Sei sulla pagina 1di 1

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

LEGEND OF FINISHES
J H3 H2 H1 H G1 G F E1 E D C B1 B A1 A
64000
A SPECIFICATION TABLE: A
3000 2000 2000 2000 3000 4500 7500 5000 3000 8000 7500 4500 7500 3000 6000 3000 3
FLOOR FINISHES
F1 - Trowel finish with Epoxy Coatings
F2 - False floor with Anti-Static PVC tiles finish on top
F3 - Anti-Static PVC tiles
F4 - Anti-Slip Ceramic tiles with 100mm high skirting
(Acid / Chemical Resistant - Except Prayer, Ablution,
5600

Kitchen, Toilet and Janitor Room)


F5 - Trowel finish with Heavy Duty Floor Hardener and
Chemical Resistant Epoxy coating
F6 - Cement render
B F7 - Carpet B
1500

WALL FINISHES
16200

W1 - Plastered and Painted for Brickwall


- Painted only for R.C. Wall
4500

VOID VOID W2 - Ceramic tiles up to door frame height


3 W3 - 2100 mm high gypsum partition wall with acoustic
treatment to specialist detail and specification
CEILING FINISHES
C1 - Fair-Faced and Painted
NOTES
3
4500

C2 - Suspended Acoustic Ceiling (1200mm x 600mm)


C3 - Without Ceiling
C4 - Aluminium Strip Ceiling
900 100

C 3 C5 - Moisture Resistant Ceiling (1200mm x 600mm)


C
3 3
SKIRTING FINISHES
MCB NORTH ELEVATION S1
S2
- 100mm high Anti-Static PVC tiles skirting
- 100mm high Ceramic tiles skirting
S3 - 100mm high False Floor skirting (Aluminium)
MAIN CONTROL BUILDING (6710-MCB-601) S4 - Without skirting
Scale 1 : 200 - AUTOCLAVED AERATED CONCRETE BLOCK
A A1 B B1 C D E E1 F G G1 H H1 H2 H3 J - R.C. WALL
64000 - DRYWALL
3000 6000 3000 4500 7500 8000 3000 5000 7500 4500 3000 2000 2000 2000 3000 - FALSE FLOOR
D D
3 DOOR SCHEDULE
D1 - 900mm x 2100mm (h) water resistant solid
core timber
D2 - 1800mm x 2100mm (h) water resistant solid
core timber
D3 - 750mm x 2100mm (h) 12mm thk. compact
5600

high pressure laminated cubicle door


D4 - 1000mm x 2100mm (h) water resistant solid
core timber
D5 - 750mm x 2100mm (h) water resistant solid
core timber
1500

FD1A - 900mm x 2100mm (h) Insulated 1 hour fire


E rated steel door E
16200

FD2A - 900mm x 2100mm (h) Insulated 2 hours fire


rated steel door
4500

VOID VOID FD1B - 1800mm x 2100mm (h) Insulated 1 hour fire


rated steel door
FD2B - 1800mm x 2100mm (h) Insulated 2 hour fire
rated steel door
FD1C - 1800mm x 2500mm (h) Insulated 1 hour fire
3 3
4500

rated steel door


FD2C - 1800mm x 2500mm (h) Insulated 2 hours fire
rated steel door
3 3
900 100

FD1E - 1000mm x 2500mm (h) Insulated 1 hour fire


F rated steel door F
3 FRS2A - 3000mm x 3000mm (h) 2 hours fire rated

MCB SOUTH ELEVATION roller shutter


WINDOW SCHEDULE
MAIN CONTROL BUILDING (6710-MCB-601) WD1 - 1200mm x 1200mm 8mm thk. clear glass with dry film
Scale 1 : 200 tinted with sliding frame
WD3 - 1200mm x 600mm 8mm thk. clear glass with dry film
1 1a 2 2a 3 3a 4 4a 5 5a 6 7 7a 8 8a 9 tinted with alum. frame top hung
WD4 - 2400mm x 2100mm 8mm thk. clear glass with
64000 fixed alum. frame
3000 6000 3000 4500 6000 1500 2500 5500 4000 4000 7500 4500 3000 6000 3000 WD6 - 1200mm x 600mm 8mm thk. clear glass with
3 fixed alum. frame
G WD7 - 1200mm x 1800mm 10mm thk. clear glass with G
fixed alum. frame
WD8 - 1800mm x 600mm 8mm thk. clear glass with dry film
tinted with alum. frame top hung
TOILET ACCESSORIES
5600

WC - V.C. Water Closet with Cistern/Flush Valve c/w


Accessories.
SR - Chrome Plated Shower Rose.
B - V.C. Wash Hand Basin with Chrome Plated
Water Tap & Accessories.
1500

SH - V.C. Wall Mounted Soap Dish.


TH - V.C. Wall Mounted Toilet Roll Holder. H
H
16200

U - V.C. Urinal Bowl c/w Accessories.


TAP - Chrome Plated Bip-Tap.
4500

VOID
VOID FT - Stainless Steel Floor Trap.
uFT - u.P.V.C. Floor Trap.
HB - Chrome Plated Hand Bidet c/w Accessories.
MIR - 6mm thk. 1st. Quality Mirror on 3mm thk.
Waterproofed Plywood Backing with Aluminium
3 3
4500

Framing.
SWM - Sanitary Waste Disposal (Mercerizer).
3 HD - Automatic Hand Dryer.
900 100

Digitally signed by Digitally signed by


Digitally signed by Irwan Kanvinchelvan A/L
Dzafir Bin Sudirman Moghana Sundaram

NOTES :
Kanagarajah
Date: 2017.03.09 16:35:42 Date: 2017.03.09 Date: 2017.03.09 16:36:36
+08'00' 16:36:08 +08'00' +08'00'

I 1. All Dimensions are in Millimeter and all Levels are in Meter 3 09-MAR-17 IFC - ISSUED FOR CONSTRUCTION IRW MOG KAN I
U.N.O.
MCB EAST ELEVATION 3 2. Car Parking shall be allocated and develope by package
contractor. (nos. of car parks required - 60 car parks.
2 12-JAN-17 IFC - ISSUED FOR CONSTRUCTION SHJ MOG KAN
1 15-JUL-16 IFC - ISSUED FOR CONSTRUCTION SHJ MOG KAN
MAIN CONTROL BUILDING (6710-MCB-601) nos. of car parks provided - 76 car parks.)
Scale 1 : 200 3. Abbreviations : 0 20-MAY-16 IFC - ISSUED FOR CONSTRUCTION SHJ MOG KAN
S.O.P - Set Out Point C 31-MAR-16 SHJ MOG KAN
IFR - ISSUED FOR REVIEW
9 8a 8 7a 7 6 5a 5 4a 4 3a 3 2a 2 1a 1 WC
S
- Water Closet
- Shower B 29-JAN-16 IFR - ISSUED FOR REVIEW SHJ MOG KAN
64000 FFL - Finish Floor Level
FFLL - Finish Floor Lower Level
A 30-NOV-15 IFR - ISSUED FOR REVIEW SHJ MOG KAN
3000 6000 3000 4500 7500 4000 4000 5500 2500 1500 6000 4500 3000 6000 3000
3 EL - Elevation Level Rev Date Status - Revision Memo Written by Checked by Approved by
RS - Roller Shutter Door J
J
AAC - Autoclaved Aerated Concrete Block In accordance with Article 41 of the Conditions of Contract, the ownership in this document shall vest in OWNER. No part of this
4. Flat roof shall be designed and constructed with effective document may be reproduced, stored in a retrieval system or transmitted in any form or by any means (electronic, mechanical
Water Proofing System to ensure no Leaking of Water. photocopying, recording or otherwise) without the permission of OWNER.
5. All HVAC Room walls shall be 250mm brick wall with finish CONFIDENTIAL Not to disclose without authorization.
and to be provided 2 nos. of floor traps.
5600

6. Package Contractor shall further confirm S.O.P. upon


Construction stage.
7. Room door size shall be further confirmed during detail
design with regard to Equipment size.
1500

8. FLOOR FINISHES - All Toilets Floor and Wets Area Shall OUI JV is a Consortium of Fluor Daniel International (Malaysia) Sdn Bhd and
Have 1 Layer of Brushbond Type Cementitious Technip Geoproduction (M) Sdn Bhd PRPC Utilities and Facilities Sdn Bhd
16200

Waterproofing Strictly to Manuf's Specs. & Requirement


K K
to Architect's Approval. PETRONAS RAPID PROJECT, PENGERANG
4500

VOID VOID 9. CEILING FINISHES - All Ceiling Height Shall Be 3000mm


Height on both ground and first floor Unless Otherwise
PACKAGE 14 - UTILITIES, INTERCONNECTING, OFFSITE UNITS
Stated.
10. All R.W.D.P. Shall Be (100mm,150mm, 200mm) with
Full Accessories Strictly to Manuf's Specs. & Requirement
ARCHITECTURAL DRAWING
3 3 Unless Otherwise Stated. MAIN CONTROL BUILDING (6710-MCB-601)
4500

11. Generally, the External Wall are Painted with Weather

3 3 3 Sheild Emulsion Paint to Architect's Approval. NORTH, SOUTH, EAST AND WEST ELEVATION
12. False floor height shall be 800mm minimum except
900 100

OTR Room shall be 600mm minimum.


13. Electrical information is preliminary, electrical room
DOC. CLASS : X SCALE : 1 : 200 SHEET : 1 OF 1
L dimension to be confirmed upon receiving vendor REVISION FORMAT
MCB WEST ELEVATION information.
14. Trenches layout to refer M & E drawings.
CONTRACTOR
Doc. Ref.
L

MAIN CONTROL BUILDING (6710-MCB-601) RAPID-P0014-0007-ELE-DWG-6710-1036


3 A1
Scale 1 : 200 15. Air Cooled Chillers layout to refer M & E drawings.
OWNER
Doc. Ref.
RAPID - P0014 - 0007 - ARC - DWG - 6710 - 1120
Project Package Originator Discipline Doc. Type Unit No Serial No
RAPID-P0014-0007-HVA-DWG-6710- 1001 & 1002.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Potrebbero piacerti anche