Sei sulla pagina 1di 15

The Austin Engineering Group Magazine

ISSUE 1

Austins First
Rope Shovel
Dipper
Operational
Australian Flow
Control Body Launch

New EX8000 Bucket


Design

Reduced Fuel
Consumption with
COR Cooling

austiningenieros
Chile

www.austineng.com
CONTENTS

6. 12. 19.
Improved Dust Control
with the Westech Flow Control Body
Contents
From the editor.................................................................................................................5
First rope shovel dipper operational....................................................................................................... 6
New EX8000 bucket design.........................................................................................8
Reduced fuel consumption with COR Cooling..........................................................9

The Westech Flow Control Body for off- Australias first flow control dump truck body launched.....................................10

highway dump trucks has a revolutionary Austin Engineering marks 10 year ASX anniversary............................................11
Modernised Indonesian facility..................................................................................12
floor design that controls the flow of
Quality controlled dragline bucket fabrication......................................................13
material out of the body during dumping.
South American operations contract wins.............................................................14
A safer water tank module..........................................................................................15
The unique design results in a range of benefits including: COR Cooling today........................................................................................................16
Making a difference......................................................................................................17
n Improved dust control n Improved truck stability
Stronger drop box oil coolers from COR Cooling..................................................18
n Increased body life n Reduced maintenance
The Colombia story.......................................................................................................19
Case study: pit rock wall remover............................................................................20
Certify JEC Tyre Handlers from manufacture or overhaul.................................21
DOWNLOAD the white paper and watch the video
at www.westechflowcontrol.com.au A leader in logistics joins Austin Ingenieros............................................................22
Austin Ingenieros Chiles growth...............................................................................22
Case study: mine excavator bucket capacity modification................................23
Tier 3 & 4 motors overheating: a cooling system solution................................24
Safety app for on-site work.......................................................................................26

Issue 1 | 3
www.austineng.com
EDITOR

The Austin Engineering Group Magazine

ISSUE 1

Austins First
Rope Shovel
Dipper

From
Operational
AUSTRALIAN FLOW
CONTROL BODY LAUNCH

NEW EX8000 BUCKET


DESIGN

REDUCED FUEL
CONSUMPTION WITH COR

the Editor
COOLING

Westech Stairway austiningenieros


Chile

www.austineng.com

Access Tank Edition 1 JUNE 2014 On behalf of the Austin Engineering Ltd Group, I welcome
IMPROVE MAINTENANCE & OPERATOR SAFETY you to the first edition of the Group magazine - Austin.
Editor
Austin has been developed to highlight some of the exciting
Kate Bishop
National Marketing Manager innovations in product design and capabilities produced by our Group
marketing@austineng.com.au members globally. As our global footprint grows, so does our range of
engineered solutions, and were proud to share them with you.
Design
Austin Engineerings unique Westech Stairway Motif Creative Design This first issue will highlight some of those solutions, along with news
from various group members and the company as a whole. I hope
Access Tank module, unlike traditional Printing
you find this publication interesting and invite you to share it with any
water tank modules, has larger baffle All Clear Print & Signs
colleagues who may be interested.
openings with a direct line of travel to Austin Engineering Ltd
173 Cobalt St I welcome feedback or suggestions for articles you would like included
improve safety when performing confined Carole Park QLD 4300 in the next edition. Please email marketing@austineng.com.au
space maintenance work. Australia
www.austineng.com.au Dont forget to keep in touch with us in between magazine editions via
The unique design results in a range of benefits including: our social media pages on LinkedIn, Facebook, Twitter and YouTube.

n Reduced confined space risk Although Austin Engineering Ltd has On behalf of the team at Austin, thank you for your support.
made every effort to ensure that the
n Increased truck stability information in this magazine was correct
n Reduced maintenance costs at time of publishing, Austin Engineering
Ltd (and its directors, officers and
consultants) do not warrant or represent
Its innovative baffle design reduces surging and improves truck stability
as to accuracy, reliability or completeness
by up to 18%, increasing operator safety. of the information in this magazine and Kate Bishop
expressly disclaim all liability and any
responsibility to any person for any loss
or damage suffered, however caused
(including negligence), relating in any way
to this magazine including the information
contained in it and any errors or omissions
however caused.

Issue 1 | 5
www.austineng.com
FEATURE

given to the lip design to provide Feedback from the mine site has
interchangeability of GET but to been positive and Austin Engineering
optimise the loading performance. Peru is following the performance
of the dipper closely. The operators
The dipper accessories (such as the comments are of particular interest
latch mechanism, snubbers, pitch as the first two operators have
braces and padlocks) were product mentioned that the original dipper
improved to give greater component was difficult to load and was rarely
life. To provide an example, the lower full, however the JEC dipper is
padlock links are forged steel rather reaching full capacity in almost every
than cast steel and offer a significant pass in the loading cycle (depending
improvement in strength and life. on the conditions). The maintenance
staff have also commented on the
The dipper can be manufactured
improvements that we have included
with cast alloy steel or fabricated
in our design which is a testament to
steel floors. The cast lip is designed
our engineering team.
with the industry standard Whistler
#12 design of Ground Engaging
Tools (GET). Thus the dipper accepts

First Rope Shovel all common brands of GET in the


market, again allowing the client to
maintain the same inventory and
Feedback from the mine
site has been positive
considering the investment in
development time of these products.

The market for rope shovel dippers

Dipper Operational
reduce operational costs.
is huge in South America and Austin
Fitted to this particular dipper is a Engineering is confident this will be
Chromium Carbide wear package Now with our experience in this the first success story of many future
due to the high abrasion conditions. 495HR dipper, Austin Engineering is dippers. This was a global effort
Custom designed wear liner packages in the process of developing other that reflects Austin Engineerings
can be tailored to suit individual mines models of dippers to expand our capability to design, manufacture
based on the degree of severity of range. We are expected to release and deliver world class products to
at least one new model each year

A
ustin Engineerings first JEC both as a complete unit and as between planned maintenance. The the operating conditions. the mining industry.
design 73yd3 (55.8m3) rope separate components of the dipper Perth engineering team carefully
shovel dipper for a Bucyrus bowl and door. The accessories such analysed the welded joints and
495HR was recently successfully as the latch mechanism, snubbers, redesigned these for increased
installed at a Southern Peru Copper pitch braces and padlocks are also joint strength, simpler manufacture
Corporation mine in Peru. interchangeable. Thus, the dipper and weldability. Attention was
allows the client to maintain the same
This project involved three of Austin inventory of spare parts, reducing
Engineerings business units; Peru, operational costs. The JEC design
making the sale, installation and 73yd3 (55.8m3) dipper suits Bucyrus Under the striking
aftersales support; Perth, the design 495HR, 495HR2 and Caterpillar
and engineering of the dipper with 7495 machines. paint work is where
the JEC brand; and Chile where the the JEC dipper has
dipper was manufactured at the La Under the striking paint work is where
Negra facility. the JEC dipper has many significant many significant
improvements with the intent of improvements
The JEC dipper is completely increasing the loading performance,
interchangeable with the original, component life and the interval

6 | The Austin Engineering Group Magazine Issue 1 | 7


EX8000 BUCKET REDUCED FUEL CONSUMPTION

New EX8000 Bucket Design Reduced Fuel


Consumption with
A
s of February 2014, Austin load. End users can be assured that

COR Cooling
Engineering has officially there will be no warranty implications
added the Hitachi EX8000- with their machine.
6 excavator bucket (backhoe
Austin Engineering custom engineers

A
configuration) to our excavator
each mining bucket taking into leading North QLD, Australia Traditional bonded tube-to-header system eliminates failure due to
product range.
consideration application specific logistic services provider CACs have known issues of cracking cracking and leaking, and is
The design model has now requirements such as loading was experiencing cracking and leakage, due in combination to guaranteed to be leak free for 5
been verified by FEA analysis in practices, material density and and consequent leaking from their the vibration and fatigue that they
years or 1,000,000 kilometres.
keeping with Austin Engineerings abrasiveness, potential for hang up, tube-to-header charge air coolers undergo as a result of the extreme
practice of testing and verifying and dump height clearances. temperature gradients they are The installation of the Dura-Lite
(CACs) installed in their trucks.
engineering theory. Our in-depth subject to during normal operation.
In addition, they had an issue CAC resulted in reduced repair and
engineering process provides results
with cracking on their relatively light After conducting a system evaluation, maintenance costs for the trucks
in productivity improvements and
Our in-depth duty manifold tanks. These problems COR Cooling supplied a Dura-Lite operation and less downtime causing
maintenance cost controls.
engineering process Charge Air Cooler to replace the negative impacts on customer
were affecting the companys ability
The bucket is designed within the CAC that had failed. Dura-Lite
provides results to reliably provide a required 24/7 service.
OEM recommended maximum CACs innovative patented silicon
envelope including correct boom in productivity service to their customers. grommet tube-to-header seal In addition, when undertaking post-
stick geometry, boom and stick improvements installation monitoring, the fuel
clearance, cab and deck structure
consumption of the truck (same
clearance and maximum suspended
truck, same driver, same route)
was reported to show increased
efficiency with the Dura-Lite CAC
installed. The fuel economy improved
Austin @ Did you from 1.72 km/litre to 1.83 km/litre
know... resulting in a payback period of only

Social Media Austin Engineering has


22,000km.

over 600 followers at


Austin Engineering now has a presence on key social media sites www.facebook.com/
including LinkedIn, Facebook, Twitter and YouTube. Traditional bonded
austinengineering.
tube-to-header CACs
Use the below addresses to find and follow or like us: If youre interested in
a career with Austin have known issues of
www.facebook.com/austinengineering
Engineering you can cracking and leakage
www.twitter.com/AustinEngAus express your interest
www.linkedin.com/company/austin-engineering-ltd on our website at
www.austineng.com.au/
www.youtube.com/user/AustinEngineering
careers For more information visit
www.corcooling.com.au

8 | The Austin Engineering Group Magazine Issue 1 | 9


FLOW CONTROL BODY LAUNCH 10 YEAR ANNIVERSARY

Australias First Flow Austin Engineering Marks


Control Dump Truck 10 Year ASX Anniversary
Body Launched
M
arch 2014 marks the 10
year anniversary of Austin
Austin Engineering
Engineering Ltds listing on the
Australian Securities Exchange (ASX). anticipates increased
demand for their
Austin Engineering was admitted to
the Official List of the ASX on the products due to sustained
4th March 2004 and the Official higher levels of mining
Quotation of Austins securities
commenced on Tuesday 9th March
production.
2004.

The company was originally founded


in 1982 and after a period of growth
and expansion Austin was acquired by
West Australian Metals Ltd in 2003,
shortly after which the company
floated on the ASX.

From that point, Austin Engineering


made a series of acquisitions

A
ustin Engineering officially Austin Engineerings Executive including Perth-based Johns
launched Australias first General Manager Eastern Australia Engineering & Cranes Pty Ltd or JEC
Westech Flow Control Body Tim Ekert said, We are very pleased (2004), Kaldura Industries (2006)
for off-highway dump trucks at the at the level of interest shown at the and Austbore (2007) located at
end of 2013. launch of the Flow Control Body. Mackay in Central QLD, and Western
Its dust control properties along with Technology Services based in
The first Flow Control Body to
improved truck stability offers a clear Wyoming USA (2007).
be manufactured in Australia was Cable reel In 2011 Austin Engineering expanded to the mining and industrial markets
on display at the Hunter Valley benefit to mine sites, particularly
In 2009 the company moved into their global presence through the in Chile.
event, which was well attended by
in the Hunter region where dust for Zambia the South American market with the acquisition of the business of V&V at
mitigation is a hot topic, he said. Moving forward in 2014, Austin
representatives of local mine sites, acquisition of a steel dump truck body Calama in Chile and the opening of

T
OEMs, government and media. Our ability to engineer products to his JEC cable reel business from Conymet Ltda based in three new manufacturing factories; Engineering anticipates increased
solve specific problems is something was designed and Antofagasta - Chiles largest mining Austin Indonesia at Batam Island, demand for their products due to
Austin Engineering built two of the were known for, and the Flow Control manufactured by Austin region. Further Australian growth Austin Ingenieros Colombia at sustained higher levels of mining
innovative dust supressing bodies for product is a great example of that. Engineering Perth for use in followed in 2010 by acquiring West Barranquilla and Austin Engineering production. The company also
use at Vales Integra mine site in the Zambia. You can find more Australian based Pilbara Hire Group Peru in Lima. 2013 saw the acquisition anticipates that the maintenance and
Hunter Valley, with the bodies going More information about the Westech information about our cable Pty Ltd, Hunter Valley NSW-based of the business of Servigrut, a repair of equipment will form a larger
into operation on site immediately Flow Control Body can be found at reels on our website Phillips Engineering Pty Ltd, and the supplier of heavy equipment lifting, part of the groups revenue going
after the launch. www.westechflowcontrol.com.au. COR Cooling Group. transportation and site services forward.

10 | The Austin Engineering Group Magazine Issue 1 | 11


INDONESIA DRAGLINE BUCKET FABRICATION

Quality Controlled NEW AUSTIN


ENGINEERING
Dragline Bucket WEBSITE

Modernised Fabrication A
ustin Engineering has
recently launched a new
website for the group.
Features of the new site include a

Indonesian product search facility and the ability


to complete smart form request
for quotes for bodies, buckets and

Facility
water tanks. You can visit the site at
www.austineng.com.

T
he opening ceremony of PT The facility is located within close
Austin Engineering Indonesias proximity, and with wide load access
large modern facility was to, Citranusa Kabil Estate Port, a well-
attended by the local governor, police equipped and maintained port which
commissioner, customs clearance was gazetted by the Indonesian
and taxation authorities, manpower government as one of the free trade
department and local community zone Ports for Batam.

A
leaders. Local traditional shirts (batik) ustin Engineering Mackay elements included quality control,
were worn as is common at formal (QLD, Australia) was weld qualifications, build processes,
functions. approached by SIMCO ultra sonic / NDT testing, scheduling,
With material yard Mining Products and Services, an reporting and a defined timeline.
Austin Engineering Indonesias OEM designer and supplier of dragline
improved facility has an estimated storage laydown of Austin Engineering Mackay has
buckets and replacement parts to
workshop production capacity 10,000m2 available, and the mining industry, to fabricate their manufactured multiple buckets over
of 280-320MT structural steel, latest generation Omega Dragline the years for various clients with
bulk gas and waste proven in-field success and has a
small modular structures and plate Buckets.
products per month. storage, we are able very experienced team to ensure a
Based on a defined process, Austin quality product. Both of the Omega
to handle the largest
The facility consists of three Engineering Mackay was awarded Buckets were built on time in budget
workshops, a combined total of of jobs. the build process of two Omega and are currently surpassing both
12,800m2 in size, each with a range Dragline Buckets on behalf of production and maintenance targets
of the latest equipment, and support SIMCO, fulfilling very stringent in all areas.
equipment and facilities. manufacturing criteria. Both of the Omega
Cintranusa Kabil Port is compliant Austin Engineering Mackay complete
With material yard storage laydown with the International Security and Austin Engineerings ability to work manufacture for our own OEM Buckets were built on
of 10,000m2 available, and bulk gas Port Facility Securities code and has closely with the client to ensure all products but also supports a number time in budget
and waste storage, we are able to 5 berths, warehouses and large open KPIs were achieved was an integral of OEMs with build processes when
handle the largest of jobs. space for storage. part of the selection criteria. These required.

12 | The Austin Engineering Group Magazine Issue 1 | 13


SOUTH AMERICAN CONTRACTS SAFER WATER TANK

South American Austins scope includes A Safer


Water Tank
a number of products

Operations from its product

Module
range

Contract Wins
W
hen Westech, based in
Wyoming, USA, set out
to design a new water
tank module, they wanted to create
a tank that was safer to operate
and maintain, while improving
manufacturability and quality.
The resulting outcome is Austin
Engineerings Westech Stairway
Access Tank - an industry leading Westech wanted to
water tank design, especially from lead the industry in
the standpoint of worker safety.
design innovation for
At the top of the tank, a folding
this product.
handrail system and slip proof
decking lead to the fill port. The fill

A
ustin Engineerings South Vale has also confirmed that it will port doubles as the tank access,
American operations have discuss with Austin the adoption of the hinged access covers convert
recently announced two scheduled maintenance programs of Bi-metallic from screen cover to handrails when upper and lower levels of baffled in the tank. These features not only
major contract wins. The first, was the kind used by Austin in its Pilbara wear package opened. A wide stairway access with compartments. Climbing ladders improve safety when performing
signing of a significant contract Hire service and repair business. handrails and serrated bar grate steps up to small openings, which lead a confined space maintenance work,
with Vale, the Brazil-based leads to the bottom of the tank.

A
worker into a dead end compartment they also make the maintenance
The delivery of products will be ustin Engineering
international miner. has been completely eliminated. This process more efficient, reducing
from Austins Chilean and Colombian Peru has installed The internal tank walls egg- preventative maintenance costs.
facilities to the Brazilian border, where a bi-metallic wear crate together, are corrugated for is a result of our innovative lateral
The contract, which is in the form Remember, a poorly designed water
Vale will arrange for the crossover package in the bucket of the increased stiffness and minimize surge baffle system, which also
of a supply agreement, is for three tank could be the most costly
into Brazil. first Hitachi EX5600 Hydraulic structural members that rust in a helped increase tank stability by 18%
years. Equipment will be ordered by investment you ever make!
Face Shovel delivered in Peru. traditional water tank. Large, wide on the haul road over our previous
Vale and supplied in accordance with design. The tank floor is completely
The second contact is for the supply This is one of three machines inline manway openings provide Suitable for all off-highway
its requirements, as determined by of 2 x 80 tonne and 1 x 140 tonne flat for safety, and there is a natural
for which Austin Engineering for easy navigation inside the tank. trucks, Westech Stairway Access
its ongoing production schedules and cranes as well as further spot services sump at the tank bottom for ease of
Peru will complete this service. These openings are 1549mm tall Tank modules are available in
equipment replacement programs. for a period of three years on BHPs by 610mm wide, having no doors cleaning and tank draining. 76,000 litres to 284,000 litre
In all of our global operations
Spence mine in Northern Chile. we offer the service to design which could create obstructions for capacity, configurable for both dust
Austins scope includes a number All mine water tanks are designed to
and install customised wear working personnel - or for a rescue suppression and fire fighting.
of products from its product range The Spence mine is 65 kilometres be entered to perform maintenance;
packages for all types of situation if that were to occur.
such as dump truck bodies, buckets from Austin Engineerings Calama we feel that our tank has the best Although originally designed by
and ancillary equipment. Other mining equipment (buckets,
operation, with the contract being Unlike traditional water tank chance of quickly and safely rescuing Westech in the USA, the Stairway
trays, blades, dippers).
products may be considered by Vale serviced by the merged Calama and modules, all Stairway Access Tanks a worker if something happens to Access Tank is available through
as the contract progresses. Servigrut operations. have only one floor, there are no them while performing their work Austin Engineering operations globally.

14 | The Austin Engineering Group Magazine Issue 1 | 15


FROM THE COR COOLING CEO PILBARA HIRE

COR Making a Difference


Cooling
Today
M
ore than 30 years ago, a small it from its competitors. This is due entire mining industry. Our clients have Tray
radiator service business to its combined group resources, been the beneficiary of CORs ongoing transport
operated by one person locations, capabilities, and product commitment to .delivery safe, reliable
started out in a small workshop in value added solutions that save

T
range, service and experience and
money. We see more opportunities his Westech body, to
Perth, Western Australia. It was called its quality and safety standards. COR
for growth in our niche services in suit a Komatsu 930E,
COR Radiators and it provided a is also unique because it can offer
other Australian and international hits the road from our
humble radiator workshop service for genuine aftermarket solutions to
mining regions where Austin has Perth operation on the way to
local customers and passing traffic. industry, tailored direct to end users, BEFORE
established its global footprint and its new home.
that adds real value whilst reducing AFTER
Today, COR Cooling has become where mining production is increasing.
operating costs.
Australias leading company in the
We have continued to forge strong
heavy industrial market for advanced Twelve months ago, COR Cooling set
relationships with all our valued

P
cooling and heat transfer equipment itself an ambitious target of achieving
and solutions. With seven service and full ISO Accreditation in Quality and
customers including several key
partnerships with blue chip companies
ilbara Hire were nominated for
a Rio Tinto Making a Difference
of strain and injury. The techniques
used to carry the water into the
Did you
Safety in an eighteen month time
repair centres strategically located
in Mackay, Brisbane, Hunter Valley, frame. Just twelve months later COR
and we are confident of winning more
of these in the near future that will
Award for the work carried out
in fabricating and installing a new
gantry also increase the risk of
manual handling issues from a HSE
know...
Newcastle, Adelaide, Perth and has obtained full Accreditation for add a sizable uplift to our operations. safe access walkway to the Fuel perspective.
Kalgoorlie, and its head office based in ISO AS/NZS 9001:2008 Quality, ISO With the mining sector moving from Austin Engineerings Perth
Facility for the Locomotives at Cape
Brisbane, COR is Australias only truly AS 18001:2007 and AS/NZS 4801 new investment and exploration to a (WA, Australia) operation
Lambert Rail Yard. Solution
national service company of its kind. Safety, as well ISO AS 14001:2004 production phase over the next few has an employee who
Environmental Standards. This is a years in Australia, along with further Pilbara Hires workshop, civil Install a two part ramp to allow crews recently celebrated 40
COR provides an extensive range of major achievement for COR which diversification plans we have in other maintenance team and boilermakers years service. Chris
to trolley their equipment into the
innovative products and advanced has increased the bench mark for its sectors, COR Cooling is very well at the Cape Lambert plant worked Double started with JEC
placed to grow. This growth will occur locomotive fuel bay.
services to the mining, heavy competitors to follow. together to manufacture and install in 1974 as an apprentice
transport, rail, automotive, earth through the delivery of our strategic boilermaker.
the final product. Benefits
moving, power generation, marine I am also pleased with the team work partnering, our high standards in safety
and industrial sectors. COR has its and the effort by our people to this and quality, our ability to be innovative The Problem Decreases strain and injury. COR Cooling is now
own design capabilities and can tailor point of the year. We have also had with the latest in technology and fully certified with ISO
some stand out performers this year our ability to add real value and save To maintain 3 points of contact Decrease issues of manual handling.
make technical solutions to industry Accreditation for AS/
no matter what the application in including our Singleton, Thornton, and money for our customers. when walking up the stairs at the Removes the issues of maintaining NZ 9001:2008 Quality,
the latest heat transfer and cooling Kalgoorlie and Mackay operations on Warren Arthur locomotive fuel bay ramp, it is quite 3 points of contact. AS 4801 Safety and
technologies. the back of difficult trading conditions CEO difficult when carrying equipment AS14001 Environment.
Incline isnt as steep.
and in the mining regions where we COR Cooling and water supplies up the stairs. Not
COR is unique on a number of strategic have seen dramatic cost cutting only do crews lose their 3 points of Trolleys can be used to carry
points of difference which separates measures being implemented by the contact, they also increase the risk equipment into the gantry.

16 | The Austin Engineering Group Magazine Issue 1 | 17


STRONGER OIL COOLERS COLOMBIA

Stronger Drop Box The Colombia Story products for different mining
applications, cementing its reputation
as the premium manufacturer of

Oil Coolers from this type of equipment in Colombia.

With over $2 million in the latest

COR Cooling
equipment, including four overhead
cranes, CNC plasma cutter, 20
welding machines and a 1500 ton
brake press, Austin Engineering
Colombia is prepared and able to
provide high end services to its
customers throughout 2014 and
beyond.
JEC EX5600
bucket

T
his 34m3 JEC EX5600
bucket was recently
manufactured by our
Brisbane (QLD, Australia)

A
operation. ustin Engineerings began to perform repairs on mining
Colombian facility was buckets.
formed in 2011 in
Barranquilla, Atlantico, Colombia The operation then expanded
when 42,000m2 of land was acquired. its product range to become the
first manufacturer in Colombia
In early 2012 the facilities workshops to fabricate water tank modules,
Colombian

T
he drop box oil coolers of were set up, staff was trained manufacturing two 20,000 gallon
some major OEMs have and procedures developed. Then, Westech stair access water tanks for water tank
This new design results
always had inherent issues in late 2012 Austin Engineering Caterpillar 777F trucks. manufacture
with failure and leaking issues due to in the elimination of manufactured its first product a
the vibration that is common in these 240 tonne capacity Westech tray for

T
down time. his Westech Stair Access Water
machines. a Caterpillar 793D truck application.
Tank for a Komatsu 785-7
The first few products manufactured
Austin Engineering was recently manufactured by
COR Coolings engineering team
have re-designed these drop box by Austin Engineering Colombia, Colombia is prepared our Colombian Operation.
oil coolers to make them stronger The new design is proving to be the demonstrated to the local market
preferred choice of a large number Tray fleet and able to provide
than the original. The cooler is now the reliability, quality and improved
made from a fully welded bar and of machine owners including Atlas delivery safety of Austin Engineerings high end services to its
plate design with high pressure tank Copco and Barminco. These re- products and purchase orders began
designed coolers have now been in
customers throughout

A
construction, tubes with 1.2mm to arrive for a wide variety of truck
ustin Engineering Peru 2014 and beyond.
cladding and reinforced corners. operation for over 5 years and have body models.
has delivered a fleet of
proven to be the superior cooler for
This new design results in the trays to Glencore - Las Following this, the Colombian
this application.
elimination of down time due to Bambas. This photo shows the operation rolled out its repair and
maintenance on leaking coolers and a For more information visit first one going into operation. maintenance services to the various Throughout 2013 Austin Colombia
2% improvement in temperature drop. www.corcooling.com.au coal mining regions of Colombia and manufactured a wide range of

18 | The Austin Engineering Group Magazine Issue 1 | 19


CASE STUDY TYRE HANDLERS

Certify JEC Tyre


Handlers from
Manufacture or
Overhaul
Dragline bucket Did you
refurbishment know...

T
his dragline bucket was The first Australian order
refurbished by our Mackay for a Westech Stair
operation. Access Water Tank has
CASE STUDY been received.

Pit Rock Wall Remover Austin Engineering now


has a profile listing on the
global Mining Technology
website. You can visit the

A
n OEM approached Austin Engineering to help an overseas profile at www.mining-
customer by designing an attachment for an excavator to technology.com.
remove rocks from the pit wall. The attachment had to address
the issue of rocks potentially falling from high on the pit wall onto Austins Mackay (QLD,
equipment and personnel. Australia) and Hunter
Valley (NSW, Australia)
To address the potential safety issue of falling rocks, Austin Engineering

A
ustin Engineerings Mackay a TH7000 unit along with their first operations are currently
needed to design an attachment which would give the excavator
(QLD, Australia) operation manufactured TH2500 assembly. undergoing the process
extended reach to remove protruding rocks before they fell to the
has recently invested to achieve AS/NZS4801
ground. This service adds to the East Coasts
Inter-operation $35,000 in a specialised proof test safety standards.
Using Pro-E 3D and FEA software, Austin Engineering completed a jig to certify tyre handlers from capabilities by offering Austin
cooperation to Engineerings clients a fully backed Austin Engineering
design proposal that would extend the boom by approximately 10 manufacture or overhaul.
metres. It also included claws at the end of the boom that could be deliver bodies engineering solution for tyre handlers. Indonesia has supplied
hydraulically operated from the cab to selectively pick rock from the A number of clients had approached just over 160 JEC

T
high wall face. he Hunter Valley (NSW) and Austin Engineering Mackay for bodies in the past 3
Perth (WA) operations of support for tyre handler recertification years to their customers
The customer placed an order for the attachment which was a fully backed in Indonesia and the
Austin Engineering recently on Australias East Coast.
successfully manufactured and delivered to site where the design worked together to secure, engineering solution feedback has been very
worked as specified. The design of this attachment can be adapted for manufacture and deliver three Since commissioning the test jig positive.
a variety of machine types. for tyre handlers
Westech 830E coal combo bodies to in February 2014 the Mackay
a mine site in South Australia. operation has successfully recertified

20 | The Austin Engineering Group Magazine Issue 1 | 21


CHILE
LOGISTICS LEADER JOINS AUSTIN CHILE

A Leader in
the experience and unquestionable
professionalism from Austin
Ingenieross officers and personnel
CASE STUDY
Logistics Joins Servigrut has confirmed
its status as one of the
and lead them to place their
confidence in the capabilities of our
company. This was reflected by the Mine excavator bucket
Austin Ingenieros leaders in its field important contracts awarded to the
company last year.
capacity modification
The growth that comes from new

L
ate last year Servigrut, a crane Located in one of the most important This new structure allows us to be projects brings new challenges and

T
and freight service company mining regions in Chile, Servigrut has more competitive which keeps us the requirement to adapt, which he mine site approached
located in Antofagasta, confirmed its status as one of the highly motivated. We are sure that is why Austin Ingenieros acquired Austin Engineering with an
became part of Austin Ingenieros leaders in its field, winning significant the value brought to the market metalcav facilities in Calama. The issue that their backhoe
Chile. Its expertise and reputation highly complex project work from through the integration of Servigrut 13,800m2 facility was reconditioned bucket fitted to their recently
major mining companies in the area. and Austin will allow us to win new with new state of the art technology purchased excavator was not
in the mining industry allows Austin
projects and continue the growth that allows us provide a fast and reaching anticipated productivity
Ingenieros to offer their customers
With the crane leasing business unit path that will keep us as leaders in efficient response to the actual figures. This was a surprise as
an increasingly comprehensive and other machines of the same type
consisting of a crane fleet of over 35 Northern Chile, he said. project needs.
quality service. in the area, and the Bowen Basin,
units, 13 trucks and a 40,000m2
facility. The new facility means new At the same time, a new Austin were reporting the opposite.
Servigrut is a company that, since
1996, has had an outstanding challenges for Austin Ingenieros, for Ingenieros business unit structure
Austin Engineering conducted
which they are ready. was created. This is led by Max Flores
performance in the freight and an analysis of the machine and
Francino who takes the control as
mobile cranes service market. The market has not been indifferent discovered that it was fitted with a
Operations Manager. I am very 30m3 capacity bucket rather than
Since then, the company has to the incorporation of Servigrut into
distinguished themselves through Austin Ingenieros, a company that
Austin Ingenieros happy with these new projects that the standard 34m3 bucket (the standard offering for coal overburden
we just won, because they are the
their operational efficiency, highly has a strong position in Antofagasta, Chiles Quality best proof that the things we have
of around 1.8mt/m3 density). The excavator OEM had recommend
caution based on the material density and abrasiveness at this site.
trained professionals and the use of said Mauricio Vidal, General Manager Service Enables done are taken seriously, said Flores
state of the art equipment. at Austin Ingenieros Renting.
Growth Francino. As the bucket had completed its service cycle (9000 hours) and was
scheduled for major repairs including replacement of the floor, it was
It also shows that what we have

T
agreed that Austin Engineering would do some initial engineering work
he professionalism and quality
been communicating to the market, to establish the feasibility of resizing the bucket to 34m3 capacity.
service that Austin Ingenieros
that Austin Ingenieros is a world class
has been offering resulted in Austin Engineering produced an FEA report, which included a pass match
company that ensures our services
them obtaining the confidence of the for the mine trucks on site. This report was based on maintaining the
meet the high standards required by
most important mining operation in existing cast lip, and therefore the bucket width, and adding additional
our industry, and our new facilities,
Chile; winning, in 2013, the major wear plate to strategic areas while maintaining the machines maximum
is proof that we are betting on
structural maintenance contract for suspended load requirements.
mine equipment and large structural continued growth to become leaders
repair services. in maintenance. After co-operation between the mine site, the OEM dealer and
Austin Engineering the work was carried out at Austin Engineerings
Safety and reputation is our Muswellbrook facility and was returned to service in July 2013.
business. This is the slogan of
Austin Ingenieros Chile, a promise Safety and reputation Reports from site, including the excavator operator, indicate that the
that is upheld daily through the is our business bucket was digging well and productivity was greatly improved.
quality service that we provide to
our customers, who have valued

22 | The Austin Engineering Group Magazine Issue 1 | 23


MINING MACHINE COOLING MINING MACHINE COOLING

Tier 3 & 4 Motors Overheating in require high use of exhaust gases


being fed back through the motors
to meet application requirements.
pack to be cleaned before work
could resume. Another example is
a forklift company who had taken
of work it does, it is some time after
that before a cooling system clean is
necessary. The new cooling system

Harsh Australian Environments: High levels of EGR (Exhaust Gas


Reticulation) means more heat
their standard 5 tonne forklift and
added a very large attachment to
more than quadrupled the front
end loaders operation time before
cleaning is required.
development during operation, it in order to be able to move bulky
A Cooling System Solution which means more heat to get rid of
from the system to prevent engine
products. This attachment added a
lot of heat to the system, mainly via In the case of the forklift with heavy
attachment (Tier 4 motor), after
overheating. All types of engines the hydraulics, putting the system
designed to meet Tier 3 and 4 at risk of overheating. Overheating working closely with the forklift
emission requirements create more a system risks damaging the motor; OEM, a complete assembly cooler
heat than standard diesel motors. pack additional to the OEM system
motors are designed to run at their
was supplied as a bolt on pack to
optimal temperature and anything
The current trend is to design off- dispense the extra heat.
above their designed temperature
road equipment with smaller front will cause damage to the motor.
ends or bonnet scapes, to make Cooling system solutions can
be tailored to OEM equipment
them more compact, increase In order to combat the inherent high
specifications resulting in drop
visibility around them or to make temperatures of a Tier 3 or 4 system,
in replacements. This results in
them more aerodynamic in design. together with the need to allow
limited equipment downtime whilst
This results in a system requirement these machines to operate in harsh
alterations are made, and limited
for smaller cooling packs, but which conditions, the OEM cooling packs
costs as no other motor alterations
offer more cooling capacity. The are able to be replaced by a cooling
need to be made.
result of these design trends is that system that is more suitable to the
earth moving and other off-road requirements of operating in harsh A custom designed cooling system

O
ff-road diesel engines, stringent Tier 2 and Tier 3 standards with no or only limited use of exhaust machinery is not as serviceable from a Australian environments. will reduce the likelihood of damage
such as dozers, graders, were introduced from 2000, with gas after treatment (oxidation trash collection point of view (in high to the motor due to overheating, and
forklifts and tractors, have Tier 3 standards for NOx + HC (Hydro catalysts). In 2004 Tier 4 emission debris environments). In an attempt reduces the need for cooling system
long working lives and are significant Carbon) being similar in stringency standards, which are being phased-in to resolve this issue, the trend is to cleaning reducing equipment repair
sources of fine-particle matter (PM) to the 2004 standards for highway over the period of 2008-2015 were
go for a higher efficiency radiator - Cooling system solutions and maintenance costs.
and nitrogen oxide (NOx) pollution engines. which means tighter tube and/or fin can be tailored to OEM
introduced. The Tier 4 standards
spacing. For more information, or to seek
into our fragile environment. require that emissions of PM and NOx equipment specifications assistance with your machinery
be further reduced by about 90%. The result of installing radiators with cooling systems, please visit
While on-road diesel engines sold in Such emission reductions can be resulting in drop in
tighter tube spacing is that some of www.corcooling.com.au.
Australia, such as highway registered Off-road equipment achieved through the use of control replacements.
the off-road equipment, operating
trucks and buses, are regulated to incorporating these technologiesincluding advanced in harsh Australian environments, is
meet strict emission limits, there are exhaust gas after treatment. (2)
Tier 3 and 4 designed experiencing clogging of the cooling
no regulations or standards in place system in a very short period of
(as of yet) to control emissions from engines are increasingly Off-road equipment incorporating operating time. This is due to debris In the case of the overheating front
non-road diesel engines.(1) these Tier 3 and 4 designed engines end loader (Tier 4 motor) operating
being put into service reducing air flow through the cooling
are increasingly being put into service system, leading to overheating. in an extremely harsh environment
However, in the USA, where many of in the harsh Australian in the harsh Australian environment. (mentioned above) - an open flow
the original equipment manufacturers environment. Meeting these standards has meant An example of this is a recent case through system was developed
(OEMs) are based, federal standards that the cooling systems for these of an OEM front end loader with a for the radiator, charge air cooler
to restrict emissions have been engines have to deal with more heat Tier 4 motor which could operate for and oil cooler. The result being that
in place since 1998, when Tier 1 load than ever before. only 10 minutes before the cooling the loader can now operate for 45
standards for off-road diesel engines The Tier 1-3 standards are met system would overheat. This meant minutes with no temperature rise at
were implemented. The increasingly through advanced engine design, The Tier 3 and 4 designed systems operation had to stop for the cooler all, and then depending on the amount

24 | The Austin Engineering Group Magazine Issue 1 | 25


TECHNOLOGY

Safety app for on-site work

Safe, Efficient
Cable Handling
with a Westech cable reel

Westech cable handlers can be mounted


on any chassis, allowing your operator

P
ilbara Hire has designed awareness of safety issues. and automatically syncs with the to quickly and safely pick up or lay down
and implemented a safety latest data when it is back in range.
The third main goal is to provide cable at your mine site.
interaction iPad app with
the intention of increasing their access to up to date analytics to
workplace safety culture. With safety measure the effectiveness of each The Westech cable reel range includes:
being the number one priority for interaction and enable Pilbara Hire to The app enables
Pilbara Hire, the app was developed report honestly and openly to clients.
employees to create a Loader Mounted Cable Handlers Westech Dragline Live Cable Reel
with three main goals in mind. The app enables employees to create
Loader mounted cable reels are designed Dragline Live Cable Reels are designed
a report on risks on any daily task report on risks on any
The first goal is to increase to safely and efficiently pick up, lay down to be pulled by a dozer in conjunction
with the ability to upload photos to
communication between employees assist in assessing risks. This enables
daily tasks and store cable in and around any mining with movements of the dragline.
or construction project.
and clients. The use of technology management to create reports on
such as this app encourages real time Westech Terragator Cable Reel
top risks facing staff and encourages Westech Shovel Live Cable Reel
communication between employees, Westech designed this cable reel to
staff to be involved in eliminating Pilbara Hire has entered the safety
their team leaders, managers and Shovel Live Cable Handlers are attached operate in difficult conditions, while
these risks.
direct clients. interaction app in the Chamber to and pulled behind the shovel, sled remaining stable and safe to operate.
The app also enables Pilbara Hire to of Minerals and Energy (Western fashion, on pontoon runners protected
The second goal is to enable Australia) awards in the innovation by abrasion resistant liner plates.
capture positive contributions and
employees to have a voice during continuous improvement that team section.
safety interactions to help eliminate members are implementing in the field.
workplace risks. The app is used Watch the video about the safety
as a tool to facilitate discussions The app is able to be used when out app on our YouTube channel - www.
on safety operations and increase of range, in the case of remote sites, youtube.com/user/AustinEngineering.

26 | The Austin Engineering Group Magazine


www.austineng.com
Safer Tyre Maintenance
with the JEC T3 TYRE HANDLER

Austin Engineerings innovative range


of JEC three-arm tyre handlers
are ideaL for, but not restricted
to, underground tyre maintenance
operations.

The unique design results in a range of benefits including:


n Increased machine stability

n Maximised visibility and accessibility

n Protection from flying debris

www.austineng.com

Potrebbero piacerti anche