1 Problem 1. Expand alternative road from KESAS to Federal road. 2. Traffic congestion during peak hours. Propose all decision alternative 1. To up grade from 1 lane to 2 lane. 2. Sampling & lab testing for others action approval from authorities. 3. New improvement method design Choose expected decision alternative (1) & (2) 2 Focus on the differences 1. To up grade from 1 lane to 2 lane. 2. Sampling & lab testing for others action approval from authorities 1. To upgrade from 1 lane to 2 lane. a. To find utilities maps to relocated after the new lane. b. take time to design and prepare report and must submit & approve by the local authorities. 3 Use a consistent viewpoint 2. Sampling & lab testing for others action approval from authorities a. take time to design and prepare report and must submit & approve by the local authorities. b. Recognize type of soil which is suitable 2. Sampling & lab testing for others action approval from authorities a. take time to design and prepare report and must submit & approve by the local authorities. b. Recognize type of soil which is suitable for the 4 Use a common unit of measure construction method used.
3. New improvement method design
a. Change design used for support slope at river from sheet pile to gabion wall.
5 Consider all relevant criteria Review again all criteria
Advantages a. Cost saving than using sheet pile b. Vibrating machine cost 6 Make uncertainty explicit risk Disadvantages a. Take a long time to construct gabion wall b. Hire more general worker 77 7 Revisit your decisions Choose the best decision 3. New improvement method design