BILL OF QUANTITIES
Bridge w/ zocalo (connecting Bakery to Transient
Bldg.)
Rectification of terrace flooring
Finishing of door openings
Finishing of demolished surfaces
CHB 4,745.00 pcs.
Cement 323.00 bags
Sand 25.00 cu.m.
Gravel 48.00 cu.m.
RSB 16mm 70.00 pcs.
12mm 68.00 pcs.
Tiewire,G.I. 60.00 kls.
III. Doors and Windows
Sliding glass window, bronze glass w/ screen and
grilles, 1.60w x 1.10h 32.00 sets
Jalousie glass window, 60x60, w/ screen and grilles 8.00 sets
Panel door w/ jamb 22.00 sets
Door knobs 22.00 sets
IV. Repair and Extension of Roof Frames
C-purlins, 3"x4" 65.00 lngths
Angle bar, 2 48.00 lngths
Miscellaneous (welding rod, drill bit, cutting disc,
etc.) 1.00 lot
V. Roofing Works w/ Insulation
0.4mm x 1.05mx5.40m hi rib, long span prepainted
roofing sheets 64.00 sheets
0.4mm x 12" x 8' fascia cover, pre-painted 30.00 pcs
0.4mm x 18" x 8' ridge roll, pre-painted 14.00 pcs
Accessories (nails, vulcaseal, touch up paint, etc.) 1.00 lot
Insulation sheets, 5mm x 1m x 60m 7.00 rolls
VI. Ceiling Works
Fiber cement board, 3.5mm x4'x8' 120.00 shts
Metal frames, 8' 530.00 lngths
Blind rivets 10.00 boxes
Ventilation panels 24.00 units
Accessories (riveter, blade, cutting disc, tie wire,
nails, tie wire, etc.) 1.00 lot
VII. Drywall Partition
Fiber cement board, 4.5mm x4'x8' 145.00 shts
Metal frames, 8' 195.00 lngths
Blind rivets 14.00 boxes
Accessories (riveter, blade, cutting disc, tie wire,
nails, tie wire, etc.) 1.00 lot
VIII. Tile Works
Tiles, 60x60 2,130.00 pcs
Tiles, 30x30 2,180.00 pcs
Page 2 of 28
BILL OF QUANTITIES
Adhesive (25kgs) 105.00 bags
Grout (2kgs) 733.00 bags
Page 3 of 28
BILL OF QUANTITIES
Acrytex primer 9.00 pails
Acrytex topcoat 12.00 pails
Miscellaneous (brush, roller, sand paper, waste
cloth, tinting color, tape, etc.) 1.00 lot
Materials Required
Concrete/Finishing works
a. Column/ Footing
b. Walls (0.60m ht)
c. Flooring
Cement 155.00 bags
Sand 9.00 cu.m.
Gravel 18.00 cu.m.
RSB 16mm x 6m 55.00 pcs
10mm x 6m 130.00 pcs
Tie wire #16 25.00 kls
CHB 4" 825.00 pcs
Steel works
a. Roof framing
b. Mezzanine floor frame
C-purlins 2" x 3" 95.00 lngths
2" x 6" 27.00 lngths
Page 4 of 28
BILL OF QUANTITIES
Angle bar 1.5" 32.00 lngths
RSB 10mm x 6m 48.00 lngths
Miscellaneous (welding rod, etc.) 1.00 lot
Roofing works
Corrugated, G.i., prepainted .4mmx1.05x5m 74.00 shts
Ridge roll 7.00 pcs
End flashing 8.00 pcs
Fascia cover 19.00 pcs
Accessories (screw, touch-up paint,
etc) 1.00 lot
Carpentry Works
Marine plywood, 3/4" 30.00 shts
Accessories (nails, screw, glue, etc.) 1.00 lot
Painting works
Latex, flat 2.00 gals
Latex, semi-gloss 4.00 gals
Epoxy primer grey 2.00 gals
QDE 6.00 gals
Accessories (paint brush, roller,
tinting color, etc.) 1.00 lot
Electrical
works
Wires and Accessories 1.00 lot
Fluorescent lamp, LED 6.00 units
Materials Required
Page 5 of 28
BILL OF QUANTITIES
Flat sheets, 5.000 shts.
KD s4s, ecofor, 2x2x8 30.000 lngths
Nails, assorted 5.000 kls
Concrete works
a. Precast panels
(for plant boxes, gravel bed retaining wall, foot walks)
Labor
Subtotal per pc
Precast panels 700 pcs
b. Steel post footing
Cement 10 bags
Sand 1 cu.m.
Gravel 1 cu.m.
10mm x 6m 8 pcs
Miscellaneous 1 lot
Steel works and Net Enclosure
a. Roof framing
b. Installation of net
Item Spec Qty Unit
c. Painting of steel components
G.I. pipe 2", schd. 40 18 lngths
1" 300 lngths
Epoxy primer gray 12 gals
Net 1 lot
Laminated sacks 1 lot
Miscellaneous 1 lot
Page 6 of 28
BILL OF QUANTITIES
NGO: Hospicio de San Jose
Email: mspg.evidente@gmail.com
Contact: Maria Socorro Evidente, Administrator
Phone: (02) 734 2366
Project Status and Description: Renovation of Chapel
Location: Pandi, Bulacan
Materials Required
Page 7 of 28
BILL OF QUANTITIES
Electrical wires 1 Lot
Accessories (flexible hose, clamp, wires, utility box, 1 Lot
etc.)
VI. Roofing Extension
Angle bar 3/16x1 50 Pcs
G.I. Pipe, sched. 40, 1 35 Pcs
G.I. Pipe, sched. 20, 1 100 Pcs
Translucent roofing 85 Shts
Round bar, 16mm 20 Pcs
Turn buckle 20 Pcs
Flat bar, 1/8x1 aluminum 190 Pcs
Teks screw 2000 Pcs
Welding rod 2 Boxes
Stranded wire, #10 2 Boxes
VII. Painting works
Epoxy primer, gray 15 Gals
Latex, flat, white 6 Pails
Latex, semi-gloss, white 10 Pails
Skim coat 2 Pails
Sanding paper, #120 30 Ft
Bay roller 4 Pcs
Roller, big with handle 4 Pcs
Brush asstd 8 Pcs
Accessories (masking tape, waste cloth, old 1 Lot
newspaper, tray, etc)
VIII. Artworks and decoratives
Paintings 14 Units
Statue of Christ on the cross 1 Unit
Plants 1 Lot
Page 8 of 28
BILL OF QUANTITIES
Materials Required
1 Conference Room
Beam Cladding sqm 42.00
Toilet sqm 6.00
operable wall (folding Panel) sqm 43.20
2 Unit 1 sqm 35.75
Floor Finishes
Laminated Floor Boards Boxes 18.00
Bathroom Floor Tiles 300x300mm pcs 52.00
Bathroom Wall Tiles 300x300mm pcs 200.00
Balcony sqm 1.08
Wall Panelling sqm 80.15
Gypsum Board pcs 21.00
Pine Paneling 1x12x12 bdft 360.00
2x2x 12 lumber pcs 72.00
Ceiling Works sqm 35.75
Gypsum Board pcs 12.00
2x2 lumber bdft 228.80
Painting Works sqm 94.08
Paint Primer gal 8.00
Paint Finishes gal 8.00
Miscellaneous/ Consumables
Hardware kg 25.00
Painting implements/others lot 1.00
Masonry works cum 1.90
cement bags 24.00
sand cum 2.00
Page 9 of 28
BILL OF QUANTITIES
Toilet/Bath sqm 4.68
Floor Finishes
Laminated Floor Boards Boxes 16.00
Bathroom Floor Tiles 300x300mm pcs 52.00
Bathroom Wall Tiles 300x300mm pcs 200.00
Balcony Pebble washout sqm 10.56
cement bags 2.03
pebbles cans 12.00
Wall Panelling sqm 58.20
Gypsum Board pcs 20.21
Pine Paneling 1x12x12 bdft 261.90
2x2x 12 lumber bdft 267.72
Ceiling Works sqm 31.93
Gypsum Board pcs 11.09
2x2 lumber bdft 203.68
Painting Works sqm 94.08
Paint Primer gal 7.53
Paint Finishes gal 7.84
Miscellaneous/ Consumables
Hardware kg 25.00
Painting implements/others lot 1.00
Masonry works cum 1.90
cement bags 22.80
sand cum 1.90
Page 10 of 28
BILL OF QUANTITIES
Hardware kg 25.00
Painting implements/others lot 1.00
Masonry works cum 1.50
cement bags 18.00
sand cum 1.50
Page 11 of 28
BILL OF QUANTITIES
Gypsum Board pcs 43.40
Pine panelling 1x12x12 bdft 561.25
2x2 lumber bdft 575.00
Ceiling Works sqm 36.45
Gypsum Board pcs 12.66
2x2 lumber bdft 142.16
Painting Works sqm 125.00
Paint Primer gal 10.00
Paint Finishes gal 10.42
Miscellaneous/ Consumables
Hardware kg 25.00
Painting implements/others lot 1.00
Masonry works cum 1.50
cement bags 41.00
sand cum 3.00
chb pcs 557.00
10mm steel bar pcs 56.00
Stairs
2x12 lumber bdft 124.96
ballusters pcs 38.00
stair rails lm 11.30
Page 12 of 28
BILL OF QUANTITIES
Paint Finishes gal 10.42
Miscellaneous/ Consumables
Hardware kg 25.00
Painting implements/others lot 1.00
Masonry works cum 1.50
cement bags 41.00
sand cum 3.00
chb pcs 182.00
10mm steel bar pcs 25.00
Stairs
2x12 lumber bdft 124.96
ballusters pcs 38.00
stair rails lm 11.30
Page 13 of 28
BILL OF QUANTITIES
stair rails lm 5.68
10 Corridor
Second floor sqm 16.00
Floor topping cum 1.00
cement bags 12.00
sand cum 1.00
Engineered wood sqm 16.00
Ceiling sqm 16.00
2x2 lumber bdft 62.40
4.5 ficem ceiling panels shts 7.0
trimms and moulds lm 48.00
hardware lot 1.00
Wall Panelling sqm 60.0
Page 14 of 28
BILL OF QUANTITIES
Ficem Panelling shts 21.00
1x12 wood panels bdft 216.00
trimmings and center mouls lm 48.00
hardware lot 1.00
Paint/ Finishes sqm 76.00
12 Electrical Fixtures
Ceiling Lights sets 84.00
Ceiling Lights 3 way sets 25.00
Convenience Outlets sets 54.00
Emergency Lights sets 4.00
Water Heaters units 9.00
MTTC units 12.00
CTVC units 12.00
20mm pvc conduit lgts 80.00
Utility Box pcs 96.00
Junction Box pcs 60.00
4x4 pull box pcs 16.00
Junction box with cover pcs 30.00
pvc clamps bags 4.00
Page 15 of 28
BILL OF QUANTITIES
1/2 pvc long elbow pcs 40.00
NGO: UAP-MAC
Email: joeybvaldes@yahoo.co.uk
Contact: Joey Valdez
Phone:
Project Status and Description: Punduhan ng mga Dumagat
Location: Norzagaray, Sierra Madre
Materials Required
item
DESCRIPTION QTY Unit
no
1 2
I Gen. Requirements
Page 16 of 28
BILL OF QUANTITIES
vi Hauling of Excess Mtls 1.00 lot
II Site Preparation
a. FTG.
b. Column
b. Girder
Page 17 of 28
BILL OF QUANTITIES
d. Suspended Slab
IV Metal Works
V Masonry Works
VI Roofing Works
a. WaterProofing
ii Elastomeric 88.00 sm
VII Wood Works
including Painting
Page 18 of 28
BILL OF QUANTITIES
D-1 swing Panel Door 3.00 set
X Architectural Finishes
XII Specialty
Page 19 of 28
BILL OF QUANTITIES
excluding roughing-in works
Page 20 of 28
BILL OF QUANTITIES
ii Feeder Line 1.00 lot
Material Required
NO.
1 GENERAL REQUIREMENTS
2 SITE REQUIREMENTS
Preparatory Work
Page 21 of 28
BILL OF QUANTITIES
Ordinary Plywood 4'x8' 20.00 pc
2.Wall footing
3.Footing
4.Concrete Column
5.Concrete Beam
Page 22 of 28
BILL OF QUANTITIES
G.I. Tie Wire #16 1.00 kg
6.Slab
4 MASONRY WORKS
Roofing
Page 23 of 28
BILL OF QUANTITIES
Rafters & Purlins
6 CEILING WORKS
7 PAINTING WORKS
Painting
8 GRILLS
Windows
Page 24 of 28
BILL OF QUANTITIES
Jalousie Window 1.2m x 1.2m with Glass Blades 4.00 set
10 ELECTRICAL WORKS
Panel Board 30amp with 1-15 Amp CB, 2-20Amp CB 1.00 set
2.0mm 2 TW 0.40 LM
3.5mm 2 TW 0.40 LM
5.5mm 2 TW 0.05 LM
1. PLUMBING FIXTURES
2. DRAINAGE LINE
Page 25 of 28
BILL OF QUANTITIES
4" PVC Elbow 90 1.00 pc.
3.Water Line
5.SEPTIC TANK
12 TILE WORKS
Toilet
Page 26 of 28
BILL OF QUANTITIES
Tile Grout 2.00 kg
Kitchen Counter
Materials Required
A. 2- UNITS WATER TANKS
Page 27 of 28
BILL OF QUANTITIES
15 BAGS CEMENT
3 CUM SAND
2 CUM GRAVEL
6 KGS NAILS
1 PAIL U WATERPROOFING
Materials Required
Page 28 of 28