Sei sulla pagina 1di 5

91435

Procurement Plan

(Updated in May 2014)

Serial No. Description of assignment Firm or Internation Estimated Procureme World Expected Expected Remark
Individual al or amount of nt method Bank date of duration
national contract(USD (CS:QSBC, review TOR of
) CQ, IC, SSS; prior or submissio contract
G: ICB, post n (month)
NCB)

MOHURD PMO
1-A-CS-001- Urban planning consultant to develop Individual National US$15,000 IC prior Oct. 31, 12 WB provided
PIN the program design and quality 2013 comments for
assurance revision in May.
1-A-CS-005- Building energy efficiency consultant WB provided
Oct. 31,
PIN to develop the program design and Individual National US$15,000 IC post 12 comments for
2013
quality assurance revision in May.
1-A-CS-006- Urban planning consultant to develop WB provided
Internation Oct. 31,
PIN the program design and quality Individual US$20,000 IC post 12 comments for
al 2013
assurance revision in May.
1-A-CS-007- Urban form study and LOCAL urban Firm national $290,000 CQ prior Oct. 31, 24 REOI advertised on
PIN planning pilots of city A&B through TA 2013 May 12, four pilot
grants (in addition to Beijing and cities are considered:
Ningbo) Yangquan in Shanxi,
Xi'an in Shaanxi,
Qingdao in Shandong,
and Zhuzhou in
Hunan
1-A-CS-009- Suggestion on revisions of national Firm national $200,000 CQ post April 30, 12 WB comments
PIN statutory urban planning regulations 2014 provided in
and standards December and
international advisor
provided further
guidance during the
meeting in March
1-A-TSW-001 Planned International
1st national consultation workshop US$50,000 for July, conference on urban
2014 plan & development.
1-A-TSW-002 Oversea study tour to
Planned German, hasnt got
1 domestic training and 1 overseas
US$180,000 for June, proved by foreign
study tour to German
2014 affairs bureau, why
budget is so high?
1-A-TSW-003 Planned
1 overseas study tour to Sweden & for TOR was approved by
US$30,000
Demark April30, WB in May
2014
1-A-CS-013- Financing management consultant to Individual national $6,000 IC post April 30, 12
TOR was approved by
PIN develop the program quality 2014
the WB in May
assurance
2-A-CS-001- Develop methodology and draft Firm Internation US$750,000
QCBS (Joint Draft
RFP guidelines on energy performance al (including
tender: submitted Contract is being
benchmarking for public and $100,000 prior 30
MOHURD, in July negotiated
commercial buildings from
BJ & NB) 2013
MOHURD)
2-A-CS-002- Promote disclosure mechanism on Firm national US$200,000 CQ post Planned 24 TOR was approved in
PIN energy performance for large public for April, May
and commercial buildings 2014
4-A-CS-001- 2 consultants of PMO staff Firm national $40,000 CQ Post Nov.30. Annual TOR approved in
PIN 2013 updated November
BHURDC PMO

1-B-CS-001 Beijing urban form study firm national $250,000 CQ prior Feb, 2013 24 REOI was advised on
April 14
2-A-CS-001- Pilot EPB&D program for large public firm National $450,000 QCBS prior 2013 30 In charge of the
RFP and commercial buildings and/or contract by
internation MOHURD, follow the
al contract number of
MOHURD
2-B-CS-001 Research on amending Beijing firm national $80,000 CQ Prior Sept,2013 18 Contract signed
Building Energy Conservation
Regulations
2-B-CS-002 Investigation and Research for revising firm national $80,000 CQ post Sept,2013 36 Contract signed
Beijings Energy Efficient Design
Standard for Public and Commercial
Buildings
2-B-CS-003 The investigation and development of firm national $80,000 CQ post Oct 31, 21 Contract signed
'Beijing Code for acceptance of green 2013
building construction'
2-B-CS-004 Establishment of green building firm national $200,000 CQ Prior Sept,2013 18 Contract signed
evaluation and certification platform
and provision of related training

2-B-CS-005 international green building and individual internation $20,000 IC prior Oct, 2013 8 Contract signed
building energy efficiency consultant al
2-B-CS-006 Amendment of Evaluation standard firm national $80,000 CQ post Jan, 2014 12 TOR to be submitted
for green building for Beijing DB11/T
825-2011
2-B-CS-007 Atlas of Universal Prefabricated Units firm National $80,000 CQ post Jan,2014 12 TOR to be submitted
for Assembly Integral Type Shear Wall
Housing
2-B-CS-008 Study on the indoor major air firm national $80,000 CQ post Jan,2014 24 TOR to be submitted
pollutant control technology
Terms of Reference
2-B-CS-009 Key Variety, Technical Guide and firm national $80,000 CQ post Jan,2014 12 TOR to be submitted
Management Measures for Promotion
and Application of Green Building
Materials in Beijing
2-B-CS-010 international green building and individual internation $20,000 IC post Oct ,2014 12 TOR to be submitted
building energy efficiency consultant al
2-B-TSW Regular trainings of green building NA NA $20,000 NA July, 2014
-001 evaluation (2 times).
2-B-TSW-002 Seminars and investigation (green NA NA $20,000 NA July, 2014
building) (more than 1)
2-B-TSW-003 Oversea study tour (participation of NA NA $20,000 NA Depending on
training MOHURD will organize) MOHURD PMOs
schedule
NHURDC PMO

1-C-CS001 Urban form study firm national $250,000 CQ Post Draft 24 Negotiating &
submitted drafting contract
in July,
2013
1-C-CS002.1 International advisors on Damuwan individual internation $60,000 IC prior Oct 31, 24 Inviting the qualified
pilot and Ningbo urban form study al 2013 candidates
1-C-CS002.2 National advisors on Damuwan pilot individual national $40,000 IC post Oct 31, 24 Inviting the qualified
and Ningbo urban form study 2013 candidates
1-C-CS003 Damuwan transport system planning firm internation $450,000 QCBS prior Draft 12 Contracted
and concept design al submitted negotiated, proposed
in July, to postpone the
2013 signing of the
contract due to the
delay of hiring related
qualified individual
consultants

2-A-CS-001- EPB&D pilot firm national $150,000 QCBS (joint Prior Draft 30
RFP and/or tender submitted
internation with in July,
al MOHURD 2013
and
BHURDC)
2-C-CS002 EPB&D pilot local consultant firm national $290,000 CQ Post Draft 30 Evaluation completed
submitted and requesting for
in July, proposal.
2013
2-C-CS003 Research on large-scale advance the firm national $200,000 CQ Prior Oct 31, 18 Negotiation
development of green building 2013 completed and the
contract drafted
1-C-TSW-001 Workshop on low-carbon urban forms $20,000 When? 2 days When?
Promotion of the development of the
low-carbon urban forms
2-C-TSW-001 study tour: Building energy saving and $20,000 When? 5 days When?
green buildings
BDRC PMO

3-D-CS-001- Capacity building and business firm Internation $450,000 QCBS Prior ToR 36 REOI published in
REI development of Yuanshen al completed April
3-D-CS-002- Independently M&E of project Past due, When to
Firm National $280,000 CQS Prior Dec. 2013. 60
REI implementation and results submit the TOR?
3-D-CS-003- Two-way metering pilot firm National $260,000 CQS Prior 24 Revised TOR to be
REI submitted
3-D-CS-004 On-line monitoring system design individual national $4,000 IC Prior Contract 2 Contract signed and
review and quality control signed. completed
3-D-CS-005 Program monitoring and evaluation individual national $6,000 IC Prior ToR 4 Contract signed
advisor completed

May be cancelled if
the need is weak
Two-way metering pilot quality considering the
3-D-CS-006 Individual National $15,000 IC Post 26
control consultant team
composition Any
update?
3-D-CS-007- Planning and design of renewable Individual national $10,000 IC Post ToR 15 Delayed?
a/b/c energy education teaching completed
laboratories
3-D-CS-008 TA on New and Renewable Education Individual national $50,000 IC Prior Jun. 2014 16
Platform

Goods and Equipment


Ref. No. Contract (Description) Estimated Cost Procurement Review by Bank Expected Bid- Comments
USD Method (Prior / Post) Opening Date
NHURDC PMO
2-C-G--001 On-line monitoring $360,000 NCB prior Dec. 2014
system equipment
BDRC PMO
3-D-G-001-IFB On-line monitoring $300,000 NCB prior March 2014 Last procurement
system equipment plan was 250,000,
change of budget
amount?
3-D-G-002-IFB Demonstration $300,000 NCB post TBD
laboratories equipment

Potrebbero piacerti anche