Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Department of State
Bureau of Overseas Buildings Operations
Design and Construction Program
FEDCon 2013 The Market Outlook on Federal Construction
January 9, 2013
WHO WE ARE
OBO directs the overseas building
program for the U.S. Department
of State and other Agency
personnel serving abroad as
foreign service diplomats.
70,000,000 5,300
SQUARE FEET ARTWORKS
$7 BILLION
UNDER DESIGN & CONSTRUCTION
PROJECT TYPES
Embassies
Consulates
Housing
Shops
Warehouses
JAKARTA
BUREAU INVENTORY
BUREAU INVENTORY
ASPIRATIONS
Positive Representation of the United States to the
Host Nation
Site
Design
Engineering
Sustainability
GUIDING PRINCIPLES
Architecture and Engineering
Professional Services
Construction and Craftsmanship
Art
Historically, Architecturally, or
Culturally Significant Properties
and Collections
DESIGN EXCELLENCE
Past Moving Forward
Remote Locations / Greenfield Urban Locations / Brownfield
Development Redevelopment
Standard Embassy Design Purpose-built Embassies
Security Security
DESIGN EXCELLENCE
Past Moving Forward
Limited Design Leadership Expanded Design Leadership
Hire Production Teams with Good Hire Strong Design Teams with
Leadership Good Leadership
14 LEED Certified
30 LEED Registered
| Addis Ababa | Antananarivo | Bandar Seri Begawan | Brazzaville | Dubai | Johannesburg | Karachi | Lusaka |
| Manila | Monrovia | Ouagadougou | Panama | Sofia | Tijuana |
A/E TEAM SELECTION PROCESS
Established new processes to hire the most talented
A/E teams
JAKARTA
CONSTRUCTION
Contractor Selection
The Department is recruiting, prequalifying and
awarding contractors committed to the best
D-B-B and D-B practices with verifiable records of
consistent success
Contract Award
Best Value method is be used to evaluate proposals,
with focus on past performance and project
management in the evaluation process, rather than
strictly low proposed cost
CONSTRUCTION
Successful OBO contractors
Are aggressive with their procurements and logistics management
Focus on and fully implement project schedules
Provide high quality cleared American supervision and labor
Take commissioning seriously
OBO contractors struggle when they
Have partnership that doesnt work
Split procurement responsibilities
Dont read the security specifications carefully
Dont take jobsite safety and health seriously
Focus on claim vs. production
PROJECT FUNDING
FY13 Budget
BANDAR
ANTICIPATED PROJECTS FY13
Capital Program Major Renovation
Georgetown Chancery
Nouakchott NEC
Vilnius Chancery
Paramaribo NEC
Seoul Chancery
* Construction Award
RECENTLY AWARDED PROJECTS
A/E A/E
IDIQ for Worldwide Design Services IDIQ for Worldwide Design Services
(Shortlisted) (Shortlisted)
New Construction Major Rehabilitations / Renovations
BNIM Architects Architecture Research Office
Ennead Architects Beyer Blinder Belle Architects
Mack Scogin / Merrill Elam BNIM Architects
Architects CO Architects
Miller Hull Partnership Goody, Clancy & Associates, Inc.
Moore Ruble Yudell Krueck & Sexton Architects
Richard + Bauer Architecture Weiss/Manredi Architects
Shop Architects Clive Wilkinson Architects, Inc.
Skidmore Owings & Merrill Zimmer Gunsul Frasca
Steven Holl Architects
Studio-Gang Architects
RECENTLY AWARDED PROJECTS
A/E
New U.S. Embassy Mexico City, Mexico
Tod Williams Billie Tsien/ Davis Brody Bond Architects and Planners Joint
Venture