
Shear Diagram:
Moment Diagram
Mu = 15 KN-m
Design For Flexure:
= 0.851 (^ )/ (600/
b = 0.0421753
(600+))
Final:
b= 250 mm
d= 340 mm
h= 400 mm
Area of Steel:
Mu = = ^2 (10.59 /(^ Roots:
)) =((^24))/2
a^2+b+=0
a = 49672157654 1 = 0.14084
b = -7173558000 2 = 0.00357
c= 25000000 new = 0.00357 choose the smaller
rho new < rho min, use rho min
= (0.25(^ ))/
min = 0.00508 0.00439 0.00508 (governs)
1.4/
rho actual > rho min, ok!
rho max> rho actual, ok!
Mu=
Mn = 48.412 Kn-m Mu=
Mn > Mu, ok (safe)
Design Moment:
Area of Steel:
Mu = = ^2 (10.59 /(^ Roots:
)) =((^24))/2
a^2+b+=0
a = 49672157654 1 = 0.14230
b = -7173558000 2 = 0.00212
c= 15000000 new = 0.00212 choose the smaller
rho new < rho min, use rho min
= (0.25(^ ))/
min = 0.00508 1.4/ 0.00439 0.00508 (governs)
rho actual > rho min, ok!
rho max > rho actual, ok!
First Stirrup:
s1= 85 mm
Stirrups:
1 @ 0.085 m
Rest @ 0.170 m
Moment Diagram:
Theoritical Bar Cut-off Graph: Wight & macGregor "Reinforced Concrete",6th edition, pp.1102
Bar Cut-off (1/3 and 2/3 of bars that satisfy the ACI code)
Bar Spacing (s): clear spacing between parallel bars Use smax
s =(b-2(cover+stirrup)-nbars(row))/
(n-1)
s= 33 mm
s > 2db, use case 1 or 2 equation for ld
Factors (ACI CODE 2010):
t= 1
e= 1
s= 1
= 1
Developement Length:
ld= 0.44 m ld=12fyte/(25(fc)) db
12db= 0.19 m
d= 0.34 m
use: 0.44 m Choose whichever is greater
Actual Bar Cut-Off from support:
X1actual= 0.50 m, X1 - development length
X2actual= 0.80 m, X2 + development length
Beam Details:
Beam Sections Stirrups
Lef Midspan Right Lef Right
8mm 8mm
1 @ 0.085 m
SAME
Rest @ 0.170 m
O.C.
Section:
Reinforcing Bars:
Top bars: 2 bars (16mm)
Bot. bars: 2 bars (16mm) Direct Counting Method
Stirrups: 4 bars (8mm)
Summary: 4 B-1
Item Quantity Unit Cost Total
Concrete Cement 16 220 3520
Works Sand 4 600 2400
Gravel 4 600 2400
Total 8320
16mm x 6m DS 16 368 5888
Rebar 8mm x 6m DSB 16 73 1168
Works #16 Tie Wire (Kls 4 58 232
Total 7288
*Verify actual to minimize cost
Two-Story office Building Date Prepared:
A. Design of Beams Checked By:
Beam B-2 - 2nd Floor Framing Plan Rating:
Service Loads:
Dead loads: KN/m3 KN/m2 KN/m
Weight of beam (Wb) Wb =
24.00 ---- 1.80
Weight of Slab (Ws1 + Ws2) Ws = (1+2)
24.00 ---- 11.40
Wall (Normal weight concrete, Ww1) Ww1 =( )
21.20 ---- 6.36
Wall (Foam/Plastered Finished, Ww2) ---- 0.48 0.024 Ww2= 1
Beam B-2:
Line of symmetry
L = 7.60 m L = 7.60 m
Shear Diagram:
Moment Diagram
Design For Flexure:
= 0.851 (^ )/ (600/
b = 0.0421753
(600+))
Final:
b= 250 mm
d= 340 mm
h= 400 mm
Area of Steel:
Mu = = ^2 (10.59 /(^ Roots:
)) =((^24))/2
a^2+b+=0
a = 49672157654 1 = 0.12237
b = -7173558000 2 = 0.02204
c = 134000000 new = 0.02204 choose the smaller
rho new > rho min, use rho new
= (0.25(^ ))/
min = 0.00508 0.00439 0.00508 (governs)
1.4/
rho actual > rho min, ok!
rho max> rho actual, ok!
Mu=
Mn = 134.726 Kn-m Mu=
Mn > Mu, ok (safe)
Design Moment:
Area of Steel:
Mu = = ^2 (10.59 /(^ Roots:
)) =((^24))/2
a^2+b+=0
a = 49672157654 1 = 0.13340
b = -7173558000 2 = 0.01102
c= 73000000 new = 0.01102 choose the smaller
rho new > rho min, use rho new
= (0.25(^ ))/
min = 0.00508 1.4/ 0.00439 0.00508 (governs)
rho actual > rho min, ok!
rho max > rho actual, ok!
Use smax
Design For Shear: Shear Diagram:
At Lef Support:
= 8 mm
= 0.75 ACI CODE 2010
Factored Shear Force:
Vu= 107.40 KN
Smax = 170 mm
First Stirrup:
s1= 62.5 mm
Stirrups:
1 @ 0.065 m
16 @ 0.125 m
Rest @ 0.170 m
Smax = 170 mm
Theoritical Bar Cut-off Graph: Wight & macGregor "Reinforced Concrete",6th edition, pp.1102
Bar Cut-off (1/3 and 2/3 of bars that satisfy the ACI code)
Beam Details:
Lef Midspan Right Lef Right
8mm 8mm
1 @ 0.065 m 1 @ 0.075 m
16 @ 0.125 m 11 @ 0.150 m
Reinforcing Bars:
Top bars: 5 bars (20mm)
Bot. bars: 4 bars (20mm) Direct Counting Method
Stirrups: 9 bars (8mm)
Summary: 2 B-2
Item Quantity Unit Cost Total
Concrete Cement 14 220 3080
Works Sand 2 600 1200
Gravel 2 600 1200
Total 5480
20mm x 6m DS 18 605 10890
Rebar 8mm x 6m DSB 18 73 1314
Works #16 G.I Tie Wire 5 58 290
Total 12494
*Verify actual to minimize cost
Two-Story office Building Date Prepared:
A. Design of Beams Checked By:
Beam B-3 - 2nd Floor Framing Plan Rating:
Service Loads:
Dead loads: KN/m3 KN/m2 KN/m
Weight of beam (Wb) Wb =
24.00 ---- 1.80
Weight of Slab (Ws) Ws =
24.00 ---- 5.7
Wall (Normal weight concrete, Ww1) 21.20 ---- 6.36 Ww1 =( )
Wall (Foam/Plastered Finished, Ww2) ---- 0.48 0.024 Ww2= 1
Beam B-3:
Wu
L = 3.80 m
Shear Diagram:
Moment Diagram
Mu = 22 KN-m
Design For Flexure:
= 0.851 (^ )/ (600/
b = 0.0421753
(600+))
Final:
b= 250 mm
d= 340 mm
h= 400 mm
Area of Steel:
Mu = = ^2 (10.59 /(^ Roots:
)) =((^24))/2
a^2+b+=0
a = 49672157654 1 = 0.14084
b = -7173558000 2 = 0.00357
c= 25000000 new = 0.00357 choose the smaller
rho new < rho min, use rho min
= (0.25(^ ))/
min = 0.00508 0.00439 0.00508 (governs)
1.4/
rho actual > rho min, ok!
rho max> rho actual, ok!
Mu=
Mn = 48.412 Kn-m Mu=
Mn > Mu, ok (safe)
Design Moment:
Mu
Area=of=
Steel: ^2 (10.59 /(^ Roots:
)) =((^24))/2
a^2+b+=0
49672157654 1 = 0.14128
a = -7173558000 2 = 0.00313
b= 22000000 new = 0.00313 choose the smaller
c= rho new < rho min, use rho min
Check if Stirrups
Ultimate
are nee
Shear Moment (Vu)= 47.50 KN/m
Shear Strenght by Concrete (Vc) = 70.05 KN/m =0.17(^ ) bwd
Vc= 52.54 KN/m
Vu > 0.5Vc, Stirrups are needed!
Vu < Vc, Provide minimum shear reinforcement!
First Stirrup:
s1= 85 mm
Stirrups:
1 @ 0.085 m
Rest @ 0.170 m
Moment Diagram:
Theoritical Bar Cut-off Graph: Wight & macGregor "Reinforced Concrete",6th edition, pp.1102
Bar Cut-off (1/3 and 2/3 of bars that satisfy the ACI code)
Beam Details:
Beam Sections Stirrups
Lef Midspan Right Lef Right
8mm 8mm
1 @ 0.085 m
SAME
Rest @ 0.170 m
O.C.
Reinforcing Bars:
Top bars: 2 bars (16mm)
Bot. bars: 2 bars (16mm) Direct Counting Method
Stirrups: 4 bars (8mm)
Summary: 2 B-3
Item Quantity Unit Cost Total
Concrete Cement 8 220 1760
Works Sand 2 600 1200
Gravel 2 600 1200
Total 4160
16 mm x 6m D 8 368 2944
Rebar 8mm x 6m DSB 8 73 584
Works #16 G.I Tie Wire 2 58 116
Total 3644
Two-Story office Building Date Prepared:
A. Design of Beams Checked By:
Beam B-4 - 2nd Floor Framing Plan Rating:
Service Loads:
Dead loads: KN/m3 KN/m2 KN/m
Weight of beam (Wb) Wb =
24.00 ---- 1.80
Weight of Slab (Ws) Ws =
24.00 ---- 5.7
Wall (Normal weight concrete, Ww1) 21.20 ---- 6.36 Ww1 =( )
Wall (Foam/Plastered Finished, Ww2) ---- 0.48 0.024 Ww2= 1
Beam B-4:
Line of symmetry
Wu
L = 3.80 m L = 3.80 m
Shear Diagram:
= 0.851 (^ )/ (600/
b = 0.0421753
(600+))
Final:
b= 250 mm
d= 340 mm
h= 400 mm
Area of Steel:
Mu = = ^2 (10.59 /(^ Roots:
)) =((^24))/2
a^2+b+=0
a = 49672157654 1 = 0.13981
b = -7173558000 2 = 0.00461
c= 32000000 new = 0.00461 choose the smaller
rho new < rho min, use rho min
= (0.25(^ ))/
min = 0.00508 0.00439 0.00508 (governs)
1.4/
rho actual > rho min, ok!
rho max> rho actual, ok!
Mu=
Mn = 48.412 Kn-m Mu=
Mn > Mu, ok (safe)
Design Moment:
Area of Steel:
Mu = = ^2 (10.59 /(^ Roots:
)) =((^24))/2
a^2+b+=0
a = 49672157654 1 = 0.14201
b = -7173558000 2 = 0.00241
c= 17000000 new = 0.00241 choose the smaller
rho new < rho min, use rho min
= (0.25(^ ))/
min = 0.00508 1.4/ 0.00439 0.00508 (governs)
rho actual > rho min, ok!
rho max > rho actual, ok!
First Stirrup:
s1= 85 mm
Stirrups:
1 @ 0.085 m
Rest @ 0.170 m
Moment Diagram:
Theoritical Bar Cut-off Graph: Wight & macGregor "Reinforced Concrete",6th edition, pp.1102
Bar Cut-off (1/3 and 2/3 of bars that satisfy the ACI code)
Bar Spacing (s): clear spacing between parallel bars Use smax
s =(b-2(cover+stirrup)-nbars(row))/
(n-1)
s= 33 mm
s > 2db, use case 1 or 2 equation for ld
Factors (ACI CODE 2010):
t= 1
e= 1
s= 1
= 1
Developement Length:
ld= 0.44 m ld=12fyte/(25(fc)) db
12db= 0.19 m
d= 0.34 m
use: 0.44 m Choose whichever is greater
Actual Bar Cut-Off from support:
X1actual= 0.50 m, X1 - development length
X2actual= 0.80 m, X2 + development length
Beam Details:
Beam Sections Stirrups
Lef Midspan Right Lef Right
8mm 8mm
1 @ 0.085 m
SAME
Rest @ 0.170 m
O.C.
Section:
Use smax
Reinforcing Bars:
Top bars: 2 bars (16mm)
Bot. bars: 2 bars (16mm) Direct Counting Method
Stirrups: 4 bars (8mm)
Summary: 2 B-4
Item Quantity Unit Cost Total
Concrete Cement 8 220 1760
Works Sand 2 600 1200
Gravel 2 600 1200
Total 4160
16 mm x 6m D 8 368 2944
Rebar 8mm x 6m DSB 8 73 584
Works #16 G.I Tie Wire 2 58 116
Total 3644
Two-Story office Building Date Prepared:
A. Design of Beams Checked By:
Beam B-5 - 2nd Floor Framing Plan Rating:
Service Loads:
Dead loads: KN/m3 KN/m2 KN/m
Weight of beam (Wb) Wb =
24.00 ---- 1.80
Weight of Slab (Ws1 + Ws2) Ws = (1 + l2)
24.00 ---- 8.25
Beam B-5:
Wu1
Wu2
L = 7.60 m
Shear Diagram:
Moment Diagram:
Design For Flexure:
= 0.851 (^ )/ (600/
b = 0.0421753
(600+))
Final:
b= 250 mm
d= 340 mm
h= 400 mm
Area of Steel:
Mu = = ^2 (10.59 /(^ Roots:
)) =((^24))/2
a^2+b+=0
a = 49672157654 1 = 0.12698
b = -7173558000 2 = 0.01744
c = 110000000 new = 0.01744 choose the smaller
rho new > rho min, use rho new
= (0.25(^ ))/
min = 0.00508 0.00439 0.00508 (governs)
1.4/
rho actual > rho min, ok!
rho max> rho actual, ok!
Mu=
Mn = 115.655 Kn-m Mu=
Mn > Mu, ok (safe)
Design Moment:
Area of Steel:
Mu = = ^2 (10.59 /(^ Roots:
)) =((^24))/2
a^2+b+=0
a = 49672157654 1 = 0.13876
b = -7173558000 2 = 0.00566
c= 39000000 new = 0.00566 choose the smaller
rho new > rho min, use rho new
= (0.25(^ ))/
min = 0.00508 1.4/ 0.00439 0.00508 (governs)
rho actual > rho min, ok!
rho max > rho actual, ok!
At Lef Support:
Ultimate Shear Moment (Vu)= 69.30 KN/m
Shear Strenght by Concrete (Vc) = 70.05 KN/m =0.17(^ ) bwd
Vc= 52.54 KN/m
Vu > 0.5Vc, Stirrups are needed!
Vu > Vc, calculate Shear Strenght of steel!
Use smax
Design For Shear: Shear Diagram:
At Lef Support:
= 8 mm
= 0.75 ACI CODE 2010
Factored Shear Force:
Vu= 69.30 KN
Smax = 170 mm
First Stirrup:
s1= 85 mm
Stirrups:
1 @ 0.085 m
Rest @ @ 0.170 m
= 8 mm
= 0.75 ACI CODE 2010
Factored Shear Force:
Vu= 46.50 KN
First Stirrup:
s1= 85 mm
Stirrups:
1 @ 0.085 m
Rest @ 0.170 m
Vol.conc.
Bar cut-off and Development Length:
Moment Diagram:
Theoritical Bar Cut-off Graph: Wight & macGregor "Reinforced Concrete",6th edition, pp.1102
Bar Cut-off (1/3 and 2/3 of bars that satisfy the ACI code)
Beam Details:
Lef Midspan Right Lef Right
8mm 8mm
1 @ 0.085 m
SAME
Rest @ 0.170 m
O.C.
Reinforcing Bars:
Top bars: 6 bars (20mm)
Bot. bars: 3 bars (20mm) Direct Counting Method
Stirrups: 8 bars (8mm)
Summary: 1 B-5
Item Quantity Unit Cost Total
Concrete Cement 7 220 1540
Works Sand 1 600 600
Gravel 1 600 600
Total 2740
20 mm x 6m D 9 605 5445
Rebar 8mm x 6m DSB 8 73 584
Works #16 G.I Tie Wire 2 58 116
Total 6145
*Verify actual to minimize cost
Two-Story office Building Date Prepared:
A. Design of Beams Checked By:
Beam B-6 - 2nd Floor Framing Plan Rating:
Service Loads:
Dead loads: KN/m3 KN/m2 KN/m
Weight of beam (Wb) Wb =
24.00 ---- 1.80
Weight of Slab (Ws1 + Ws2 ) 24.00 ---- 11.40 Ws = (1+2)
Wall (Normal weight concrete, Ww1) 21.20 ---- 6.36 Ww1 =( )
Wall (Foam/Plastered Finished, Ww2) ---- 0.48 0.024 Ww2= 1
Beam B-6:
Wu
L = 3.80 m
Shear Diagram:
Moment Diagram:
Mu = 19 KN-m
Design For Flexure:
= 0.851 (^ )/ (600/
b = 0.0421753
(600+))
Final:
b= 250 mm
d= 340 mm
h= 400 mm
Area of Steel:
Mu = = ^2 (10.59 /(^ Roots:
)) =((^24))/2
a^2+b+=0
a = 49672157654 1 = 0.14099
b = -7173558000 2 = 0.00343
c= 24000000 new = 0.00343 choose the smaller
rho new < rho min, use rho min
= (0.25(^ ))/
min = 0.00508 0.00439 0.00508 (governs)
1.4/
rho actual > rho min, ok!
rho max> rho actual, ok!
Mu=
Mn = 48.412 Kn-m Mu=
Mn > Mu, ok (safe)
Design Moment:
Area of Steel:
Mu = = ^2 (10.59 /(^ Roots:
)) =((^24))/2
a^2+b+=0
a = 49672157654 1 = 0.14172
b = -7173558000 2 = 0.00270
c= 19000000 new = 0.00270 choose the smaller
rho new < rho min, use rho min
= (0.25(^ ))/
min = 0.00508 1.4/ 0.00439 0.00508 (governs)
rho actual > rho min, ok!
rho max > rho actual, ok!
First Stirrup:
s1= 85 mm
Stirrups:
1 @ 0.085 m
Rest @ 0.170 m
Moment Diagram:
Theoritical Bar Cut-off Graph: Wight & macGregor "Reinforced Concrete",6th edition, pp.1102
Bar Cut-off (1/3 and 2/3 of bars that satisfy the ACI code)
Beam Details:
Beam Sections Stirrups
Lef Midspan Right Lef Right
8mm 8mm
1 @ 0.085 m
SAME
Rest @ 0.170 m
O.C.
Reinforcing Bars:
Top bars: 2 bars (16mm)
Bot. bars: 2 bars (16mm) Direct Counting Method
Stirrups: 4 bars (8mm)
Summary: 1 B-6
Item Quantity Unit Cost Total
Concrete Cement 4 220 880
Works Sand 1 600 600
Gravel 1 600 600
Total 2080
16 mm x 6m D 4 368 1472
Rebar 8mm x 6m DSB 4 73 292
Works #16 G.I Tie Wire 1 58 58
Total 1822
Two-Story office Building Date Prepared:
A. Design of Beams Checked By:
Beam B-7- 2nd Floor Framing Plan Rating:
Service Loads:
Dead loads: KN/m3 KN/m2 KN/m
Weight of beam (Wb) Wb =
24.00 ---- 1.80
Weight of Slab (Ws) Ws =
24.00 ---- 3.75
Railings (3" ) 77.30 ---- 5.22 Wr =( )
Wu= 20.52 Wu =+ + Wr
Beam B-7:
Wu
L = 7.60 m
Shear Diagram:
Moment Diagram:
Design For Flexure:
= 0.851 (^ )/ (600/
b = 0.0421753
(600+))
Final:
b= 250 mm
d= 340 mm
h= 400 mm
Area of Steel:
Mu = = ^2 (10.59 /(^ Roots:
)) =((^24))/2
a^2+b+=0
a = 49672157654 1 = 0.11948
b = -7173558000 2 = 0.02494
c = 148000000 new = 0.02494 choose the smaller
rho new > rho min, use rho new
= (0.25(^ ))/
min = 0.00508 0.00439 0.00508 (governs)
1.4/
rho actual > rho min, ok!
rho max> rho actual, ok!
Mu=
Mn = 168.811 Kn-m Mu=
Mn > Mu, ok (safe)
Design Moment:
Area of Steel:
Mu = = ^2 (10.59 /(^ Roots:
)) =((^24))/2
a^2+b+=0
a = 49672157654 1 = 0.12902
b = -7173558000 2 = 0.01540
c = 98666666.67 new = 0.01540 choose the smaller
rho new > rho min, use rho new
= (0.25(^ ))/
min = 0.00508 1.4/ 0.00439 0.00508 (governs)
rho actual > rho min, ok!
rho max > rho actual, ok!
Use smax
Design For Shear: Shear Diagram:
At Right & Lef Support:
= 8 mm
= 0.75 ACI CODE 2010
Factored Shear Force:
Vu= 78.00 KN
Smax = 170 mm
First Stirrup:
s1= 85 mm
Stirrups:
1 @ 0.085 m
Rest @ 0.170 m
x1
x2
x3
Bar Cut-off (1/3 and 2/3 of bars that satisfy the ACI code)
Factored Moment:
Mu1= Mu=Mn = Asfy(d-a/2)
65.9 KN-m
Parabolic Equation:
xu= 3.80 m
Factored Moment:
Mu2= Mu=Mn = Asfy(d-a/2)
122.2 KN-m
Parabolic Equation:
xu= 3.80 m
x2= 2.59 m
Mu2/xu=Mu22/x2
Beam Details:
Beam Sections Stirrups
Lef Midspan Right Lef Right
8mm 8mm
1 @ 0.085 m
SAME
Rest @ 0.170 m
O.C.
Reinforcing Bars:
Top bars: 4 bars (20mm)
Bot. bars: 10 bars (20mm) Direct Counting Method
Stirrups: 9 bars (8mm)
Summary: 1 B-7
Item Quantity Unit Cost Total
Concrete Cement 7 220 1540
Works Sand 1 600 600
Gravel 1 600 600
Total 2740
20 mm x 6m D 14 605 8470
Rebar 8mm x 6m DSB 9 73 657
Works #16 G.I Tie Wire 2 58 116
Total 9243
*Verify actual to minimize cost
Two-Story office Building Date Prepared: Two-Story office
A. Design of Beams Checked By: A. Design of Bea
Beam B-8 - 2nd Floor Framing Plan Rating: Beam EB-1 - 2nd
L = 2.30 m
= 0.851 (^ )/ (600/
b = 0.0421753 b =
(600+))
Final: Final:
b= 250 mm b=
d= 340 mm d=
h= 400 mm h=
= (0.25(^ ))/
min = 0.00508 0.00439 0.00508 (governs) min =
1.4/
rho actual > rho min, ok!
rho max> rho actual, ok!
Depth of Rectangular Stress Block (a): Check if Tension Steel Yields: Depth of Rectan
Mu=
Mn = 48.412 Kn-m Mu= Mn =
Mn > Mu, ok (safe)
a = 49672157654 1 = 0.14344 a=
b = -7173558000 2 = 0.00098 b=
c= 7000000 new = 0.00098 choose the smaller c=
rho new < rho min, use rho min
= (0.25(^ ))/
min = 0.00508 1.4/ 0.00439 0.00508 (governs) min =
rho actual < rho min, It's ok since it must be provided at least two longitudinal bars at all locations
rho max > rho actual, ok!
First Stirrup:
s1= 85 mm
Stirrups:
1 @ 0.085 m
Rest @ 0.170 m
ax^2+bx+c=0 Vu/xu=Vc/(xu
x=(-b(b^2-4ac))/2a
a= 8.0724 (-)x= 2.01257 m Point where Stir
b= -18.6 (+)x= 0.29158 m By ratio and pro
c= 16.7 x' = 0.29158 m, use smaller x (bar cut-off)
Vu/xu=(0.5Vc
Bar Spacing (s): clear spacing between parallel bars
s =(b-2(cover+stirrup)-nbars(row))/ Design For Shea
(n-1) Vs
s= 33 mm 14.88
s > 2db, use case 1 or 2 equation for ld
Factors (ACI CODE 2010): Maximum Spaci
t= 1 a.) smax1=
e= 1 b.)smax2=
s= 1 c.)smax3=
= 1
Developement Length: Use smax=
ld= 0.44 m ld=12fyte/(25(fc)) db
12db= 0.19 m Check for maxim
d= 0.34 m Vs
use: 0.44 m Choose whichever is greater Vs
Actual Bar Cut-Off from support: 14.88
X1actual= 0.42 m, ln/2 -(X' + development length) smax will n
Smax =
Actual Spacing (
s=
First Stirrup:
s1=
Stirrups:
1
Rest
1 @ 0.085 m
SAME
Rest @ 0.170 m
O.C.
Depth of Rectan
a=
Factored Mome
Mu1=
Parabolic Equati
Mu2/xu=Mu12/x
Beam Details:
Lef
*Closed Stirrups we
*Safe & Aesthetic d
Sections:
Reinforcing Bars
Top bars:
Bot. bars:
Stirrups:
Summary:
Concrete
Works
Rebar
Works
L = 7.60 m
Shear Diagram:
Shear Diagram:
= 0.851 (^ )/ (600/
0.0421753 b =
(600+))
Final:
250 mm b=
340 mm d=
400 mm h=
= (0.25(^ ))/
0.00508 0.00439 0.00508 (governs) min =
1.4/
rho actual > rho min, ok!
rho max> rho actual, ok!
Depth of Rectangular Stress Block (a): Check if Tension Steel Yields: Depth of Rectangular
Mu=
134.726 Kn-m Mu= Mn =
Mn > Mu, ok (safe)
49672157654 1 = 0.13134 a=
-7173558000 2 = 0.01308 b=
85333333.33 new = 0.01308 choose the smaller c=
rho new > rho min, use rho new
= (0.25(^ ))/
0.00508 1.4/ 0.00439 0.00508 (governs) min =
rho actual > rho min, ok!
rho max > rho actual, ok!
170 mm Smax =
x1
x2
x3
Bar Cut-off (1/3 and 2/3 of bars that satisfy the ACI code) Bar Cut-off (1/3 and 2
1 @ 0.085 m
SAME
Rest @ 0.170 m
O.C.
*Closed Stirrups were used for the ease of construction* *Closed Stirrups were used
*Safe & Aesthetic design acquires if beams are uniformly tied (Structral Integrity) *Safe & Aesthetic design a
Sections:
1 EB-1 Summary:
Item Quantity Unit Cost Total
Cement 7 220 1540 Concrete
Sand 1 600 600 Works
Gravel 1 600 600
Total 2740
20 mm x 6m D 10 605 6050
8mm x 6m DSB 10 73 730 Rebar
#16 G.I Tie Wire 2 58 116 Works
Total 6896
*Verify actual to minimize cost *Verify actual to minimize cost
Two-Story office Building Date Prepared:
A. Design of Beams Checked By:
Beam CB-5 - 2nd Floor Framing Plan Rating:
Service Loads:
Dead loads: KN/m3 KN/m2 KN/m
Weight of beam (Wb) Wb =
24.00 ---- 1.80
Wr =( )
Railings (3" ) 77.30 ---- 5.22
Beam CB-5:
Wu
L = 1.00 m
Shear Diagram:
Moment Diagram:
Design For Flexure:
= 0.851 (^ )/ (600/
0.0421753 (600+))
250 mm
340 mm
400 mm
Area of Steel:
Mu = = ^2 (10.59 /(^ Roots:
)) =((^24))/2
a^2+b+=0
49672157654 1 = 0.13357
-7173558000 2 = 0.01085
72000000 new = 0.01085 choose the smaller
rho new > rho min, use rho new
= (0.25(^ ))/
0.00508 0.00439 0.00508 (governs)
1.4/
rho actual > rho min, ok!
rho max> rho actual, ok!
Mu=
73.452 Kn-m Mu=
Mn > Mu, ok (safe)
Design Moment:
Area of Steel:
Mu = = ^2 (10.59 /(^ Roots:
)) =((^24))/2
a^2+b+=0
49672157654 1 = 0.13738
-7173558000 2 = 0.00703
48000000 new = 0.00703 choose the smaller
rho new > rho min, use rho new
= (0.25(^ ))/
0.00508 1.4/ 0.00439 0.00508 (governs)
rho actual > rho min, ok!
rho max > rho actual, ok!
170 mm
170 mm
First Stirrup:
85 mm
@ 0.085 m
@ 0.170 m
Moment Diagram:
72 KN-m
x1
Bar Cut-off (1/3 and 2/3 of bars that satisfy the ACI code)
Factored Moment:
Mu=Mn = Asfy(d-a/2)
25.8 KN-m
Parabolic Equation:
xu= 1.00 m
x1= 0.13 m
Mu2/xu=Mu12/x1
1 @ 0.085 m
SAME
Rest @ 0.170 m
O.C.
Reinforcing Bars:
1 bars (20mm)
1 bars (20mm) Direct Counting Method
1 bars (8mm)
1 CB-5
Item Quantity Unit Cost Total
Cement 1 220 220
Sand 1 600 600
Gravel 1 600 600
Total 1420
20 mm x 6m D 2 605 1210
8mm x 6m DSB 2 73 146
#16 G.I Tie Wire 0.5 58 29
Total 1385
*Verify actual to minimize cost
Two-Story office Building Date Prepared:
A. Design of Beams Checked By:
Beam - Roof Deck Framing Plan Rating:
Section Property:
b= 250 mm
h= 400 mm
d= 340 mm
d'= 60 mm
Service Loads:
Dead loads: KN/m3 KN/m2 KN/m
Weight of beam 24.00 ---- 0.58 Wb =
Weight of Slab 24.00 ---- Ws =(thickness x l/2)
Wall (Normal weight concrete) ---- 21.20 Ww =(thickness x hwall)
Wall (Foam/Plastered Finished) ---- 0.48 Wmat'l =unit load(w x h)wall
Section:
Design For Flexure:
Design Moment:
(+)Mu= 165.00 KN-m Positive Moment
Steel ratio:
b = 0.0421753
b = 0.851 (f^ c)/fy (600/
max = 0.03163 (600+fy))
Area of Steel: max =0.75b
As= 2688.67 mm2
Depth of Rectangular Stress Block (a): As=maxbd
a = 148.4928 mm a = (As fy)/
(0.85f^ c b)
Maximum Nominal Moment (Mn):
Mn= 197.07 KN-m
Mn= 177.36 KN-m Mn=Asfy(d-a/2)
Mu < Mn, Compression Steel is not needed
Excess Moment:
M2= Mn As2 = As
M1= -13.73 KN-m
Area of Steel @ Compression bars: M1=Mu/-M2
A's= -177.83 mm2
Total Steel Area: A^ s=M1/(fy(d-d^))
As1=A's As2 = As
AsT= 2510.85 mm2
Check if compression steel yields: AsT=As1+As2
'= -0.0021
= As/bd
actual = 0.0295
= As bd
cy= 0.0054 atual T/
Assume Section:
b= 325 mm
h= 325 mm
d= 265 mm
d'= 60 mm
Cross Section:
h= 0.325 m
b= 0.325 m
Square Column
Design of Columns: Ground - 2nd Floor
Cross Section:
b = h = Ag
b'= 147.49 mm
h'= 147.49 mm
b' & h' < b & h, safe!
Final:
b= 400 mm
h= 400 mm
d= 340 mm
Area of Steel:
Agnew= 160000 mm2 Ag=
A =((0.85^
Ast1 = -11472.25 mm2 st (0.85^ ))
))/(
Steel ratio:
min = 0.010 ACI CODE 2010 (410.10.1)
max = 0.080
actual = 0.010
min < actual,ok!
actual = Ast/bh
actual <max, ok!
Cross Section:
b = h = Ag
b'= 147.49 mm
h'= 147.49 mm
b' & h' < b & h, safe!
Final:
b= 325 mm
h= 325 mm
d= 265 mm
Area of Steel:
Ag= 105625 mm2 Ag=
A =((0.85^
Ast1 = -12492.92 mm2 st (0.85^ ))
))/(
Ast2 = Ast= x Ag
2112.50 mm2
Steel ratio:
min = 0.010 ACI CODE 2010 (410.10.1)
max = 0.080
actual = 0.008
revise column cross
actualsection!
= Ast/bh
actual <max, ok!
2nd Floor - C1
Roof Deck 0.325
4 - 20 mm
0.325 2 8mm
2
Ground Flr - C1
2nd Floor 0.325
4 - 20 mm
Investigation: C1
= 16 mm
Nc= 3 bars (compression) A's= 603.19 mm2 y = 0.0014
Nt= 3 bars (Tension) As= 603.19 mm2 cb= 233 mm
Interaction Diagram:
c fs Final fs f's Final f's a Cc Pn Mn e Mn Pn Pn
50 3480 275.8 -120.0 -120.0 42.5 339.6 100.8 73.9 732.4 66.5 90.8 72.6
100 1440 275.8 240.0 240.0 85.0 679.2 657.6 150.5 228.9 135.5 591.8 473.4
233 276 275.8 445.4 275.8 198.0 1581.9 1581.9 206.4 130.4 185.7 1423.7 1139.0
250 216 216.0 456.0 275.8 212.5 1697.9 1733.9 200.7 115.8 180.6 1560.6 1248.4
300 80 80.0 480.0 275.8 255.0 2037.5 2155.6 177.8 82.5 160.0 1940.0 1552.0
350 -17 -17.1 497.1 275.8 297.5 2377.0 2553.7 143.7 56.3 129.3 2298.4 1838.7
400 -90 -90.0 510.0 275.8 340.0 2716.6 2937.2 97.2 33.1 87.5 2643.5 2114.8
488 -182 -182.0 526.2 275.8 414.8 3314.3 3590.4 -16.6 -4.6 -14.9 3231.3 2585.1
Checking:
Mu = 106 KN-m (max. moment @ ground floor)
Mn = 186 KN-m (max. moment from Interaction Diagram)
Mn>= Mu,Safe!
Interaction Diagram
4000.0
Pn vs. Mn
3500.0 Column T
3000.0
2500.0
2000.0
1500.0
1000.0
500.0
0.0
-50.0 0.0 50.0 100.0 150.0 200.0 250.0
C1
Mark Type X-direction
Y-direction Total Unit
Pu 177 58 235 KN
2nd - Roo
Mu KN-m
Pu 235 KN
und -2nd
Mu KN-m
C2
Mark Type X-direction
Y-direction Total Unit
Pu 117 124 241 KN
2nd - Roo
Mu 126 30 KN-m
Pu 263 167 430 KN
und -2nd
Mu 7 13 KN-m
C3
Mark Type X-direction
Y-direction Total Unit
Pu 128 73 201 KN
2nd - Roo
Mu 12 0 KN-m
Pu 173 139 312 KN
und -2nd
Mu 3 0 KN-m
Investigation: C1
= 16 mm
Nc= 2 bars (compression) A's= 402.12 mm2 y = 0.0014
Nt= 2 bars (Tension) As= 402.12 mm2 cb= 182 mm
Interaction Diagram:
c fs Final fs f's Final f's a Cc Pn Mn e Mn Pn Pn
50 3480 275.8 -120.0 -120.0 42.5 339.6 180.4 54.4 301.5 48.9 162.4 129.9
100 1440 275.8 240.0 240.0 85.0 679.2 664.8 102.8 154.6 92.5 598.3 478.6
182 524 275.8 401.7 275.8 154.3 1233.0 1233.0 128.0 103.8 115.2 1109.7 887.7
200 420 275.8 420.0 275.8 170.0 1358.3 1358.3 128.0 94.2 115.2 1222.5 978.0
250 216 216.0 456.0 275.8 212.5 1697.9 1721.9 115.8 67.2 104.2 1549.7 1239.8
300 80 80.0 480.0 275.8 255.0 2037.5 2116.2 86.0 40.6 77.4 1904.6 1523.7
350 -17 -17.1 497.1 275.8 297.5 2377.0 2494.8 43.3 17.4 39.0 2245.3 1796.3
388 -74 -74.2 507.2 275.8 329.8 2635.1 2775.9 2.0 0.7 1.8 2498.3 1998.6
Checking:
Mu = 32 KN-m (max. moment @ ground floor)
Mn = 115 KN-m (max. moment from Interaction Diagram)
Mn>= Mu,Safe!
Interaction Diagram
3500.0
Pn vs. Mn
3000.0 Column T
2500.0
2000.0
1500.0
1000.0
500.0
0.0
-50.0 0.0 50.0 100.0 150.0 200.0
Two-Story office Building Date Prepared:
A. Design of Columns Checked By:
Column - C1 Rating:
Assume Section:
b= 400 mm
h= 400 mm
d= 340 mm
d'= 60 mm
Cross Section:
h= 0.400 m
b= 0.400 m
Square Column
Design of Columns: Ground - 2nd Floor
Cross Section:
b = h = Ag
b'= 147.49 mm
h'= 147.49 mm
b' & h' < b & h, safe!
Final:
b= 400 mm
h= 400 mm
d= 340 mm
Area of Steel:
Agnew= 160000 mm2 Ag=
A =((0.85^
Ast1 = -11472.25 mm2 st (0.85^ ))
))/(
Steel ratio:
min = 0.010 ACI CODE 2010 (410.10.1)
max = 0.080
= /
actual = 0.012
Cross Section:
b = h = Ag
b'= 147.49 mm
h'= 147.49 mm
b' & h' < b & h, safe!
Final:
b= 400 mm
h= 400 mm
d= 340 mm
Area of Steel:
Ag= 160000 mm2 Ag=
A =((0.85^
Ast1 = -12492.92 mm2 st (0.85^ ))
))/(
Ast2 = Ast= x Ag
3200.00 mm2
Steel ratio:
min = 0.010 ACI CODE 2010 (410.10.1)
max = 0.080
= /
actual = 0.012
6 - 20 mm
0.400 3 8mm
2
0.300 m
Ground Flr - C1 On Center
2nd Floor 0.400
6 - 20 mm
Section:
Estimate for Column:
Total Volume of Concrete: Class A Mixture Factor
Vol.conc.= 1.264 m2 Vol =L x W x H Cement (40kg) 9.00
sand 0.50
Use Class A Mixture (1:2:4) Gravel 1.00
No. of Bags of Cement:
No.bags= 11.376 bags No. bags =Volume x Factor
say: 12
Volume of Sand:
Vsand= 0.632 m3 Vol=Vsand x Factor
say: 1
Volume of Gravel:
Vgravel= 1.264 m3 Vol=Vgravel x Factor
say: 2
Reinforcing Bars:
Rebars: 8 bars (20mm)
Stirrups: 8 bars (8mm) Direct Counting Method
Summary: 6 C1
Item Quantity Unit Cost Total
Concrete Cement 72 220 15840
Works Sand 6 600 3600
Gravel 12 600 7200
Total 26640
20mm x 6m DSB 48 141 6768
Rebar 8mm x 6m DSB 48 73 3504
Works #16 Tie Wire (Kls) 9 58 522
Total 10794
*Verify actual to minimize cost
Investigation: C1 (Ground -2nd)
= 20 mm
Nc= 3 bars (compression) A's= 942.48 mm2 y = 0.0014
Nt= 3 bars (Tension) As= 942.48 mm2 cb= 233 mm
Interaction Diagram:
c fs Final fs f's Final f's a Cc Pn Mn e Mn Pn Pn
50 3480 275.8 -120.0 -120.0 42.5 339.6 -33.5 81.3 -2428.6 73.1 -30.1 -24.1
100 1440 275.8 240.0 240.0 85.0 679.2 645.4 175.0 271.2 157.5 580.9 464.7
233 276 275.8 445.4 275.8 198.0 1581.9 1581.9 232.6 147.0 209.3 1423.7 1139.0
250 216 216.0 456.0 275.8 212.5 1697.9 1754.2 224.1 127.7 201.7 1578.8 1263.0
300 80 80.0 480.0 275.8 255.0 2037.5 2222.0 194.7 87.6 175.2 1999.8 1599.8
350 -17 -17.1 497.1 275.8 297.5 2377.0 2653.1 156.0 58.8 140.4 2387.8 1910.2
400 -90 -90.0 510.0 275.8 340.0 2716.6 3061.4 106.0 34.6 95.4 2755.2 2204.2
488 -182 -182.0 526.2 275.8 414.8 3314.3 3745.7 -12.1 -3.2 -10.9 3371.1 2696.9
Checking:
Mu = 7 KN-m (max. moment @ ground floor)
Mn = 209 KN-m (max. moment from Interaction Diagram)
Mn>= Mu,Safe!
Interaction Diagram
4000.0
Pn vs. Mn
3500.0 Column T
3000.0
2500.0
2000.0
1500.0
1000.0
500.0
0.0
-50.0 0.0 50.0 100.0 150.0 200.0 250.0
-500.0
C1
Mark TypeX-direction
Y-direction Total Unit
Pu 80 108 188 KN
2nd - Ro
Mu 16 106 KN-m 106
Pu 177 216 235 KN
nd -2nd
Mu 7 32 KN-m 32
C2
Mark TypeX-direction
Y-direction Total Unit
Pu 117 124 241 KN
2nd - Ro
Mu 126 30 KN-m 126
Pu 263 167 430 KN
nd -2nd
Mu 7 13 KN-m
C3
Mark TypeX-direction
Y-direction Total Unit
Pu 128 73 201 KN
2nd - Ro
Mu 12 0 KN-m 12
Pu 173 139 312 KN
nd -2nd
Mu 3 0 KN-m 3
Investigation: C1 ( 2nd Floor - Roof Deck)
= 20 mm
Nc= 3 bars (compression) A's= 942.48 mm2 y = 0.0014
Nt= 3 bars (Tension) As= 942.48 mm2 cb= 233 mm
Interaction Diagram:
c fs Final fs f's Final f's a Cc Pn Mn e Mn Pn Pn
50 3480 275.8 -120.0 -120.0 42.5 339.6 -33.5 81.3 -2428.6 73.1 -30.1 -24.1
100 1440 275.8 240.0 240.0 85.0 679.2 645.4 175.0 271.2 157.5 580.9 464.7
233 276 275.8 445.4 275.8 198.0 1581.9 1581.9 232.6 147.0 209.3 1423.7 1139.0
250 216 216.0 456.0 275.8 212.5 1697.9 1754.2 224.1 127.7 201.7 1578.8 1263.0
300 80 80.0 480.0 275.8 255.0 2037.5 2222.0 194.7 87.6 175.2 1999.8 1599.8
350 -17 -17.1 497.1 275.8 297.5 2377.0 2653.1 156.0 58.8 140.4 2387.8 1910.2
400 -90 -90.0 510.0 275.8 340.0 2716.6 3061.4 106.0 34.6 95.4 2755.2 2204.2
488 -182 -182.0 526.2 275.8 414.8 3314.3 3745.7 -12.1 -3.2 -10.9 3371.1 2696.9
Checking:
Mu = 106 KN-m (max. moment @ 2nd floor)
Mn = 209 KN-m (max. moment from Interaction Diagram)
Mn>= Mu,Safe!
Interaction Diagram
4000.0
Pn vs. Mn
3500.0 Column T
3000.0
2500.0
2000.0
1500.0
1000.0
500.0
0.0
-50.0 0.0 50.0 100.0 150.0 200.0 250.0
-500.0
Two-Story office Building Date Prepared:
A. Design of Columns Checked By:
Column - C2 Rating:
Assume Section:
b= 400 mm
h= 400 mm
d= 340 mm
d'= 60 mm
Cross Section:
b= 0.400 m
h= 0.400 m
Square Column
Design of Columns: Ground - 2nd Floor
Cross Section:
b = h = Ag
b'= 154.28 mm
h'= 154.28 mm
b' & h' < b & h, safe!
Final:
b= 400 mm
h= 400 mm
d= 340 mm
Area of Steel:
Agnew= 160000 mm2 Ag=
A =((0.85^
Ast1 = -11184.51 mm2 st (0.85^ ))
))/(
Steel ratio:
min = 0.010 ACI CODE 2010 (410.10.1)
max = 0.080
= /
actual = 0.012
Cross Section:
b = h = Ag
b'= 154.28 mm
h'= 154.28 mm
b' & h' < b & h, safe!
Final:
b= 400 mm
h= 400 mm
d= 340 mm
Area of Steel:
Ag= 160000 mm2 Ag=
A =((0.85^
Ast1 = -12492.92 mm2 st (0.85^ ))
))/(
Ast2 = Ast= x Ag
3200.00 mm2
Steel ratio:
min = 0.010 ACI CODE 2010 (410.10.1)
max = 0.080
= /
actual = 0.012
6 - 20 mm
0.400 2 8mm
3
0.300 m
Ground Flr - C2 On Center
2nd Floor 0.400
6 - 20 mm
Section:
Estimate for Column:
Total Volume of Concrete: Class A Mixture Factor
Vol.conc.= 1.264 m2 Vol =L x W x H Cement (40kg) 9.00
sand 0.50
Use Class A Mixture (1:2:4) Gravel 1.00
No. of Bags of Cement:
No.bags= 11.376 bags No. bags =Volume x Factor
say: 12
Volume of Sand:
Vsand= 0.632 m3 Vol=Vsand x Factor
say: 1
Volume of Gravel:
Vgravel= 1.264 m3 Vol=Vgravel x Factor
say: 2
Reinforcing Bars:
Rebars: 8 bars (20mm)
Stirrups: 8 bars (8mm) Direct Counting Method
Summary: 4 C2
Item Quantity Unit Cost Total
Concrete Cement 48 220 10560
Works Sand 4 600 2400
Gravel 8 600 4800
Total 17760
20mm x 6m DSB 32 141 4512
Rebar 8mm x 6m DSB 32 73 2336
Works #16 Tie Wire (Kls) 6 58 348
Total 7196
*Verify actual to minimize cost
Investigation: C1 (Ground -2nd Floor)
= 20 mm
Nc= 3 bars (compression) A's= 942.48 mm2 y = 0.0014
Nt= 3 bars (Tension) As= 942.48 mm2 cb= 233 mm
Interaction Diagram:
c fs Final fs f's Final f's a Cc Pn Mn e Mn Pn Pn
50 3480 275.8 -120.0 -120.0 42.5 339.6 -33.5 81.3 -2428.6 73.1 -30.1 -24.1
100 1440 275.8 240.0 240.0 85.0 679.2 645.4 175.0 271.2 157.5 580.9 464.7
233 276 275.8 445.4 275.8 198.0 1581.9 1581.9 232.6 147.0 209.3 1423.7 1139.0
250 216 216.0 456.0 275.8 212.5 1697.9 1754.2 224.1 127.7 201.7 1578.8 1263.0
300 80 80.0 480.0 275.8 255.0 2037.5 2222.0 194.7 87.6 175.2 1999.8 1599.8
350 -17 -17.1 497.1 275.8 297.5 2377.0 2653.1 156.0 58.8 140.4 2387.8 1910.2
400 -90 -90.0 510.0 275.8 340.0 2716.6 3061.4 106.0 34.6 95.4 2755.2 2204.2
488 -182 -182.0 526.2 275.8 414.8 3314.3 3745.7 -12.1 -3.2 -10.9 3371.1 2696.9
Checking:
Mu = 13 KN-m (max. moment @ ground floor)
Mn = 209 KN-m (max. moment from Interaction Diagram)
Mn>= Mu,Safe!
Interaction Diagram
4000.0
Pn vs. Mn
3500.0 Column T
3000.0
2500.0
2000.0
1500.0
1000.0
500.0
0.0
-50.0 0.0 50.0 100.0 150.0 200.0 250.0
-500.0
C1
Mark Type X-direction
Y-direction Total Unit
Pu 177 58 235 KN
2nd - Roo
Mu KN-m
Pu 235 KN
und -2nd
Mu KN-m
C2
Mark Type X-direction
Y-direction Total Unit
Pu 117 124 241 KN
2nd - Roo
Mu 126 30 KN-m
Pu 263 167 430 KN
und -2nd
Mu 7 13 KN-m
C3
Mark Type X-direction
Y-direction Total Unit
Pu 128 73 201 KN
2nd - Roo
Mu 12 0 KN-m
Pu 173 139 312 KN
und -2nd
Mu 3 0 KN-m
Investigation: C1 ( 2nd Floor - Roof Deck)
= 20 mm
Nc= 3 bars (compression) A's= 942.48 mm2 y = 0.0014
Nt= 3 bars (Tension) As= 942.48 mm2 cb= 233 mm
Interaction Diagram:
c fs Final fs f's Final f's a Cc Pn Mn e Mn Pn Pn
50 100 100.0 -120.0 -120.0 42.5 339.6 132.2 58.1 439.1 52.3 119.0 95.2
100 1440 275.8 240.0 240.0 85.0 679.2 645.4 175.0 271.2 157.5 580.9 464.7
233 276 275.8 445.4 275.8 198.0 1581.9 1581.9 232.6 147.0 209.3 1423.7 1139.0
250 216 216.0 456.0 275.8 212.5 1697.9 1754.2 224.1 127.7 201.7 1578.8 1263.0
300 80 80.0 480.0 275.8 255.0 2037.5 2222.0 194.7 87.6 175.2 1999.8 1599.8
350 -17 -17.1 497.1 275.8 297.5 2377.0 2653.1 156.0 58.8 140.4 2387.8 1910.2
400 -90 -90.0 510.0 275.8 340.0 2716.6 3061.4 106.0 34.6 95.4 2755.2 2204.2
488 -182 -182.0 526.2 275.8 414.8 3314.3 3745.7 -12.1 -3.2 -10.9 3371.1 2696.9
Checking:
Mu = 126 KN-m (max. moment @ 2nd floor)
Mn = 209 KN-m (max. moment from Interaction Diagram)
Mn>= Mu,Safe!
Interaction Diagram
4000.0
Pn vs. Mn
3500.0 Column T
3000.0
2500.0
2000.0
1500.0
1000.0
500.0
0.0
-50.0 0.0 50.0 100.0 150.0 200.0 250.0
Two-Story office Building Date Prepared:
A. Design of Columns Checked By:
Column - C3 Rating:
Assume Section:
b= 400 mm
h= 400 mm
d= 340 mm
d'= 60 mm
Cross Section:
b= 0.400 m
h= 0.400 m
Square Column
Design of Columns: Ground - 2nd Floor
Cross Section:
b = h = Ag
b'= 131.42 mm
h'= 131.42 mm
b' & h' < b & h, safe!
Final:
b= 400 mm
h= 400 mm
d= 340 mm
Area of Steel:
Agnew= 160000 mm2 Ag=b x h
Steel ratio:
min = 0.010 ACI CODE 2010 (410.10.1)
max = 0.080
actual = 0.012
min < actual,ok!
actual = Ast/bh
actual <max, ok!
u
= 34 - 12(M
klKlu/r/r M
30.001/ 2) lu = 3.6 unsupported length
40
r1 = 0.120 ratio of gyration(rectangular)
34-12(M1/M2)= 33.40 r2 = 0.1 ratio of gyration(circular)
Cross Section:
b = h = Ag
b'= 131.42 mm
h'= 131.42 mm
b' & h' < b & h, safe!
Final:
b= 400 mm
h= 400 mm
d= 340 mm
Area of Steel:
Ag= 160000 mm2 Ag=b x h
Ast2 = Ast= x Ag
3200.00 mm2
Steel ratio:
min = 0.010 ACI CODE 2010 (410.10.1)
max = 0.080
actual = 0.012
min < actual,ok!
actual = Ast/bh
actual <max, ok!
6 - 20 mm
0.400 2 8mm
3
0.300 m
Ground Flr - C3 On Center
2nd Floor 0.400
6 - 20 mm
Section:
Estimate for Beam:
Total Volume of Concrete: Class A Mixture Factor
Vol.conc.= 1.264 m2 Vol =L x W x H Cement (40kg) 9.00
sand 0.50
Use Class A Mixture (1:2:4) Gravel 1.00
No. of Bags of Cement:
No.bags= 11.376 bags No. bags =Volume x Factor
say: 12
Volume of Sand:
Vsand= 0.632 m3 Vol=Vsand x Factor
say: 1
Volume of Gravel:
Vgravel= 1.264 m3 Vol=Vgravel x Factor
say: 2
Reinforcing Bars:
Rebars: 8 bars (20mm)
Stirrups: 8 bars (8mm) Direct Counting Method
Summary: 2 C3
Item Quantity Unit Cost Total
Concrete Cement 24 220 5280
Works Sand 2 600 1200
Gravel 4 600 2400
Total 8880
20mm x 6m DSB 16 141 2256
Rebar 8mm x 6m DSB 16 73 1168
Works #16 Tie Wire (Kls) 3 58 174
Total 3598
*Verify actual to minimize cost
Investigation: C1 (Ground -2nd Floor)
= 20 mm
Nc= 3 bars (compression) A's= 942.48 mm2 y = 0.0014
Nt= 3 bars (Tension) As= 942.48 mm2 cb= 233 mm
Interaction Diagram:
c fs Final fs f's Final f's a Cc Pn Mn e Mn Pn Pn
50 3480 275.8 -120.0 -120.0 42.5 339.6 -33.5 81.3 -2428.6 73.1 -30.1 -24.1
100 1440 275.8 240.0 240.0 85.0 679.2 645.4 175.0 271.2 157.5 580.9 464.7
233 276 275.8 445.4 275.8 198.0 1581.9 1581.9 232.6 147.0 209.3 1423.7 1139.0
250 216 216.0 456.0 275.8 212.5 1697.9 1754.2 224.1 127.7 201.7 1578.8 1263.0
300 80 80.0 480.0 275.8 255.0 2037.5 2222.0 194.7 87.6 175.2 1999.8 1599.8
350 -17 -17.1 497.1 275.8 297.5 2377.0 2653.1 156.0 58.8 140.4 2387.8 1910.2
400 -90 -90.0 510.0 275.8 340.0 2716.6 3061.4 106.0 34.6 95.4 2755.2 2204.2
488 -182 -182.0 526.2 275.8 414.8 3314.3 3745.7 -12.1 -3.2 -10.9 3371.1 2696.9
Checking:
Mu = 3 KN-m (max. moment @ ground floor)
Mn = 209 KN-m (max. moment from Interaction Diagram)
Mn>= Mu,Safe!
Interaction Diagram
4000.0
Pn vs. Mn
3500.0 Column T
3000.0
2500.0
2000.0
1500.0
1000.0
500.0
0.0
-50.0 0.0 50.0 100.0 150.0 200.0 250.0
-500.0
C1
Mark Type X-direction
Y-direction Total Unit
Pu 177 58 235 KN
2nd - Roo
Mu KN-m
Pu 235 KN
und -2nd
Mu KN-m
C2
Mark Type X-direction
Y-direction Total Unit
Pu 117 124 241 KN
2nd - Roo
Mu 126 30 KN-m
Pu 263 167 430 KN
und -2nd
Mu 7 13 KN-m
C3
Mark Type X-direction
Y-direction Total Unit
Pu 128 73 201 KN
2nd - Roo
Mu 12 0 KN-m
Pu 173 139 312 KN
und -2nd
Mu 3 0 KN-m
Investigation: C1 ( 2nd Floor - Roof Deck)
= 20 mm
Nc= 3 bars (compression) A's= 942.48 mm2 y = 0.0014
Nt= 3 bars (Tension) As= 942.48 mm2 cb= 233 mm
Interaction Diagram:
c fs Final fs f's Final f's a Cc Pn Mn e Mn Pn Pn
50 100 100.0 -120.0 -120.0 42.5 339.6 132.2 58.1 439.1 52.3 119.0 95.2
100 1440 275.8 240.0 240.0 85.0 679.2 645.4 175.0 271.2 157.5 580.9 464.7
233 276 275.8 445.4 275.8 198.0 1581.9 1581.9 232.6 147.0 209.3 1423.7 1139.0
250 216 216.0 456.0 275.8 212.5 1697.9 1754.2 224.1 127.7 201.7 1578.8 1263.0
300 80 80.0 480.0 275.8 255.0 2037.5 2222.0 194.7 87.6 175.2 1999.8 1599.8
350 -17 -17.1 497.1 275.8 297.5 2377.0 2653.1 156.0 58.8 140.4 2387.8 1910.2
400 -90 -90.0 510.0 275.8 340.0 2716.6 3061.4 106.0 34.6 95.4 2755.2 2204.2
488 -182 -182.0 526.2 275.8 414.8 3314.3 3745.7 -12.1 -3.2 -10.9 3371.1 2696.9
Checking:
Mu = 12 KN-m (max. moment @ 2nd floor)
Mn = 209 KN-m (max. moment from Interaction Diagram)
Mn>= Mu,Safe!
Interaction Diagram
4000.0
Pn vs. Mn
3500.0 Column T
3000.0
2500.0
2000.0
1500.0
1000.0
500.0
0.0
-50.0 0.0 50.0 100.0 150.0 200.0 250.0
Two-Story office Building Date Prepared:
A. Design of Columns Checked By:
Column - Roof Deck Framing Plan Rating:
Steel ratio:
= 0.02
Ag= mm2
Ast = 0 mm2
Cross Section:
b x h = Ag
b= mm
h= mm
d= mm
Final:
b= 300 mm
h= 300 mm
d= mm
Area of Steel:
Ag= 90000 Ag=b x h
Pu=[0.85f^ c(Ag-Ast)+Astfy]
Ast=(Pu-(0.85f^ c Ag))/
(
(fy-0.85f^ c))
Ast = 1200 mm2
Latearal Ties:
stirrups= 10 mm
spacing:
1.) 16db 192 mm use: spacing= 192 mm
2.) 48stirrups 480 mm say: mm
3.) 7.5" 300 mm
Check for ACI Requirements:
Maximum Load bearing capacity:
Pu=
Pn(max)=
Pn(max) < Pu,revise section!
Pn(max)=[0.85f^ A -Ast)+Astfy]
c( g
Steel ratio:
min = 0.01 ACI CODE 2010 (410.10.1)
max = 0.08
actual = 0.01
actual = Ast/bh
min < actual,ok!
actual <max, ok!
Smax = #REF! mm
Wu = 8.42 KN/m
Actual Spacing (s):
Mu
71.5 s= 120 mm
x
First Stirrup:
Vu 75.7 s1= 60 mm
Mu=75.7() 8.42(2/2)71.5 ; eq.1
Stirrups:
1 @ 60
9 @ 120
Rest @
Design Moment:
Area of Steel:
Mu = = ^2 (10.59
Roots:
/(^
=((^24))/2
a^2+b+=0
))
a= #REF! 1 = #REF!
b= #REF! 2 = #REF!
c= 0 new = #REF! choose the smaller
#REF!
= (0.25(^ ))/
min = 0.00000 1.4/ 0.00439 0.00508 (governs)
#REF!
#REF!
= 16 mm
n= -59.97 bars
NBX= bars
Shear Diagram: Bar cut-off and Development Length:
Moment Diagram:
Theoritical Bar Cut-off Graph, Appendix A- Design Aids by Wight & macGregor
Bar Cut-off (1/3 and 2/3 of bars that satisfy the ACI code)
Cut-off
0.74
0.50
0.21