EmiratesSSteel(ES)hassexistingope
erationslocate
edintheInduustrialCityoffAbuDhabi(IICAD),AbuDh
habi,
UAE,whicchcurrentlyccomprisesanintegratedstteelmakingfaacility(Phase1)forthepro
oductionor
reinforcin
ngbarandwirrerodandan
nintegratedsteelmakingffacility(Phasee2)fortheprroductionof
structurallsectionsand
dsemifinishe
edproducts.TTheCompanyyhasrecentlyyacquiredanadjacent
steelmakingfacility,caapableofprod
ducing350KTTPAofsquareebillet,thein
ntentionbeingtoprovidebillet
feedstockktothePhase
e1longprodu
uctrollingmills.
TheComp
panyislocate
edinMussafaahIndustrialA
Area(ICAD1),,ontheNortthEastofAbu
uDhabi.Therreisa
localportintheMusafffahareaapproximately8kmfromthe siteandthemainMinaPortofAbuDh
habiis
pproximatelyy50kmfromthesite.TheCompanyha sasmalljettyyonthePhasse2siteforim
locatedap mport
ofironoxxidepellet;ho
oweveritisno
otsuitablefortheimport ofplantandeequipment.
Thearea isservicedbyaroadnetw
workwithinttheIndustria lCityofAbuDhabi(ICAD
D1)whichleaadsto
themainAbuDhabimotorwaynetw
workapproximately8kmffromthesite..
ufacturing un
The manu nits include a
a Direct Redu
uction Plant (DR Plants) o
on both Phasse 1 and Phaase 2.
Figure1b
belowshowstthelocationo
oftheDRproductionplantts(whichareidentical).
DRP1
DRP2
Aspartoffaprocessim programme,ttheexistinge mergencyventingsystemsfortheDRP
mprovementp Plants
requireim
mprovementiintermsofth
heirventingcapability,atppresentaflarresystemisusedto
depressurrizethereactorincasesoffemergency.Thissystemddoesnotventtthereactorquicklyenou
ugh,
soitisintendedinfuturetouseacoldventtodepressurizethereactor,inplaceofthecurrentflare
systemwhenanyemergenciesoccur.
2.ESRequirements
ESrequirestheservicesofasuitablyexperiencedandqualifiedcompanytosupplythebasicand
detaileddesignsforanewseparatecoldventingsystem.Tosupply,manufactureandinstallthenew
coldventonbothDRPproductionunits,toalsocommissionthenewsystemonceinstalled.Thevent
shouldberoutedtothetopofthereactortowertoaheightthatcomplieswiththeenvironmental
regulationsrelatedtoemergencyvents.
Thedesignshallfacilitatethedepressurizationofthereactortoatleast0.5barinamaximumtimeof
10minutes.
ThenewsystemwillneedtohaveEnvironmentalapproval,whichisunderESresponsibility,the
contractorwillberesponsibleforprovisionofthenecessaryspecification(drawing,input,output,
emissionsetc.)whichshouldcomplywiththeUAEEnvironmentallawinadvanceinordertogetthe
requiredapproval.
ThesituationonthetwoDRPunitsisslightlydifferentasatieintothereactorquenchorificehas
alreadybeeninstalledontheDRP2reactor,atieinwillneedtobeinstalledontheDRP1reactor.The
followingsectionsdetailtheindividualrequirementforbothproductionunits.
2a.DRP2
Thetieinforthecoldventhasalreadybeeninstalledinthe
DRP2reactorquenchorifice,whichisdetailedindrawing
DP017SFE21M1401TD101Rev02.Thescopeofworkforthe
phase2coldventistoconnecttotheexistingquenchorifice
ventlineisolationvalve(V1)spectacleplate,asshown
opposite.
One12ventcontrolvalve(V2)on/offneedstobeinstalled
afterthespectacleplate,thisvalvewillbefreeissuefrom
EmiratesSteelbutfittedbythecontractor,thespecificationof
thisvalveisdetailedinAppendix1.Theventline(P3)then
P-1
needstobeinstalledtotravelfromtheventvalvetotheverytopof N2line
P-6
P-2
thereactortowerwherethegaswillbeventedtoatmosphere.The
V-1 V-3
existingspectacleplateneedstoberepositionedbetweentwonew SpectaclePlate
Ventline
flangesasshowninthediagramopposite.Allnecessarypipeand P-3 P-4 P-5
V-2
valvesupportsfromV1shallbeincludedinthecontractorsscope.Thecontroloftheventvalve(V2)
shallbeprovidedbythecontractorthisincludestheinstrumentairconnection,themodificationstothe
HMIscreensintheDRP2controlroomwillbecarriedoutbyES.Anitrogenpurgeline(P6)with
automaticcontrolvalve(V3)needstobeinstalledtotheventlineaftertheventvalve(V2).
2b.DRP1
Atiein,isrequiredtobeinstalledontheDRP1quench
orifice,thepositionofthetieinshouldsuittherouteofthe
ventpipework.Apotentiallysuitablelocationishighlightedin
thephotographopposite.TheBOMforthetieinisdetailedin
table1below.
Thevalvearrangementwillbeexactlythesameasthatfor
DRP2detailedinthediagramabove,exceptforbeingina
differentorientation.
Isolationvalve(VI)andventcontrolvalve(V2)willbefreeissuedbyESbutfittedbythecontractor,the
valvespecificationanddetailsarefoundinAppendixone.Aspectacleplateneedstobeprovidedbythe
contractorandinstalledbetweenV1andV2.AllnecessarypipeandvalvesupportsfromV1shallbe
includedinthecontractorsscope.Thecontroloftheventvalve(V2)shallbeprovidedbythe
contractor,thisincludestheinstrumentairconnection,themodificationstotheHMIscreensintheDRP
1controlroomwillbecarriedoutbyES.Anitrogenpurgeline(P6)withautomaticcontrolvalve(V3)
needstobeinstalledtotheventlineaftertheventvalve(V2).
Bill of Material for DRP 1
SN Description/Size/Type Material Qty Unit Remarks Equipment
Specification/Dimension
1 12" NPS Pipe Sch 40 SS 304 L 1 Pc SS Cut to suit shell radius, Length Quench orifice
Seamless TBD connection (P2)
2 12"-150# RF Flange ASTM A 105N - ANSI B 5 Pcs V1, V2 and
Slip- On 16.5 spectacle plate
6 7/8" dia x 155 Long ASTM A93 Gr B7M & 24 Pcs For Spectacle Blind Spectacle
Stud Bolts & Nuts A192- Gr 2H
7 7/8" dia x 120 Long ASTM A93 Gr B7M & 36 Pcs For V1 and V2
Stud Bolts & Nuts A192- Gr 2H
8 12" Reinforcing Pad ASTM A240 19 mm thk 1 Cut and rolled to suit external shell Quench Orifice
radius same thickness of quench orifice
shell
9 Vent line TBD by contractor P3, P4 & P5
2 12"-150# Gasket ASME B16.20 SPW (SS 5 Pcs Flexitallic Quench orifice
-Graphite filled)
3 7/8" dia x 155 Long ASTM A93 Gr B7M & 24 Pcs For Spectacle Blind Spectacle
Stud Bolts & Nuts A192- Gr 2H
4 7/8" dia x 120 Long ASTM A93 Gr B7M & 36 Pcs For V1 and V2
Stud Bolts & Nuts A192- Gr 2H
2c.ControlSystems
Aspartofthemechanismsrequiredforoperatingthecoldventsafely,thefollowingitemsneedtobe
procuredandinstalledbythecontractor,theplantoperatingsystemsalsoneedtobemodifiedto
operateandmonitorthesenewlyinstalledsystemsonbothDRP1&DRP2.
PGHIsolation
Anautomaticisolationvalve(mentionvalvesizehere)needsto
beinstalledontheinlettothePGHasshowninthephotograph
opposite,permanentaccess(newfloorandhandrails)alsoneeds
tobeprovided.Thisvalveshallautomaticallyshutwhenthecold
ventlineisoperated.Thecontroloftheisolationvalveshallbe
providedbythecontractor,thisincludestheinstrumentair
connection,themodificationstotheHMIscreensintheDRP
controlroomswillbecarriedoutbyES.
NitrogenBlanket
N2injectionpoints
AN2blanketneedstobeprovidedbetweenthereactorandthe
PGHthatwillautomaticallyoperatewhenthecoldventis
operated.Thephotographoppositeshowsthetwofeedlinesfor
theO2enrichment,whichiswherethenitrogenshouldbe
introduced.Thesystemoperationshouldbe,assoonasthecold
ventsystemisoperatedtheO2mainisolationvalveclosesand
thenewN2valveopens.ThecontroloftheN2supplyvalveshall
beprovidedbythecontractor,thisincludestheinstrumentair
connection,themodificationstotheHMIscreensintheDRP
controlroomswillbecarriedoutbyES.
3.ScopeofSupply
1. AHAZOPstudyofthenewsystemandanycurrentsystemsorproceduresthenewsystemwill
impactonwillneedtobecarriedoutaspartofthedesignprocess.
2. Theprovisionoftheinformationnecessaryforenvironmentalapproval.
3. Thecompletebasicanddetaileddesignfortheinstallationandcommissioningofacoldvent
system.Thisshallinclude,butnotlimitedto:
a. Optimumrouteandpositionforcoldventsystem.
b. Sizeoftieintoexistingquenchorificeandvalvespecification.
c. Interconnectingpipeworktonewvent.
d. Pipeworksupportingmethod.
e. Assessmentofexistingstructuralsteelworkintegrity.
f. Specificationofcoldvent.
g. Paintingandcorrosionresistancespecification.
h. Maintenanceandoperationalaccess.
i. Environmentalimpactstudy.
4.DesignCriteria
4.1DesignBasis
ThelatestInternationalandLocalCodes,Standardsandconsiderationsshallbeusedinthedesignofthe
coldventsystem.
1. Safetyandenvironmentalrequirements(dispersion,smokinglimits,radiationlimits,noise,etc.).
2. Typeandquantitiesofreleasedgasesandnatureofflaringevent(toxicornontoxicfluids,
emergencyventing,etc.).
3. Constructionmaterialsrequirements(seawaterenvironment,corrosiveproductsofcombustion,
highheatflameintensity,intermittentoperation,multipletipsinclosevicinity,etc.).
4. Materialselectionsuitableforoperationaltemperatures,corrosion,erosion,hydrogen
embrittlement,temperaturecyclingembrittlement,etc.Materialselectionshouldtakeinto
considerationaspecialissueassociatedwithpotentialautorefrigerationfromdepressurizing.
5. Typicaloperatingconditions
6. Accesstoventusuallyrequiredformaintenanceandinspection.
7. Pipinginterfaceconnectionsshallbeflanged.
8. Buttweldsshallbefullpenetrationwelds.
9. Buttweldsshallbe100%radiographed.
10. RadiographicproceduresandacceptancecriteriashallcomplywithASMEB31.3.
11. Laddersandplatforms,includingboltingandotherattachments,shallbehotdipgalvanized.
12. Materialsofstructuresandaccessoriesshallbeadequateforallloadconditionsatlowest
specifiedambienttemperature.
13. Earthing(grounding)ofthestructureshallbeasrecommendedbyBS6651orequivalent
nationalstandards.
4.2Materials
ThecoldventsystemshallbeconstructedofmaterialsspecifiedintheBOMandequipmentdatasheets,
andasspecifiedbythevendorsdesign.
4.3NoiseLevellimits
Theventshallbedesignedandsitedsuchthatnoiseatpositionsnormallyaccessibletopersonnel.Noise
levelsshallnotexceedthelevelssetbytheenvironmentalagency,thesetobespecifiedintheoffer.The
vendorsquotationshallprovideinformationonexpectednoiseemissionfromthevent
4.4Guarantees
TheContractorshallprovidethefollowingperformanceguaranteeforthecoldventsystem:
1. Performanceoftheventhydraulically,mechanically,andelectrically.
2. Capacityofventforspecifiedcompositionrange.
3. Noiselevelsoverspecifiedoperatingrange.
4. Noiseatdesignflow.
5. Guaranteesshallapplytobothsummerandwinteroperation.
5.Documentation
Adetailedoperatingprocedureandmaintenancemanualsshallbedevelopedfortheventsystem.
Theoperatingprocedureshouldincludethefollowingmajortopics:
1. Detailedsystemdescription.
2. Operatingrangeandoperatinglimits.
3. Operatortrainingrequirementsandtrainingfrequency.
4. ProcessConditions
5. UtilityRequirements
6. ErectionandInstallationGuidanceProceduresandBOM
7. InstrumentandPipingDataSheets.
8. Drawings.
6.OtherStandards
ESEngineeringStandardsneedtobefollowedunlessthesehavebeensupersededbylocalregulations
theseareattachedinAppendix2.
7.Drawings
SupplieddrawingsaredetailedbelowandincludedinAppendix3:
DRP1DP017SFE21P4000AD501
DRP2DP02KBFE21P4000RD501
DP017SFE21M1401TD101Rev02ArrangementofProcessGasQuenchOrifice
8.Deliverables
Pleaseprovideanoutlineprojectplanwithyoursubmission.
Thetablebelowdetailstheresponsibilitymatrix.
2 ProvisionofactualP&IDs,CivilandMechanicalDrawings ES
3 Study/ReviewofMinimumDepressurizingtimewithoutaffectingInternalsof Contractor
Equipment.
4 ReviewingofActualpipingCapacityforVentingtoachieverequiredventingtime Contractor
5 ReviewingofActualShutOffValvesCapacitytoachieveventingtime Contractor
6 DesignofNewColdVentFlare Contractor
7 PFDandP&IDsandGAdrawingForNewColdVents. Contractor
9 Environmentalapproval ES
10 Information/documentationfortheenvironmentalapprovalprocess Contractor
11 CarryoutHAZOPstudyforthenewmodification. Contractor ES
14 DesignofPipingInterconnection Contractor
15 Designofvent,pipeworkandmaintenanceaccessplatforms Contractor
17 PLCandHMIConfiguration/Logicmodification(??) Contractor ES
18 VentCommissioningProcedure Contractor ES