MINUTES OF 494th MEETING OF OPERATION &

COORDINATION SUB-COMMITTEE OF WRPC HELD ON


12th APRIL, 2017 AT WRPC MUMBAI

The 494th meeting of Operation & Co-ordination Sub-Committee of WRPC was held on
12th April 2017 at WRPC Mumbai. The list of participants is enclosed at Annexure-A.

Shri M A K P Singh, Member Secretary, WRPC welcomed all the delegates of 494th
OCC meeting of WRPC. He informed the Committee that the following important
events/meetings took place since last OCC meeting held on 10th March at NTPC Vindhyachal:

1. A meeting on URTDSM & SCADA/EMS was held on 17th & 18th March 2017 at Indore.
2. An interactive workshop on Smart Power Management was held on 20th and 21st March
2017 organized by MPPMCL at Bhopal to address recent commercial issues.
3. A Special TCC meeting of WRPC was held on 05.04.2017 at WRPC, Mumbai to discuss
a single point agenda of Phasing out of generating units which do not have a space for
installation of FGD for compliance of new MOEF norms of SOX emissions.
4. A meeting on Reserve Regulation Ancillary Services(RRAS) was held on 10th April 10,
2017 at CERC New Delhi wherein CERC discussed experiences on RRAS with RPCs &
NLDC.

He further appraised the Committee that

1. WR utilities to utilize PSDF Fund for system strengthening, modernization of system,


technological developments in their system etc and outflow from PSDF on account of
RRAS UP to be minimized.
2. CAG Auditors have made observations in audit report on WR operational parameters,
reactive power management, planning & effective implementation of maintenance of
generating machines, transmission elements etc.

Thereafter the regular agenda items were taken up for discussion.

ITEM No. 1: CONFIRMATION OF THE MINUTES


Minutes of 493rd meeting of Operation & Coordination Sub-Committee (OCC) of WRPC
held on 10th March 2017 at NTPC Vindhyachal was forwarded vide letter No.
WRPC/OPN/OCC-Minutes/2016-17/3198 dated 20.03.2017. WRLDC vide email dated
rd
22.03.2017, commented on Item No.8.8 of MoM of 493 meeting regarding ICT capacity of
400/220 kV Solapur-MSETCL. They requested that the ICT capacity shall be recorded as 2x500
MVA at MSETCL(Lambothi) Solapur & 2x315MVA+1x500 MVA at PGCIL Solapur S/s.

Sub-Committee confirmed the Minutes of 493rd OCCM with above modification.

ITEM No. 2: REVIEW OF SYSTEM OPERATION DURING THE MONTH OF


MARCH 2017.

Member Secretary, WRPC requested WRLDC to brief the Committee on Grid


performance during the month of March, 2017.

Representative from WRLDC presented the performance of the WR Grid during the
month of March 2017. The presentation also covered Annual statistics (FY 2016-17) of WR &
its analysis (copy enclosed).

Sub-Committee appreciated the presentation & analysis made by WRLDC.

2.1 Frequency Particulars


The average frequency during the month of March, 2017 was 49.99 Hz. The maximum
instantaneous frequency was 50.34 Hz at 18:03:00 hrs on 05.03.2017, while minimum
instantaneous frequency was 49.66 Hz at 18:58:20 hrs on 27.03.2017. The frequency profile
during March, 2017 was as under:

01st March, 2017 to 31st March, 2017 % time

IEGC band (49.9 < f < 50.05 Hz) 73.56


< 49.9 Hz 8.95
> 50.05 Hz 17.50

The frequency particulars are enclosed at Annex-2.1.

Member Secretary, WRPC enquired the reason of high percentage of operation on higher
side of IEGC frequency band. General Manager, WRLDC clarified that it is mainly due to the
unpredictable RE generation. This can be confined to IEGC band by improving the visibility of
RE generation.
2.2 Inter-Regional Exchanges
There was a net inter-regional export of 6360.00 MUs by WR against net export schedule
of 6529.00 MUs.
The Sub-Committee noted the above information.

2.3 Voltage Profile

The details of Voltage profile at some of 765/400 kV sub-stations during the month of
March, 2017 furnished by WRLDC is enclosed at Annexure-2.3.

Member Secretary, WRPC informed that CAG has made observation on reactive power
management in WR. Over voltages at important nodes is a serious concern as at present at times
it is managed by opening of several important lines. He requested all Generators to absorb MVAr
as per their capability curves. All utilities were requested to expedite the commissioning of
reactors well within the timeline agreed in the plan.

Sub-Committee agreed to take all possible steps to improve the voltage profile.

2.4 U/F Relay Operations

During March, 2017 the system frequency didnt touch 49.5 Hz and no UFR operation
was reported by WRLDC.

The Sub-Committee noted the above information.

2.5 Power Cuts / Load Restrictions

Details of Power Cuts and Regulatory measures during the month of March, 2017 as
furnished by the State utilities are given in Annexure. 2.5.
Member Secretary, WRPC stated that WR is surplus region having Installed capacity of
almost 110000 MW as compared to demand of around 50000 MW. He asked the States the
reasons for Power cuts and load shedding.
CE, SLDC, Kalwa clarified that there is no planned load shedding in the Maharashtra
State. The figures indicating in Power cut report is due to line or equipment failures.
Representative from Chhattisgarh State also informed that the figures in load shedding report are
part of load management due to sudden/forced tripping of generating units.
Member Secretary, WRPC suggested that it shall be clearly indicated by State
utilities whether load shedding is of planned nature or contingency, system
constraints/failures etc.
2.6 Details of Generating Units under Forced outages
Details of generating units under forced outages during the month of March, 2017 are
given in Annexure-2.6.

The Sub-Committee noted the information.

2.7 Details of Generating Units under Planned outages

The details of generating units under Planned Outages during the month of March, 2017
are given in Annexure-2.7

Member Secretary, WRPC stated that with the onset of summer season the demand is
under rising trend. He requested concerned generators to keep their units on bar/ready to meet
any exigencies and if required, should postpone planned AOH as and when requested by
WRLDC/SLDC.

The Sub-Committee agreed with the above suggestion.

ITEM No. 3: OPERATIONAL PLANNING

3.1 Proposed planned maintenance programme of generating units.

The maintenance programme of generating units for the months April 2017 & May 2017
is given in Annexure 3.1.

CE, SLDC, Maharashtra requested that as the demand in Maharashtra is increasing


APML to defer the outages of unit no 2 & 3. APML agreed to defer the outage as requested. CE,
SLDC, Gujarat requested to defer the outage of CGPL unit # 50 till unit # 20 is synchronised.
CGPL agreed with the request.

AGM, NTPC, Sipat informed that unit # 1 is planned for Boiler licence renewal & AOH
work.

Member Secretary, WRPC requested NTPC to defer the outage of big size units(500 MW
and above) in view of the rising trends of demand in the region. He suggested NTPC to write to
Boiler Inspector for extension of renewal date as this being a peak summer season.

As predicted this summer season would be harsher, Sub-committee agreed that, AOH
work of the bigger size unit should be deferred. Agreed plan is enclosed at Annexure 3.1.

3.2 Outage programme of Transmission Lines/Elements.


Maintenance programme for transmission lines/elements for the month of May 2017 was
discussed and the finalised plan is enclosed at Annexure 3.2.

Representative from WRPC/WRLDC suggested following for real time coordination:

1. All outages from 08:00 hrs shall be scattered from 06:00 hrs to 09:00 hrs. Similarly
evening revival time also scattered by 3 hours.
2. Rescheduling to be avoided for long outages(more than two days) and outages which
require NLDC consent to be availed in same dates as approved in OCC.
3. All rescheduling to be done on D-3 basis.
4. Once outage is approved on D-2 basis by reliability team, no rescheduling allowed unless
extreme emergency.
5. A large number of A/R on non-auto mode outages for OPGW work is being put up by
utilities, but same is not availed. Only 30% outages are availed. Tentative date shall also
given by availing agency.
6. It is seen that some utilities seeking outages are not writing elements names clearly.
Proposal shall be put through HOD of the Section/organization only.
7. For important outages of State elements, SLDCs may furnish the contingency plan along
with the request.

The Sub-Committee agreed to follow the above mentioned guidelines.

3.3 Anticipated power supply position for the months April 2017 & May 2017
Details of anticipated restricted & un-restricted demands for the months of April & May,
2017 are given in Annexure 3.3.

The Sub-Committee noted the information.


ITEM No. 4: OPERATIONAL STATISTICS FOR THE MONTH OF MARCH 2017

The details of actual generation, demand, drawl of power from grid; exchanges etc. are
given in the following Annexures:

Annexure 4.1 - Actual Generation and Requirement.


Annexure 4.2 - Peak Demand: Schedule Vs Actual.
Annexure 4.3 - Integrated Operation of the System and Operation of Inter State Tie lines
Annexure 4.7 Details of level of Major Reservoirs in Western Region

The Sub-Committee noted the information.

ITEM No. 5: SYSTEM DISTURBANCES IN WESTERN REGION


There was no major grid disturbance in the Western Region during the month of March,
2017. The details of minor incidences occurred during the month of March 2017 received from
WRLDC are enclosed at Annexure-5.
The Sub-Committee noted the information.

ITEM No. 6: HEALTHINESS STATUS OF SERs/DRs OF EQUIPMENT IN THE


SYSTEM.

Following Constituents have furnished the status of healthiness of SER/DRs in their


systems.

S.l. No. Name of Constituent Date of Receipt


1 PGCIL,WRTS-I 05.04.2017
2 PGCIL,WRTS-II 06.04.2017
3 MPPTCL 12.04.2017
4 NTPC 04.04.2017
5 CSPTCL 05.04.2017
6 GETCO 12.04.2017
7 MSETCL 05.04.2017
8 DD/DNH
9 GOA
10 NPCIL
11 NCA/SSP
12 NHDC
13 Jindal PL
14 CGPL
15 DB POWER
16 KWPCL
17 ACBIL/TRN ENERGY
18 KSK
19 GMR
CHHATTISHGARH
20 JNSTPS
21 MB POWER
22 SASAN UMPP
23 NSPCL
24 RGPPL
25 SUGEN
26 RKM POWER
27 ESSAR POWER
28 BDTCL/JTCL/RTCL
29 RELIANCE
TRANSMISSION
30 ATIL
31 JHABUA POWER
32 EPTCL
33 TPGL

All utilities were reminded to submit the status regularly well before the issue of OCCM
agenda.

ITEM No. 7: STATUS OF COMPLETION OF ONGOING SCHEMES FOR


COMMISSIONING OF REACTORS, TRANSMISSION LINES AND
GENERATING UNITS IN WR.
7.1 Status of completion of ongoing Schemes for Commissioning of Reactors.

The present status regarding schedule and commissioning of Reactors:

Sl. 400 kV Size (MVAr) Implementing Expected date of


No. Sub/Stn. agency commissioning
1 Nanded 125 MSETCL June 2017
2 Sholapur 125 MSETCL June 2017
3 Kolhapur 125 MSETCL June 2017
4 Akola 125 MSETCL June 2017
5 Alkud 125 MSETCL Commissioned on
01.01.2017
6 ISP 125 NHDC April 2017
(Tendering done)
7 L/R at Nagda - 50 MPPTCL Commissioned on
ISP line at 31.03.2017
Nagda end
8 Satpura 50 MPPGCL Dec-2017
9 Khandwa 125 PGCIL Commissioned on
01.04.2016
10 Vindhyachal 125 NTPC Commissioned on
06.04.2016

WRLDC suggested that the original planned date should also be mentioned in the above
table so that any deviation from the planned dated can be monitored by the Sub-Committee.
MSETCL was requested to install 125 MVAs reactors at Dhule S/S as the CSR installed are of
less rating and are not working properly.

Sub-Committee was requested to expedite the commissioning of reactors well within the
original dates given by the utilities. The Sub-Committee agreed with the same.

7.2 Status of completion of 765/400 kV and above ongoing Transmission schemes being
executed/implemented by Transmission agencies.

The updated status on various ongoing transmission schemes for the current year as per
the current information available is as follows: -

Sl. Name of the Line Target Remarks


No. Completion

Date
POWERGRID
1 400 kV Navsari Kudus D/C Line May -17 ROW/Forest problem
2 Commissioned on
765 kV Wardha Nizamabad- D/C
30.03.2017
3 June 17
765 kV Nizamabad-Hyderabad D/C
4 400 kV Aurangabad - Boisar line D/C line May -17
5 765 kV Aurangabad (PG) - Padghe (PG) June -17
D/C
6 800 kV Champa Kurukshetra Bipole One pole test charged on 25.01.2017

Pole two expected at end of Mid


May 2017.
7 LILO of both circuits of Aurangabad Commissioned on
Pune 400 kV D/c line at Pune 765/400 kV 03.04.2016
GIS
8 400 kV KSK-Champa(PS) III & IV Commissioned on
04.10.2016
9 400 kV RKM-Raigarh Commissioned on
02.11.2016
10 400 kV MOUDA BETUL PG LINES May -17
CHHATTISHGARH
1 400 kV DCDS Raipur(Raita)- June -17 Work completed
Jagdalpur(DCDS)
2 LILO of 220 kV Raigarh-Budipadar at 400 May -17
kV PGCIL S/s Raigarh. Ideal charged on
11.8.2015 for anti theft reason
GUJARAT
1 400 kV D/C Vadinar-Amreli line Dec -17
2 400kV APL-Hadala LILO to Halvad Oct -17
3 400 kV D/C Amreli-Kasor line(Part-1) May -17
4 400 kV Charanka- Veloda Commissioned on 28th
March 2017
5 400 kV Varsana-Halvad May -17

MADHYA PRADESH

MAHARASHTRA(STU)
1 400 kV Bableshwar-Kudus D/C (Quad) Forest clearance awaited,
July -17
severe ROW problem
STERLITE (RPTCL)
1 Commissioned on
26.02.2016(But idle charged
from Sujalpur end as bays at
Rapp end are not ready)
400 kV Sujalpur(PG) - RAPP(Kota) (IR
by RTCL) I & II Ckt I charged from both end on
11.11.2016.

Ckt II charged from both end on


15.11.2016

The Sub-Committee noted the above information.


7.3 Commissioning of new Generating units in Western Region and the capacity
expected to be commissioned during the current year 2016-17.

The status of Generating units, commissioned /expected to be commissioned during the


current year according the available information:

Name of the Power Projects Unit No. Capacity Date of Commissioning


(MW) /Schedule Date
GUJARAT
NIL
CHHATTISGARH
MARWA 2 500 COD on 00.00 hrs of 31.07.2016
MAHARASHTRA
CHANDRAPUR 8 500 Synchronized on 29.3.2015. COD
on 04.06.2016
CHANDRAPUR 9 500 Commissioned on 21.03.2016.
COD not yet declared
KORADI 9 660 Synchronized on 21.01.2016.
COD on 22.11.16
KORADI 10 660 Synchronized on 01.07.2016.
COD on 19.01.2017.
MADHYA PRADESH

Essar Power MP Ltd(Mahan) 2 600 July -17


BLA 2 45 Commissioned on 20.03.2017
CENTRAL SECTOR/IPP

GMR Chhattisgarh 2 685 COD on 01.04.2016


KSK 3 600 Dec -2017
KSK 4 600 Dec 2017
RKM 3 360 Sept 2017
RKM 4 360 December 2017
TRN Energy 1 300 COD on 19.08.2016
Spectrum 1 50 COD on 25.10.2016
SKS 1 300 Expected by April 2017
SKS 2 300 Expected by July 2017
JPL STAGE-II 4 600 COD ON 12.12.2016
Spectrum Energy(ACBIL) 2 50 COD on 09.12.2016
NTPC Mouda 3 660 COD on 01.02.2017
NTPC Monda 4 660 May 2017
NTPC Lara 1 800 Dec 2017
NTPC Solapur 1 660 June 2017
NTPC Solapur 2 660 Sept 2017

The Sub-committee noted the above information.

ITEM No. 8: MISCELLANEOUS OPERATIONAL ITEMS

8.1: QUARTERLY REVIEW OF CRISIS MANAGEMENT PLAN AND PHYSICAL &


CYBER SECURITY(P&CS) IN POWER SECTOR

The current status of submission of CMP and P&CS report (constituent wise) for the
fourth quarter (January 2017 to March 2017) is given below:

Sr No Name of Constituents CMP Status P&CS Status


1 NTPC I & II
2 PGCIL I & II Submitted status
3 WRLDC
4 GUJARAT
5 MAHARASHTRA Submitted status by SLDC
Maharashtra
6 CHHATTISGARH
7 MADHYA PRADESH Submitted status by SLDC MP
8 DD/DNH
9 GOA
10 NPCIL
11 NCA
12 NHDC
13 Jindal PL
14 CGPL
15 DB POWER
16 KWPCL
17 ACBIL/TRN ENERGY
18 KSK
19 GMR CHHATTISHGARH
20 JNSTPS
21 MB POWER
22 SASAN UMPP
23 NSPCL
24 RGPPL
25 SUGEN
26 RKM POWER
27 ESSAR POWER
28 BDTCL/JTCL/RTCL
29 RELIANCE
30 TRANSMISSION
ATIL
31 JHABUA POWER
32 EPTCL

Member Secretary, WRPC suggested that CMP & P&CS document of all the Power
utilities in WR shall be submitted before OCC forum & the same shall be uploaded on WRPC
web portal. He further requested Utilities to submit the status report for the period of Jan-17 to
March-17(Q4 for the financial year 2016-17).

The Sub-Committee agreed to furnish the same.

8.2: LGBR PREPARATION FOR THE YEAR 2017-18 IN WESTERN REGION.

LGBR for the year 2017-18 has been issued and available at WRPC website. The next
quarterly review will be done at the end of June 2017.

The Sub-Committee noted as above.

8.3: MONITORING OF SCHEMES FUNDED FROM PSDF


In the 6th meeting of NPC held on 19th December 2016 at Bengaluru, it was decided that
all the RPCs in the monthly OCC meetings may follow up with the utilities to expedite the
completion of schemes by giving due priority. The implementations of most of the schemes are
based on the recommendation of the enquiry committee on grid disturbance of July, 2012 headed
by Chairperson, CEA. Therefore timely implementation of these schemes would enhance the
grid security and reliability. Accordingly the detail of grant sanctioned from PSDF for the
schemes of Western Region is enclosed at annexure- 8.3A for the deliberation in the meeting.
The status of implementation of above schemes (physical as well as financial progress) are to be
reviewed and the utilities requested to expedite implementation of the schemes.

The utilities were advised to furnish the information in the format enclosed at annexure
8.3 B by first week of every month on regular basis to Member Convener, PSDF project
monitoring group (AGM, NLDC, POSOCO) with a copy to NPC & WRPC division. Gujarat &
Madhya Pradesh have submitted progress/status in prescribed format (Annexure 8.3C). All other
availing utilities were also requested to submit in the same format (annexure 8.3B).
Representative from Madhya Pradesh informed that MP, SLDC has already completed
the requisite formalities for release of 30% of approved grant through PSDF fund. However it
has not been released so far. He requested OCC forum for assistance for release of fund from
PSDF.
General Manager, WRLDC ensured that they will take up the matter with NLDC. He
further requested other utilities to come forward with proposal to avail the PSDF fund.
The Sub-Committee noted as above.

8.4: MAPPING OF FEEDERS WIRED UNDER AUFLS IN SCADA-ITEM FROM


NPC.

In the 4th, 5th & 6th NPC meetings, the feeders/lines mapping of the Feeders / Lines
covered under AUFLs, on SCADA systems of SLDC's/RLDC's was discussed, wherein NPC
have desired that monitoring of the feeders / loads under the AUFLS shall be done at SLDC's /
RLDC's, so as to ascertain that the desired results are ensured during the events, frequency
falling below the AUFLs frequency settings.

In the 6th NPC meeting it was informed that SR has already achieved mapping of 84% of
loads/ feeders on the SCADA system & online feedback of tripping of these feeders during
frequency falling below the AUFLs settings, is available at SRLDC. In NR the exercise/process
of mapping such feeders into the SCADA system has started. In the 6th NPC meeting it was
therefore desired that all the loads/feeders wired under the AUFLS is monitored in Western
Region also and the progress be submitted to NPC.
A list of feeders/loads implemented under AUFLs in WR was compiled at WRPC in
2014 and same is uploaded in website of WRPC under news section and PCM Minutes section.
States were requested to update the list of feeders under AUFLs and intimate the feeders which
have already been mapped in their SCADA System and are presently monitored on line by them.
Also constraints, if any, faced in mapping AUFLs feeders in their SCADA System may be
intimated. Constituents / States were requested to initiate the process of mapping these feeders in
the SCADA System & same shall be made available to WRLDC.

In 493rd OCC meeting it was decided that list of feeders connected with AUFLs,
available with WRPC/WRLDC shall be shared to all SLDCs by WRPC. SLDCs shall update the
same and send to WRPC/WRLDC. SLDCs were requested to map the feeders where currently
available telemetered AUFLs and load relief obtained. For other feeders which are not covered,
SLDCs shall submit their action plan for the mapping.

Subsequently WRPC sent the list of feeders connected with AUFLs, available with
WRPC/WRLDC on 15.03.2017. The updated list from SLDCs are still awaited. SLDCs were
requested to expedite the same.

The Sub-Committee agreed to submit the updated list.

8.5 TRANSFER OF URS POWER ALONGWITH EQUAL SHARING OF FC


Addl. CGM, MPPMCL vide letter dated 03.03.2017 have stated that presently, the URS
power is transferred to requisitioning beneficiary along with its 100% fixed cost. Due to this it
hardly comes in the MoD of the beneficiary who wants to purchase URS power and thus prevent
such units from going under RSD. During FY-16-17 (up to Jan-17) the URS power available was
16722 MUs which was 21% of the DC, whereas the utilized URS power was only 597 MU (only
3% of URS power ) with a recovery of fixed charges @ Rs. 1.25 /kWh to the surrendering
beneficiary.
In order to utilize the URS power by requisitioning beneficiary effectively so as to reduce
such huge backing down of power, it was envisaged that equal sharing of fixed charges by URS
selling and purchasing beneficiary will reduce the overall cost of URS power by Rs. 0.27 to Rs
0.95/kWh and such URS power may then easily be accommodated in the MoD of purchasing
beneficiary. This will result in increased purchase of URS power and ultimately create a win-win
situation for selling as well as purchasing beneficiary, increased plant efficiency and reduction in
backing down/RSD instances also.
Member Secretary, WRPC requested that all the beneficiaries to give their comments on
the proposal of MPPMCL. He further suggested that the comments of States will be put up in the
next CCM for further discussion.
The Sub-Committee noted as above.

8.6 TRANSFER OF STATE SURPLUS (STATE-URS) WITHOUT FIXED COST.


Addl CGM, MPPMCL vide letter dated 03.03.2017 have stated that State Gencos is
availing the benefit of getting the technical minimum schedule even when the demand is not
there in some time blocks. This has resulted in back down of other cheaper power sources and
thus increases the power purchase cost.
It is envisaged that, if the market rates are not supportive, at-least the power of such On-
Bar units of State Gencos which are scheduled to technical minimum or above for meeting the
demand in some of the time blocks may be sold in other time blocks when they are not required
by treating this as State URS (SURS).

Member Secretary agreed to take up this item in the next CCM for further discussion.

The Sub-Committee noted as above.

8.6 INTRA REGION BANKING.


Addl CGM, MPPMCL vide letter dated 03.03.2017 have stated that presently, the
banking transactions are being made by WR states outside the Region. In banking with the States
out of WR, constraints for import are very less compared to the export whereas if it is done
within WR States there shall be no constraints.
Considering the surplus status of WR States, the requirement of power to meet the
demand by banking of power doesnt exists, but at the same time, in peak demand months when
costly power is scheduled to meet the demand, banking can be a tool to reduce the overall power
purchase cost. As the practice of power banking is based on energy exchange only, without any
monitory transaction, it can be easily planned considering the demand, surplus and season.

Member Secretary, WRPC advised to take up this item in ensuing CCM for further
discussion. However a whatsapp group has been created by WRLDC to exchange the
information of Intra regional banking & URS power.
The Sub-Committee noted as above.

8.8 OUTAGE PROPOSAL FOR MUNDRA SAMI LINE # 1 & 2 FOR


MODIFICATION IN TOWER FOR CANAL CROSSING.
Sardar Sarovar Narmada Nigam Limited (an undertaking of Govt. of Gujarat) is
constructing the canal in Gujarat State. The proposed canal at village Lunva, Gujarat crosses
(under passes) the existing Adani Transmission (I) limiteds (ATIL) 400 kV Mundra-Sami Line.
ATIL has been assigned the work of increasing the clearance from the newly under construction
canal near village Lunva, Ta-Bhachhau, Dist-Kutchh, Gujarat. SSNNL requested an outage on
6th April, 2017 and 10th April, 2017 but as confirmation could not be received, looking to the
urgency of work new outage is requested as follows.

Mundra Sami #1 on 21st April17 from 7 hrs to 18 hrs


Mundra Sami #2 on 18st April17 from 7 hrs to 18 hrs

The Sub-Committee agreed for the above outages.

8.7 OPERATION OF ISTS ELEMENTS IN STATE WITHOUT CONSENTING SLDC


SHIFT CHARGE:

CE, SLDC Gujarat vide letter dated 03.04.2017 intimated that, WRLDC had issued code
on 23.03.17 for opening of 765 kV Indore Vadodara line to allow impulse testing in 765 kV
Vadodara S/S without informing SLDC Shift in charge. Prior to opening of said line, 765 kV
Dhule Vadodara line and one 765/400 kV ICT was already made off on 21.03.17.

The outage of 765 kV S/C Indore Vadodara line was permitted for impulse testing
without taking consent of SLDC- Gujarat in real time up to 27.03.17 even when 765 kV S/C
Vadodara Dhule was already under outage. SLDC requested WRLDC to restore the line
immediately due many bigger sized units (EPGL 2 x 600 MW, APL Unit No. 1, 2 and 3 330
MW each, APL Unit No. 6 660 MW, UTPS Unit No. 6 500 MW) were out. There being sharp
demand rise in the system due to onset of summer GUVNL was requisitioning URS power from
central generating stations and purchasing short term power purchase round the clock. Despite
these facts, WRLD has over ruled the request of SLDC-Gujarat. SLDC-Gujarat has expressed
their grave concern as without agreeing with SLDC, Shift charge such important operation had
been allowed by WRLDC. CE, SLDC Gujarat requested to accommodate the concerns of
SLDCs during the real time in future.

GM, WRLDC informed that the outage of 765/400 kV Vadodara S/S from 21-27.317 was
a planned outage and was discussed in 493rd OCCM held at Vindhyachal. PGCIL had informed
that a team from China is coming for the high voltage impulse test of Vadodara GIS S/S and in
OCCM it was agreed that WRLDC would do the studies for analyzing the feasibility.
Accordingly reliability suggestions were forwarded by WRLDC with study results in advance.
NLDC also consented this outage by postponing some outages in the inter-regional corridor on
priority as outside agency was involved. WRLDC took all real time measures to control the flow
and to take care of grid security such as keeping HVDC Mundra-Mahendragarh bipole flow
below 2000 MW and reversing HVDC Vindhyachal flow towards NR in consultation with
NLDC. He further informed that at times WRLDC has to take decision to facilitate some planned
outages on priority especially when a team from outside is called in advance, but grid security is
always taken care by WRLDC/NLDC.

Member Secretary, WRPC clarified that the above outages was discussed during last
OCC. Accordingly PGCIL, Vadodara tied up with Chinese Expert. He appraised the concern of
rising demand of Gujarat. He requested WRLDC to discuss with the SLDCs also before allowing
such outages so that SLDC can take other remedial steps.

The Sub-Committee agreed as above.

8.8 INSTALLATION OF NEW BUSBAR PROTECTION SCHEME FOR 400 KV


SWITCHYARD AT KANSARI (ZERADA) S/S REGARDING KEEPING
BUSBAR PROTECTION OUT AT 400 KV SWITCHYARD AT KANSARI FOR 30
DAYS W.E.F. 17.04.17.

CE, SLDC Gujarat vide letter dated 03.04.2017 have intimated that, GETCO Corporate
office has sought permission for keeping bus bar protection out for about thirty days at 400 kV
Switchyard at Kansar (Zerda) substations for replacement of existing bus bar protection scheme.

SLDC-Gujarat intends to allow permission keeping 400 kV bus bar protections out from
17.04.17 with following conditions:

a. Bus bar arrangements at 400 kV Kansai S/S would be as under during bus bar
protection scheme will remain out:
400 kV Bus - 1 400 kV Bus - 2
ICT- 1 ICT-3
ICT- 2 Kankroli
Bhinmal line Vadavi 2
APL line Varsana
Vadavi 1 line Soja

220 kV Bus - 1 220 kV Bus - 2


All 220/66 KV Trf
Palanpur 1 Palanpur 2
Jangaral 1 Jangaral 2
Agathala 1 Tharad
Deodar 1 Deodar 2
ICT 1, ICT 2 ICT - 3
Thavar 1 Thavar - 2
b. There shall be provision of SPS that in case of any ICT tripping at Kansari S/S either
from HV or LV side, there shall be tripping of both 220 kV Kansari Palanpur line No. 1
& 2 and there shall be tripping of around 50 to 60 MW load serving from 220/66 kV
Transformers at Kansari S/S. There shall be load relief of around 200 MW.
c. 400 kV / 220 kV Bus coupler at Kansari S/S will remain close.
d. No 400/220 kV, ICT outages will be permitted at Soja & Vadavi S/S.
Also, the following outages will be required for shifting bus bar protection wiring in
new panel.

Lines / Elements From To Reason

Date Time Date Time


315MVA 400/220kv ICT No.3 22-Apr-17 08:00 22.04.2017 18:00

400 KV Kansari - Vadavi line No. 1 24-Apr-17 08:00 24.04.2017 18:00

400 KV Kansari - Vadavi line No. 2 25-Apr-17 08:00 25.04.2017 18:00

New 400 kv Bus bar protection scheme


400 KV Kansari-Varsana line 26-Apr-17 08:00 26.04.2017 18:00
logic test and commissioning work

400 KV Kansari-Mundra line 27-Apr-17 08:00 27.04.2017 18:00

400 KV Kansari - Soja 28-Apr-17 08:00 28.04.2017 18:00


315 MVA 400/220kv ICT No.2 29-Apr-17 08:00 29.04.2017 18:00
400 KV Kansari-Bhinmal line 01-May-17 08:00 01-May-17 18:00
400 KV Kansari-Kankroli line 02-May-17 08:00 02-May-17 18:00

Representative from SLDC Gujarat gave a presentation. During the presentation he


explained that all precautionary measures will be taken care during the activities. He informed
that following SPS would be under implementation:

During tripping of any ICT at Kansari S/S, either from HV/ LV side, there shall be tripping of

(1) Both 220 kV Kansari Palanpur line No. 1 & 2.


(2) Approx. 50 to 60 MW load shedding at Kansari S/S
(3) Total load relief would be around 200 MW.
(4) 400 kV / 220 kV Bus Coupler at Kansari S/S will remain close.
(5) No outages of 400/220 kV ICT will be permitted at Soja & Vadavi S/S.

The Sub-Committee agreed/noted as above.

8.9 REPLACEMENT OF 400 /220/33 KV ICT AT BHADRAWATI BY LOWER


RATING ICT

GM, WRTS-I, PGCIL vide Email dated 06.04.2017 informed that in CERC Petition No:
56/77/2015 Order dated: 29.07.2016, clause no. 18, CERC advised to shift the 400/220/33 kV,
315 MVA ICT at Bhadrawati to some other location where its capacity could be fully utilized. In
491st OCC Meeting, WR-OCC members opined that the alternate auxiliary supply from tertiary
loading of ICT is required at Bhadrawati for reliability on auxiliary supply, and POWERGRID
shall explore possibility of replacement of 315 MVA ICT with an ICT of lower rating. He
further submitted that

1. The auxiliary supply of HVDC Bhadrawati Station is met through two independent
sources at 33 kV level from MSEDCL, namely MIDC feeder and Warora feeder. In
addition, two DG sets of 1850 kVA each are provided for providing backup power supply
in the event of the failure of the 33 kV feeders.
2. 315 MVA ICT has been provided at Bhadrawati for additional reliability. However
considering the orders of CERC and the discussions held in 491st OCC, shifting of the
315 MVA ICT from Bhadrawati to some other location where its capacity could be fully
utilized has been identified as Daltongunj, which is scheduled to be commissioned by
May 17 and one number 250 MVA ICT available at Moga Substation, which is
decapitalised there, is identified to be shifted to Bhadrawati HVDC. This ICT is
completely suitable to meet the requirements at Bhadrawati HVDC.
3. Since the ICT being shifted from Moga is a decapitalised one, POWERGRID do not
envisage to capitalise the cost of the transformer at Bhadrawati .
4. Dismantling of ICT at Bhadrawati need to be taken up immediately as it will take 15
days. In the meantime transformer from Moga shall reach at Bhadrawati and the same
can be commissioned in minimum time.
In view of this Committee may consent for the 315MVA ICT to be taken out of service
at Bhadrawati to commence dismantling.

GM, WRLDC informed that considering reliability and ensuring continuous auxiliary
supply to HVDC Bhadrawati, it is suggested to first bring the 250 MVA Moga ICT at
Bhadrawati and then 315 MVA ICT can be dismantled and transported to ER. This would
minimize the ICT outage time at Bhadrawati and PGCIL to take all measures to install the ICT at
Bhadrawati on priority. It was also agreed that PGCIL will give a self certification about the
RLA of transformer being brought from Moga as replacement.

Member Secretary, requested Powergrid to first bring the 250MVA Moga ICT at Bhadrawati
before dismantling 315 MVA ICT for reliable & continuous auxiliary supply to HVDC Bhadrawati and
furnish RLA certificate so that frequent shifting of ICT .

The Sub-Committee agreed as above.

ITEM No -9. AGENDA FROM WRLDC:

1. REMEDIAL MEASURES FOR LOSS OF SCADA DATA AND HOT LINE


VOICE COMMUNICATION AT WRLDC

Complete loss of SCADA data at WRLDC occurred on 24th& 25th Feb 17 for duration of
16 hours and 1 hour respectively due to communication link failure. The issue was raised by
WRLDC in 493rd OCCM wherein OCC members agreed that loss of SCADA data need to be
viewed as disturbance in power system and reliable communication to be ensured by all means.
WRLDC suggested interim arrangements that are to be taken by POWERGRID to avoid such
reoccurrence till Master Communication Plan is commissioned. The issue was also discussed in
URTDSM/SCADA project review meeting held on 17-18 March17 wherein POWERGRID
agreed for
a. Providing an alternate communication link of STM-1 between WRLDC and Asoj from
independent service provider.
b. Deployment of ULDC engineer at WRLDC to resolve the routine communication issues
with WRTS-I/II of POWERGRID, IPPs & ISGS for cases wherever ULDC
Communication network is being utilized.
c. Expedite establishment of Terminal server links and ICCP links up to Back up control
Centre of WRLDC.
d. Swift Integration of major stations in WR with WRLDC through Orange Hotline phones.
Present status of hotline phone integration with respect to WRLDC exchange is as
follows.

Member Secretary, WRPC directed POWERGRID to take immediate action on all


remedial measures as discussed to avoid such type of failure of data in future.
GM WRTS 1 agreed to expedite the all actions. He confirmed that internal approval for
STM 1 has been already obtained. He said that all out effort will be made to commission this
STM 1 by 30.04.2017. Regarding early posting of an officer, he informed that he will take up the
matter with his Management.
The Sub-Committee agreed as above.

2. INSTALLATION OF PMU AT CHAMPA HVDC

Pole-I of 800 kV HVDC Champa-Kurukshetra Bipole (WR-NR) has been commissioned


and power order is varied from 150 MW to 1500 MW as per system conditions. Being a high
capacity corridor between WR and NR, it is desirable to install a PMU at Champa HVDC for
better visualization and understanding of transients and controller actions of HVDC.
As Champa HVDC is a newly commissioned substation, the PMU at Champa was not
included in BOQ of URTDSM. However during meeting with NLDC on 14th March,
POWERGRID had agreed for installing a PMU at Champa HVDC by diverting PMU from
nearby substation. The letter addressed to POWERGRID from NLDC dated 17th March, 2017
(Letter Enclosed as Annexure-9.2)
GM, WR-I, PGCIL informed that revised note sheet with PMU requirement at Champa
HVDC is sent to CC and installation would be done immediately after approval.

The Sub-Committee agreed/noted as above.

3. TELEMETRY OF RENEWABLE ENERGY SOURCES IN WR

Western region has RES (Wind+Solar) installed capacity of around 13.8 GW. RES being
intermittent and variable poses challenges in maintaining load generation balance and system
parameters within thresholds. Latest status of RES (Wind+Solar) telemetry availability at
WRLDC is tabulated.
State/Region RES Installed Telemetered RES Capacity % of RES
Capacity at WRLDC (Wind+Solar) Visibility/Observability
(Wind+Solar) in MW in MW at SLDC/WRLDC
Gujarat 5740 (4622+1118) 5734 (4616+1118) 99
Maharashtra 5024 (4662+362) 0 0
Madhya Pradesh 3036 (2239+797) 2564 (2076+488) 84
Chhattisgarh 76 (0+76) 66 (0+66) 87
Diu 9 (0+9) 0 0
Daman 1(0+1) 0 0
WR 13810 (11523+2287) 8298 60

The visibility of RES in Maharashtra is 0% whereas in Gujarat and Madhya Pradesh it is


99% and 84% respectively. On the regional basis the observability of RE is only 60 % in WR.

Telemetry of RES is essential for decision making in real-time. Further, the accuracy of
RE forecasts could be also improved if telemetry of RES is available. The issue was raised in
previous OCC meetings by WRLDC and there was consensus amongst all stakeholders on the
need to ensure telemetry from RES at SLDCs and WRLDC.

Chief Engineer, SLDC Maharashtra expressed difficulties of not having telemetry of RES
data at SLDC due to failure of implementation of communication scheme awarded to M/s TULIP
earlier. Further he informed that it would take another 6 months period for achieving telemetry of
RES data at SLDC, Maharashtra. CE, Gujarat and EE, Madhya Pradesh informed that they are
providing connectivity to RE sources with the condition of telemetry availability and are not
allowing injection to the state grid if telemetry at their control centers is not available.
GM WRLDC emphasized that the visibility of Wind data at Maharashtra SLDC and
WRLDC is very much required due to onset of high wind period from May to September, 2017.
It would be very difficult for system operator to handle around 3500 MW of wind generation
expected in Maharashtra in real time during high wind period with blind fold operation. It is also
required to accommodate the green power at the time of availability as must run station.
However, System operator may instruct the wind/solar generator to back down generation on
consideration of grid security or safety of any equipment or personnel is endangered and Solar/
wind generator shall comply with the same. For this, Data Acquisition System facility shall be
provided for transfer of information to concerned SLDC and RLDC.

There was a consensus among OCC members to resolve this issue by alternate means to
get the telemetered data from RE stations / pooling stations of Maharashtra to SLDC/WRLDC.
GM , WRLDC suggested to call a special meeting with all wind developers of Maharashtra and
MEDA officials for discussion and for urgent resolution of issues regarding telemetry of RE
data at the SLDC/RLDC.

Member Secretary, WRPC suggested to call the special meeting in next 10 days period.
Subsequently a meeting between Wind developers, MEDA, SLDC Maharashtra, STU MSETCL,
WRLDC & WRPC was scheduled for 21.04.2017 at WRPC office to resolve the issues.
The Sub-Committee noted as above.

4. COMPLIANCE TO LOW VOLTAGE RIDE THROUGH (LVRT) BY WIND


GENERATORS

The installed capacity of Wind RE in Western Region is around 11000 MW (4662 MW


in Maharashtra, 4622 MW in Gujarat and 2213 MW in Madhya Pradesh). In view of the CEA
regulations and the CERC order it is desirable that the status of LVRT compliance is compiled
by all SLDCs.
All states to indicate the present methodology of checking LVRT compliance in
vogue for giving clearance for integration and update the status of LVRT compliance.
In this regard, a detailed letter was also sent from WRLDC to all WR-SLDCs on 17th
February 2017 (Letter enclosed as Annexure-9.4). The issue was discussed in 493rd OCCM
wherein SLDCs agreed for compilation of LVRT compliance by wind generators in respect of
their states. The details may be compiled in the format given below and submit the same to
WRPC and WRLDC.

If turbine
If turbine
commissioned
commissioned
after
before
Pooling Turbine Turbine Turbine 15.04.2014
Location Developer 15.04.2014,
Station make type Capacity whether
Expected date of
compliant to
completion of
LVRT
retrofitting
(Yes/No)

Gujarat, Madhya Pradesh and Maharashtra agreed to submit the details in the prescribed
format within 15 days time period.

5. OPENING OF INTERIM CONNECTIVITY ARRANGEMENT OF VANDANA


VIDYUT LTD

CERC vide order dated 28.09.2016 on petition no. 30/MP/2014 had directed CTU to take
up all existing cases of connectivity of interim LILO with RPC of respective region for review
and decision of disconnection of the same.

VandanaVidyut Ltd (VVL) connected through LILO of one ckt of Korba-Birsingpur D/C
as an interim arrangement since July12. In 33rd meeting of WRPC held on 01.02.2017 it was
recommended to open interim arrangement of VVL by 31.3.2017. CTU vide letter dated
30.03.2017 advised WRLDC to remove the interim connectivity to VandanaVidyut (Letter
enclosed as Annxure-9.5). POWERGRID is to submit proposed date for availing the Shutdown
of 400 kV Korba-Vandana and 400 kV Vandana-Birsinghpur for removal of LILO and restoring
the 400 kV Korba-Birsinghpur to its original configuration. POWERGRID to also confirm
coordination with MPPTCL/MPPGCL and NTPC Ltd for shifting of PLCC panels and revising
the Protection settings.

POWERGRID informed the forum that they have initiated action for removal of LILO of
Korba Birsinghpur line at Vandanafor restoring the line to its original configuration.
POWERGRID have submitted the date for availing shutdown from 19-25.4.17. NTPC and
SLDC, MP were requested to give full support for protection coordination at both ends and
PLCC panel shifting.

The Sub-Committee noted as above.

6. FREQUENCY RESPONSE CHARACTERISTICS

With the help of SCADA data the frequency response characteristics of region/states and
generating units are being evaluated by WRLDC for grid events involving generation/load loss
that cause sharp variations in grid frequency. Based on past four events average response of
generators has been evaluated
It may be inferred from the response that
a. Response of NTPC Mouda was consistently above 60%. The average response was 85 %.
b. Average response of MB Power, Lanco, Essar Mahan, Sipat-II, Korba-II, JPL Tamnar,
VSTPS-IV, APML Tiroda and NSPCL was in the range of 10 20 %.
c. The response of all the other stations was either zero or between 0-10 %.
Generating stations and States may apprise the following to OCC

1. NTPC Mouda whose response is consistently above may share the details of
FGMO/RGMO logic implemented and df/dt measurement etc, for the benefit of total
western region. The details may be shared to OCC forum through small presentation.
2. All other generating stations whose response is poor/inadequate may share the same
details (the details of FGMO/RGMO logic implemented and df/dt measurement etc.) and
issues faced in FGMO/RGMO implementation.
3. All SLDCs are requested to analyse the performance of State generators & observations
may be presented.

WRLDC expressed very serious concern w.r.t poor frequency response of WR utilities
for grid events involving generation/load loss more than 1000 MW which caused sharp variation
in frequency.

GM, WRLDC informed the forum that, enough time have been given to all utilities of
WR for complying the CERC order on Frequency response. But there is not much tangible
results achieved in frequency response which is less than 10% for most of the stations and even
ZERO response for some of the units. In view of this, WRLDC has no option left except filing
the petition before Honble CERC. There would be no further discussion on technical and
commercial constraints of the generating stations in compliance of CERC order which has
clearly mandated the stations to ensure compliance to the IEGC provisions in respect of primary
response.

Member Secretary, WRPC directed all generators to participate in frequency control


which is regulatory requirement for grid security. He directed that a final letter may be issued by
WRLDC with a cut-off date to all concern generators.

The Sub-Committee noted as above.

7. EXTENSION OF RGMO STATUS TO SLDC / WRLDC


Generating stations whose signal integration is still pending and stations from whom no
response has been received so far are tabulated below.

S.No Station Current Status


Remarks
1 TRN Energy Pending RGMO Not Commissioned
2 GMR Warora Pending Reply awaited from Station
3 GMR Chhattisgarh Pending Reply awaited from Station
4 MCCPL Pending Reply awaited from Station
5 MB Power Pending Reply awaited from Station
6 Mouda Pending Reply awaited from Station
7 KSTPS U#1 & U#7 Pending Reply awaited from Station
8 BALCO Pending Extended date of Integration April 1st week
9 JP Nigrie Pending Proposed date of testing 5 April 17
10 VSTPS U#1-10 Pending Wiring completed by NTPC, Signal
integration in RTU by POWERGRID
Generating stations TRN Energy, GMR Warora, GMR Chhattisgarh, MCCPL, MB
Power, Mouda, KSTPS and VSTPS to give the plan for integrating RGMO status in WRLDC.

State SLDCs may update the current status of mapping of RGMO signals of State
generators in SLDC SCADA.

AGM WRLDC stated that in line with IEGC 5.2 compliance, it is essential to monitor
RGMO status at SLDC/RLDC. The unit wise status of RGMO at ISGS needs to be telemetered.
So far 49 units from 18 generating stations have been wired in WRLDC SCADA.
Member Secretary, WRPC appreciated the efforts of WRLDC to make the visibility of
RGMO position at control centre and requested all generators for taking faster action to wire the
100 % status of RGMO at WRLDC SCADA.

The Sub-Committee noted as above.

8. TELEMETRY ISSUES

Telemetry issues are being taken up regularly in OCCM. In the month of March, 17 due
to intermittency of data from following nodes problems were faced in computation of drawl
calculations and impeding suggestable measures for better system operation. Utilities may
apprise OCC, actions being taken for ensuring consistency of data during n-1 of communication
channel upto WRLDC.
S.No Node Constraints Remarks
1 Telemetry availability was very poor in the WR-I to resolve
Wardha_PG month of March 17 causing drawl calculation the issue
problems of Maharashtra. Reliable telemetry
to be considered
2 Communication link is GPRS since LANCO to
Lanco_IP commissioning which is intermittent. Primary update
link upto Bilaspur to be expedited.

3 The telemetry is highly intermittent. Also, GMR to update


GMR secondary link to be established for reliability

4 RKM Communication link is GPRS since RKM to update


commissioning which is intermittent. Primary
link upto Kotra to be expedited.
5 BALCO Communication link is GPRS since BALCO to
commissioning which is intermittent. Primary update the
link upto Dharamjaygarh to be expedited. status of
Also, the voltages of 400kV buses and bus resolution
coupler is down since long
6 Major 765kV station. Telemetry is highly Maharashtra to
Ektuni_MAH intermittent. Maharashtra to confirm update
availability of secondary channel.
7 Not available since 22nd March 2017. Maharashtra to
Warora_MH Required as alternate for Wardha telemetry update

8 IEPL The telemetry of IEPL is highly intermittent Maharashtra to


update
9 Mahalaxmi, Tillari The telemetry of 220kV Mahanlaxmi & 220kV Maharashtra to
Tillari substation through which lines go to update
Goa grid is not available causing problems in
real time drawl calculations of Maharashtra
and Goa
10 Goa Goa telemetry not updating. During recent Goa to update
tripping in Goa grid, the system was not visible
to control room
11 DNH Telemetry of none of the DNH stations is DNH to update
updating at WRLDC

Representative from RKM informed that telemetry would be done within 10 days.
Goa is not taking any action even after taking up in earlier meetings. It was decided in 492nd
OCCM that WRLDC would take initiative to arrange meeting with Goa to solve the protection
and telemetry issues. Accordingly letter was issued by GM, WRLDC, but so far no response
received from Goa.
The Sub-Committee noted as above.
9. PREPAREDNESS FOR POWER SUPPLY POSITION DURING SUMMER

WRLDC intimated the forum that, WR has already achieved its highest ever maximum
demand in 1st week of April 17. Gujarat and Maharashtra also have crossed their maximum
demand of 2016-17 in 1st week of April17 due to increase of temperature in Western Region.

IMD has predicted that the temperature would remain 4-6 degrees above normal in many
areas during summer this year. Last year generation at Parli, Tirora, Chandrapur and NTPC-
Mouda, were affected due to water shortage. A meeting was held on 31st March 2017, Secretary,
Ministry of Power reviewed preparedness of forthcoming summer demand. The meeting was
attended by representatives from State Governments, IMD, CEA, POSOCO and various
SLDCs. All constituents were advised to take following measures for enhanced power supply
position
Deploying water conservation measures
Hydro stations to be used for peaking condition only and not as base load.
Forecast of demand for proper real time operation. As the demand rises, the constituents
to revive the generating units in RSD/closed down.
Availability of thermal generating stations with adequate water supply to be ensured.
Stocking of coal in thermal power stations.
Rescheduling or deferment of maintenance schedule of power plans whenever possible.
Procurement of fuels in advance such as coal, Naptha and Gas etc.
Utilization of Gas/Naptha (RLNG) based stations, availing URS(Un-Requisition
Surplus).
Maintaining the load generation balance and advance planning of load shedding measures
if required.
CE,SLDC Gujarat stated that, all state utilities should schedule upto the technical
minimum to the cheaper ISGS stations to keep more units ON-BAR. Maximum URS power to
be utilized to avoid over drawl from the grid. Gujarat is also utilizing RLNG in its extreme
requirement to meet the high demand. Maharashtra intimated that there would be no water
shortage problem this year.

Member Secretary, WRPC requested all to cooperate in high demand period to the extent
of maximum in order to maintain the grid parameters under control and keeping the grid secure.
The Sub-Committee noted as above.

10. CONTROLLING HIGH VOLTAGE DURING OFF-PEAK HOURS

Switchable Shunt Reactors are being taken in service during high voltage conditions.
However in view of inadequate shunt reactive compensation, the generating units are advised to
contribute in voltage regulation by operating their units in under-excited mode (absorb Reactive
Power) within the capability curve. The MW, MVAR and Voltage of generating units was
analyzed for the month of Feb 2017 with the help of SCADA data available at WRLDC. It has
been observed that following generators are injecting reactive power into the grid even when the
bus voltage is above nominal.
1. IPP : DB Power, Essar Mahan, GMR Chhattisgarh, KSK Mahanadi
2. ISGS: KSTPS-I
3. Generators under the control of Gujarat SLDC
a. Essar Vadinar (U#1 & U#2)
b. Wanakbori (U#4, U#5 & U#6)
4. Generators under the control of Maharashtra SLDC
a. Koradi (U#8 & U#9)
b. Bhuswal (U#4 & U#5)
c. Jaigad (U#3 & U#4)
5. Generators under the control of Madhya Pradesh SLDC
a. Satpura (U#10 & U#11)

WRLDC vide letter dated 21st Mar 17 had advised above generators for reviewing
/adjustment of AVR settings and GT tap so as to enable generating units to contribute in voltage
regulation within capability curve.
Representative from NTPC, Sipat expressed concern over switching of 240 MVAR bus
reactor frequently for voltage control. AGM, WRLDC informed that there were only 4 switching
operations from Jan-Apr17 where as Bilaspur 240 MVAR Bus reactor is used often for voltage
control during real time. WRLDC further informed that low voltages are observed at 765 kV
Sipat and Sipat generators are generally in MVAR absorption mode of operation. WRLDC
suggested that since sufficient reactive compensation is available at Sipat( 240 MVAR B/R and
240 MVAR LR at Sipat end of Sipat-Bilaspur 1&2 line) unity pf may be maintained by
generators. If required, 240 MVAR LR at Sipat end of 765 kV Sipat Bilaspur line can be kept
out as the line is very short (around 20 kms after LILO of earlier 765 kV Sipat-Seoni line at
Bilaspur) to avoid frequent switching of bus reactor at Sipat.

NTPC, Sipat also informed that there was MVAR hunting on Sipat units on
dt.04.04.2017.
WRLDC informed that it was not hunting, but a sudden change of MW and MVAR flows
after charging and synchronizing of 765 kV Bilaspur-DharamjaygarhS/C at 1150 hrs on 4.4.17.
Since Bilaspur-Dharamjaygarh S/C is a short line, with closing of the line, considerable power
flow was reversed from Bilaspur-Seoni to Bilaspur-Dharamjaygarh and also with voltage
increase(10 kV increase), MVAR absorption became more in units.
WRLDC also informed that in future, Sipat would be informed whenever there is any
switching operation in the nearby substations.
The Sub-Committee noted as above.

11. FORECASTING OF RE BEFORE ONSET OF THE MONSOON

Western region is having wind RE installed capacity of around 11 GW. Wind


generation is variable and intermittent in nature. Wind generation is predominantly high
during May to September. In a two day workshop held on 09-10 Feb17 organized by
WRLDC on RE Integration and System Recovery procedure, importance and necessity of RE
forecasting was elaborated. Considering high penetrations of Wind energy in May to
September forecasting of RE generation is utmost important for smooth and reliable system
operations.

CE, SLDC Gujarat informed the forum that, forecasting of wind energy in Gujarat is
being done by forecasting service provider. Recently they have signed MOU with National
Institute of Wind Energy on no cost implication for forecasting of total Gujarat wind station.
Gujarat would share the experience and forecasting error with the forum in next OCC.
Madhya Pradesh is also in dialogue with forecasting service provider to forecast the day
ahead wind generation.
AGM WRLDC requested Maharashtra to initiate immediate action with forecasting
service provider to forecast the wind energy of Maharashtra in order to plan the generating
schedule and to take right real time decision.
The Sub-Committee noted as above.

12. STATUS OF EXTENDING 765 KV GWALIOR-AGRA SPS SIGNAL TO SASAN

SPS designed for Sudden loss of import of 1500 MW and above on 765 kV Gwalior-
Agra-1&2 generates signals to back down generation in WR generators VSTPS, KSTPS, CGPL
and Sasan and load shedding in NR. The SPS signals are extended from Agra to VSTPS, KSTPS
and CGPL through OPGW while the signal to Sasan is extended through PLCC link via 765 kV
Gwalior-Satna-Sasan.
POWERGRID may apprise OCC the following
Current status of OPGW works and the terminal equipment on 765 kV Gwalior-Agra,
765 kV Gwalior-Satna and 765 kV Satna-Sasan.
Status of SPS signal transfer between Agra and Gwalior over OPGW
Availability of Spare Card module at Gwalior station in case of failure of card.
GM, WRLDC intimated that, 765 kV Gwalior-Agra D/C tripped on 12th April at
05:51hrs.He informed that preparedness for SPS operation should always be there to meet any
such eventuality. He requested POWERGRID to apprise OCC during next meeting

The Sub-Committee noted as above.

13. N-1 ADEQUACY OF 765/400 KV ICT AT 765 KV AKOLA (2) AND 765 KV
TIRODA

The N-1 inadequacy of 765/400 kV ICT at Akola and Tirora was discussed in 476th OCC
held on 14th October 2015. Representative MEGPTCL informed that Installation of ICT along
with associated bays is feasible at both substation, and the process of amendments in MEGPTCL
transmission license for inclusion of ICTs at Tiroda and Akola 2 substation had been taken up. In
subsequent meetings it was informed that MEGPTCL had filed the petition with MERC for
amendment in transmission license. MEGPTCL and SLDC Kalwa to update the present status in
the next meeting.
The Sub-Committee noted the same.

SA-1 VARIOUS LINE OUTAGES FOR MULTIPLE LINES CROSSING, FOR PFC
PACKAGES AWARDED TO ADANI TRANSMISSION LIMITED IN WESTERN
REGION.

Adani Transmission Ltd has been awarded the following packages as per the above
LOIs, the details of transmission elements of respective SPV (special purpose vehicle) are as
follows: -
SPV Package: - Raipur Rajnandgaon Warora Transmission Ltd.

1. 765 kV switching station at Rajnandgaon.


2. Raipur Pool - Rajnandgaon 765 kV D/C line.
3. Rajnandgaon new pooling station at near Warora 765 kV D/C line.
SPV Package: - Chhatisgarh Western Region Transmission Ltd.

1. 400 / 220 kV Substation at Morena.


2. Gwalior 765 /400 kV Morena 400 kV D/C
3. Vindhyachal-IV&V STPP - Vindhyachal Pool 400 kV D/C (Quad) 2nd line.
4. 2-Nos 400 kV Line bays at Vindhyachal IV. STPP Switchyard.
5. 1-No 765 kV line bay at Sasan UMPP.
6. Sasan UMPP - Vindhyachal Pooling station 765 kV S/C line.
7. LILO of one circuit of Aurangabad Padghe 765 kV D/C line at Pune.
8. Raigarh (Kotra) Champa (Pool) 765 kV 2nd S/C Line.
9. Champa (Pool) Dharamjaygarh 765 kV 2nd S/C line.
SPV Package: - Sipat Transmission Ltd: -

1. Bilaspur pooling station Rajnandgaon 765 kV D/C line.


2. Sipat Bilaspur Pooling station 3rd 765 kV S/C line.
3. 1 No 765 kV Line bay at Sipat STPPS of NTPC.

Further in to it Transmission System Diagram of above three packages has also been
enclosed for reference. However the substations, bay work and line work are at advance
stage; for the timely completion of the work following enclosed outages shall be required, the
tentative outages period is also mentioned in the sheet.

M/s Adani requested to approve the line outages (attached at Annexure I) in principal,
so that based on the opportunities, same can be availed.

The Sub-Committee agreed to consider the request for outage as and when required.

SA-2 CAG OBSERVATIONS FOR OPERATIONAL PARAMETERS IN WR

Para -1: Not maintaining proper voltages through system study committee and monitoring of
installed capacitors and other functions.

(a) As per the functions of Western Regional Power Committee (WRPC), to facilitate
the stability and smooth operation of the integrated grid and economy and efficiency
in the operation of power system in the region,

the WRPC to undertake planning for maintaining proper voltages though review of
reactive compensation requirement through system study committee and monitoring of installed
capacitors. As per the minutes of the 32nd meeting of WRPC, held on 24th Aug., 2016 it was
noticed that during June 2016, the voltage at various sub stations remained above 420 kV for
47%-63% of the time. In this regard it is to be clarified that any study committee has been
formed for monitoring of installed reactors, if so the reports of the same may be furnish to audit.

In reply WRPC stated that requirement of reactors/capacitors to control the voltage at


different nodes; study was done by Study Committee of WRPC and its reconditions put up to
standing committee of CEA for approval. Report of study committee, copy of formation of the
committee and members of the committee had not been produced to audit. So, the reply is not
acceptable.

(b) To undertake Regional level operation analysis for improving grid performance.

Any Regional level operation analysis for improvement of grid performance undertaken
relevant records may be produced to audit. In reply department stated that performance of the
grid is discussed in the protection committee meeting. It is clear that regional level operation has
not been carried out by the WRPC. Hence the reply is not acceptable.
(c) To coordinate planning of maintenance of generating machines of various
generating companies of the region including those of inter-state generating
companies supplying electricity of the region on annual basis and also to undertake
review of maintenance programmed on monthly basis.

Any review of maintenance program on monthly basis and planning of maintenance of


generating machines of various generating companies of the region including those of interstate
generating companies supplying electricity of the region on annual basis if any relevant records
may be produced to audit. In reply the WRPC stated that OCC forum planning for outage of
generating units. The reply is not acceptable because of CE, SLDC Gujarat has intimated that
arrangement of alternate allocation of power to Indian Railway Gujarat. This issue has not been
resolved. Hence, the reply is not acceptable.

These items have been discussed during agenda items taken up earlier.

SA3 Regarding declaration of 132 kV Nepanagar (MP) Dharni (Maharashtra) lines as


ISTGS.

The 132 kV Nepanagar-Dharni line has been charged in radial mode. On this line the
power flow has started from 16.02.2017 to MSEDCL. The power was procured through this line
from MPPCL at the rate of Rs.4.90 per unit up to 5 MW for the period of 16.02.17 to 28.02.17.
This was an interim arrangement for testing the system and to study demand pattern of Dharni
area. Meanwhile, MSEDCL had floated tender for the purchase of power for the month March-
17. In this tender only participant was M/s.PTC. The rate offered by M/s.PTC was Rs.3.83 per
unit and the seller was MPPMCL. Further, MSEDCL floated tender for the period April 17 to
June 17 for power transaction through this radial line. Again only PTC participated with an offer
of Rs.4.69/- unit and the seller was MPPMCL.

MSEDCL is a power surplus entity and the power offered through above transaction was
a costly one. Therefore, MSEDCL has applied for short term open access to MP SLDC for date
01.04.2017. However, MPSLDC rejected the application with reason as Consent cannot be
given due to system constraints. Presently, the transaction through 132 kV Nepanagar Dharni
line in radial mode is being done through banking arrangement with the terms and conditions as
offered by MPPMCL. MPPMCL will supply up to 15 MW power from April-2017 to June-17.
MSEDCL will return back 105% of scheduled energy from Nov-2017 to January-2018 during
day period.

From above it is clear that although MSEDCL has tried for bilateral transaction of power on 132-
kV Nepanagar Dharni Line but this situation cannot be continued as a solution for this
transaction. Hence MSEDCL is hereby requested to discuss in 494 th OCC meeting for declaring
132-KV Nepanagar Dharni Line as Interstate line and the point shall be considered as interstate
drawl point of Maharashtra.

Sub-Committee decided that this point needs to be taken up in next CCM as all possible
required actions for declaring a line ISTS has not been followed.

ITEM No. 10: DATE AND VENUE OF NEXT OCC MEETING


493rd OCC reviewed the meeting roster and finalized sheet is enclosed at Annexure-10.
The 495th OCC meeting will also be hosted by WRPC in the month of May, 2017 whereas 496 th
OCC meeting will be hosted by Torrent Power in the month of June 2017.

The Sub- Committee noted as above


LIST OF PARTICIPANTS OF 494 th OCC MEETING OF WRPC
HELD AT WRPC, MUMBAI ON 12.04.17
Sl.No. Organisation, Name & Designation Mobile No. E-mail Address

WRPC
1 Shri M.A.K.P.Singh, M.S. 9425066437 ms-wrpc@nic.in
2 Shri J.K. Rathore, S.E. 9987910799
3 Shri L.K.S. Rathore, D.D. 9833371844 lksr_ies@nic.in
4 Shri P.D.Lone 9867622823 comml-wrpc@nic.in
5 Shri D.N. Gawali 9930666765 comml-wrpc@nic.in
6 Shri Vikas Mundotia 9011022577 comml-wrpc@nic.in

II MSETCL / MSEDCL/MahaGenco/MSPGCL
7 Shri Sanjay S. Kulkarni, C.E. 9819363329 drsanjaykulkarni@gmail.com
8 Shri Bulbule Arvind, S.E. 9833383882 selmkalwa@gmail.com
9 Shri Sandeep Patil, E.E. 9833980238 selmkalwa@gmail.com
10 Shri D.J. Kolhe, E.E. 9820981115 deepakkolhe@yahoo.com
11 Shri V.K. Patki, E.E. 8554993587 patkinagpur@gmail.com
12 Shri Ashish L. Tadwar, A.E. 9833929934 ashishtadwar@gmail.com

III MPPTCL / MPPGCL


13 Shri Dhiraj Muniys, Dy. G.M. 9425805880 dhiraj_1968@yahoo.com
14 Shri Brijesh Maravi, E.E. 9425806537 gcc.mppgcl@gmail.com
15 Shri Jayant Agasty, E.E. 9425806822 jivagasty@gmail.com

IV CSPTCL
16 Shri Vinod Agrawal, E.E. 9300040007 vinod.iim.alumni@gmail.com

V GETCo. / GSECL
17 Shri B.B. Mehta, C.E. 9879200736 celd@gebmail.com
18 Shri B.M. Shah, D.E. 9925212836 04sldc.getco@gebmail.com
19 Shri K.G. Patel 9925210977 det.gsecl@gebmail.com

VI WRLDC / POWERGRID
20 Shri Vinay Shrivastava, G.M. 9869450221 vks@posoco.in
21 Shri B. Anantha Sarma, G.M. 9422081971 basarma@powergridindia.com
22 Shri Abhimanyu Gartia, A.G.M. 9869088058 agartia@posoco.in
23 Smt. Pushpa S., Asst. G.M. 9869404482 pushpa@posoco.in
24 Smt. Sachala Mishra, Asst.G.M. 9869450223 sachalamishra@posoco.in
25 Shri Kuleshwar Sahu, Asst.G.M. 9425294214 kuleshwar@powergridindia.com
26 Shri Biswajit Sahu, Asst. G.M. 9425409539 biswajit@posoco.in
27 Shri Utpal Sharma, A.G.M. 9436302980 utpals_12@yahoo.com
28 Shri P.R. Wankhede, D.G.M. 9422811668 wankhede@powergridindia.com
29 Shri D. Bruhananda, C,M. 9428504279 dbruhananda@powergridindia.com
30 Shri Sunil Aharwal, C.M. 7738254040 aharwal@gmail.com
31 Shri S.S. Raghuwanshi, C.M. 9427615762 satyendra@posoco.in
32 Shri Vivek Pandey, C.M. 9869404673 vivek.pandey@posoco.in
33 Shri Chandan Kumar, Sr. Engg. 9869251460 chandan@posoco.in
34 Shri Pradeep Kumar, Sr. Engg. 8452045338 psanodiya@posoco.in
35 Shri M. Venkateswara Rao, Engg. 8452928806 venkyminnakuri@posoco.in
36 Shri S.K.Mastanvali, Engg. 9177210068 mastanvali.nitco@gmail.com
37 Shri Vishal B. Puppala, Eng. 9702691034 vishal.puppala@posoco.in
38 Ms. Chitrankshi Ghangrekar, Mgr. 9869004892 chitrankshi@posoco.in

VII NTPC
39 S. Mukhopadhyay, G.M. 9453008341 smukhopadhyay@ntpc.co.in
40 Shri S.K. Takhele, A.G.M. 9004472114 sktakhele@ntpc.co.in
41 Shri H. Harchandani, A.G.M. 9109917825 hharchandani@ntpc.co.in
42 Shri D. Roy Choudhury, A.G.M. 9425222094 droychoudhury@ntpc.co.in

VIII NSPCL
43 Shri Prabhulinga, Sr. Mgr. 9425293586 prabhulinga@nspcl.co.in
44 Ms. Nidhi Kesharwani, Dy. Mgr. 9425293813 nidhi.kesharwani@nspcl.co.in

IX NPCIL
45 Shri R.K. Gupta, O.S. 9423081697 rajendragupta@npcil.co.in
46 Shri S.S. Gadre, O.S. 9423982777 ssgadre@npcil.co.in
47 Shri P.C. Khandelwal, S.C.E. 9428821923 pckhandelwal@npcil.co.in

X RELIANCE ADA
48 Shri R.P. Singh, G.M. 9770010025 rajendra.pr.singh@relianceada.com
49 Shri Rajesh J. Ambavale, D.G.M. 9325119785 rajesh.ambavale@relianceada.com
50 Shri Vijay Chavan 9320167746 vijay.chavan@relianceada.com
51 Shri Chirag Prajapati 9327014812 chirag.prajapati@relianceada.com

XI APML
52 Shri Manoj Taunk, G.M. 9099005517 manoj.taunk@adani.com
53 Shri Manak Bhatt, Asso. Mgr. 9825805203 manakb.bhatt@adani.com
54 Shri Rakesh Bhalerao, A.M. 9773504395 rakesh.bhalerao@adani.com

XII TATA POWER


55 Shri Prakash Gadave, Head Grid Opn. 9223553341 prgadave@tatapower.com
56 Shri S.K. Sahoo, C.M. 9099006553 sushanta.sahoo@tatapower.com

XIII STERLITE POWER


57 Shri Vivek Karthikeyan, Asso. Mgr. 8966903034 vivek.karthikeyan@sterlite.com

XIV RATTAN INDIA


58 Shri A.K. Mishra, G.M. 9665070111 anil.m@rattanindia.com

XV KSK
59 Shri Ramakant Upadhyay 7869916080 ramakant.u@ksk.co.in

XVI GMR
60 Shri Pramod Khandelwal, G.M. 8390903524 pramod.khandelwal@gmrgroup.in

XVII Torrent Power


61 Shri P.G. Patel, G.M. 9824370005 pramodpatel@torrentpower.com
62 Shri Ronak Naik, Mgr. 9227410210 ronaknaik@torrentpower.com
63 Shri N.V. Patel, Mgr. 9428613639 niteshv_2000@yahoo.com

XVIII RKM POWER GEN.


64 Shri T. Rajesh Kumar, Mgr. 8435000779 t.rajeshkumar@rkmpowergen.in

XIX OTHERS
65 Shri Pappu Kumar, Jr. Engg. 9820675210 rajpapukumars@gmail.com
Anaulagnak 2.1

maah maaca- 2017 maoM AavaRi%t ko AaMkD,aoM ka ivavarNa


( piScama xao ~ Baar p`oYaNa kond` kI AavaRi%t irpaoT- ko AaQaar pr )
FREQUENCY PARTICULARS DURING MARCH 2017
(AS PER FREQUENCY REPORT OF WRLDC)
1. INTEGRATED OVER AN-HOUR
ek GaMTo maoM samaakilat
1.1 MAXIMUM FREQUENCY 50.14 Hz. BETWEEN 1300 Hrs & 1400 Hrs Hrs. ON 12.03.2017
AiQaktma AavaRi%t
1.2 MINIMUM FREQUENCY 49.86 Hz. BETWEEN 1800 Hrs & 1900 Hrs Hrs. ON 27.03.2017
nyaUnatma AavaRi%t
1.3 AVERAGE FREQUENCY 49.99 Hz.
AaOsat AavaRi%t
2. INSTANTANEOUS ta%kailak
2.1 MAXIMUM FREQUENCY 50.34 Hz. AT 18:03:00 Hrs. ON 05.03.2017
AiQaktma AavaRi%t

2.2 MINIMUM FREQUENCY 49.66 Hz. AT 18:58:20 hrs Hrs. ON 27.03.2017


nyaUnatma AavaRi%t

3. %AGE OF TIME WHEN FREQUENCY WAS MARCH 2017 FEBRUARY 2017 JANUARY 2017
AavaRi%t ka samaya p`itSat maoM
3.1 BELOW 48.5 Hz. 0.00 0.00 0.00
48.5 hT\ja ko naIcao
3.2 BETWEEN 48.5 Hz. AND 48.8 Hz. 0.00 0.00 0.00
48.5 hT\ja AaOr 48.8 hT\ja ko baIca
3.3 BETWEEN 48.8 Hz. AND 49.2 Hz. 0.00 0.00 0.00
48.8 hT\ja AaOr 49.2 hT\ja ko baIca
3.4 BETWEEN 49.2 Hz. AND 49.5 Hz. 0.00 0.00 0.00
49.2 hT\ja AaOr 49.5 hT\ja ko baIca
3.5 BETWEEN 49.5 Hz. AND 49.7 Hz. 0.00 0.00 0.00
49.5 hT\ja AaOr 49.7 hT\ja ko baIca
3.6 BETWEEN 49.7 Hz. AND 49.9 Hz. 8.95 5.30 6.18
49.7 hT\ja AaOr 50.2 hT\ja ko baIca
3.7 BETWEEN 49.9 Hz. AND 50.05 Hz. 73.56 73.99 70.46
49.9 hT\ja AaOr 50.05 hT\ja ko baIca
3.8 BETWEEN 50.05 Hz. AND 51.5 Hz. 17.50 20.71 23.35
50.05 hT\ja AaOr 51.5 hT\ja ko baIca
3.9 ABOVE 51.5 Hz. 0.00 0.00 0.00
51.5 hT\ja ko }pr
4.1 NO. OF TIMES FREQUENCY 0 0 0
TOUCHED 48.80 Hz. AavaRi%t 48.80 hT\ja kao CUhI
4.2 NO. OF TIMES FREQUENCY 0 0 0
TOUCHED 48.60 Hz. AavaRi%t 48.60 hT\ja kao CUhI
4.3 NO. OF TIMES FREQUENCY 0 0 0
TOUCHED 51.00 Hz. AavaRi%t 51.00 hT\ja kao CUhI
2017
Voltage Profile during the month of Mar'2017 Annex-2.3

Date Bhopal Khandwa Itarsi Damoh Nagda Indorer Gwalior Raipur Raigarh
400kV 400kV 400kV 400kV 400kV 400kV 400kV 400kV 400kV

Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min

1 419 407 423 408 413 401 420 404 421 408 418 404 418 396 419 411 423 416
2 418 405 421 406 412 399 417 406 420 407 417 403 416 397 418 409 422 416
3 420 401 423 406 415 395 420 404 419 405 417 400 415 398 417 408 421 413
4 416 404 422 404 414 398 419 406 418 404 416 402 415 394 417 408 422 414
5 421 403 426 405 416 398 422 407 422 405 420 402 412 395 418 408 423 414
6 416 402 422 407 412 398 418 407 420 407 417 404 419 389 418 409 422 414
7 415 405 423 409 412 400 418 407 419 406 417 405 420 394 418 410 423 416
8 418 403 424 409 413 400 421 407 420 407 418 404 418 397 419 410 422 415
9 421 407 425 411 418 402 422 408 418 405 419 406 420 398 419 409 422 415
10 418 405 426 406 414 400 421 408 419 403 418 406 416 399 419 410 422 416
11 421 401 428 405 417 397 423 407 421 402 422 401 416 395 420 410 422 415
12 420 406 425 411 417 403 421 409 421 409 419 407 416 399 417 411 420 413
13 419 409 422 410 414 404 424 411 422 412 420 411 414 400 418 412 418 414
14 419 400 425 404 414 396 423 410 422 406 421 402 418 394 419 410 420 412
15 420 406 423 408 416 401 422 409 418 405 419 404 414 396 418 412 420 413
16 417 404 423 407 413 398 421 407 419 406 417 403 413 398 417 406 419 412
17 417 402 424 408 413 398 418 405 420 405 418 402 414 398 416 405 422 411
18 420 402 424 406 414 396 421 406 421 403 419 400 418 395 417 409 423 414
19 421 403 424 406 415 399 423 410 419 404 419 402 412 399 416 409 419 414
20 418 403 423 406 415 399 421 410 416 403 415 401 419 397 415 409 419 412
21 416 402 421 407 413 398 418 408 417 402 413 399 414 395 415 408 418 412
22 417 404 420 409 411 399 419 408 420 407 415 401 411 397 416 407 419 412
23 415 400 422 404 411 395 418 396 418 404 414 398 411 390 416 407 421 412
24 421 400 424 407 416 397 417 397 420 406 416 402 410 394 416 408 419 410
25 417 403 423 407 413 399 419 406 421 406 415 400 415 394 415 409 419 412
26 419 403 424 407 413 398 420 407 421 406 416 400 411 396 415 407 419 410
27 417 404 424 407 412 398 418 408 420 404 416 400 410 396 414 407 416 409
28 419 405 424 411 413 402 421 407 421 409 416 405 412 396 418 409 421 412
29 416 404 424 409 411 401 418 409 421 409 416 404 413 393 416 407 420 410
30 414 403 420 407 409 398 418 405 418 400 414 400 416 397 412 405 415 409
31 416 380 421 407 410 397 419 406 420 380 417 400 414 399 413 403 416 409
421 380 428 404 418 395 424 396 422 380 422 398 420 389 420 403 423 409

Date Bhilai Wardha Dhule Parli Boisar Kalwa Karad Dehgam
Asoj
400kV 400kV 400kV 400kV 400kV 400kV 400kV 400kV 400kV

Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min

1 415 407 417 403 425 394 418 384 415 392 427 394 428 403 414 397 421 405
2 414 406 416 401 426 397 417 386 413 394 423 397 427 403 411 398 418 405
3 413 404 418 403 430 400 421 390 414 402 425 405 429 404 413 401 419 400
4 412 404 420 402 425 397 418 388 416 399 426 402 428 403 412 399 419 405
5 415 404 421 404 428 399 423 390 418 401 426 404 430 404 417 402 421 409
6 414 405 420 405 424 400 417 393 422 400 432 400 427 406 416 399 423 381
7 414 405 422 404 428 399 420 390 417 396 428 398 428 404 414 399 420 400
8 415 407 419 401 424 397 418 389 415 393 425 395 427 403 414 402 421 406
9 414 405 413 402 427 399 421 387 415 386 427 394 428 400 413 399 421 406
10 415 407 415 406 426 403 422 392 417 399 429 419 430 413 414 399 420 407
11 415 406 415 415 428 404 421 395 415 399 428 411 428 407 415 403 424 411
12 414 407 415 406 429 407 419 397 417 404 428 412 428 409 419 405 425 412
13 416 409 415 415 424 398 421 392 425 414 433 421 429 410 421 413 428 400
14 416 407 417 409 428 400 419 397 426 406 435 411 430 411 422 405 431 413
15 414 407 415 411 426 403 421 394 417 395 428 400 427 403 417 403 424 410
16 413 402 414 411 427 402 422 394 417 395 430 404 426 403 414 400 422 381
17 412 401 417 402 430 401 420 391 414 397 427 402 428 402 413 398 421 388
18 413 405 419 406 425 400 420 389 414 394 428 398 426 400 415 399 423 400
19 412 405 419 407 426 402 421 400 411 401 428 407 428 409 414 403 423 411
20 411 405 415 404 427 400 418 393 416 392 427 394 428 404 414 399 423 400
21 411 405 415 405 424 399 415 391 418 397 426 396 426 402 413 399 423 408
22 412 404 416 405 425 393 414 390 413 392 424 393 425 401 414 400 423 409
23 411 403 419 403 428 394 418 384 413 388 426 390 427 394 412 397 422 408
24 411 404 418 405 423 399 419 390 410 396 422 399 426 402 413 400 425 412
25 411 405 417 408 427 400 418 397 413 392 424 398 426 400 417 402 427 391
26 411 404 419 405 422 396 424 394 414 399 424 399 429 398 415 405 426 415
27 410 403 414 406 427 394 420 392 411 390 419 394 429 405 415 398 425 400
28 414 405 418 408 426 400 419 394 411 396 421 399 427 404 413 399 423 400
29 412 404 416 403 428 402 416 391 414 393 421 392 426 399 412 397 422 400
30 408 400 413 407 425 400 414 388 411 390 418 389 427 391 412 397 424 400
31 410 399 418 404 428 402 419 390 406 392 416 395 427 399 413 397 424 381
416 399 422 401 430 393 424 384 426 386 435 389 430 391 422 397 431 381

Date Kasor Jetpur Amreli Vapi Mapusa Kala Magarwada Hazira
400kV 400kV 400kV 400kV 400kV 400kV 400kV 400kV

Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min

1 416 408 410 400 417 405 415 392 431 392 407 395 415 392 416 396
2 415 407 409 397 416 405 415 393 430 397 413 391 415 395 414 399
3 416 407 410 400 415 406 416 399 423 395 412 397 415 401 416 400
4 416 406 408 397 415 406 417 397 427 394 414 394 416 398 417 397
5 418 382 409 399 419 406 419 399 429 400 415 396 423 402 420 401
6 417 407 409 399 416 406 422 398 429 398 419 395 423 400 422 397
7 415 406 409 399 417 406 417 393 429 398 412 389 417 397 419 394
8 416 407 409 399 417 405 414 394 428 396 412 391 414 392 417 397
9 417 405 411 400 419 406 415 385 433 390 412 382 414 385 415 393
10 416 408 408 400 416 406 417 396 429 398 413 397 416 397 417 398
11 417 407 411 401 417 406 416 398 426 398 413 395 416 398 421 401
12 419 410 409 400 417 408 420 403 431 403 416 400 420 404 421 404
13 422 415 411 400 415 408 429 416 430 398 426 413 429 417 425 412
14 422 410 411 400 415 405 431 407 430 395 428 404 430 407 424 401
15 418 407 408 399 415 406 420 392 424 393 416 391 417 395 420 397
16 416 407 408 400 415 406 418 394 429 390 414 391 415 394 415 396
17 415 407 409 400 417 407 415 395 424 394 412 393 414 395 416 398
18 417 405 409 398 416 405 413 390 427 389 412 390 414 395 417 398
19 415 407 408 399 416 406 414 401 427 395 412 399 414 403 416 397
20 416 405 410 399 418 407 420 394 430 393 416 391 418 395 418 399
21 415 407 407 397 415 400 419 394 426 394 416 392 417 396 416 396
22 415 407 408 400 416 408 415 393 424 398 412 390 414 393 414 394
23 416 405 409 399 416 400 415 389 428 386 411 386 413 390 414 391
24 414 405 408 400 415 398 412 393 427 391 409 391 410 395 414 392
25 417 407 410 400 418 400 413 392 429 395 411 390 414 394 415 398
26 416 407 409 397 416 402 416 398 434 388 414 397 417 401 416 396
27 416 404 412 398 420 407 414 389 428 397 411 388 412 391 414 391
28 416 406 410 397 418 404 413 395 428 390 410 393 411 396 412 390
29 416 406 409 398 416 406 414 392 430 389 412 390 413 394 411 390
30 414 403 409 399 417 406 411 388 426 382 408 386 409 390 412 387
31 418 408 410 381 416 406 408 391 424 388 405 388 408 392 414 393
422 382 412 381 420 398 431 385 434 382 428 382 430 385 425 387

Date Sasan Satna Tamnar Kotra Vadodara Durg Gwalior Sipat Seoni Wardha Bina Indore
765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv

Max Min Max Min Max Max Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min
1 774 761 780 762 800 787 802 788 789 756 793 784 798 767 768 757 785 762 795 763 791 769 789 760
2 775 762 781 761 798 786 800 787 785 758 805 777 794 764 767 757 784 758 793 760 789 765 783 756
3 777 761 783 757 798 782 799 783 791 764 797 774 799 761 767 753 785 756 795 764 790 760 795 755
4 771 762 777 761 798 784 799 785 785 760 797 779 793 762 769 756 786 758 804 763 784 764 785 759
5 775 761 785 762 800 784 800 784 796 762 802 778 796 763 771 757 791 757 803 760 792 762 795 754
6 774 759 781 755 798 784 799 784 790 760 791 782 798 752 768 756 786 759 799 763 788 757 787 758
7 774 762 782 758 801 787 802 788 789 760 800 782 799 762 768 756 788 761 806 767 790 765 785 762
8 773 762 781 764 799 785 801 785 789 765 790 778 798 768 768 756 787 759 799 761 791 770 788 758
9 775 759 785 758 799 785 800 784 766 766 792 778 802 770 769 756 791 759 786 758 796 766 793 763
10 776 758 789 764 799 786 800 786 786 763 798 780 804 772 769 756 789 765 799 772 795 768 791 759
11 780 754 789 756 800 784 801 784 795 765 799 776 803 763 770 754 796 759 786 786 793 755 798 758
12 774 762 781 765 791 779 792 778 798 773 780 771 798 771 772 756 792 770 788 772 793 771 789 765
13 777 765 786 767 789 779 789 778 802 782 780 771 801 751 766 756 790 767 792 763 795 771 789 770
14 781 756 792 757 791 776 792 775 803 764 792 770 801 760 768 751 789 760 791 764 792 756 791 751
15 775 757 787 758 793 780 794 779 794 769 792 773 800 766 767 756 790 765 792 769 796 766 788 759
16 772 759 777 759 789 778 790 776 790 760 783 744 797 763 767 757 788 756 792 783 790 764 784 757
17 774 760 782 759 798 777 799 777 790 758 801 758 792 761 772 756 786 755 796 769 789 762 787 755
18 775 756 785 755 801 778 801 778 790 757 801 773 796 762 775 760 789 763 800 765 790 758 792 752
19 776 764 786 766 790 779 791 780 790 766 791 782 798 770 771 758 780 758 800 770 794 767 793 754
20 772 761 778 762 788 778 790 778 794 757 783 773 797 766 770 757 784 759 796 768 790 766 787 753
21 767 755 773 753 788 778 789 777 790 757 786 776 789 761 769 758 783 761 792 768 782 761 779 751
22 771 761 779 765 790 780 791 777 786 759 786 776 793 769 765 755 785 763 793 769 788 767 781 755
23 773 759 779 759 802 778 801 778 787 743 804 776 794 755 768 753 793 759 804 763 789 757 782 745
24 773 761 781 762 797 774 797 773 765 765 795 762 793 761 766 754 788 762 796 770 791 763 789 752
25 771 759 780 760 795 778 795 778 765 765 791 773 792 761 765 756 784 766 797 776 788 765 783 758
26 772 761 779 762 794 774 795 772 765 765 791 766 793 764 765 754 787 763 798 764 789 764 786 754
27 770 762 781 766 786 776 786 774 801 739 782 769 789 763 767 754 789 762 794 767 785 766 791 755
28 774 762 781 763 798 779 803 778 789 764 803 778 794 767 769 758 791 769 805 765 789 769 789 761
29 772 759 778 764 798 777 798 775 787 756 794 765 789 763 767 755 786 759 793 762 786 767 781 758
30 767 757 778 758 785 775 784 774 783 756 782 769 796 763 766 755 783 763 794 784 787 763 782 755
31 770 756 778 761 789 776 788 774 788 758 783 769 794 765 765 753 785 762 803 771 787 763 787 758
781 754 792 753 802 774 803 772 803 739 805 744 804 751 775 751 796 755 806 758 796 755 798 745
ANNEX -2.4
Under Frequency Operation in various Constituent System of Western Region during the month MARCH- 2017
( Compiled from the data received from the constituents)
Sl. No Date Gujarat Chhattisgarh Madhya Pradesh Maharashtra
No. of Max Load Relief No. of Max Load Relief No. of Max Load Relief No. of Max Load Relief
Occasions at 49.2 Hz Occasions at 49.2 Hz Occasions at 49.2 Hz Occasions at 49.2 Hz
1 01-Mar-17 0 0 0 0 0 0 0 0
2 02-Mar-17 0 0 0 0 0 0 0 0
3 03-Mar-17 0 0 0 0 0 0 0 0
4 04-Mar-17 0 0 0 0 0 0 0 0
5 05-Mar-17 0 0 0 0 0 0 0 0
6 06-Mar-17 0 0 0 0 0 0 0 0
7 07-Mar-17 0 0 0 0 0 0 0 0
8 08-Mar-17 0 0 0 0 0 0 0 0
9 09-Mar-17 0 0 0 0 0 0 0 0
10 10-Mar-17 0 0 0 0 0 0 0 0
11 11-Mar-17 0 0 0 0 0 0 0 0
12 12-Mar-17 0 0 0 0 0 0 0 0
13 13-Mar-17 0 0 0 0 0 0 0 0
14 14-Mar-17 0 0 0 0 0 0 0 0
15 15-Mar-17 0 0 0 0 0 0 0 0
16 16-Mar-17 0 0 0 0 0 0 0 0
17 17-Mar-17 0 0 0 0 0 0 0 0
18 18-Mar-17 0 0 0 0 0 0 0
19 19-Mar-17 NIL NIL NIL NIL 0
20 20-Mar-17 0 0 0 0 0 0 0 0
21 21-Mar-17 0 0 0 0 0 0 0 0
22 22-Mar-17 0 0 0 0 0 0 0 0
23 23-Mar-17 0 0 0 0 0 0 0 0
24 24-Mar-17 0 0 0 0 0 0 0 0
25 25-Mar-17 0 0 0 0 0 0 0 0
26 26-Mar-17 0 0 0 0 0 0 0 0
27 27-Mar-17 0 0 0 0 0 0 0 0
28 28-Mar-17 0 0 0 0 0 0 0 0
29 29-Mar-17 0 0 0 0 0 0 0 0
30 30-Mar-17 0 0 0 0 0 0 0 0
31 31-Mar-17
Recommonded Load relief at
49.2 Hz / 49.0/48.8/48.6 Hz
1025 91 490 851
ANNEXURE 2.5
Power Cut/Restrictions in Western Region for the month of March-2017
k : gaujarat Gujarat
1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM
1 Power Cut/ Restriction on Industries
a) All industries are allowed to run their units on all days of week & if they want to avail staggered holiday,
then they will have to staggered on notified day only & cannot avail as per their choice.
b) All industries are required to keep their recess timings staggered.

2 kRiYa va ga`amaINa xao~aoM kao ivaVut AapUit-


2. Power supply to Agricultural & Rural Sectors
a) 08 Hrs. power supply in staggered form in rotation of day & night is given to Ag. Single Phase supply given during
rest of 16 Hrs by providing LSTC.

b) Jyotigram Yojana 24 hrs.

3 Anya jaanakarI
3. Any other information: NIL.

K : maQya p`doSa Madhya Pradesh


1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM / pabMaidyaaM , rajya maoM Baar inayamana Aaid
1 Power Cut/ Restriction on Industries, Load Shedding in the state etc
ivavarNa Details ivaVut kTaOtI kI maa~a pabandI ka samaya p`it idna kula }jaa- kTaOtI
Quantum of Restriction Timing Total Energy Cut
power cut (MW) sao From tk To (MUs /day
(a) Power Restrictions(Evening SaUnya Nil SaUnya Nil SaUnya Nil SaUnya Nil
peak Hour) on non continuous
process HT/LT IndustriesM
(b) Baar inayamana Load Shedding SaUnya Nil SaUnya Nil SaUnya Nil SaUnya Nil
(c) Anya jaanakarI Other information
1.Weekly Off SaUnya Nil SaUnya Nil SaUnya Nil SaUnya Nil
2.Staggering of power supply SaUnya Nil SaUnya Nil SaUnya Nil SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-


2. Power supply to Agricultural Sector: -
ivavarNa Details sao From tk To p`it idna AapUit- GaMTo Supply Hours per day
idnaaMk Date idnaaMk Date Max. (Hrs) Min. (Hrs) Average (Hrs)
2.1 Three-Phase 01.03.2017 31.03.2017 23:44 23:08 23:28
Supply(DLF)
2.1 Three-Phase 01.03.2017 31.03.2017 09:53 09:35 09:49
Supply(Irrigation)
2.1 Three-Phase 01.03.2017 31.03.2017 23:34 22:48 23:16
Supply(Mixed)
3 Anya jaanakarI
3. Any other information
SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban Areas
ivavarNa Details sao From tk To idnaaMk Aaosat p`itidna Average Supply
idnaaMk Date Date AapUit- GaMTo Hours per day
Max. Min. (Hrs) Average (Hrs)
(Hrs)
3.1 Commissionary H. Qtrs. 01.03.2017 31.03.2017 23:56 23:23 23:47
3.2 District Head Qtrs. 01.03.2017 31.03.2017 23:57 23:34 23:52
3.3 Tehsil Head Qtrs. 01.03.2017 31.03.2017 23:53 23:35 23:45
ga : maharaYT/ Maharashtra
1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM / pabMaidyaaM , rajya maoM Baar inayamana Aaid
1. Power Cut/ Restriction on Industries, Load Shedding in the state etc
ivavarNa Details ivaVut kTaOtI kI maa~a pabandI ka samaya p`it idna kula }jaa- kTaOtI
Quantum of Restriction Timing Total Energy Cut
(MUs /day
power cut (MW) From To
(a) Power Cuts/Restriction on HT/ SaUnya Nil SaUnya Nil SaUnya Nil SaUnya Nil
LT Industries
(b) Load Shedding
@ 0-703 MW 00.00 24.00 @ 0.336MUs/day
From 01.03.17 to 31.03.17

(c) Any other information


1.Weekly Off
2. Staggering of power supply SaUnya Nil SaUnya Nil SaUnya Nil SaUnya Nil
Industrial Staggering LS
withdrawn from 03/02/2012

2 kRiYa xao~ kao ivaVut AapUit-


2. Power supply to Agricultural Sector
ivavarNa Details sao From tk To p`it idna AapUit- GaMTo Supply Hours per day
idnaaMk Date idnaaMk Date
Max. (Hrs) Min. (Hrs) Average (Hrs)
2.1 Three-Phase Supply 01.03.2017 31.03.2017 10:00 8:00 09:00
2.2 Single-Phase Supply 01.03.2017 31.03.2017 18:00 18:00 18:00
Note:-
*vide circular ED-I/12hrs AG supply/37003 dt 15.12.2016 , 3 Ph. supply to AG extended upto 8/10
hrs to AG AM Scheme (Feeders) w.e.f. 16.12.2016

3 Anya jaanakarI Any other information:


There is no load shedding on industrial feeders in Maharashtra
Ga : C%tIsagaZ, Chhattisgarh:
1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM / pabMaidyaaM , rajya maoM Baar inayamana Aaid
1 Power Cut/ Restriction on Industries, Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~a pabandI ka samaya p`it idna kula
Quantum of power cut (MW) Restriction Time }jaa- kTaOtI
sao From tk Total
To Energy Cut
(MUs /day)
(A) Scheduled
(a) (i) Power Cuts/ 00.00(Av) - - -
Restriction on HT Industries
(ii) Power Cuts/Restriction
on LT Industries 00.00(Av) - - -
(iii) Power Cuts/Restriction
on Rural 00.00 (Av) - - -
(iv) Agriculture pump* 00.00 (Av) 00.00 00.00 0.00
(v)Urban/ Sub-Urban 00.00(Av) - - -
(iv)Town feeders(C-1to C-6) 00.00 (Av) - - -

(B) Un-Scheduled
(a) Load Shedding 1.Rural 91:55 MW(Av) For 84.17 Hrs. - - 0.251
2.Town Feeders (C-1to C-6 & X) : 0.00(Av)
- -
0.114
3. Industries 81.75 MW (Avg) For 46:24
Hrs
Total Energy Cut/day 0.365
( b) Any other information 1day (In a week as per
1.Weekly Off/staggering of consumers option) 50MW(Av.) - - -
power supply

2 kRiYa xao~ kao ivaVut AapUit-


2. Power supply to Agricultural Sector

ivavarNa Details sao From tk To p`it idna AapUit- GaMTo Supply Hours per day
idnaaMk Date idnaaMk Date Max. (Hrs) Min. (Hrs) Average (Hrs)
2.1 Three-Phase Supply 01.03.2017 to 31.03.2017 18.00
2.2 Single-Phase Supply - - - - -
2.3 Remarks/Note/ - - - - -

3 Anya jaanakarI / Any other information: SaUnya Nil


Annex-2.6

2017
Details of forced unit outages during the month ofMar.2017

o o
Unit Constituent/IPP From From Reason

Sl.No Cap.MW
Time Date Time Date
1. GTPS-2 GSECL 120 01:30 09-04-2016 Still out Still out Long restoration period

2. GTPS-1 GSECL 120 01:30 09-04-2016 Still out Still out Long restoration period

3. Ukai-2 GSECL 120 16:00 09-04-2016 Still out Still out Long restoration period

4. Ukai 1 GSECL 120 03:18 07-05-2016 Still out Still out Excitation problem

5. STPS 2 GSECL 120 13:05 24-09-2016 Still out Still out Bunker problem

6. STPS 1 GSECL 120 18:00 26-09-2016 Still out Still out RSD

7. Wanakbori 1 GSECL 210 10:37 10-11-2016 22:01 11-03-2017 RSD

8. Pipavav-1 GSECL 350 00:55 29-11-2016 Still out Still out Generator testing work

9. Ukai 4 GSECL 200 19:49 02-12-2016 Still out Still out RSD

10. Pipavav 2 GSECL 350 12:32 17-12-2016 Still out Still out RSD

11. UTRAN STG II 1 GSECL 375 14:13 22-12-2016 03:52 22-03-2017 RSD

12. DGBP 1 GSECL 107 14:45 26-12-2016 15:26 26-03-2017 Rotor earth fault

13. SUGEN 3 GSECL 13:08 29-12-2016 06:11 01-04-2017 Testing


14. Wanakbori 6 GSECL 210 19:55 07-01-2017 10:50 05-04-2017 RSD

15. GPEC 1 GSECL 218 11:57 21-01-2017 09:03 07-03-2017 RSD

16. OPGS 2 GSECL 150 00:00 01-02-2017 Still out Still out Less schedule

17. GPEC 3 GSECL 210 11:26 03-02-2017 02:55 06-03-2017 RSD

18. Wanakbori 5 GSECL 210 11:33 04-02-2017 Still out Still out RSD

19. Wanakbori 4 GSECL 210 20:17 08-02-2017 Still out Still out RSD

20. BECL 1 GSECL 250 22:25 10-02-2017 Still out Still out Coal handling plant

21. SUGEN 2 GSECL 382 16:56 16-02-2017 Still out Still out RSD

22. Wanakbori 2 GSECL 210 16:59 22-02-2017 10:25 18-03-2017 RSD

23. GTPS- 3 GSECL 210 13:37 23-02-2017 05:56 21-03-2017 RSD

24. GPEC 2 GSECL 218 15:38 28-02-2017 06:02 01-03-2017 RSD

25. Wanakbori 3 GSECL 210 21:36 02-03-2017 04:13 07-03-2017 RSD

26. GPEC 3 GSECL 218 19:38 06-03-2017 17:24 16-03-2017 RSD

27. GPEC 1 GSECL 218 18:46 08-03-2017 10:28 20-03-2017 RSD

28. Wanakbori 3 GSECL 210 20:05 08-03-2017 06:52 18-03-2017 RSD

29. GIPCL STG 1 GSECL 145 14:08 10-03-2017 Still out Still out RSD

30. Wanakbori 5 GSECL 210 17:42 10-03-2017 16:13 17-03-2017 RSD


31. GPEC 3 GSECL 218 19:38 16-03-2017 21:20 28-03-2017 RSD

32. SLPP 1 GSECL 125 06:31 19-03-2017 16:15 29-03-2017 BTL

33. DGBP 2 GSECL 112 04:48 20-03-2017 Still out Still out High exhaust temp

34. GPEC 1 GSECL 218 12:00 20-03-2017 Still out Still out Gas unavailable

35. GPEC 2 GSECL 218 00:00 21-03-2017 Still out Still out PSD(Planned Shutdown)

36. Ukai 6 GSECL 500 23:54 22-03-2017 13:28 25-03-2017 BTL

37. UTRAN STG II 1 GSECL 375 19:57 25-03-2017 06:02 29-03-2017 Costly generation

38. SLPP 4 GSECL 125 07:44 29-03-2017 10:20 03-04-2017 BTL


39. GPEC 3 GSECL 218 15:10 29-03-2017 Still out Still out RSD
40. UTRAN STG II 1 GSECL 375 17:57 29-03-2017 Still out Still out RSD

41. Torrent Power 120 00:00 19-03-2017 09:52 23-03-2017 BTL


Torrent Power- F
42. Chandrapur-1 MAHAGENCO 210 7:15 28-08-2014 Still out Still out BTL/ Economic shutdown.

43. Koradi-6 MAHAGENCO 210 01:02 20-03-2015 Still out Still out Economic shutdown

44. Parli-3 MAHAGENCO 210 12:52 14.06.2015 Still out Still out Water shortage

45. Parli 4 MAHAGENCO 210 19:47 05-07-2015 Still out Still out Water shortage

46. Parli 5 MAHAGENCO 210 14:55 06-07-2015 Still out Still out Water shortage.

47. Chandrapur 2 MAHAGENCO 210 04:42 12-01-2016 Still out Still out BTL

48. WPCL 1 MAHAGENCO 135 17:03 16-02-2016 Still out Still out Low Schedule
Change over against unit-3
49. WPCL 2 MAHAGENCO 135 21:46 29-02-2016 Still out Still out
as per scheduled dispatch
50. Bhusawal 2 MAHAGENCO 210 19:35 14-06-2016 Still out Still out BTL

51. Koradi 5 MAHAGENCO 200 00:21 05-09-2016 Still out Still out ID fan problem

52. Paras 3 MAHAGENCO 250 08:52 25-10-2016 22:30 16-03-2017 Stator winding E/F


Cooling water tube
53. Jaigad 1 MAHAGENCO 300 14:38 16-11-2016 13:40 04-03-2017
leakage
54. Jaigad 2 MAHAGENCO 300 00:00 01-12-2016 23:32 04-04-2017 Less schedule

VIPL 1
Turbine bearing
55. MAHAGENCO 300 00:45 03-01-2017 12:02 14-03-2017
temperature high
56. Chandrapur 7 MAHAGENCO 500 19:32 25-01-2017 Still out Still out Turbine bearing sparking

Koradi-2-10
PG test on Ash handling
57. MAHAGENCO 660 00:10 07-02-2017 Still out Still out
plant

58.
MAHAGENCO 388 17:45 07-02-2017 Still out Still out Low schedule
PIONEER(262+127) 1
59. Koradi 7 MAHAGENCO 210 14:18 15-02-2017 Still out Still out Low schedule

60. Uran 5 MAHAGENCO 108 10:05 22-02-2017 15:42 14-03-2017 Filter replacement work
61. Nasik 5 MAHAGENCO 210 14:30 24-02-2017 04:25 25-03-2017 Less Schedule

62. Chandrapur 8 MAHAGENCO 500 12:24 27-02-2017 10:18 05-03-2017 BTL

63. Khaparkheda 2 MAHAGENCO 210 22:51 28-02-2017 10:51 02-03-2017 BTL

64. WPCL 3 MAHAGENCO 135 06:51 01-03-2017 12:00 04-03-2017 Flame failure

65. Khaparkheda 1 MAHAGENCO 210 13:08 02-03-2017 08:12 22-03-2017 Less schedule

66. Bhusawal 3 MAHAGENCO 210 06:42 03-03-2017 01:00 25-03-2017 Less schedule

67. Chandrapur 4 MAHAGENCO 210 05:23 04-03-2017 10:24 07-03-2017 BTL


68. Khaparkheda 1 MAHAGENCO 210 13:08 02-03-2017 08:12 22-03-2017 Less schedule

69. Khaparkheda 4 MAHAGENCO 210 07:19 07-03-2017 05:45 26-03-2017 Drum level low

70. WPCL 3 MAHAGENCO 135 15:00 08-03-2017 08:45 20-03-2017 Coal Shortage

71. Chandrapur 6 MAHAGENCO 500 08:50 10-03-2017 03:21 13-03-2017 BTL

72. Khaparkheda 3 MAHAGENCO 210 02:35 11-03-2017 04:27 22-03-2017 Low schedule

73. Khaparkheda 2 MAHAGENCO 210 12:02 16-03-2017 09:51 22-03-2017 BTL

74. Khaparkheda 5 MAHAGENCO 500 16:53 21-03-2017 01:06 25-03-2017 BTL

75. WPCL 4 MAHAGENCO 135 00:01 22-03-2017 00:39 01-04-2017 SSC chain broken

76. Khaparkheda 3 MAHAGENCO 210 19:38 23-03-2017 21:38 26-03-2017 BTL

77. URAN B0 1 MAHAGENCO 120 00:30 26-03-2017 Still out Still out Filter clearing

78. Chandrapur 9 MAHAGENCO 500 14:33 28-03-2017 11:13 02-04-2017 BTL

79. Paras 4 MAHAGENCO 250 18:26 28-03-2017 17:00 01-04-2017 BTL

80. Parli 8 MAHAGENCO 250 12:55 31-03-2017 Still out Still out Furnace pressure low

81.
RGPPL 320 23:00 31-03-2014 Still out Still out
Dry preservation/Gas
RGPPL-1B shortage

82.
RGPPL 320 13:30 8-07-2014 Still out Still out Less requisition
RGPPL-1A

83.
RGPPL 230 14:15 11-02-2017 Still out Still out Unit change over
RGPPL 2B

84.
RGPPL 230 21:47 20-02-2017 10:07 06-03-2017 Change over of units
RGPPL 2A

85.
RGPPL 230 18:05 06-03-2017 Still out Still out Withdrawal of backup unit
RGPPL 2A
RATTAN POWER
86. AMRAVATI 270 03:01 29-06-2016 08:59 29-03-2017 No Schedule
INDIA LTD
TPP(INDIABULL)-3
RATTAN POWER
87. AMRAVATI 270 20:00 15-11-2016 17:58 27-03-2017 RSD
INDIA LTD
TPP(INDIABULL)-5
RATTAN POWER
88. AMRAVATI 270 22:36 16-11-2016 07:14 28-03-2017 Less schedule
INDIA LTD
TPP(INDIABULL)-2
RATTAN POWER
89. AMRAVATI 270 21:03 16-11-2016 06:08 30-03-2017 Less schedule
INDIA LTD
TPP(INDIABULL)-4
RATTAN POWER
90. AMRAVATI 270 17:23 17-11-2016 07:19 27-03-2017 RSD/Zero Schedule
INDIA LTD
TPP(INDIABULL)-1

91.
Adani Power Ltd 660 20:46 03-03-2017 09:12 06-04-2017 Hydrogen gas leak
APL Mundra6

92.
Adani Power Ltd 330 18:58 05-03-2017 16:37 02-04-2017 Coal Shortage
APL Mundra1

93.
ATIL 330 02:01 07-03-2017 14:20 02-04-2017 Coal shortage
APL Mundra 2

94.
ATIL 330 22:16 17-03-2017 14:57 04-04-2017
Tripped due to TG
APL Mundra 3 vibration high

95.
ATIL 660 22:00 24-03-2017 14:10 30-03-2017
closing of Main Steam
APML Tiroda 4 Stop Valve left hand side
96.
MPPGCL 600 20:12 16-05-2016 Still out Still out Flame failure.
MB Power 2
97. Satpura III 8 MPPTCL 210 11:42 27-12-2016 Still out Still out RSD

98. Satpura III 9 MPPTCL 210 11:44 27-12-2016 Still out Still out RSD

MB Power 1
ID fan blade pitch
99. MPPTCL 600 19:46 28-12-2016 Still out Still out
problem
100. Singaji 1 MPPGCL 600 19:10 26-01-2017 19:12 27-03-2017 RSD

101. Satpura II 6 MPPGCL 200 11:50 21-02-2017 Still out Still out Deaerator Problem

102. Singaji 2 MPPGCL 600 13:44 01-03-2017 11:54 04-03-2017 Preparing for PG test

103. SGTPS 1 MPPGCL 210 18:03 04-03-2017 Still out Still out RSD
Checking of circuits and
104. JP BINA MPPGCL 250 00:17 05-03-2017 Still out Still out
components of protection
105. Satpura II 7 MPPGCL 210 15:00 10-03-2017 Still out Still out RSD

106. Singaji 2 MPPGCL 600 19:30 11-03-2017 Still out Still out RSD

107. SGTPS 3 MPPGCL 210 14:10 15-03-2017 04:05 23-03-2017 RSD

108. SGTPS 2 MPPGCL 210 20:19 19-03-2017 18:51 22-03-2017 RSD

109. Singaji 1 MPPTCL 600 14:19 30-03-2017 Still out Still out BTL

110. Marwa TPS 1 CSPGCL 500 19:42 02-05-2016 09:42 12-03-2017 BTL

111. KORBA(E) 5 CSPGCL 120 21:35 22-03-2017 Still out Still out BTL

112. Marwa TPS 1 CSPGCL 500 13:23 12-03-2017 16:34 15-03-2017 Drum level low

113. Marwa TPS 2 CSPGCL 500 10:36 31-03-2017 07:05 04-04-2017 flame failure

114. Marwa TPS 1 CSPGCL 500 22:28 31-03-2017 Still out Still out Vibrations high

115. DB Power I DBPL 600 00:02 15-03-2017 02:26 23-03-2017 BTL

116. ACBIL 300 04:23 19-03-2017 Still out Still out ID fan problem
TRN Energy 1
117. VANDANA -1 VANDANA 135 15:00 9-01-2015 Still out Still out BTL

118. JPL Stg-II 3 JPL 600 09:54 17-06-2016 Still out Still out Less schedule/RSD

119. JPL Stg-I 2 JPL 600 03:20 19-11-2016 06:42 20-03-2017 APH2-B gear box problem

JPL Stg-II 2
Due to abnormal sound in
120. JPL 600 08:25 30-11-2016 16:40 10-03-2017
APH-A
121. JPL Stg-II 4 JPL 600 13:59 11-12-2016 Still out Still out Taken out after COD test

122. JPL Stg-I 4 JPL 250 04:57 07-03-2017 04:32 30-03-2017 Low Schedule

123. JPL Stg-II 1 JPL 600 20:40 10-03-2017 Still out Still out BTL
HP Heater both pass tube
124. JP Nigrie 1 JAYPEE 660 00:02 27-02-2017 12:18 15-03-2017 leakage & RAPH guide
bearing problem.
125. Dhariwal-1 DHARIWAL 300 2:27 28-May-14 Still out Still out High vibration problem.

126. UNOSUGEN-1 TPGL 382 21:55 04-03-2016 Still out Still out RSD

127. DGEN-52 2 TPGL 400 20:00 25-11-2016 Still out Still out No schedule

128. DGEN-51 TPGL 400 19:28 02-12-2016 Still out Still out No schedule

129. DGEN-53 TPGL 400 19:12 23-12-2016 Still out Still out Low schedule

130. GCEL 685 01:10 02-08-2016 Still out Still out No Schedule
GMR CHHATISGARH 2
131. ACBIL 2 ACBIL 135 10:13 27-02-2017 07:09 08-03-2017 BTL

132. Lanco 1 LANCO 300 00:00 28-01-2017 19:11 30-01-2017 BTL

133. KAPS 2 NPCIL 220 14:09 01-07-2015 Still out Still out Nuclear reactor side problem

134. KAPS 1 NPCIL 220 08:52 11-03-2016 Still out Still out Reactor side problem

135. BALCO(300 MW) 4


Tripped due to fault in
BALCO 300 16:08 31-03-2017 Still out Still out
220 S/Y.
136. BALCO(300 MW) 2
Tripped due to fault in
BALCO 300 16:08 31-03-2017 16:16 03-04-2017
220 S/Y.
137. EPGL 1 ESSAR 600 06:56 01-03-2017 00:00 01-04-2017 Vacuum problem

138. EPGL 2 ESSAR 600 14:46 16-03-2017 Still out Still out BTL
Due to sudden HP Heater
139. KWPCL 600 23:59 03-03-2017 06:00 07-03-2017
KWPCL 1 5 A man hole leakage

Heavy leakage from CBD


140. KWPCL 600 23:59 19-03-2017 06:08 23-03-2017
KWPCL 1 manual isolation valve


Reverse power protection
141. RKM Power 1 RKMPPL 360 07:58 03-03-2017 16:42 27-03-2017
operated
142. Sasan 5 SASAN 660 11:33 16-03-2017 12:46 19-03-2017 CW pump leakage

143. Sasan 5 SASAN 660 17:50 19-03-2017 17:17 22-03-2017 APH Bellow problem

144. TAPS 2 NPCIL 160 00:59 16-03-2017 20:32 28-03-2017 Tripped on MFT

Kawas GT 2A
Low schedule; Change
145. NTPC 106 10:37 22-01-2017 06:16 29-03-2017
over of units

Kawas ST 2C
Low schedule/Change
146. NTPC 116 16:27 22-01-2017 Still out Still out
over

Kawas GT 2B
Low schedule/Change
147. NTPC 106 16:30 22-01-2017 18:09 29-03-2017
over
148. GandharGT ST 3 NTPC 219 18:26 30-01-207 10:00 20-03-2017 withdrawn as per schedule

149. Gandhar GT ST 1 NTPC 219 00:03 22-02-2017 11:51 05-03-2017 RSD

150. Gandhar GT ST 3 NTPC 219 19:30 22-03-2017 06:30 23-03-2017 RSD due to low schedule

151. VSTPS 5 NTPC 210 00:26 27-03-2017 01:20 31-03-2017 BLR+ESP R&M

152. Kawas GT 2A NTPC 106 08:21 29-03-2017 Still out Still out Withdrawn on low schedule

153. Kawas GT 2B NTPC 106 20:21 29-03-2017 Still out Still out RSD

Note: Units out for more than 72 hrs are only included.
Annex-2.7

2017
Details of planned unit outages during the month of Mar.2017
o o
Unit Constituent/IPP From From Reason

Sl.No Cap.MW
Time Date Time Date

1. TPC 500 00:00 06-03-2016 Still out Still out AOH


TROMBAY 6
2. Ukai 5 GSECL 210 23:57 06-12-2016 08:59 28-03-2017 AOH

3.
SSP 200 09:00 15-03-2017 Still out Still out
AOH for 30
SSP(RBPH) 1 Days(upto 14.04.17)
AOH (Withdrawn on
BTL,But will
4. NASIK 4 MAHAGENCO 210 05:45 25-03-2017 Still out Still out
continue to be out for
AOH)
KORBA EAST
5. CSPGCL 250 23:50 08-03-2017 Still out Still out AOH
EXT(DSPM) 2
ANNEXURE 3.1
DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING APRIL 2017 AND MAY 2017

S. No. Unit No. Capacity Outage as per Annual Reason


Maintenance Plan
(MW) From To
1 GUJARAT
1.1 APL, Mundra 4 330 25-May-17 30-Jun-17 COH

2 MADHYAPRADESH
NIL

3 CHHATTISHGARH
NIL

4 MAHARASHTRA
4.1 GMR WARORA ENERGY LTD 2 300 10-May-17 20-May-17 Schedule maintenance works

5 Central Sector
5.1 CGPL 20 30-Apr-17 05-May-17
800
Boiler Recertification
5.2 CGPL 30 800 10-May-17 13-Jun-17 HPH replacement
5.3 TAPS 2 2 160 01/05/2017 05/05/2017 For mandatory sequence change of control rods
5.4
Refueling outage of the unit, regulatory inspection and
TAPS 1 1 160 15/05/2017 30/11/2017 upgradation of the station as per regulatory requirements
5.5 ACBIL 2 135 15-Apr-17 04-May-17 AOH
5.6 NTPC Korba 1 200 25-Apr-17 27-Apr-17 BLR LICENSE RENEWAL
5.7 NTPC Korba 2 200 04-May-17 07-May-17 ESP GD/PG TEST
5.8 NTPC Korba 3 200 10-May-17 13-May-17 ESP GD/PG TEST
5.9 NTPC Korba 6 500 27-May-17 30-May-17 ESP GD/PG TEST
5.10 NTPC Vindhyachal 12 500 01-Apr-17 25-Apr-17 BLR+GEN
5.11 NTPC Vindhyachal 1 210 26-Apr-17 29-Apr-17 BLR LICENSE RENEWAL
5.11 01-May-17 04-Jun-17 TG CAPITAL+GEN+CW DUCT+BLR ESP +GUILLOTINE
3 210
NTPC Vindhyachal GATES-R&M WORK
6.11 NTPC Sipat 1 660 28-Apr-17 27-May-17 BOILER
5.12 TAPS 4 540 23-Apr-17 28-May-17 BINNEL SHUTDOWN
* The outages of Big size NTPC & CGPL shall be deferred as per demand on summer season
ANNEXURE -3.2
LIST OF TRANSMISSION ELEMENTS OUTAGES PROPOSALS FOR THE MONTH OF MAY 2017

Sr No. KV Line / Element From To Basis Reason System Agency Type Site Comments
Date Time Date Time
1 765/400 1500MVA ICT-1 at 765kV Raichur 12-Apr-17 6:00 12-Apr-17 15:00 Daily System Improvement Works: RTV COATING OF SRPC PGCIL
2 765/400 1500MVA ICT-2 at 765kV Raichur 13-Apr-17 6:00 13-Apr-17 15:00 Daily System Improvement Works: RTV COATING OF SRPC PGCIL
3 400 Boisar-Magarwada 18-Apr-17 6:00 19-Apr-17 15:00 Daily Powerline crossing work of Aurangabad-Boisar line POWERGRID WR-II C BOISAR
Replacement of all porcelain disc insulator strings with
4 400 Navsari - Magarwada Ckt.1 20-Apr-17 8:00 21-Apr-17 18:00 Daily POWERGRID WR-II C
CLR Polymer insulators in complete line to avoid
For Line crossing work of 400kV D/C Agra(UP)-
5 765 765kV GWALIOR - AGRA # 1 21-Apr-17 8:00 21-Apr-17 18:00 Daily NRPC POWERGRID
Agra(South) under Lalitpur -Agra consultancy project.
For Line crossing work of 400kV D/C Agra(UP)-
6 765 765kV GWALIOR - AGRA # 2 24-Apr-17 8:00 24-Apr-17 18:00 Daily NRPC POWERGRID
Agra(South) under Lalitpur -Agra consultancy project.
Tie Bay-717 of 765KV Sundergarh-Dharamjaygarh Line#II at REFURBISHMENT OF 765KV CB FOR DCRM ER-II/Odisha/
7 765 25-Apr-17 8:00 01-May-17 18:00 Continuous ERPC
Sundergarh PROBLEM(CONSTRUCTIONAL DEFECT) Sundergarh
8 400 Essar - Bhachau circuit I & II 01-May-17 8:00 15-May-17 18:00 Daily For rectification of shutdown nature defects WR-II POWERGRID R BHACHAU
A/R of Ckt-1to be kept in non auto mode for online BHACHAU
9 400 Bachau - Ranchodpura Ckt.1 01-May-17 8:00 02-May-17 20:00 Daily POWERGRID WR-II R
installation of Bird divertors on earthwire as per the TLM
10 400 412,Shujalpur-2 Main bay at Bina 01-May-17 9:30 01-May-17 18:00 Daily AMP WORKS POWERGRID WR-II R BINA
11 400 Bay No-407 Main Bay of 400kv Boisar-Padghe Line at Boisar 01-May-17 6:00 01-May-17 15:00 Daily AMP POWERGRID WR-II R BOISAR
12 400 500MVA ICT#3 at Damoh 01-May-17 6:00 01-May-17 15:00 Daily For CSD Installation ICT#3 Main Bay (415 Bay) POWERGRID WR-II C DAMOH SLDC MP consent
Online code is required to shift the Line over TBC for
13 220 220kV Dehgam-Dehgam#1 01-May-17 6:00 01-May-17 10:00 Daily GETCO WR-II R DEHGAM
Thermovision scanning.No outage will be required
Online code is required to shift the Line over TBC for
14 400 220kV Dehgam-Dehgam#2 01-May-17 13:00 01-May-17 17:00 Daily GETCO WR-II R DEHGAM
Thermovision scanning. No outage will be required
15 400 315MVA ICT- I at Kala 01-May-17 8:00 04-May-17 19:00 Daily For internl inspection of main tank POWERGRID WR-II C KALA
For Jumpering of Reactor NGR Breaker & Wiring of
16 765 765KV Satna-Gwalior-1 Line Reactor at Satna SS (Switchable) 01-May-17 6:00 01-May-17 15:00 Daily POWERGRID WR-II C SATNA
Single Phase Breaker for Switching scheme
17 765 Main-Bay(701) of Vadodara-Dhule line at Vadodara GIS 01-May-17 10:00 01-May-17 16:00 Daily AMP Work of CB POWERGRID WR-II R VADDDAR
Online permint for PID testing of insulator strings. A/R Will be deferred if any
18 400 Shujalpur- Nagda-1 01-May-17 6:00 31-May-17 15:00 Daily for both ciruicts to be kept into non auto mode during POWERGRID WR-II R outage in shujalpur, Bina
PID testing. is approved.Shujalpur-
Online permint for PID testing of insulator strings. A/R
19 400 Khandwa -Dhule-1 01-May-17 6:00 31-May-17 15:00 Daily POWERGRID WR-II R
for both ciruicts to be kept into non auto mode during
Online replacement of E/W with OPGW. A/R shall be Sasan satna V'chal PS-
20 765 Sasan - Satna Ckt-I 01-May-17 6:00 31-May-17 18:00 Daily POWERGRID WR-II C ULDC
kept in non auto mode Satna & satna Gwalior
Online replacement of E/W with OPGW. A/R shall be Sasan satna V'chal PS-
21 765 Satna - Gwalior Ckt-I 01-May-17 6:00 31-May-17 18:00 Daily POWERGRID WR-II C ULDC
kept in non auto mode Satna & satna Gwalior
22 220 Chhegeon Khandwa # 1 01-May-17 6:00 31-May-17 18:00 Daily Online replacement of E/W with OPGW. A/R shall be MPPTCL WR-II C ULDC
23 220 Barwaha Chhegeon (MPPTCL) # 1 01-May-17 6:00 31-May-17 18:00 Daily Online replacement of E/W with OPGW. A/R shall be MPPTCL WR-II C ULDC
24 220 Seoni- Seoni ( MPPTCL)-1 01-May-17 6:00 31-May-17 18:00 Daily Online replacement of E/W with OPGW. A/R shall be MPPTCL WR-II C ULDC
25 400 Korba-Birsingpur -S/c 01-May-17 6:00 31-May-17 18:00 Daily Online replacement of E/W with OPGW. A/R shall be POWERGRID WR-II C ULDC
Online replacement of E/W with OPGW. A/R shall be Will be deferred for anu
26 400 Mundra-Jetpur Ckt 1 01-May-17 6:00 31-May-17 18:00 Daily POWERGRID WR-II C ULDC
kept in non auto mode shutdown from CGPL
Online rectification works of OPGW. A/R shall be Sasan satna V'chal PS-
27 400 Vindhyachal Pooling- Sasan-1 01-May-17 6:00 31-May-17 18:00 Daily POWERGRID WR-II C ULDC
kept in non auto mode Satna & satna Gwalior
28 765 Jabalpur PS-Bina PG-1 01-May-17 6:00 31-May-17 18:00 Daily Online replacement of E/W with OPGW. A/R shall be POWERGRID WR-II C ULDC
Will be deferred if any
Online replacement of E/W with OPGW. A/R shall be
29 400 Dehgam- Nagda Ckt 1 01-May-17 6:00 31-May-17 18:00 Daily POWERGRID WR-II C ULDC outage in shujalpur, Bina
kept in non auto mode
is approved.Shujalpur-
Online replacement of E/W with OPGW. A/R shall be Will be deferred for any
30 765 Indore -Bina-S/c 01-May-17 6:00 31-May-17 18:00 Daily POWERGRID WR-II C ULDC
kept in non auto mode outage in vadodara and
31 220 400kV Bina(MPPTCL)-220 kV Bina (MPPTCL)-1 01-May-17 6:00 31-May-17 18:00 Daily Online replacement of E/W with OPGW. A/R shall be MPPTCL WR-II C ULDC
32 66 Kharadpara- Amli 01-May-17 6:00 31-May-17 18:00 Daily Online replacement of E/W with OPGW. A/R shall be DNH WR-II C ULDC DNH consent required.
Power line crossing of 400 kV D/C Korba to Raipur
33 400 Korba-Raipur Ckt 3&4 01-May-17 8:00 01-May-17 19:00 Daily PGCIL STL Routine
Ckt 3&4 at Tower No.212 & 213 by 765 KV S/C Sipat-
34 765/400 1500MVA , ICT II @Ektuni 01-May-17 8:00 02-May-17 18:00 Continuous Isolator alignment work MSETCL MSETCL
35 220 220 KV Wardha(Deoli) - Pusad Line 01-May-17 8:00 31-May-17 17:00 Daily Taking Auto Reclose in Non AR Mode for stringing MSETCL M/s KEC ltd.
36 220 200kV Wardha(Deoli)-Badnera-S/c 01-May-17 8:00 04-May-17 18:00 Daily PID testing of Line ( A/R switch is kept off position MSETCL MSETCL
37 400 Tranfer Bus Coupler @ BBLR 01-May-17 6:00 01-May-17 14:00 Daily Maintenance work & Servicing and allignment of PG MSETCL MSETCL TBC is
Online permit for Hotline Washing of insulator strings.
38 400 Jaigad-Newkoyna Ckt - 1&2 01-May-17 6:00 31-May-17 15:00 Daily JPTL JPTL
A/R for both ciruicts to be kept into non auto mode
39 400 Jaigad-Karad Ckt -1&2 01-May-17 6:00 31-May-17 15:00 Daily Online permit for Hotline Washing of insulator strings. JPTL JPTL Will be deferred for
40 400 Koyna IV-Lonikhand-S/c 01-May-17 6:00 31-May-17 18:00 Daily Taking Auto Reclose in Non AR Mode for stringing MSETCL MSETCL
41 400 Karad - New Koyna ckt 1 01-May-17 6:00 31-May-17 18:00 Daily Taking Auto Reclose in Non AR Mode for stringing MSETCL MSETCL
N.Koyn
a-Karad
42 400 N.Koyna-Karad ckt 1 01-May-17 10:00 04-May-17 18:00 Daily Cold washing of Insulators MSETCL MSETCL
ckt 2
will be
43 400 Parli - Wardha-1 01-May-17 6:00 31-May-17 18:00 Daily Online OPGW work. A/R to be kept in Non auto mode WRTML WRTS-I AR One ckt from one node
44 400 400kV RAIPUR-BHILAI I 01-May-17 6:00 31-May-17 14:00 Daily Online PID Works . A/R to be kept in Non Auto mode WRTS-I WRTS-I C AR will be deferred if Korba-
45 400 400kV BHILAI-KORADI 01-May-17 6:00 31-May-17 14:00 Daily Online PID Works . A/R to be kept in Non Auto mode WRTS-I WRTS-I C AR
46 400 400kV KORADI-SATPURA-S/c 01-May-17 6:00 31-May-17 14:00 Daily Online PID Works . A/R to be kept in Non Auto mode WRTS-I WRTS-I C AR
47 400 400kV BHADRAVATI-CHANDRAPUR I-II 01-May-17 6:00 31-May-17 14:00 Daily Online PID Works . A/R to be kept in Non Auto mode WRTS-I WRTS-I C AR
48 400 400kV BHILAI/ RAIPUR-1-BHADRAVATI 01-May-17 6:00 31-May-17 14:00 Daily Online PID Works . A/R to be kept in Non Auto mode WRTS-I WRTS-I C AR
49 400 BUS REACTOR_400kV_125MVAR_AURANGABAD 01-May-17 6:00 01-May-17 15:00 Daily For AMP Works at Aurangabad WRTS-I WRTS-I R BR subjected to voltage
50 765 765 kv Kotra #1 Line bay 810L at Durg PS 01-May-17 6:00 01-May-17 15:00 Daily AMP of bay WRTS-I WRTS-I R Bay
765KV RANCHI 02 MAIN BAY(728) AT
51 765 01-May-17 6:00 01-May-17 15:00 Daily AMP Works WRTS-I WRTS-I R BAY
DHARAMJAYGARH(KORBA) SS
52 400 400 KV Swithable Reactor of Bhadrawati 2 Line at Raipur SS 01-May-17 9:30 01-May-17 17:30 Daily AMP work at Raipur WRTS-I WRTS-I R BR
53 765 765kV PUNE(GIS)-SOLAPUR-S/c 01-May-17 8:00 01-May-17 18:00 DAILY For crossing of 400KV NTPC#3&4 WRTS-1 POWERGRID C Line
Insulator replacement work at Various locationsof line wardha-Parli A/r or
54 400 400kV WARDHA-AKOLA I 01-May-17 6:00 31-May-17 15:00 Daily WRTS-I WRTS-I LINE
Line on daily basis. Other Ckt in Non Auto mode wardha Akoa outage
For Replacement of conventional insulators with
55 400 400 kV Khandwa-Dhule I 01-May-17 6:00 02-May-17 18:00 Daily Polymer Insulators in N.H, S.H, Rail crossings,etc. for WRTS-II WRTS-I C LINE
Public safety
56 765 Bhopal-Indore 765 kV Line alongwith Line Reactor at Bhopal 01-May-17 8:00 02-May-17 18:00 Daily For AMP works BDTCL BDTCL R
57 400 SSP-Rajgarh-1 01-May-17 6:00 05-May-17 18:00 Daily For Replacement of Defective Disc Insulator String MPPTCL/SSP MPPTCL
58 400 400KV Kansari Bhinmal line 01-May-17 8:00 01-May-17 18:00 Daily New 400KV Bus bar protection scheme logic test and GETCO GETCO
59 220 Kawas-Haldarwa 1&2 01-May-17 8:00 05-May-17 18:00 Daily Tower shifting under DIFCC Railway diversion work POWERGRID WR-II C NAVSARI Already approved from 1
60 220 Kawas-Haldarwa 2 01-May-17 10:00 01-May-17 17:00 Daily Balance replacement of disc insulator strings with POWERGRID WR-II C NAVSARI
61 400 400KV BAY-401 (DEHGAM-2 MAIN BAY) at Pirana 02-May-17 6:00 02-May-17 13:00 Daily AMP Work POWERGRID WR-II R PIRANA
62 765 Seoni#2 main bay 707 at Bilaspur SS 02-May-17 6:00 02-May-17 15:00 Daily AMP works WRTS-I WRTS-I R Bay
63 765 BUS REACTOR_765kV_240MVAR_WARDHA 02-May-17 8:00 03-May-17 18:00 Continuous RTV coating Work in HV bushings Trench Make. WRTS-I WRTS-I BR Outage can be availed
64 400 411,Satna-4 & Shujalpur-2 Tie bay at Bina 02-May-17 9:30 02-May-17 18:00 Daily AMP WORKS POWERGRID WR-II R BINA
65 400 Bay No-408 Tie Bay of 400kv Boisar-Padghe Line & ICT-I at Boisar 02-May-17 6:00 02-May-17 15:00 Daily AMP POWERGRID WR-II R BOISAR
Online code is required to shift the Line over TBC for
66 400 220kV Ranasan-Dehgam#1 02-May-17 6:00 02-May-17 10:00 Daily GETCO WR-II R DEHGAM
Thermovision scanning.No outage will be required
Online code is required to shift the Line over TBC for
67 400 220kV Ranasan-Dehgam#2 02-May-17 13:00 02-May-17 17:00 Daily GETCO WR-II R DEHGAM
Thermovision scanning. No outage will be required
68 400 VINDHYACHAL -4 MAIN BAY (407) at Jabalpur SS 02-May-17 6:00 02-May-17 14:00 Daily AMP WORK POWERGRID WR-II R JABALPU
For Jumpering of Reactor NGR Breaker & for taking
69 765 765KV Satna-Gwalior-2 Line Reactor at Satna SS (Switchable) 02-May-17 6:00 02-May-17 15:00 Daily POWERGRID WR-II C SATNA
spare reactor in to service for attending oil lekage and
70 220 220KV Vapi-Magarwada-2 02-May-17 6:00 02-May-17 10:00 Daily AMP of terminal equipment POWERGRID WR-II R VAPI
71 765 Main Bay of Satna 2 LINE (bay- 707) at Vchal SS 02-May-17 6:00 02-May-17 17:00 Daily FOR AMP WORK POWERGRID WR-II R VCHAL
72 400 409 GT#20 Main and 408 GT#20 Tie Bay at CGPL 02-May-17 6:00 02-May-17 15:00 Daily Tightness check of GT Overhead line droppers and CGPL CGPL
73 400 400KV KWB - RAITA FDR. 02-May-17 8:30 03-May-17 18:00 Continuous Maintenance & Testing Work CSPTCL CSPTCL
(1) Cleaning and tightness of clamps of bus and line
400 KV Korba West -Raita Feeder at 400 KV switchyard HTPS, isolator, CT's & CVT's and breaker.Cleaning of CSPTC
74 400 02-May-17 8:30 03-May-17 18:00 Continuous CSPTCL CSPTCL
Korba West. insulator of CT's & CVT's ,isolator and breaker. L
(2) Terminal tightness of relay & control
75 400 315 MVA ICT-3 at 400 KV S/s Khedamara. 02-May-17 6:00 03-May-17 14:00 Continuous Annual Maintenance Programme. CSPTCL CSPTCL CSPTC
Preventive maintenance of 404 89A Isolator and 404
76 400 400 KV DGEN GT-51 (BAY 404) 02-May-17 8:00 02-May-17 18:00 Daily TPL TPL R
89AE Earth switch.Bus A isolation and Bay 404
77 400/220 167 MVA Spare - ICT (Bay No- 401 ) Main CB @ Warora 02-May-17 6:00 02-May-17 16:00 Daily DCRM of main CB at 400KV S/s. Warora. MSETCL MSETCL
78 220 220KV SAGAR-PGCIL(Damoh) 02-May-17 6:00 02-May-17 15:00 daily LINE MAINTENANCE WORK MPPTCL MPPTCL R
79 400 400kV BHADRAVATI-PARLI I 02-May-17 8:00 02-May-17 18:00 Daily Replacement of Porcelain insulators & Other Ckt is in WRTS-I WRTS-I R LINE
80 765/400 ICT1_765/400kv_CHAMPA 02-May-17 6:00 02-May-17 14:30 Daily For AMP Works POWERGRID POWERGRID R ICT
81 765 765kV TAMNAR PS-KOTRA PS I 02-May-17 6:00 02-May-17 18:00 Daily Quad to Twin Modification of Droppers WRTS-I WRTS-I C LINE
82 765/400 ICT1_765/400kv_PUNE(GIS) 02-May-17 6:00 02-May-17 15:00 Daily For CSD commissioning of 765kV tie bay CSD and WRTS-I WRTS-I R ICT
83 220 220KV Bus # 2 at Talegaon 02-May-17 6:00 02-May-17 15:00 Daily For AMP works WRTS-I WRTS-I R Bus Outage will be feasible
84 765 SOLAPUR_BAY 404_MAIN BAY_ICT#3 02-May-17 6:00 02-May-17 15:00 DAILY AMP 17-18 WRTS-1 POWERGRID R BAY
85 765 765 KV Wardha-Aurangabad # 2 Main Bay 713 at Wardha 02-May-17 6:00 05-May-17 15:00 Continuous All 6 poles CB Mechanism Boxes Replacement Work WRTS-I WRTS-I Bay
KSK consent
86 400 KSK-CHAMPA LINE-2(ckt-03 & 04) 02-May-17 6:00 03-May-17 18:00 Continuous OVERHEAD CROSSING OF 400 LARA-CHAMPA TL KSK WRTS-I C LINE required./As per OCC
Meeting KSK informed
for Overhead Stringing of U/C 765KV D/C Raipur-
87 400 400KV D/C Rourkela-Raigarh CKT-III&CKT-IV 02-May-17 6:00 03-May-17 16:00 Daily PGCIL OGPTL C
Sundargarh Transmission line(of OGPTL) at OGPTL
For Replacement of conventional insulators with
88 765 765kV SEONI-BILASPUR II 02-May-17 8:00 03-May-17 18:00 Daily Polymer Insulators in N.H, S.H, Rail crossings,etc. for WRTS-I WRTS-I C Line
Public safety
89 765 SWITCHABLE LR_765kV_SEONI 2_BILASPUR 02-May-17 6:00 02-May-17 15:00 Daily AMP works (CB CRM meas. & Grading capacitor WRTS-I WRTS-I R LR To be taken alongwith
90 400 400KV Kansari Kankroli line 02-May-17 8:00 02-May-17 18:00 Daily New 400KV Bus bar protection scheme logic test and GETCO GETCO
91 400 Kansari-Vadavi-1 03-May-17 8:00 03-May-17 18:00 Daily BAY PMM WORK GETCO GETCO
92 400 Bay-10 -VINDHYACHAL LINE#3 Main Bay at Sasan 03-May-17 08:00 03-May-17 18:00 Daily Bay Yearly maintenance SASAN RELIANCE
93 400 400kV Raipur-1 Main Bay (410Bay) at Bhadravati 03-May-17 6:00 05-May-17 15:00 Continuous OLD BHEL CT Replacement By new CT under R&M WRTS-I WRTS-I R Bay
Korba-Bhilai-III is also
94 400 400kV KORBA-BHILAI I 03-May-17 6:00 07-May-17 15:00 Continuous Rectification of damaged tower leg (D) of Loc No 309 WRTS-I WRTS-I R LINE
approved for 2 to 4 .Are
95 765 ICT#2 at Indore at Indore PS 03-May-17 10:00 03-May-17 14:00 Daily HOT SPOT TO BE ATTENDED POWERGRID WR-II R INDORE
96 400 Khandwa -seoni Ckt-2 03-May-17 6:00 03-May-17 15:00 Daily Terminal Equip,ent maintenance work. POWERGRID WR-II R KHANDW
97 400 Vindhyachal - Satna Ckt.1 03-May-17 8:00 03-May-17 18:00 Daily AMP of line and bay terminal equipment POWERGRID WR-II R
98 400 Varsana APL-2 03-May-17 6:00 03-May-17 14:00 Daily Water washing GETCO GETCO
99 400 400KV DHL- SSNNL line I & II 03-May-17 6:00 04-May-17 14:00 daily PID testing . A/R in Non Auto mode . MSETCL MSETCL
100 400 410,Satna-4 Main bay at Bina 03-May-17 9:30 03-May-17 18:00 Daily AMP WORKS POWERGRID WR-II R BINA
101 400 Tarapur-Padghe ckt-I 03-May-17 6:00 03-May-17 15:00 Daily Powerline crossing work of Aurangabad-Boisar line POWERGRID WR-II C BOISAR
Online code is required to shift the ICT# 1 on TBC for
102 220 220kV ICT1 main bay at Dehgam 03-May-17 6:00 03-May-17 10:00 Daily POWERGRID WR-II R DEHGAM
Thermovision scanning. No ICT outage will be
Online code is required to shift the ICT# 2 on TBC for
103 400 220kV ICT 2 main bay at Dehgam 03-May-17 13:00 03-May-17 17:00 Daily POWERGRID WR-II R DEHGAM
Thermovision scanning. No ICT outage will be
104 400 bay 413(MAIN bay for ICT2) at Indore PS 03-May-17 10:00 03-May-17 18:00 Daily AMP OF BAY EQUIPMENTS POWERGRID WR-II R INDORE
105 220 220KV Transfer Bus at Khandwa SS 03-May-17 6:00 03-May-17 15:00 Daily AMP Work POWERGRID WR-II R KHANDW
106 400 400KV BAY-402 (DEHGAM-2 TIE BAY) at Pirana 03-May-17 6:00 03-May-17 13:00 Daily AMP Work POWERGRID WR-II R PIRANA
For Jumpering of Reactor NGR Breaker & Wiring of
107 765 765KV Satna-Bina-1 Line Reactor at Satna SS (Switchable) 03-May-17 6:00 03-May-17 15:00 Daily POWERGRID WR-II C SATNA
Single Phase Breaker for Switching scheme
108 400 Tie-Bay(702) of Vadodara-Dhule line at Vadodara GS 03-May-17 10:00 03-May-17 16:00 Daily AMP Work of CB POWERGRID WR-II R VADDDAR
109 220 220KV Vapi-Khadoli 03-May-17 6:00 03-May-17 10:00 Daily AMP of terminal equipment POWERGRID WR-II R VAPI
110 400 408 GT#20 Tie Bay at CGPL 03-May-17 6:00 03-May-17 15:00 Daily 408 CT Testing CGPL CGPL
Bus
reactor
already
out of
765 kV Bus Reactor and its Main & Tie Bay (705 & 706 Bay) at Bus Reactor and its Bay Equipment Testing and service
111 765 03-May-17 6:00 03-May-17 18:00 Daily MEGPTCL MEGPTCL Status of BR?
Tiroda plant Maintenance since
long but
we will
have to
do
Line I/S
112 765 Tie Bay (708) of Tiroda Line-2 to Akola Line-1 at Koradi III SS 03-May-17 6:00 03-May-17 10:00 Daily For Gripper replacement at 708 Q52 MEGPTCL MEGPTCL Throug
h Main
Chandrapur II-Switching-Ckt-2 (Bay 404 & 405) @ 400KV
113 400 03-May-17 6:00 03-May-17 18:00 Daily Routine Maintenance & Dignostic testing work MSETCL MSETCL
Chandrapur- II
114 400 400 KV JULWANIA-SSTPS 03-May-17 8:00 03-May-17 17:00 daily LINE MAINTENANCE WORK MPPTCL MPPTCL R
115 220 220 KV RAJGARH( PG )- I/C FEEDER -I 03-May-17 6:00 03-May-17 14:00 daily LINE MAINTENANCE WORK MPPTCL MPPTCL R
116 765 765 kv Champa #1 Line bay 816L at Durg PS 03-May-17 6:00 03-May-17 15:00 Daily AMP of bay WRTS-I WRTS-I R Bay
117 765 765kV TAMNAR PS-KOTRA PS I 03-May-17 6:00 03-May-17 18:00 Daily Quad to Twin Modification of Droppers WRTS-I WRTS-I C LINE
118 765/400 ICT2_765/400kv_PUNE(GIS) 03-May-17 6:00 03-May-17 15:00 Daily For CSD commissioning of 765kV tie bay CSD and WRTS-I WRTS-I R ICT
Line to be in service via
119 400 403 BAY (Main Bay of 400kv Talegaon Kharghar Line) at Talegaon 03-May-17 6:00 03-May-17 15:00 Daily For AMP works WRTS-I WRTS-I R Bay
tie bay.
120 400 SOLAPUR_BAY 405_TIE BAY_ICT#3 &FUTURE 03-May-17 6:00 03-May-17 15:00 DAILY AMP 17-18 WRTS-1 POWERGRID R BAY
121 400 400 KV side 1500 Mva ICT-2 Main Bay 407 Bay at Wardha 03-May-17 6:00 03-May-17 15:00 Daily AMP works related to Bay WRTS-I WRTS-I Bay
122 765 Seoni (PG)_Wardha I_240 MVAR SLR at Seoni SS 03-May-17 6:00 04-May-17 18:00 Daily for RTV coating on HV Bushings. Line shall remain in WRTS-I WRTS-I C SLR
123 220 220 kv Bus 2 at Raipur SS 03-May-17 9:30 03-May-17 17:30 Daily AMP work at Raipur WRTS-I WRTS-I R BUS
124 765 701 Main Bay of 765 kV Bhopal-Indore Line at BDTCL Bhopal) 03-May-17 8:00 04-May-17 18:00 Daily For AMP works BDTCL BDTCL R
125 400 400kV PARLI(PG)-PARLI(MSETCL) II 03-May-17 10:00 03-May-17 16:00 Daily For collection of CT Oil Sample (DGA Test) at WRTS-I WRTS-I R Line Outage will be feasible
126 400 Chandrapur 2 - Chandrapur Switching Ckt-2 03-May-17 8:00 03-May-17 17:00 Daily Line Routine Maintenance work MSETCL MSETCL
for Overhead Stringing of U/C 765KV D/C Raipur-
127 400 400kV S/C Raipur-Sipat-III 04-May-17 6:00 05-May-17 16:00 Daily PGCIL OGPTL C
Sundargarh Transmission line(of OGPTL) at OGPTL
During PID Testing A/R relay to be kept as Non- ER-II/Odisha/
128 400 A/R Non-Auto oprtaion in 400 KV Sundergarh-raigarh-II 04-May-17 8:00 17-May-17 17:00 Daily ERPC
automode Sundergarh
129 765 Sipat#1 Tie bay 708 at Bilaspur PS 04-May-17 6:00 04-May-17 15:00 Daily AMP works WRTS-I WRTS-I R Bay
130 400 Varsana Kansari 04-May-17 6:00 04-May-17 14:00 Daily Water washing GETCO GETCO
For isolation of L/R, line will out of service for 30 POWERGRID ER
131 400 80 MVAR Sipat LR-II AT RANCHI 04-May-17 10:00 04-May-17 17:30 Daily ERPC
minutes. After that line may be charged w/o L/R. for -I
For Replacement of conventional insulators with
132 765 765kV SEONI-BILASPUR I 04-May-17 8:00 05-May-17 18:00 Daily Polymer Insulators in N.H, S.H, Rail crossings,etc. for WRTS-I WRTS-I C Line
Public safety
133 765 Seoni (PG)_Wardha II_240 MVAR SLR at Seoni 04-May-17 6:00 05-May-17 18:00 Daily for RTV coating on HV Bushings. Line shall remain in WRTS-I WRTS-I C SLR
134 400 Vindhyachal - Satna Ckt. 2 04-May-17 8:00 04-May-17 18:00 Daily AMP of line and bay terminal equipment POWERGRID WR-II R
May be availed on
135 400 500 MVA, 400/ ICTNo. 1 at Asoj 04-May-17 8:00 05-May-17 18:00 Daily PMM work GETCO GETCO
4.05.17 due to SSP -
A/R of Ckt-2 to be kept in non auto mode for online BHACHAU
136 400 Bachau - Ranchodpura Ckt.2 04-May-17 8:00 05-May-17 20:00 Daily POWERGRID WR-II R
installation of Bird divertors on earthwire as per the TLM
137 400 bay 414(tie bay for ICT2) at Indore PS 04-May-17 10:00 04-May-17 18:00 Daily AMP OF BAY EQUIPMENTS POWERGRID WR-II R INDORE
138 400 CHORNIYA-VADAVI-2 Bay at Vadavi SS GETCO 04-May-17 8:00 04-May-17 17:00 Daily AMP WORK & TBC CHECKING GETCO WR-II R PIRANA
For Jumpering of Reactor NGR Breaker & Wiring of
139 765 765KV Satna-Bina-2 Line Reactor at Satna SS (Switchable) 04-May-17 6:00 04-May-17 15:00 Daily POWERGRID WR-II C SATNA
Single Phase Breaker for Switching scheme
140 220 220KV Vapi-Sayali 04-May-17 6:00 04-May-17 10:00 Daily AMP of terminal equipment POWERGRID WR-II R VAPI
141 765 711 bay ( 765kV Bina#1 Tie bay) at Gwalior 04-May-17 10:00 05-May-17 18:00 Daily AMP WORKS POWERGRID WR-II R GWALIOR
For attending electircal clearance problem in crossing
142 765 Bina - Indore 04-May-17 6:00 04-May-17 17:00 Daily POWERGRID WR-II R
span of 400kV Jaypee-Bina & 765kV Bina-Indore
143 400 Jaypee - Bina MPPTCL 04-May-17 6:00 04-May-17 17:00 Daily Outage required to attend low clearnace problem due JAYPEE WR-II R
144 400 Sami - Mundra 400 KV Line 1 04-May-17 8:00 04-May-17 18:00 Daily Tower line Modification, work to be carried out due to ATIL SSVNL Routine
145 400 423 Jetpur-1 Tie Bay at CGPL 04-May-17 6:00 04-May-17 15:00 Daily 423 CT Testing CGPL CGPL
146 400 Varsana APL-1 04-May-17 6:00 04-May-17 14:00 Daily Water washing GETCO GETCO
147 400/220 501MVA ICT-II bay No 416 & 415(Main & Tie bay) at Lonikand-II 04-May-17 6:00 04-May-17 15:00 Daily Routine Maintenance & Dignostic testing work MSETCL MSETCL
400kV
Routine Maintenance, Dignostic testing work & Babhal
148 400 Babhaleshwar-Padghe-Ckt-1 @BBLR 04-May-17 6:00 04-May-17 14:00 Daily MSETCL MSETCL eshwar-
Servicing and allignment of PG isolators work
Padghe-
Ckt-2
400KV Chandrapur- Khaperkheda Line bay @400KV S/S 1)For Numerical Relay testing work. 2) Breaker CRM
149 400 04-May-17 8:00 05-May-17 18:00 Daily MSETCL MSETCL
Chandrapur Measurment work
150 500 500KV HVDC Chandrapur-Padghe line Pole-I 04-May-17 18:00 04-May-17 20:00 Daily Routine Maintenance & Dignostic testing work MSETCL MSETCL
151 220 220 KV Wardha(Deoli) - Pusad Line 04-May-17 10:00 04-May-17 17:00 Daily Replacement of damaged disc insulator at loc MSETCL MSETCL
152 400 Bus Reactor& ICT-1 Tie bay @ Warora 04-May-17 6:00 04-May-17 16:00 Daily DCRM of main CB at 400KV S/s. Warora. MSETCL MSETCL Element not clear
153 400 400kV Chakan-Talegaon PGCIL line 04-May-17 8:00 04-May-17 16:00 Daily Half yearly Bay n line maint.. by Lonikand I Staff MSETCL MSETCL
154 400 400KV BINA-BHOPAL -I 04-May-17 6:00 04-May-17 14:00 daily LINE MAINTENANCE WORK MPPTCL MPPTCL R
155 400 400KV ISP-INDORE -II 04-May-17 8:00 05-May-17 18:00 CONTINUOUS PREMANSOON MAINTENANCE WORK & CB MPPTCL NHDC(ISP) R
156 220 220 KV MALANPUR-PGCIL-I 04-May-17 6:00 04-May-17 14:00 daily LINE MAINTENANCE WORK MPPTCL MPPTCL R
157 220 220 KV RAJGARH( PG )- I/C FEEDER -II 04-May-17 6:00 04-May-17 14:00 daily LINE MAINTENANCE WORK MPPTCL MPPTCL R
Bay-11 -TIE#4 (TIE BETWEEN SASAN VINDHYACHAL-3 AND
158 400 04-May-17 08:00 04-May-17 18:00 Daily Bay Yearly maintenance SASAN RELIANCE Element not clear
SASAN JABALPUR-3)
159 765 Wardha-1 Tie Bay 714 at Aurangabad 04-May-17 8:00 04-May-17 18:00 Daily for commissioning of Solapur-1 Main CB-713-52 WRTS-I WRTS-I C Bay
160 765/400 ICT5_765/400kv_CHAMPA 04-May-17 6:00 04-May-17 14:30 Daily For CSD Commissioning work POWERGRID POWERGRID C ICT
161 765 SWITCHABLE LR_765kV_CHAMPA 1_DURG PS 04-May-17 6:00 04-May-17 15:00 Daily AMP of L/R & its Bay WRTS-I WRTS-I R L/R
162 765 765kV TAMNAR PS-KOTRA PS II 04-May-17 6:00 04-May-17 18:00 Daily Quad to Twin Modification of Droppers WRTS-I WRTS-I C LINE
163 400 400kV RAIPUR-DURG I 04-May-17 9:30 04-May-17 17:30 Daily Relay testing and AMP work at Raipur SS & TLM. WRTS-I WRTS-I R LINE
164 400 SOLAPUR_BAY 707_MAIN BAY_765KV AURANGABAD#1 04-May-17 6:00 04-May-17 15:00 DAILY AMP 17-18 WRTS-1 POWERGRID R BAY
165 765 765 kv bus #2 at Vchal SS 05-May-17 6:00 05-May-17 15:00 Daily For IPS tube erection for construction work POWERGRID WR-II C VCHAL
166 765 Main Bay of Satna 1 LINE (bay- 704) at Vchal PS 05-May-17 6:00 05-May-17 17:00 Daily FOR AMP WORK POWERGRID WR-II R VCHAL
167 400 400 KV Wardha Raipur # 1 Tie Bay 414 bay at Wardha 05-May-17 6:00 05-May-17 15:00 Daily AMP works related to Bay WRTS-I WRTS-I Bay
168 765 Jabalpur-2 line reactor at Bina 05-May-17 9:30 05-May-17 18:00 Daily For commissioning of NGR by pass circuit breaker. POWERGRID WR-II C BINA
169 400 Tarapur-Boisar ckt-I 05-May-17 6:00 05-May-17 15:00 Daily Powerline crossing work of Aurangabad-Boisar line POWERGRID WR-II C BOISAR SLDC Maharashtra and
Bay No-411, Tie Bay of 400kv Boisar-Vapi & 400kv Boisar-Tarapur-I
170 400 05-May-17 6:00 05-May-17 15:00 Daily AMP POWERGRID WR-II R BOISAR
at Boisar
171 400 Bay 415(Main bay Bus reactor 2) at Indore PS 05-May-17 10:00 05-May-17 18:00 Daily AMP OF BAY EQUIPMENTS POWERGRID WR-II R INDORE
172 400 VINDHYACHAL -4 TIE BAY(408) at Jabalpur SS 05-May-17 6:00 05-May-17 14:00 Daily AMP WORK POWERGRID WR-II R JABALPU
For Jumpering of Reactor NGR Breaker & Wiring of
173 765 765KV Vchal-Satna#1 Line 05-May-17 6:00 05-May-17 15:00 Daily POWERGRID WR-II C SATNA
Single Phase Breaker for Switching scheme at Satna
174 765 Main-Bay(703) of ICT#1 at Vadodara GIS 05-May-17 10:00 05-May-17 16:00 Daily AMP Work of CB POWERGRID WR-II R VADDDAR
175 400 430 GT#50 Main Bay at CGPL 05-May-17 6:00 05-May-17 15:00 Daily 430 CT Testing CGPL CGPL
176 400 315 MVA ICT-2 at 400 KV S/s Khedamara. 05-May-17 6:00 06-May-17 14:00 Continuous Annual Maintenance Programme. CSPTCL CSPTCL CSPTC
177 400 500 MVA ICTNo. 2 Asoj 05-May-17 8:00 06-May-17 18:00 Daily PMM work GETCO GETCO
178 400 500 MVA ICT-1 Chorania 05-May-17 6:00 05-May-17 17:00 Daily Conditioning Monitoring Work GETCO GETCO
179 400 Bus coupler @ 400 KV Koradi S/S 05-May-17 10:00 05-May-17 17:00 Daily Daignostice testing & predictive maintenance work MSETCl MSETCL
400KV
Side
180 400 400 kV Side ICT MAIN BAY 403 at Tiroda plant 05-May-17 6:00 05-May-17 15:00 Daily Bay Equipment Testing and Maintenance ATIL ATIL will be
in
service
Outage
1)Measurement of Tan-Delta & Capacitance value will be
of C.T.'s. & CC's propose
181 220 200kV Wardha(Deoli)-Badnera-S/c 05-May-17 10:00 05-May-17 16:00 Daily MSETCL MSETCL
2) Measurement of Timing and CRM of C.B. d by
3) Bay Routine maintenance work. 220 kv
Wardha
182 220 220kV Bhugaon-Wardha(Deoli)-S/c 05-May-17 10:00 05-May-17 17:00 Daily Replacement of damaged disc insulator at loc6,12,21 MSETCL MSETCL
183 400 400/220kV ICT - I at 400kV Deepnagar 05-May-17 6:00 05-May-17 14:00 Daily Diagnostic testing of ICT units and routine MSETCL MSETCL
184 400 Nagothane-Dabhol 1 Line @ Nagothane 05-May-17 6:00 05-May-17 14:00 Daily To carry out Routine Bay Maintenance work MSETCL MSETCL
N.Koyn
a-Karad
185 400 N.Koyna-Karad ckt 2 05-May-17 10:00 06-May-17 18:00 Daily Cold washing of Insulators MSETCL MSETCL
ckt 1
will be
PREMANSOON MAINTENANCE WORK &
186 400 400 KV JULWANIA-CHHEGAON 05-May-17 8:00 05-May-17 17:00 daily MPPTCL MPPTCL R
REPLACEMENT OF DAMAGED INSULATOR
187 400 400 KV CHHEGOAN-MALWA(Singhaji) 05-May-17 6:00 05-May-17 15:00 daily LINE MAINTENANCE WORK MPPTCL MPPTCL R
188 400 400KV SEONI -BHILAI-S/c 05-May-17 6:00 05-May-17 15:00 daily LINE MAINTENANCE WORK MPPTCL MPPTCL R
189 220 220 KV MALANPUR-Gwalior-II 05-May-17 6:00 05-May-17 14:00 daily LINE MAINTENANCE WORK MPPTCL MPPTCL R
190 220 220 KV DHAR-RAJGARH-S/c 05-May-17 6:00 05-May-17 14:00 daily LINE MAINTENANCE WORK MPPTCL MPPTCL R
191 220 220KV Damoh-Tikamgarh-S/c 05-May-17 6:00 05-May-17 15:00 daily LINE MAINTENANCE WORK MPPTCL MPPTCL R
192 765 SWITCHABLE LR_765kV_SEONI 1 at BILASPUR 05-May-17 6:00 05-May-17 15:00 Daily AMP works (Reactor, CB CRM,Timing,DCRM ) WRTS-I WRTS-I R LR
193 765 SWITCHABLE LR_765kV_JABALPUR 3 at D'JAIGARH 05-May-17 6:00 05-May-17 15:00 Daily Scheme checking for 1ph switching of Reactor CB for WRTS-I WRTS-I C LR
194 765 765kV TAMNAR PS-KOTRA PS II 05-May-17 6:00 05-May-17 18:00 Daily Quad to Twin Modification of Droppers WRTS-I WRTS-I C LINE
411 Bay ( TIE bay of 400kv Talegaon GIS Shikrapur Line # 4 & ict #
195 400 05-May-17 6:00 05-May-17 15:00 Daily For AMP works WRTS-I WRTS-I R Bay
2) at Talegaon
For crossing works of up-coming 400 D/C QUAD KWPCL KWPCL consent to be
196 400 400 D/C KWPCL-KOTRA(RAIGARH) 05-May-17 8:00 05-May-17 18:00 Daily LARA NTPC-CHAMPA TL (Between Location WRTS-I (AVANTHA C LINE submitted on D-3 basis
no:17/0(DD+25)-18/0(DD+25) POWER) by WR-I
For Replacement of conventional insulators with
197 765 765kV SEONI-BILASPUR I 05-May-17 8:00 06-May-17 18:00 Daily Polymer Insulators in N.H, S.H, Rail crossings,etc. for WRTS-I WRTS-I C Line
Public safety
198 400 400 kv Durg PS 1 Main Bay at Raipur SS 05-May-17 9:30 05-May-17 18:30 Daily AMP work at Raipur WRTS-I WRTS-I R BAY
199 765 702 Tie Bay of 765 kV Bhopal-Indore line at BDTCL Bhopal 05-May-17 8:00 06-May-17 18:00 Daily For AMP works BDTCL BDTCL R
Erection and stringing of M/C (Multi Ckt) tower of ER-II/Odisha/
200 220 220 KV s/c Budhipada-Korba Line 05-May-17 8:00 31-May-17 18:00 Continuous ERPC
diversion work Sundergarh
201 400 Bay no-409, Main Bay of 315MVA ICT-I at Boisar 06-May-17 6:00 06-May-17 15:00 Daily AMP POWERGRID WR-II R BOISAR
202 220 220kV D/C Babhaleshwar-Bhenda line & Waluj-Bhenda-D/c 06-May-17 8:00 06-May-17 18:00 Daily for stringingof 765kV Aurangabad-Padghe line at Loc WRTS-I WRTS-I C Line
203 400 BUS-1 at Navsari GIS 06-May-17 6:00 06-May-17 15:00 Daily Trip logic implimentation of kapp bays for LOW gas POWERGRID WR-II R NAVSARI
204 400 Bhachau-Vadavi-1 06-May-17 8:00 06-May-17 18:00 Daily BAY PMM WORK GETCO GETCO
205 400 Varsana - Kansari Line 06-May-17 8:00 06-May-17 18:00 Daily Line maintenance work GETCO GETCO It may be approved for
206 765 718,Gwalior-3 main bay at Bina 06-May-17 9:30 06-May-17 18:00 Daily for testing of CT tan delta POWERGRID WR-II R BINA
765KV Jabalpur-Bina#1 switchable Reactor along with Reactor Erection of Circuit Breaker & BPI for implementation JABALPU
207 765 06-May-17 10:00 06-May-17 18:00 Daily POWERGRID WR-II C
bay(815 Reactor Bay) at Pooling station,jabalpur of NGR Bypass Scheme R PS
208 400 400 kv bus #2 at Vchal PS 06-May-17 6:00 06-May-17 15:00 Daily for IPS tube erection for construction work POWERGRID WR-II C VCHAL
209 765 Wardha-3 Tie Bay 717 at Aurangabad 06-May-17 8:00 06-May-17 18:00 Daily for commissioning of Solapur-1 Main CB-716-52 WRTS-I WRTS-I C Bay
210 400 125MVAR Bus Reactor at Damoh 06-May-17 6:00 06-May-17 15:00 Daily AMP work POWERGRID WR-II R DAMOH subjected to voltage
211 400 bay 416 (Main bay bus reactor 1) at Indore PS 06-May-17 10:00 06-May-17 18:00 Daily AMP OF BAY EQUIPMENTS POWERGRID WR-II R INDORE
212 765 713 bay ( 765kV Satna#1 Main bay) at Gwalior 06-May-17 10:00 06-May-17 18:00 Daily AMP WORKS POWERGRID WR-II R GWALIOR
213 400 Kasor-GPEC Line 06-May-17 8:00 06-May-17 18:00 Daily Line maintenance work GETCO GETCO
214 765 Tie Bay (708) of Tiroda Line-2 to Akola Line-1 at Koradi III SS 06-May-17 6:00 06-May-17 10:00 Daily For Gripper replacement at 708 Q52 MEGPTCL MEGPTCL
400/220
kV
315MV
Maintenance work & Servicing and allignment of PG A ICT-I,
215 400/220 315MVA, ICT 2 @ BBLR 06-May-17 6:00 06-May-17 14:00 Daily MSETCL MSETCL
isolators work 500MV
A ICT-
III &
500MV
216 400/220 500 MVA ICT No- I (Bay No . 404)Main CB @ Warora 06-May-17 6:00 06-May-17 16:00 Daily DCRM of main CB at 400KV S/s. Warora. MSETCL MSETCL
Replacement of B-ph unit with New repaired spare Long
217 400 400/220kV 315 MVA ICT-III at 400 KV Bhusawal 06-May-17 8:00 18-May-17 18:00 Continuous MEGPTCL MEGPTCL
Unit Outage
218 400 400 KV CHHEGOAN-MALWA 06-May-17 6:00 06-May-17 15:00 daily LINE MAINTENANCE WORK MPPTCL MPPTCL R
219 400 400KV BINA-BHOPAL -II 06-May-17 6:00 06-May-17 14:00 daily LINE MAINTENANCE WORK MPPTCL MPPTCL R
220 220 220 KV PITHAMPUR-RAJGARH 06-May-17 6:00 06-May-17 14:00 daily LINE MAINTENANCE WORK MPPTCL MPPTCL R
221 400 416 BAY (Main Bay of 400kV Talegaon Kalwa Line) at Talegaon 06-May-17 6:00 06-May-17 15:00 Daily For AMP works WRTS-I WRTS-I R Bay
222 220 220 kV SEONI-SEONI I 06-May-17 8:00 06-May-17 18:00 Daily For AMP testing work MPPTCL WRTS-I R Line
223 765 SOLAPUR_BAY 710_MAIN BAY_765KV AURANGABAD#2 06-May-17 6:00 06-May-17 15:00 DAILY AMP 17-18 WRTS-1 POWERGRID R BAY
224 400 SSP-Rajgarh-2 06-May-17 6:00 10-May-17 18:00 Daily For Replacement of Defective Disc Insulator String MPPTCL/SSP MPPTCL
NAVSARI SLDC Guj:Subject to real
225 220 Navsari- Navsari GETCO 2 07-May-17 6:00 07-May-17 15:00 Daily AMP work POWERGRID WR-II R
GIS time condition. To be
226 765 Bina-Seoni line 07-May-17 9:30 07-May-17 18:00 Daily For Checking of Auto Recloser Protection system at POWERGRID WR-II R BINA line shutdown required
227 400/220 315MVA, ICT II @ Dhule 07-May-17 8:00 07-May-17 18:00 Daily Maintenance work & ROTINE TESTING MSETCL MSETCL
765KV Jabalpur-Bina#2 switchable Reactor along with Reactor Erection of Circuit Breaker & BPI for implementation JABALPU
228 765 07-May-17 10:00 07-May-17 18:00 Daily POWERGRID WR-II C
bay(818 Reactor Bay) at Pooling station,jabalpur of NGR Bypass Scheme R PS
229 400 315 MVA ICT-2, Varsana 07-May-17 6:00 07-May-17 14:00 Daily Water washing GETCO GETCO
230 400 Kasor-GPEC Line 07-May-17 8:00 07-May-17 18:00 Daily Line maintenance work GETCO GETCO
400 kV
Akola-
231 400 400 kV Akola- Aurangabad Ckt-2 @ Akola 07-May-17 8:00 07-May-17 17:00 Daily Routine Maintenance & Dignostic testing work MSETCL MSETCL Aurang
abad
Ckt-1
232 400 Bay No-412, Main Bay of 400kv Boisar-Vapi Line at Boisar 07-May-17 6:00 07-May-17 15:00 Daily AMP POWERGRID WR-II R BOISAR
Shifting of 220 Vapi- Magarwada D/C line between DD consent to be
233 220 Vapi - Magarwada Ckt.1&2 07-May-17 6:00 11-May-17 15:00 Continuous loc.no. 62-65 to facilitate clearance for DFCCI Railway POWERGRID WR-II C RHQ-AM submitted by WR-2 on D-
line corrioder and Shifting of 220 Vapi-Sayali & Vapi- 3 basis.Load of DD will
234 765 765 KV Wardha-Aurangabad # 1 Main Bay 716 at Wardha 07-May-17 6:00 11-May-17 15:00 Continuous All 6 poles CB Mechanism Boxes Replacement Work WRTS-I WRTS-I Bay
765KV Jabalpur-Bhopal Tie Bay along with Future Bay ( 822 Bay & For Vindhyachal & Urai Bay Extension work at JABALPU
235 765 07-May-17 10:00 09-May-17 18:00 Daily POWERGRID WR-II C
823 bay) at Jabalpur PS Pooling station,Jabalpur R PS
236 400 J P NIGRIE-SATNA-1 07-May-17 6:00 07-May-17 14:00 Daily Fixing of missing Arcing Horns,Twin Spacers & Rigid JP NIGRIE JP NIGRIE Nigrie not to sale power
237 400/220 500MVA ICT III @ Kalwa 07-May-17 8:00 07-May-17 19:00 Daily Routine Maintenance & testing work MSETCL MSETCL
WR-1 to propose a
238 400 SOLAPUR_400KV SOLAPUR-KOLHAPUR#1 & 2 07-May-17 8:00 07-May-17 18:00 DAILY For crossing of 400KV NTPC#3&4 WRTS-1 Reliance C LINE suitable date in
discussion with SLDC
239 765 Seoni Line reactor at Bina 07-May-17 9:30 07-May-17 18:00 Daily For commissioning of NGR by pass circuit breaker. POWERGRID WR-II C BINA Line to be taken in
240 765 765KV Bus-II at Jabalpur PS 08-May-17 10:00 13-May-17 18:00 Daily For Vindhyachal & Urai Bay Extension work at POWERGRID WR-II C JABALPU Already approved in
241 400 Korba-Sipat Line 08-May-17 08:30 hrs 10-May-17 17:30 Hrs. Continuous For annual maintenance of bay equipments and hot NTPC NTPC
242 400 405 & 406-Bay (Main& Tie Bay of Girwali Line-2) at Nanded . 08-May-17 8:00 08-May-17 11:00 Daily Quarterly Maintenance of bays equipment MSETCL MSETCL
243 400 CHORNIYA-VADAVI-1 Bay at Vadavi SS GETCO 08-May-17 8:00 08-May-17 14:00 Daily AMP WORK & TBC CHECKING GETCO WR-II R PIRANA
244 400 400kV KOLHAPUR (MSETCL)- KOLHAPUR (GIS) II 08-May-17 10:00 08-May-17 18:00 Daily For AMP works of Line bay WRTS-I WRTS-I R LINE GOA consent required.
245 765 SOLAPUR_BAY 708_TIE BAY_765KV AURANGABAD#1 08-May-17 6:00 08-May-17 15:00 DAILY AMP 17-18 WRTS-1 POWERGRID R BAY
220KV Bay 207 Charadova 2 Line outage for alignment of 89 T Cleaning and Greasing of balance BPI and Isolator SLDC Gujarat consent
246 220 08-May-17 6:00 08-May-17 15:00 Daily POWERGRID WR-II C BHACHAU
Isolator at Bachau 89A alignment required.
247 400 409,Shujalpur-1 Main bay at Bina 08-May-17 9:30 08-May-17 18:00 Daily AMP WORKS POWERGRID WR-II R BINA
248 400 Bay No-413, Main Bay of 400kv Boisar-Tarapur-II Line at Boisar 08-May-17 6:00 08-May-17 15:00 Daily AMP POWERGRID WR-II R BOISAR
249 400 ICT#1 at Damoh 08-May-17 6:00 08-May-17 15:00 Daily AMP work POWERGRID WR-II R DAMOH
250 400 400/220kV ICT2 at Dehgam 08-May-17 6:00 10-May-17 14:00 Continuous To attend the leakage from R phase Turret CT & POWERGRID WR-II R DEHGAM
251 400 bay 417(Tie bay for bus reactor 1) at Indore PS 08-May-17 10:00 08-May-17 18:00 Daily AMP OF BAY EQUIPMENTS POWERGRID WR-II R INDORE
252 400 RAPP#1 Main Bay(413) at Shujalpur 08-May-17 10:00 08-May-17 18:00 Daily For commissioning of CSD works POWERGRID WR-II C SHUJALP
253 765 Main-Bay(707) of Bus Reactor at Vadodara GIS 08-May-17 10:00 08-May-17 16:00 Daily AMP Work of CB POWERGRID WR-II R VADDDAR
254 765 Tie bay of satna 2 line-(bay 708) at Vchal PS 08-May-17 6:00 09-May-17 15:00 Continuous For breaker erection 709 bay POWERGRID WR-II C VCHAL
255 400 Bus Reactor#3 Main Bay at Itarsi SS 08-May-17 6:00 08-May-17 14:00 Daily AMP works POWERGRID WR-II C ITARSI
256 400 400kV Limbdi-2 (Mansar) Line Reactor 08-May-17 6:00 08-May-17 15:00 Daily Reactor LA Testing CGPL CGPL Subject to CGPL
400 kV
Koradi-
Bhusaw
al, 400
PID testing of insulator strings by Hot line Uint Akola. kV
257 400 400 kV Akola- Bhusawal Line 08-May-17 12:00 10-May-17 18:00 Daily MSETCL MSETCL Akola-
( A/R shall be kept in non auto mode)
Nandga
onpeth
& 400
kV
Koradi-
400 kV
Akola-
258 400 400 kV Akola-Wardha Ckt-2 @ Akola 08-May-17 8:00 08-May-17 17:00 Daily Routine Maintenance & Dignostic testing work MSETCL MSETCL Wardha
Ckt-1
will be
Station transformer #1 Main Bay 422 & Tie Bay 423 @ 400 KV Tan delta measurent of Line CT of Station Trans.-1
259 400 08-May-17 10:00 08-May-17 18:00 Daily MSETCL MSETCL
Koradi 2 S/S Main Bay Bay 422
260 220 200kV Wardha(Deoli)-Badnera-S/c 08-May-17 8:00 11-May-17 18:00 Daily PID testing of Line ( A/R switch is kept off position MSETCL MSETCL
SPS to be
261 400 400 kV Warora Line 2 Main Bay 409 at Tiroda plant 08-May-17 6:00 08-May-17 15:00 Daily Bay Equipment Testing and Maintenance ATIL ATIL
in service
Load
262 400/220 315MVA , ICT-II @ Karad 08-May-17 10:00 08-May-17 17:00 Daily Quarterly. Maint. work MSETCL MSETCL manage
on ICT-I
263 400 400KV Future Ckt No - I (Bay No - 419) @ Warora 08-May-17 6:00 08-May-17 16:00 Daily DCRM of main CB at 400KV S/s. Warora. MSETCL MSETCL
264 400 400KV DHL- SSNNL line I & II 08-May-17 6:00 09-May-17 14:00 daily PID testing . A/R in Non Auto mode . MSETCL MSETCL
265 400/220 501 MVA, ICT 3 @ Nagothane 08-May-17 6:00 08-May-17 14:00 Daily To carry out Routine Maintenance work MSETCL MSETCL
Koyna
M/S Ramelex Stage
266 400 N.Koyna-Karad ckt 2 08-May-17 10:00 09-May-17 18:00 Daily Cold washing of Insulators MSETCL
Pvt.Ltd. IV-
Jejuri
267 400 400 KV JULWANIA- 315 MVA ( CGL) ICT-I 08-May-17 8:00 08-May-17 17:00 DAILY PREMANSOON MAINTENANCE WORK MPPTCL MPPTCL R
268 400 400 KV BINA 50 MVAR LINE REACTOR -I 08-May-17 6:00 08-May-17 14:00 DAILY PREMANSOON MAINTENANCE WORK MPPTCL MPPTCL R
269 220 220 KV HOSHANGABAD-PGCIL 08-May-17 6:00 08-May-17 14:00 daily LINE MAINTENANCE WORK MPPTCL MPPTCL R
270 400/220 ICT - 1 Transformer at NSPCL 08-May-17 6:00 11-May-17 17:00 Continuous Painting Job NSPCL NSPCL
271 400 Bay-12 -VINDHYACHAL LINE#3-Main Bay at Sasan 08-May-17 08:00 08-May-17 18:00 Daily Bay Yearly maintenance SASAN RELIANCE
272 765 765kV KOTRA PS-DURG PS I & II 08-May-17 6:00 12-May-17 15:00 Daily Non Auto of both ckt for Additional Earthing of T/L WRTS-I WRTS-I R LINE
Auto reclose testing and primary injection testing for
273 400 KORBA-BALCO CKT-01 08-May-17 6:00 09-May-17 15:00 Daily WRTS-I WRTS-I C LINE
connecting Tie bay with Bus-01.Line shutdown is
417 Bay ( TIE bay of 400kv Talegaon Kalwa Line & ict # 3) at
274 400 08-May-17 6:00 08-May-17 15:00 Daily For AMP works WRTS-I WRTS-I R Bay
Talegaon
275 765 Solapur (PG)_Raichur_II_240 MVAR SLR at Solapur SS 08-May-17 6:00 09-May-17 18:00 Daily for RTV coating on HV Bushings. Line shall remain in WRTS-I WRTS-I C SLR
276 400 400 kv Durg PS 2 Main bay at Raipur SS 08-May-17 9:30 08-May-17 17:30 Daily AMP work at Raipur WRTS-I WRTS-I R BAY
277 765 703 Main Bay of ICT-1 at BDTCL Bhopal 08-May-17 8:00 09-May-17 18:00 Daily For AMP works BDTCL BDTCL R
278 400 KANSARI-VADAVI-1 Bay at Vadavi SS GETCO 09-May-17 8:00 09-May-17 14:00 Daily AMP WORK & TBC CHECKING GETCO WR-II R PIRANA
279 400 Mansar- CGPL Line 09-May-17 8:00 09-May-17 18:00 Daily Yearly Testing & Maintenance And Bus-B R-phase GETCO GETCO Subject to CGPL
280 765 SOLAPUR_BAY 711_TIE BAY_765KV AURANGABAD#2& PUNE 09-May-17 6:00 09-May-17 15:00 DAILY AMP 17-18 WRTS-1 POWERGRID R BAY
281 400 400kV BHADRAVATI-DHARIWAL TPP II 09-May-17 8:00 09-May-17 18:00 Daily Replacement of Porcelain insulators & Other Ckt is in WRTS-I WRTS-I R LINE
282 400 408,Satna-3 & Shujalpur-1 Tie bay at Bina 09-May-17 9:30 09-May-17 18:00 Daily AMP WORKS POWERGRID WR-II R BINA
Powerline crossing work of Kala-Kudus line at loc No. Work to be done by
283 220 Bhaveghar-Wada 09-May-17 6:00 10-May-17 15:00 Daily MSETCL WR-II C BOISAR
82-83 hotline method as wada
Powerline crossing work of Kala-Kudus line at loc No. Work to be done by
284 220 Padghe-Wada 09-May-17 6:00 10-May-17 15:00 Daily MSETCL WR-II C BOISAR
82-83 hotline method as wada
285 400 ICT#2 at Damoh 09-May-17 6:00 09-May-17 15:00 Daily AMP work POWERGRID WR-II R DAMOH
286 400 Bay 401 (Indore-2 main bay) at Khandwa 09-May-17 10:00 09-May-17 13:00 Daily Newly commissioned Alstom CT oil sampling POWERGRID WR-II C KHANDW
287 400 Bay 402 (Indore-2 - future tie bay) at Khandwa 09-May-17 15:00 09-May-17 18:00 Daily Newly commissioned Alstom CT oil sampling POWERGRID WR-II C KHANDW
288 400 KANSARI-VADAVI-2 Bay at Vadavi SS GETCO 09-May-17 8:00 09-May-17 14:00 Daily AMP WORK & TBC CHECKING GETCO WR-II R PIRANA
289 765 765KV ICT#2 Tie Bay (705 Bay) at Satna SS 09-May-17 6:00 09-May-17 15:00 Daily For Attending Isolator problem POWERGRID WR-II C SATNA
290 400 RAPP#2 Tie Bay(417) at Shujalpur 09-May-17 10:00 09-May-17 18:00 Daily For commissioning of CSD works POWERGRID WR-II C SHUJALP
291 765 710 Bay (765kV Agra#2 Main bay) @ Gwalior 09-May-17 10:00 10-May-17 18:00 Daily AMP WORKS POWERGRID WR-II R GWALIOR
292 400 Bus Reactor - 1 , APL, Mundra 09-May-17 9:30 11-May-17 18:00 Continuous Annual Shutdown Maintenance ATIL ATIL Routine
Outage for fixing of line spacer cum damper and Dhariwal
293 400 Dhariwal- Bhadrawati 400 KV Tr. Line 09-May-17 6:00 09-May-17 17:00 Daily WRTS-I Planned
jumper pad N&Bs tightening works Infrastructure Ltd.
294 400 315 MVA ICT-1 Main+Tie+Lv Bay Kosamba 09-May-17 8:00 09-May-17 18:00 Daily Yearly maintenance & testing activity GETCO GETCO
ICT and HV LV CT Tan Delta + Maintenance
295 400 315 MVA ICT1 Jetpur 09-May-17 8:00 09-May-17 18:00 Daily GETCO GETCO
296 220 Kasor - Rajgarah Line No.1 09-May-17 8:00 09-May-17 18:00 Daily Line maintenance work GETCO GETCO
297 400 400KV PGCIL Ckt (Bay No - 420) @ Warora 09-May-17 6:00 09-May-17 16:00 Daily DCRM of Tie CB at 400KV S/s. Warora. MSETCL MSETCL
ICT 1
will be
TBC shiting of 400 KV side Breaker of 315 MVA ICT 1 @ New Routine Maintenance &DCRM CB timing CRM and taken
298 400/220 09-May-17 8:00 09-May-17 18:00 Daily MSETCL MSETCL on 400
koyna Cleaning of CB
KV TBC
online
no
299 400 400 KV JULWANIA- 315 MVA ( CGL) ICT-I 09-May-17 8:00 09-May-17 17:00 DAILY PREMANSOON MAINTENANCE WORK MPPTCL MPPTCL R
300 400 400 KV NAGDA 50 MVAR BUS REACTOR 09-May-17 8:00 09-May-17 17:00 DAILY PREMANSOON MAINTENANCE WORK MPPTCL MPPTCL R
301 400 400KV BINA-BPSCL 09-May-17 6:00 09-May-17 14:00 daily LINE MAINTENANCE WORK MPPTCL MPPTCL R
302 220 220 KV ITARSI-Itarsi 09-May-17 6:00 09-May-17 14:00 daily LINE MAINTENANCE WORK MPPTCL MPPTCL R
303 765 765kV WARDHA - AURANGABAD(PG) II 09-May-17 8:00 09-May-17 18:00 Daily for stringing of 1200/400kV re-routing work at WRTS-I WRTS-I C LINE
304 765 Korba switchable LR at Bilaspur PS 09-May-17 6:00 09-May-17 15:00 Daily AMP works (CB Timing & Grading capacitor WRTS-I WRTS-I R Bay
305 765/400 ICT6_765/400kv_CHAMPA 09-May-17 6:00 09-May-17 14:30 Daily For CSD Commissioning work WRTS-I POWERGRID C ICT
306 400 400 KV Parli-1 (MSETCL) Main Bay (415) 09-May-17 10:00 09-May-17 18:00 Daily For Bay AMP works at Parli WRTS-I WRTS-I R Bay
For Replacement of conventional insulators with
307 765 765kV SEONI-BILASPUR I 09-May-17 8:00 10-May-17 18:00 Daily Polymer Insulators in N.H, S.H, Rail crossings,etc. for WRTS-I WRTS-I C Line
Public safety
308 765 BAY 211_MAIN BAY_400KV ICT#3 at Solapur 09-May-17 6:00 09-May-17 15:00 DAILY AMP 17-18 WRTS-1 POWERGRID R BAY
309 400 Kosamba - Chorania1 10-May-17 6:00 10-May-17 17:00 Daily Line Maintenance work GETCO GETCO
310 400 Main Bus-2 Mansar 10-May-17 8:00 10-May-17 18:00 Daily 4th Half Yearly Testing and maintenance work by O/S GETCO GETCO Subject to CGPL
311 400 APL - Kansari Line 10-May-17 8:00 10-May-17 18:00 Daily Line Jumper checking GETCO GETCO
312 400 400 KV Sholapur-solapur 10-May-17 10:00 10-May-17 18:00 Daily Bay Maintanance Work at Lamboti . MSETCL MSETCL Outage will be feasible
313 400 400kV DHARIWAL TPP-PARLI II 10-May-17 8:00 10-May-17 18:00 Daily Replacement of Porcelain insulators & Other Ckt is in WRTS-I WRTS-I R LINE
Carry out cross over Stringingof 765KV Warora -
314 400 400kV BHADRAVATI-PARLI I 10-May-17 8:00 11-May-17 18:00 Continuous WRTS-I WRTS-I C LINE
Parli TL under TBCB (PPTL) between Loc.no. 59/0 &
Carry out cross over Stringingof 765KV Warora -
315 400 400kV DHARIWAL TPP-PARLI II 10-May-17 8:00 11-May-17 18:00 Continuous WRTS-I WRTS-I C LINE
Parli TL under TBCB (PPTL) between Loc.no. 59/0 &
316 220 220KV Bus 1 at Bhachau 10-May-17 6:00 10-May-17 15:00 Daily Cleaning and greasing of Bus BPI POWERGRID WR-II C BHACHAU
317 400 Bina-Shujalpur ckt-1 at Bina 10-May-17 9:30 10-May-17 18:00 Daily For replacement of insulators in line . POWERGRID WR-II R BINA SLDC MP consent
318 220 220KV Damoh-Sagar line terminal equipment at Damoh 10-May-17 6:00 10-May-17 15:00 Daily AMP work POWERGRID WR-II R DAMOH
319 400 Indore(PG)-Indore(MPPTCL) ckt #I 10-May-17 10:00 10-May-17 18:00 Daily For checking auto reclosing scheme in TBC bay at POWERGRID WR-II R INDORE
320 400 Bay 404 (Indore-1 main bay) at Khandwa 10-May-17 10:00 10-May-17 13:00 Daily Newly commissioned Alstom CT oil sampling POWERGRID WR-II C KHANDW
321 400 Bay 405 (Indore-1 -future tie bay) at Khandwa 10-May-17 15:00 10-May-17 18:00 Daily Newly commissioned Alstom CT oil sampling POWERGRID WR-II C KHANDW
322 400 RAPP#2 Main Bay(418) at Shujalpur 10-May-17 10:00 10-May-17 18:00 Daily For commissioning of CSD works POWERGRID WR-II C SHUJALP
323 400 Jabalpur#4 Tie Bay at Itarsi SS 10-May-17 6:00 10-May-17 14:00 Daily AMP works POWERGRID WR-II C ITARSI
Power line crossing of 400 KV S/C Khedamara- Seoni
324 400 400 KV S/C Khedamara- Seoni 10-May-17 8:00 10-May-17 19:00 Daily CSPTCL STL Routine
Line at Tower No.107 & 108 by 765 KV D/C Bilaspur-
Power line crossing of 400KV DCDS Marwa -Raita
325 400 400KV DCDS Marwa -Raita Line 10-May-17 8:00 10-May-17 19:00 Daily CSPTCL CWRTL Routine
Line at Tower No. 6 & 7 by 765 KV S/C Champa -
Outage for fixing of line spacer cum damper and Dhariwal
326 400 Dhariwal- Parli 400 KV Tr. Line 10-May-17 6:00 10-May-17 17:00 Daily WRTS-I Planned
jumper pad N&Bs tightening works Infrastructure Ltd.
327 400 315 MVA, 400/ ICTNo. 3 Asoj 10-May-17 8:00 10-May-17 18:00 Daily PMM work GETCO GETCO
328 220 Kasor - Rajgarah Line No.2 10-May-17 8:00 10-May-17 18:00 Daily Line maintenance work GETCO GETCO

315MV
A ICT-
329 400/220 315MVA, ICT 1 @ BBLR 10-May-17 6:00 10-May-17 14:00 Daily Maintenance work MSETCL MSETCL II,
500MV
A ICT-
III &
330 400 Chandrapur 2 - Warora Ckt-1 10-May-17 8:00 10-May-17 17:00 Daily Line Routine Maintenance & Dignostic testing work MSETCL MSETCL
331 220 220 KV MALANPUR - AURAIYA CKT 10-May-17 6:00 10-May-17 14:00 daily LINE MAINTENANCE WORK MPPTCL MPPTCL R
332 765 Bay-09 -SATNA LINE#2 Main Bay @Sasan 10-May-17 08:00 10-May-17 18:00 Daily Bay Yearly maintenance SASAN RELIANCE
Powerline crossing of 765 kV DC GADARWARA- Outage will be feasible
333 400 400 kV Koradi(II)-Wardha PG Ckt 1 & Koradi (II)-IEPL Ckt 2 10-May-17 8:00 10-May-17 18:00 Daily MSETCL WRTS-I C LINE
WARORA TL between Tower No. 137/0 and 138/0 when one unit at koradi-2
334 765 765kV Raichur- Solapur-2 10-May-17 6:00 10-May-17 15:00 Continuous for bus- pipe modification works SRPC RSTCL
335 765 ANTA-PHAGI-1(765 kV) 10-May-17 6:00 10-May-17 17:00 Daily Stability test for spare reactor NRPC Rajasthan
L/R OF 765 KV NEW RANCHI -DHARAMJAYGARH -1 AT NEW POWERGRID ER
336 765 10-May-17 10:00 10-May-17 14:00 Daily Switching over of B-ph Reactor with spare Reactor . ERPC
RANCHI -I
337 400 Main Bus-1 Mansar 11-May-17 8:00 11-May-17 18:00 Daily 4th Half Yearly Testing and maintenance work by O/S GETCO GETCO
338 400/220 501 MVA ICT-2 @ Lamboti 11-May-17 10:00 11-May-17 18:00 Daily Maintenance work, Diagnoistic Testing Work. MSETCL MSETCL
339 400 400 kv Bus 2 at Raipur SS 11-May-17 9:30 11-May-17 17:30 Daily AMP work at Raipur WRTS-I WRTS-I R BUS
340 400 Bina-Shujalpur ckt-2 at Bina 11-May-17 9:30 11-May-17 18:00 Daily For replacement of insulators in line . POWERGRID WR-II R BINA
341 765 Satna-2 line reactor at Bina 11-May-17 9:30 11-May-17 18:00 Daily For commissioning of NGR by pass circuit breaker. POWERGRID WR-II C BINA
342 400 63 MVAR BUS REACTOR MAIN BAY (409) at Jabalpur SS 11-May-17 6:00 11-May-17 14:00 Daily AMP WORK POWERGRID WR-II R JABALPU
343 400 Bay 423(Seoni-1- Betul-1 tie bay) at Khandwa 11-May-17 10:00 11-May-17 13:00 Daily Newly commissioned Alstom CT oil sampling POWERGRID WR-II C KHANDW
344 400 Bay 424( Betul-1 main bay) at Khandwa 11-May-17 15:00 11-May-17 18:00 Daily Newly commissioned Alstom CT oil sampling POWERGRID WR-II C KHANDW
345 765 765KV ICT#2 at Satna SS 11-May-17 6:00 11-May-17 15:00 Daily For Attending Isolator problem POWERGRID WR-II C SATNA
346 400 Tie bay of 400kv Bus Reactor(bay- 408) at Vchal PS 11-May-17 6:00 12-May-17 15:00 Continuous For breaker erection 409 bay POWERGRID WR-II C VCHAL
Outage for fixing of line spacer cum damper and Dhariwal
347 400 400 KV Dhariwal -Chandrapur-II Tr. Line Ckt-I 11-May-17 6:00 11-May-17 17:00 Daily MSETCL Planned
jumper pad N&Bs tightening works Infrastructure Ltd.
348 400 80MVAR EMCO BUS REACTOR 11-May-17 6:00 12-May-17 15:00 continuous for schedule maintenance GMR -WARORA GMR -WARORA
349 400 315 MVA ICT-1 Varsana 11-May-17 6:00 11-May-17 14:00 Daily Water washing GETCO GETCO
350 400 315 MVA ICT-2 Main+Tie+Lv Bay Kosamba 11-May-17 0:00 11-May-17 18:00 Daily Yearly maintenance & testing activity GETCO GETCO
351 400 Transfer Bus at Asoj 11-May-17 8:00 11-May-17 18:00 Daily PMM work GETCO GETCO
Bus will
352 400 Bus Coupler @ BBLR 11-May-17 6:00 11-May-17 14:00 Daily Maintenance work MSETCL MSETCL
be
410 and 409 -Bay (Main & Tie bay of Lonikand-II -Parali ckt II) at
353 400 11-May-17 6:00 11-May-17 15:00 Daily Routine Maintenance & Dignostic testing work MSETCL MSETCL
Lonikand II
1)CT Tan Delta Mesurment Work.2) Breaker CRM,
354 400 400KV Bus coupler Bay @400KV S/S Chandrapur 11-May-17 8:00 12-May-17 18:00 Daily MSETCL MSETCL
DCRM, & Timing mesurment work. 3) PG Isolator
355 400 400KV Tie bay(421 )of warora-wardha and future @ Warora 11-May-17 6:00 11-May-17 16:00 Daily DCRM of Tie CB at 400KV S/s. Warora. MSETCL MSETCL element
356 400 Nagothane-Dabhol 2 Line @ Nagothane 11-May-17 6:00 11-May-17 14:00 Daily To carry out Routine Bay Maintenance work MSETCL MSETCL
357 400 Koyna Stage IV-Lonikand 11-May-17 10:00 13-May-17 18:00 Daily Cold washing of Insulators MSETCL MSETCL
ICT 2
will be
TBC shiting of 400 KV side Breaker of 315 MVA ICT 2 @ New Routine Maintenance &DCRM CB timing CRM and taken
358 400/220 11-May-17 8:00 11-May-17 18:00 Daily MSETCL MSETCL on 400
koyna Cleaning of CB
KV TBC
online
no
359 400 400 KV JULWANIA- 315 MVA ( EMCO) ICT-II 11-May-17 8:00 11-May-17 17:00 DAILY PREMANSOON MAINTENANCE WORK MPPTCL MPPTCL R
360 400 400 KV NAGDA 125 MVAR BUS REACTOR 11-May-17 8:00 11-May-17 17:00 DAILY PREMANSOON MAINTENANCE WORK MPPTCL MPPTCL R
361 400 400 KV BHOPAL-BINA -II 11-May-17 6:00 11-May-17 14:00 daily PREMANSOON MAINTENANCE WORK MPPTCL MPPTCL R
362 400 400 KV ISP-SARNI 11-May-17 8:00 12-May-17 18:00 CONTINUOUS PREMANSOON MAINTENANCE WORK & CB MPPTCL NHDC(ISP) R
363 400 400KV DAMOH- KATNI 11-May-17 10:00 11-May-17 17:00 daily LINE MAINTENANCE WORK MPPTCL MPPTCL R
364 400 SWITCHABLE LR_400kV_WARDHA1_AURANGABAD 11-May-17 6:00 11-May-17 15:00 Daily For AMP Works at Aurangabad WRTS-I WRTS-I R BR
365 400 BUS REACTOR_400kV_80MVAR_CHAMPA 11-May-17 6:00 12-May-17 14:30 Daily For CSD Commissioning work POWERGRID POWERGRID C BUS
366 765 765 Kv Main Bay 813 of Kotra # 2 at Durg PS 11-May-17 6:00 11-May-17 15:00 Daily AMP of Bay WRTS-I WRTS-I R Bay
Auto reclose testing and primary injection testing for
367 400 Dharamjaygarh-BALCO CKT-01 11-May-17 6:00 12-May-17 15:00 Daily WRTS-I WRTS-I C LINE
connecting Tie bay with Bus-01.Line shutdown is
For rectification/placement of Conductor, Spacers and
368 400 400Kv PARLI-PUNE(GIS)_1 11-May-17 8:00 11-May-17 18:00 Daily Tightening of Jumper, VD and Corona ring,etc. 400Kv WRTS-I WRTS-I R LINE
AURANGABAD(MSETCL)-PUNE(GIS) II also
For rectification/placement of Conductor, Spacers and
369 400 400Kv AURANGABAD(MSETCL)-PUNE(GIS) II 11-May-17 8:00 11-May-17 18:00 Daily Tightening of Jumper, VD and Corona ring,etc.400Kv WRTS-I WRTS-I R LINE
PARLI-PUNE(GIS)_1 required with this in view of M/c
370 400 ICT1_400/220kv_WARDHA 11-May-17 6:00 11-May-17 15:00 Daily AMP work at Wardha end WRTS-I WRTS-I R ICT
For Replacement of conventional insulators with
already approved for 2-
371 765 765kV SEONI-BILASPUR II 11-May-17 8:00 12-May-17 18:00 Daily Polymer Insulators in N.H, S.H, Rail crossings,etc. for WRTS-I WRTS-I C LINE
3May
Public safety
Auto
reclose
372 400 SSP - Rajgarh - 1 11-May-17 8:00 12-May-17 18:00 Daily PMM work PGCIL GETCO of SSP -
Rajgad
h-2
373 400 SSP-Rajgarh-1 11-May-17 6:00 15-May-17 18:00 Daily For Replacement of Defective Disc Insulator String MPPTCL/SSP MPPTCL
Shifting of 220 D/C Kawas-Navsari line between
374 220 Kawas - Navsari Ckt.1&2 11-May-17 6:00 15-May-17 15:00 Continuous POWERGRID WR-II C RHQ-AM
loc.no. 96-98 to facilitate clearance for DFCCI Railway
A/R of Ckt to be kept in non auto mode for online BHACHAU
375 400 Mundra - Mansar 12-May-17 8:00 14-May-17 20:00 Daily POWERGRID WR-II R
installation of Bird divertors on earthwire as per the TLM
376 400 Indore(PG)-Indore(MPPTCL) ckt #II 12-May-17 10:00 12-May-17 18:00 Daily For checking auto reclosing scheme in TBC bay at POWERGRID WR-II R INDORE
377 400 Khandwa#2 Tie Bay at Itarsi SS 12-May-17 6:00 12-May-17 14:00 Daily AMP works POWERGRID WR-II C ITARSI
It may be rescheduled
378 220 Kawas-Icchapore line#1 12-May-17 10:00 12-May-17 12:00 CONTINUOUS FOR ENERGY METER REPLACEMENT NTPC NTPC
due to Kawas - Vav D/C
It may be rescheduled
379 220 Kawas-Icchapore line#2 12-May-17 12:00 12-May-17 15:00 CONTINUOUS FOR ENERGY METER REPLACEMENT NTPC NTPC
due to Kawas - Vav D/C
380 400 400 KV BUS-2 at Talegaon 12-May-17 6:00 12-May-17 15:00 Daily For AMP works WRTS-I WRTS-I R Bus
For Jumpering of Reactor NGR Breaker & Wiring of
381 765 765KV Vchal-Satna#2 Line 12-May-17 6:00 12-May-17 15:00 Daily POWERGRID WR-II C SATNA
Single Phase Breaker for Switching scheme at Satna
382 400 400 kv Bus 3 at Raipur SS 12-May-17 9:30 12-May-17 17:30 Daily AMP work at Raipur WRTS-I WRTS-I R BUS
383 400 Bay No-414, Main Bay of 400kv Boisar-Tarapur-II & ICT-II at Boisar 12-May-17 6:00 12-May-17 15:00 Daily AMP POWERGRID WR-II R BOISAR
384 400 Jabalpur#4 Main Bay at Itarsi SS 12-May-17 6:00 12-May-17 14:00 Daily AMP works POWERGRID WR-II C ITARSI
385 400 Bus B Vadavi 12-May-17 8:00 12-May-17 18:00 Daily BAY PMM WORK GETCO GETCO
386 400 400 KV Bus Reactor-2 & Parli-2 (MSETCL) Tie Bay (417) 12-May-17 10:00 12-May-17 18:00 Daily For Bay AMP works at Parli WRTS-I WRTS-I R Bay
387 400 Indore-Khandwa line #I 12-May-17 10:00 12-May-17 18:00 Daily For NRG by passing work at Indore PS POWERGRID WR-II C INDORE
388 400 Bay 428 (Betul-2 Main bay) at Khandwa 12-May-17 10:00 12-May-17 13:00 Daily Newly commissioned Alstom CT oil sampling POWERGRID WR-II C KHANDW
389 400 Bay 429 (Seoni 2-Betul-2 Tie bay) at Khandwa 12-May-17 15:00 12-May-17 18:00 Daily Newly commissioned Alstom CT oil sampling POWERGRID WR-II C KHANDW
Outage for fixing of line spacer cum damper and Dhariwal
390 400 400 KV Dhariwal-Chandrapur-II Tr. Line Ckt-II 12-May-17 6:00 12-May-17 17:00 Daily MSETCL Planned
jumper pad N&Bs tightening works Infrastructure Ltd.
391 400 Varsana - Hadala 12-May-17 8:00 12-May-17 15:00 Daily Water washing GETCO GETCO
392 400 315 MVA ICT-3 Main+Tie+Lv Bay Kosamba 12-May-17 8:00 12-May-17 17:00 Daily Yearly maintenance & testing activity GETCO GETCO
393 400 Kasor-Chornia Line 12-May-17 8:00 12-May-17 18:00 Daily Line maintenance work GETCO GETCO
394 400 500 MVA ICT-2 Chorania 12-May-17 6:00 12-May-17 17:00 Daily Conditioning Monitoring Work GETCO GETCO
400 kV
Koradi-
Bhusaw
al, 400
Faulty String Replacement work detected in PID by kV
395 400 400 kV Akola- Bhusawal Line 12-May-17 8:00 12-May-17 16:00 Daily agency. Routine Maintenance & Dignostic testing MSETCL MSETCL Akola-
work. Nandga
onpeth
& 400
kV
Koradi-
396 400 400 kV Warora Line 1 Main Bay 406 at Tiroda plant 12-May-17 6:00 12-May-17 15:00 Daily Bay Equipment Testing and Maintenance ATIL ATIL
397 400 Waluj- Babhleshwar @ Waluj 12-May-17 8:00 12-May-17 17:00 Daily Routine Maintenance & Dignostic testing work MSETCL MSETCL
398 400 Chandrapur - Khaperkheda 12-May-17 8:00 12-May-17 17:00 Daily Line Routine Maintenance & Dignostic testing work MSETCL MSETCL
399 400 400KV Tie bay - 412 of C'pur-2 and Tirora-1 @ Warora 12-May-17 6:00 12-May-17 16:00 Daily C' & Tan Delta of tie CT & DCRM of tie CB at 400Kv MSETCL MSETCL
400 400/220 315MVA, ICT I @ Dhule 12-May-17 8:00 12-May-17 18:00 Daily Maintenance work & ROTINE TESTING MSETCL MSETCL
401 400 400/220kV ICT - II at 400kV Deepnagar 12-May-17 6:00 12-May-17 14:00 Daily Diagnostic testing of ICT units and routine MSETCL MSETCL
402 400 Padghe-Nagothane 2 @ Padgha 12-May-17 8:00 12-May-17 18:00 Daily Routine R&M work MSETCL MSETCL
403 400 400 KV JULWANIA- 315 MVA ( EMCO) ICT-II 12-May-17 8:00 12-May-17 17:00 DAILY PREMANSOON MAINTENANCE WORK MPPTCL MPPTCL R
404 400 400 KV BHOPAL 80 MVAR BUS REACTOR - I 12-May-17 6:00 12-May-17 14:00 DAILY PREMANSOON MAINTENANCE WORK MPPTCL MPPTCL R
405 400 400KV SEONI -SARNI 12-May-17 6:00 12-May-17 15:00 daily LINE MAINTENANCE WORK MPPTCL MPPTCL R
406 400 Korba Transfer bus coupler (TBC)-1 12-May-17 08:30 hrs 14-May-17 17:30 Hrs. Continuous For 400KV CT replacement NTPC NTPC
407 400 SWITCHABLE LR_400kV_WARDHA2_at AURANGABAD 12-May-17 6:00 12-May-17 15:00 Daily For AMP Works at Aurangabad WRTS-I WRTS-I R BR
408 765 ICT#2 Main Bay 721 at Bilaspur PS 12-May-17 6:00 12-May-17 15:00 Daily AMP works (CB Grading capacitor cap/tandelta meas. WRTS-I WRTS-I R Bay
409 400 ICT1_400/220kv_PUNE 12-May-17 6:00 12-May-17 15:00 Daily For AMP works at Pune Telegaon WRTS-I WRTS-I R ICT
For crossing works of up-coming 400 D/C QUAD
410 765 765kV KOTRA PS-DURG PS I & II 12-May-17 8:00 12-May-17 18:00 Daily WRTS-I POWERGRID C LINE NLDC consent required.
LARA NTPC-CHAMPA TL (Between Location no: 39/0-
411 765/400 ICT1_765/400kv_SEONI 12-May-17 8:00 12-May-17 18:00 Daily For AMP testing work WRTS-I WRTS-I R ICT
412 400 SSP-RAJGARH-1 12-May-17 8:00 12-May-17 11:00 DAILY CT, PT connection for PMU Installation SSP NCA
413 400 SSP-ASOJ 12-May-17 11:00 12-May-17 14:00 DAILY CT, PT connection for PMU Installation SSP NCA
414 400 SSP-RAJGARH-2 12-May-17 15:00 12-May-17 18:00 DAILY CT, PT connection for PMU Installation SSP NCA
415 765 765kV CHAMPA- KOTRA PS 13-May-17 6:00 13-May-17 18:00 Daily Quad to Twin Modification of Droppers WRTS-I WRTS-I C LINE
416 400 SOLAPUR_400KV_BUS#2 13-May-17 6:00 13-May-17 15:00 DAILY STATCOM CONSTRUCTION WORKS WRTS-1 POWERGRID C BUS STATCOM Capacity???
417 765 Sipat#1 main bay 709 at Bilaspur PS 13-May-17 6:00 13-May-17 15:00 Daily AMP works WRTS-I WRTS-I R Bay
418 220 Bay no-207 Main Bay of 220kv Boisar-Tarapur at Boisar 13-May-17 6:00 13-May-17 15:00 Daily AMP POWERGRID WR-II R BOISAR
419 400 400 KV 80 MVAR Reactor @Nagothane 13-May-17 8:00 Hrs 13-May-17 18:00Hrs Daily Routine R&M work MSETCL MSETCL
420 400 400 kV Tamnar 2 Tie Bay at Raipur SS 13-May-17 9:30 13-May-17 17:30 Daily AMP work at Raipur WRTS-I WRTS-I R BAY
421 765 765kV Bus-1 at Aurangabad 13-May-17 8:00 13-May-17 18:00 Daily for Jumpering of Solapur-1&2 bays WRTS-I WRTS-I C Bus NLDC consent required.
422 765 Main Bay Of 765kv Sasan Line (bay-701) at Vchal PS 13-May-17 6:00 14-May-17 17:00 Daily FOR AMP WORK POWERGRID WR-II R VCHAL
POWERGRID-
423 765 Jabalpur - Bina-3 13-May-17 8:00 14-May-17 18:00 Continuous Stringing of new 765kV D/C Jabalpur - Orai line STERLITE C
WR-I
Power line crossing of 400 kV D/C Korba to SLDC
424 400 400 kV DCDS Korba(NTPC) to Khedamara 13-May-17 8:00 13-May-17 19:00 Daily CSPTCL STL Routine
Khedamara at Tower No. 255 & 256 by 765 KV S/C Chattisgar
425 765 765 Kv tie Bay 817 of Wardha #2 at Durg PS 13-May-17 6:00 13-May-17 15:00 Daily AMP of Bay WRTS-I WRTS-I R Bay
426 220 220KV Bus 2 at Bhachau 13-May-17 6:00 13-May-17 15:00 Daily Cleaning and greasing of Bus BPI WR-II C BHACHAU
427 400 Bay no-415, Main Bay of 315MVA ICT-II at Boisar 13-May-17 6:00 13-May-17 15:00 Daily AMP POWERGRID WR-II R BOISAR
428 765 765KV ICT#1 at Satna SS 13-May-17 6:00 13-May-17 15:00 Daily For CSD Commissioning work POWERGRID WR-II C SATNA
429 400 Bay 430 (Seoni-2 Main Bay) at Khandwa 13-May-17 10:00 13-May-17 13:00 Daily Newly commissioned Alstom CT oil sampling POWERGRID WR-II C KHANDW
430 765 765kV ICT#2 at Gwalior 13-May-17 10:00 13-May-17 13:00 Daily Switching Spare ICT with R-Phase POWERGRID WR-II C GWALIOR
431 765 Main bay of ICT 1 (bay-703) at Vchal PS 13-May-17 6:00 13-May-17 17:00 Daily FOR AMP WORK POWERGRID WR-II R VCHAL
GT#30 line isolator at CGPL (including Main and Tie breaker of
432 400 13-May-17 6:00 13-May-17 15:00 Continuous GT#30 line isolator replacement CGPL CGPL
GT#30)
433 400 Bus Coupler Asoj 13-May-17 8:00 13-May-17 18:00 Daily PMM work GETCO GETCO
434 400 Kharghar - Kalwa @ Kalwa 13-May-17 8:00 13-May-17 18:00 Daily Routine Maintenance & testing work MSETCL MSETCL
435 400 400 KV INDORE-NAGDA 13-May-17 6:00 13-May-17 17:00 daily LINE MAINTENANCE WORK MPPTCL MPPTCL R
For Replacement of conventional insulators with
436 765 765kV BILASPUR-SIPAT I 13-May-17 8:00 13-May-17 18:00 Daily Polymer Insulators in N.H, S.H, Rail crossings,etc. for WRTS-I WRTS-I C LINE
Public safety
437 400 400 kv Tamnar 2 Main Bay at Raipur SS 13-May-17 9:30 13-May-17 17:30 Daily AMP work at Raipur WRTS-I WRTS-I R BAY
438 400 SSP-DHULE-1 13-May-17 8:00 13-May-17 11:00 DAILY CT, PT connection for PMU Installation SSP NCA
439 400 SSP-KASOR 13-May-17 11:00 13-May-17 14:00 DAILY CT, PT connection for PMU Installation SSP NCA
440 400 SSP-DHULE-2 13-May-17 15:00 13-May-17 18:00 DAILY CT, PT connection for PMU Installation SSP NCA
441 765 ANTA-PHAGI-2(765 kV) 13-May-17 6:00 13-May-17 17:00 Daily stability test for spare reactor NRPC Rajasthan
442 765 Jabalpur-3 line reactor at Bina 13-May-17 9:30 13-May-17 18:00 Daily For commissioning of NGR by pass circuit breaker. POWERGRID WR-II C BINA
Now, Chandrapur II -
443 400 Chandrapur 2 - Nanded Ckt-1 13-May-17 8:00 13-May-17 17:00 Daily Line Routine Maintenance & Dignostic testing work MSETCL MSETCL parli ckt - 1 is modified as
chandrapur II - nanded
444 765 765 kV BUS 1 AT KOTRA PS 14-May-17 5:30 14-May-17 14:30 Daily AMP 2017 - 18 WRTS-I WRTS-I R BUS
445 765 Jabalpur-1 line reactor at Bina 14-May-17 8:00 14-May-17 18:00 Daily For commissioning of NGR by pass circuit breaker. POWERGRID WR-II C BINA
For Replacement of conventional insulators with
already approved for 2-
446 765 765kV SEONI-BILASPUR II 14-May-17 8:00 15-May-17 18:00 Daily Polymer Insulators in N.H, S.H, Rail crossings,etc. for WRTS-I WRTS-I C Line
3May
Public safety
447 765 704 Main Bay of 765 kV Bhopal-jabalpur Line at BDTCL Bhopal 14-May-17 8:00 15-May-17 18:00 Daily For AMP works BDTCL BDTCL R
448 400 JBP POOLING-1 MAIN BAY(410) at Jabalpur SS 14-May-17 6:00 14-May-17 14:00 Daily AMP WORK POWERGRID WR-II R JABALPU
449 400 400kV BHADRAVATI-PARLI I 14-May-17 8:00 15-May-17 18:00 Daily Replacement of Porcelain insulators & Other Ckt is in WRTS-I WRTS-I C LINE
450 400 AURANGABAD(PG)_400-BUS_2 14-May-17 6:00 14-May-17 15:00 Daily For AMP Works at Aurangabad WRTS-I WRTS-I R Bus
451 765 765kV DURG PS -WARDHA_ ckt 3 14-May-17 6:00 15-May-17 17:00 Continuous For various works in Durg PS-Wardha 3 WRTS-I WRTS-I R LINE
452 400 Korba Bhatapara Line 14-May-17 08:30 hrs 16-May-17 17:30 Hrs. Continuous For annual maintenance of bay equipments and hot NTPC NTPC
During the proposed outage following works will be
453 400 KORADI - BHUSAWAL 14-May-17 8:00 14-May-17 19:00 Daily carried out :- MSETCL MSETCL
Line signature test, broken disc replacement
454 765 Bay-08 -SATNA LINE#2 Tie Bay at Sasan 14-May-17 08:00 14-May-17 18:00 Daily Bay Yearly maintenance SASAN RELIANCE
455 220 Bay no-208, Main Bay of 315MVA ICT-I at Boisar 14-May-17 6:00 14-May-17 15:00 Daily AMP POWERGRID WR-II R BOISAR
456 400 J P NIGRIE-SATNA-2 14-May-17 9AM 14-May-17 5PM Daily Fixing of missing Arcing Horns,Twin Spacers & Rigid JP NIGRIE JP NIGRIE
457 400 400KV CHD Ckt No - I ( Bay No - 413) @ Warora 14-May-17 6:00 14-May-17 16:00 Daily C' & Tan Delta of Bus CT , line CT & DCRM of main MSETCL MSETCL
458 400 Padghe-Babhaleshwar 2 @ Padgha 14-May-17 8:00 14-May-17 18:00 Daily Routine R&M work MSETCL MSETCL
459 400 400 kV Bus 2 at Tiroda plant 14-May-17 6:00 14-May-17 18:00 Daily Bus and Bus Connected Equipment Maintenance APML APML
460 400 SSP-BUS-1 14-May-17 8:00 14-May-17 12:00 DAILY CT, PT connection for PMU Installation SSP NCA
461 400 SSP-BUS-2 14-May-17 14:00 14-May-17 18:00 DAILY CT, PT connection for PMU Installation SSP NCA
462 +/-800 800 kV Champa -Kurekshetra Pole 1&2 14-May-17 6:00 15-May-17 15:00 Daily Stringing for crossing of 765KV D/C Orai-Aligarh NRPC Powergrid
463 400 Bus A At Vadavi 15-May-17 8:00 15-May-17 18:00 Daily BAY PMM WORK GETCO GETCO
464 765 Satna Bina 1 along with L/R 15-May-17 9:30 15-May-17 18:00 Daily For commissioning of NGR by pass circuit breaker. POWERGRID WR-II C BINA
465 400 JBP POOLING-1 TIE BAY(411) at Jabalpur SS 15-May-17 6:00 15-May-17 14:00 Daily AMP WORK POWERGRID WR-II R JABALPU
466 765 765 kV Main Bus -1 at BDTCL Bhopal 15-May-17 8:00 15-May-17 18:00 Daily For AMP works BDTCL BDTCL R
467 400 400KV Bus-2 at Vapi 15-May-17 6:00 17-May-17 14:00 Daily Isolator arm repalcement work POWERGRID WR-II R VAPI
468 400 400 KV Wardha Raipur # 1 Main Bay 415 bay at Wardha 15-May-17 6:00 15-May-17 15:00 Daily AMP works related to Bay WRTS-I WRTS-I Bay
469 400 404 Bay (Main Bay of Aurangabad Ckt-1) at 400 kV Akola 15-May-17 8:00 15-May-17 18:00 Daily Annual Maintenance of bays equipment MSETCL MSETCL
470 400 407,Satna-3 Main bay at Bina 15-May-17 9:30 15-May-17 18:00 Daily AMP WORKS POWERGRID WR-II R BINA
471 400 Gandhar#2 Tie Bay at Dehgam (Bay 405) 15-May-17 6:00 18-May-17 14:00 Continuous O/H of CB work POWERGRID WR-II R DEHGAM
472 400 Indore-Khandwa line #II 15-May-17 10:00 15-May-17 18:00 Daily For NRG by passing work at Indore PS POWERGRID WR-II C INDORE
473 400 ITARSI-4 MAIN BAY(411) at Jabalpur SS 15-May-17 6:00 15-May-17 14:00 Daily AMP WORK POWERGRID WR-II R JABALPU
474 765 765KV Vchal-Satna Line#1 Main Bay (713 Bay) at Satna SS 15-May-17 6:00 16-May-17 15:00 Daily For AMP work POWERGRID WR-II R SATNA
Offline washing activity for Reactor (bay 401)
475 400 400 KV DGEN REACTOR (BAY 401) 15-May-17 8:00 15-May-17 18:00 Daily TPL TPL R
including Reactor bushings and LA. Bay outage
Auto
reclose
476 400 SSNNL-Dhule-1 alongwith Auto reclose of SSP -Dhule - 2 15-May-17 8:00 16-May-17 18:00 Daily PMM work PGCIL GETCO
of SSP -
Dhule -
477 400 Asoj - Wanakbori 15-May-17 8:00 15-May-17 18:00 Daily PMM work GETCO GETCO
400 kV
Koradi-
Bhusaw
al, 400
PID testing of insulator strings by Hot line Uint Akola. kV
478 400 400 kV Akola- Nandgaonpeth Line 15-May-17 12:00 17-May-17 18:00 Daily MSETCL MSETCL Akola-
( A/R shall be kept in non auto mode)
Bhusaw
al &
400 kV
Koradi-
Nandga
479 400 407 Bay (Main Bay of Aurangabad Ckt-2) at 400 kV Akola 15-May-17 8:00 15-May-17 18:00 Daily Annual Maintenance of bays equipment MSETCL MSETCL
480 220 200kV Wardha(Deoli)-Badnera-S/c 15-May-17 8:00 18-May-17 18:00 Daily PID testing of Line ( A/R switch is kept off position MSETCL MSETCL
481 400 400KV DHL- SSNNL line I & II 15-May-17 6:00 16-May-17 14:00 daily PID testing . A/R in Non Auto mode . MSETCL MSETCL
482 400 NewKoyna- Dabhol Ckt 1 @ New Koyna 15-May-17 8:00 15-May-17 18:00 Daily Routine Maintenance & Relay testing work MSETCL MSETCL
483 400 400 KV BHOPAL 80 MVAR BUS REACTOR -II 15-May-17 6:00 15-May-17 15:00 DAILY PREMANSOON MAINTENANCE WORK MPPTCL MPPTCL R
484 400 400 KV BINA 50 MVAR LINE REACTOR -II of Bina-Bhopal 15-May-17 6:00 15-May-17 14:00 DAILY PREMANSOON MAINTENANCE WORK MPPTCL MPPTCL R
485 400 400 KV TBC AT 400KV JULWANIA S/S 15-May-17 8:00 15-May-17 17:00 daily LINE MAINTENANCE WORK MPPTCL MPPTCL R
486 400 400 KV MAIN BUS-I AT 400KV INDORE 15-May-17 6:00 15-May-17 14:00 daily MAINTENANCE & RELAY TESTING WORK MPPTCL MPPTCL R
487 220 220 KV MEHGOAN - AURAIYA CKT 15-May-17 6:00 15-May-17 14:00 daily LINE MAINTENANCE WORK MPPTCL MPPTCL R
488 400/220 ICT -2 Transformer at NSPCL 15-May-17 6:00 18-May-17 17:00 Continuous Painting Job NSPCL NSPCL
489 765 Bay-09R -SATNA LINE#2 Reactor at Sasan 15-May-17 08:00 16-May-17 18:00 Continuous Bay Yearly maintenance SASAN RELIANCE
490 765/400 ICT1_765/400kv_AURANGABAD 15-May-17 6:00 15-May-17 15:00 Daily For AMP Works at Aurangabad WRTS-I WRTS-I R ICT
491 400 400kV DHARIWAL TPP-PARLI II 15-May-17 8:00 16-May-17 18:00 Daily Replacement of Porcelain insulators & Other Ckt is in WRTS-I WRTS-I R LINE
492 765 765 Kv Main Bay 719 of champa # 2 at Durg PS 15-May-17 6:00 15-May-17 15:00 Daily AMP of Bay WRTS-I WRTS-I R Bay
493 765 ICT1_765/400_D'JAIGARH 15-May-17 6:00 15-May-17 15:00 Daily Changing of neutral connection to single to Twin WRTS-I WRTS-I R ICT
494 400 401 Bay (Main Bay of 400KV Talegaon Chakan Line ) at Talegaon 15-May-17 6:00 15-May-17 15:00 Daily For AMP works WRTS-I WRTS-I R Bay
495 400 400Kv SOLAPUR(NTPC)-SOLAPUR(PG)_1 15-May-17 8:00 15-May-17 18:00 DAILY For crossing of 400KV NTPC#3&4 WRTS-1 POWERGRID C LINE NTPC consent required.
496 400 400Kv SOLAPUR(NTPC)-SOLAPUR(PG)_2 15-May-17 8:00 15-May-17 18:00 DAILY For crossing of 400KV NTPC#3&4 WRTS-1 POWERGRID C LINE NTPC consent required.
497 765 765 KV Wardha-Aurangabad # 3 Main Bay 719 at Wardha 15-May-17 10:00 15-May-17 19:00 Continuous AMP works related to Bay WRTS-I WRTS-I Bay
AURANGABAD (PG)_SOLAPUR_I_240 MVAR SWITCHABLE LR for RTV coating on HV Bushings. Line shall remain in
498 765 15-May-17 6:00 16-May-17 18:00 Daily WRTS-I WRTS-I C SLR
at Aurangabad service
Line rectification work which incluide new foundation, ER-II/Odisha/
499 400 400 KV Sundergarh-Raigarh-II 15-May-17 8:00 22-May-17 18:00 Continuous ERPC
erection & stringing at Loc No-426 Sundergarh
Line rectification work which incluide new foundation, ER-II/Odisha/
500 400 400 KV Sterlite-Raigarh-II 15-May-17 8:00 22-May-17 18:00 Continuous ERPC
erection & stringing at Loc No-426 Sundergarh
501 400 Mundra Bhachau Line-1 16-May-17 8:00 16-May-17 20:00 Daily Protection testing and carrier trials PGCIL CGPL
502 765 765KV Bus-I at Jabalpur PS 16-May-17 10:00 22-May-17 18:00 Daily For Vindhyachal & Urai Bay Extension work at POWERGRID WR-II C JABALPU
For Replacement of conventional insulators with
503 765 765kV BILASPUR-SIPAT II 16-May-17 8:00 16-May-17 18:00 Daily Polymer Insulators in N.H, S.H, Rail crossings,etc. for WRTS-I WRTS-I C LINE
Public safety
for Overhead Stringing of U/C 765KV D/C Raipur-
504 400 400KV S/C Korba(NTPC)- Bhilai- II 16-May-17 6:00 17-May-17 16:00 Daily PGCIL OGPTL C
Sundargarh Transmission line(of OGPTL) at OGPTL
505 765 765kV DURG PS -WARDHA_ ckt 4 16-May-17 6:00 16-May-17 17:00 Continuous For Replacement of defected Insulators. A/R in N/A of WRTS-I WRTS-I R LINE
506 400 Koyna Stage IV-Lonikand 16-May-17 10:00 18-May-17 18:00 Daily Cold washing of Insulators MSETCL MSETCL
507 400 406,400KV/220KV ICT Main bay at Bina 16-May-17 9:30 16-May-17 18:00 Daily AMP WORKS POWERGRID WR-II R BINA
508 765 Bay 704, main bay for 765 KV, Bina -Indore at Indore PS 16-May-17 10:00 16-May-17 18:00 Daily For replacement of BCU card in 704 bay. POWERGRID WR-II R INDORE
509 400 Station Transformer-8, APL, Mundra 16-May-17 9:30 18-May-17 18:00 Continuous Annual Shutdown Maintenance APL APL Routine
510 400 315 MVA ICT-4 Varsana 16-May-17 6:00 16-May-17 14:00 Daily Water washing GETCO GETCO
511 400 Kosamba - Chorania 2 16-May-17 8:00 16-May-17 18:00 Daily Line Maintenance work GETCO GETCO
512 400 400/315 MVA ICTNo.1 Mansar 16-May-17 8:00 16-May-17 18:00 Daily 4th Half Yearly Testing and maintenance work by O/S GETCO GETCO
513 400/220 3x105MVA, ICT 1 @ Kharghar 16-May-17 6:00 16-May-17 14:00 Daily Routine Maintenance & Dignostic testing work MSETCL MSETCL
400kV
Babhal
514 400 Babhaleshwar-Dhule-Ckt-1 @BBLR 16-May-17 6:00 16-May-17 14:00 Daily Routine Maintenance & Dignostic testing work MSETCL MSETCL eshwar-
Dhule-
Ckt-1
515 400 Jaigad-Newkoyna Ckt- 1 16-May-17 8:00 16-May-17 18:00 Daily Coldline washing & Maintenance work JPTL JPTL
516 400 Chandrapur 2 - Chandrapur Switching Ckt-1 16-May-17 8:00 16-May-17 17:00 Daily Routine Maintenance work MSETCL MSETCL
517 400 Warora-IEPL Ckt 16-May-17 6:00 16-May-17 15:00 Daily Jumper nut-bolt fixing and tightening MSETCL MSETCL
518 400 400 KV BUS TIE AT 400KV JULWANIA S/S 16-May-17 8:00 16-May-17 17:00 daily LINE MAINTENANCE WORK MPPTCL MPPTCL R
519 400 400 KV MAIN BUS-I AT 400KV INDORE 16-May-17 6:00 16-May-17 14:00 daily MAINTENANCE & RELAY TESTING WORK MPPTCL MPPTCL R
520 220 220 KV RAJGARH-SHUJALPUR(PGCIL)-I 16-May-17 6:00 16-May-17 14:00 daily LINE MAINTENANCE WORK MPPTCL MPPTCL R
521 220 220KV SEONI-CHHINDWARA-1 16-May-17 6:00 16-May-17 15:00 daily LINE MAINTENANCE WORK MPPTCL MPPTCL R
Hot spot attending in bus-1 horizontal prapeez & Mahan
522 400 Korba Mahan line with 400KV Bus-1 SD 16-May-17 8:30 16-May-17 17:30 Continuous NTPC NTPC
quarderpole connection of Y phase consent
523 765/400 ICT2_765/400kv_AURANGABAD 16-May-17 6:00 16-May-17 15:00 Daily For AMP Works at Aurangabad WRTS-I WRTS-I R ICT
524 765 ICT#1 Main Bay 724 at Bilaspur PS 16-May-17 6:00 16-May-17 15:00 Daily AMP works (CB Grading capacitor cap/tandelta meas. WRTS-I WRTS-I R Bay
525 400 400 KV Parli (PG)-2 Main Bay(412) at MSETCL Girawli 16-May-17 10:00 16-May-17 18:00 Daily For Bay AMP works at MSETCL Girawli WRTS-I WRTS-I R Bay
526 400 406 Bay (Main Bay of 400KV IC T# 1 ) at Talegaon 16-May-17 6:00 16-May-17 15:00 Daily For AMP works WRTS-I WRTS-I R Bay
527 400 400KV RAIPUR-SIPAT II 16-May-17 9:30 16-May-17 17:30 Daily Relay testing and AMP work at Raipur SS & TLM. WRTS-I WRTS-I R LINE
Auto
reclose
528 400 SSP - Rajgarh - 2 16-May-17 8:00 17-May-17 18:00 Daily PMM work PGCIL GETCO of SSP -
Rajgad
h-1
529 400 SSP-Rajgarh-2 16-May-17 6:00 20-May-17 18:00 Daily For Replacement of Defective Disc Insulator String MPPTCL/SSP MPPTCL
530 220 Ichhapore-Ntpc(Kawas) Line No.1 16-May-17 8:00 16-May-17 18:00 Daily General Bay maitanence work GETCO GETCO
531 400 400 kv Sipat 2 Main Bay at Raipur ss 16-May-17 9:30 16-May-17 17:30 Daily AMP work at Raipur WRTS-I WRTS-I R BAY
Outage shall be deferred
532 400 Mundra Bhachau Line-2 17-May-17 8:00 17-May-17 20:00 Daily Protection testing and trials PGCIL CGPL
due to Mundra - Jetpur
533 400 400kV Bus -1 (Bus Outage) at Bhadravati 17-May-17 6:00 19-May-17 15:00 Daily Replacement of old WSI make CVTs under R&M WRTS-I WRTS-I R BUS
534 765 765 kv bus reacter main bay (bay-710) at Vchal PS 17-May-17 6:00 21-May-17 15:00 ContinuousFor breaker rectification work continuous POWERGRID WR-II C VCHAL
For Jumpering of Reactor NGR Breaker & Wiring of
535 765 765KV Sasan-Satna#2 Line 17-May-17 6:00 17-May-17 15:00 Daily POWERGRID WR-II C SATNA
Single Phase Breaker for Switching scheme at Satna
MAINTENANCE WORK & REPLACEMENT OF
536 400 400 KV ISP-NAGDA AT 400 KV ISP S/S 17-May-17 8:00 18-May-17 18:00 CONTINUOUS MPPTCL NHDC(ISP) R
SPRING ISOLATER & LINE MAINTENANCE WORK
537 400 125 MVAr Bus Reactor at Bhachau 17-May-17 6:00 17-May-17 15:00 Daily Replacement of CC ring at 419 89B and 420 89 A POWERGRID WR-II C BHACHAU
538 400 405,Bina-1 & 400kv/220kv ICT Tie bay at Bina 17-May-17 9:30 17-May-17 18:00 Daily AMP WORKS POWERGRID WR-II R BINA
539 765 Indore line reactor at Bina 17-May-17 9:30 17-May-17 18:00 Daily For commissioning of NGR by pass circuit breaker. POWERGRID WR-II C BINA Shall be planned along
540 400 Boisar-Kala 17-May-17 6:00 18-May-17 15:00 Daily Powerline crossing work of Aurangabad-Boisar line POWERGRID WR-II C BOISAR
541 765 Bay 710, main bay for 765 KV, Bhopal -Indore at Indore PS 17-May-17 10:00 17-May-17 18:00 Daily For replacement of BCU card in 710 bay. POWERGRID WR-II R INDORE
765KV Jabalpur-Bhopal Line alongwith switchable Reactor at JABALPU
542 765 17-May-17 10:00 19-May-17 18:00 Daily Stringging of Jack Bus for Vindhyachal Bay POWERGRID WR-II C
Jabalpur PS R PS
543 220 Kakrapar-Vav 1 17-May-17 10:00 17-May-17 17:00 Daily Balance replacement of disc insulator strings with POWERGRID WR-II C NAVSARI
544 765 765KV Vchal-Satna Line#1 Tie Bay (714 Bay) at Satna SS 17-May-17 6:00 18-May-17 15:00 Daily For AMP work POWERGRID WR-II R SATNA
545 765 Tie-Bay(708) of Bus Reactor at Vadodara GIS 17-May-17 10:00 17-May-17 16:00 Daily AMP Work of CB POWERGRID WR-II R VADDDAR
546 765 765kV Bus Reactor at Gwalior 17-May-17 10:00 18-May-17 18:00 Continuous Degasing of Oil in R-Ph Unit POWERGRID WR-II R GWALIOR
547 400 315 MVA ICT3 Jetpur 17-May-17 8:00 17-May-17 18:00 Daily ICT and HV LV CT Tan Delta + Maintenance GETCO GETCO
Auto
reclose
548 400 SSNNL-Dhule-2 17-May-17 8:00 18-May-17 18:00 Daily PMM work PGCIL GETCO
of SSP -
Dhule -
549 400 500 MVA, ICTNo. 4 Asoj 17-May-17 8:00 17-May-17 18:00 Daily PMM work GETCO GETCO
550 400 Kosamba -Chorania 2 17-May-17 6:00 17-May-17 17:00 Daily Line Maintenance work GETCO GETCO
551 400 400/315 MVA ICTNo.2 Mansar 17-May-17 8:00 17-May-17 18:00 Daily 4th Half Yearly Testing and maintenance work by O/S GETCO GETCO
552 400 400 kV RPL Amravati-Akola-II Line-1 @ Amravati 17-May-17 6:00 17-May-17 14:00 Daily Routine Maintenance & Premonsoon activities APTCL APTCL Outage will be feasible
553 400 Jaigad-Newkoyna Ckt -2 17-May-17 8:00 17-May-17 18:00 Daily Coldline washing & Maintenance work JPTL JPTL
554 400 Chandrapur 2 - Warora Ckt-2 17-May-17 8:00 17-May-17 17:00 Daily Line Routine Maintenance & Dignostic testing work MSETCL MSETCL
555 400 400kV Parli-Solapur @ Parli 17-May-17 6:00 17-May-17 15:00 Daily CT Tan delta Measurement work MSETCL MSETCL -
556 400 400 KV JULWANIA 50 MVAR BUS REACTOR 17-May-17 6:00 17-May-17 15:00 DAILY PREMANSOON MAINTENANCE WORK MPPTCL MPPTCL R
557 220 220 KV BINA(PGCIL)-SHIVPURI 17-May-17 6:00 17-May-17 14:00 daily LINE MAINTENANCE WORK MPPTCL MPPTCL R
558 400 400kV AURANGABAD (PG) -AKOLA I 17-May-17 6:00 17-May-17 15:00 Daily For AMP Works at Aurangabad WRTS-I WRTS-I R LINE
559 400 ICT#1 main bay 401 at Bilaspur PS 17-May-17 6:00 17-May-17 15:00 Daily AMP works (CB Grading capacitor cap/tandelta meas. WRTS-I WRTS-I R Bay
560 400 400 Kv Main Bay 419 of GMR # 1 at Durg PS 17-May-17 6:00 17-May-17 15:00 Daily AMP of Bay WRTS-I WRTS-I R Bay
561 400 400kV Mapusa-1 Main bay (406) 17-May-17 10:00 17-May-17 18:00 Daily For AMP works of Main bay WRTS-I WRTS-I R Bay
562 765 ICT2_765/400_D'JAIGARH 17-May-17 6:00 17-May-17 15:00 Daily Changing of neutral connection to single to Twin WRTS-I WRTS-I R ICT BALCO to be informed
563 765 765 kV MAIN BAY_AT1_KOTRA PS 17-May-17 5:30 17-May-17 14:30 Daily AMP 2017 - 18 WRTS-I WRTS-I R BAY
564 400 410 Bay (Main Bay of 400KV Talegaon GIS Line # 4) at Talegaon 17-May-17 6:00 17-May-17 15:00 Daily For AMP works WRTS-I WRTS-I R Bay
565 400/220 ICT1_400/220kv_SEONI 17-May-17 8:00 17-May-17 18:00 Daily For AMP testing work WRTS-I WRTS-I R ICT
Non auto mode of Line - for replacement of broken
566 765 765kV D'JAIGARH-RANCHI II 17-May-17 6:00 17-May-17 15:00 Daily WRTS-I WRTS-I R Line
insulator in Ranchi # I D/C Portion i.e. Tower No. 12
567 400 ICT2_400/220kv_WARDHA 17-May-17 6:00 17-May-17 15:00 Daily AMP work at Wardha end WRTS-I WRTS-I R ICT
AURANGABAD (PG)_SOLAPUR_II_240 MVAR SLR at for RTV coating on HV Bushings. Line will Remain in
568 765 17-May-17 6:00 18-May-17 18:00 Daily WRTS-I WRTS-I C SLR
Aurangabad Service
569 765 706 Main Bay of ICT-2 at BDTCL Bhopal 17-May-17 8:00 18-May-17 18:00 Daily For AMP works BDTCL BDTCL R
570 400/220 400/220 KV ICT-I at Dichpally 17-May-17 6:00 17-May-17 13:00 Daily Measuring of IR vales and other Maintenence works SRPC PGCIL
571 220 Ichhapore-Ntpc(Kawas) Line No.2 17-May-17 8:00 17-May-17 18:00 Daily General Bay maitanence work GETCO GETCO
572 765 705 Tie Bay of 765 kV Bhopal- Jabalpur Line at BDCTL Bhopal 17-May-17 8:00 18-May-17 18:00 Daily For AMP works BDTCL BDTCL R
573 400 Mansar-Choraniya Line 18-May-17 8:00 18-May-17 18:00 Daily Half Yearly Testing and maintenance work by O/S GETCO GETCO
574 400 400 KV Parli (PG)-1 Main Bay(411) at MSETCL Girawli 18-May-17 10:00 18-May-17 18:00 Daily For Bay AMP works at MSETCL Girawli WRTS-I WRTS-I R Bay
400KV D/C DCDS Khedmara-Korba(West) and Khedamara-Marwa for Overhead Stringing of U/C 765KV D/C Raipur-
575 400 18-May-17 6:00 19-May-17 16:00 Daily CSPTCL OGPTL C
PH Circuit of CSPTCL Sundargarh Transmission line(of OGPTL) at OGPTL
Replacement of all porcelain disc insulator strings with
576 400 Navsari - Magarwada Ckt.2 18-May-17 8:00 20-May-17 18:00 Daily POWERGRID WR-II C
CLR Polymer insulators in complete line to avoid
577 400 400 KV BUS-1 at Talegaon 18-May-17 6:00 18-May-17 15:00 Daily For AMP works WRTS-I WRTS-I R BUS
578 400 404,Bina-1 main bay at Bina 18-May-17 9:30 18-May-17 18:00 Daily AMP WORKS POWERGRID WR-II R BINA
579 765 Gwalior-1 line reactor at Bina 18-May-17 9:30 18-May-17 18:00 Daily For commissioning of NGR by pass circuit breaker. POWERGRID WR-II C BINA
For replacement of BCU card in 715 bay. Line will
580 765 Bay 715, Reactor bay for 765 KV, Vadodara -Indore at Indore PS 18-May-17 10:00 18-May-17 18:00 Daily POWERGRID WR-II R INDORE
remain in service without reactor at Indore end
581 220 Kakrapar-Vav 2 18-May-17 10:00 18-May-17 17:00 Daily Balance replacement of disc insulator strings with POWERGRID WR-II C NAVSARI
Off line washing activity for GT-51 (bay 404) including
582 400 400 KV DGEN GT-51 (BAY 404) 18-May-17 8:00 18-May-17 18:00 Daily TPL TPL R
transformer bushings, LA, EMVT and Gantry
583 400/220 501MVA ICT-I bay No 419 & 418(Main & Tie bay) at Lonikand-II 18-May-17 6:00 18-May-17 15:00 Daily Routine Maintenance & Dignostic testing work MSETCL MSETCL
584 400 400 kV RPL Amravati-Akola-II Line-2 @ Amravati 18-May-17 6:00 18-May-17 14:00 Daily Routine Maintenance & Premonsoon activities APTCL APTCL
585 400 400kV Station Transformer 1 at Tiroda plant 18-May-17 6:00 19-May-17 15:00 Continuous Staion Transformer & its Bay Equipment Testing & APML APML
400kV
Babhal
586 400 Babhaleshwar-Dhule-Ckt-2 @BBLR 18-May-17 6:00 18-May-17 14:00 Daily Routine Maintenance & Dignostic testing work MSETCL MSETCL eshwar-
Dhule-
Ckt-2
587 400 Jaigad-Karad Ckt -1 18-May-17 8:00 18-May-17 18:00 Daily Coldline washing & Maintenance work JPTL JPTL
588 400/220/33 315 MVA , ICT-I @ 400KV S/S Chandrapur 18-May-17 8:00 18-May-17 18:00 Daily Pre Mansoon Maintenance work MSETCL MSETCL
589 400 Wardha(PGCIL)-Koradi-2 S/stn. 18-May-17 6:00 18-May-17 15:00 Daily Jumper nut-bolt fixing and tightening MSETCL MSETCL
590 400 400 kV Girwali-Nanded Ckt-2 @ Girwali 18-May-17 6:00 18-May-17 15:00 Daily Bay maintenance & reactor bushing Tan delta work MSETCL MSETCL -
591 400 400kV Lonikand-Talegaon PGCIL line & Bay @ 400kV Lonikand I 18-May-17 8:00 18-May-17 16:00 Daily Half yearly Bay n line maint. . by Lonikand I Staff MSETCL MSETCL
FOR REPLACEMENT OF BAY ISOLATORS AND
592 400 400 KV NAGDA- 315 MVA ( BHEL) ICT-II 18-May-17 8:00 20-May-17 17:00 CONTINUOUS MPPTCL MPPTCL R
COMPLETE PAINTING OF ICT & ITS
593 400 400 KV BINA- 315 MVA ( BHEL) ICT-III 18-May-17 6:00 18-May-17 14:00 DAILY PREMANSOON MAINTENANCE WORK MPPTCL MPPTCL R
594 400 400 KV NAGDA-RAJGARH-I 18-May-17 6:00 18-May-17 15:00 daily PREMANSOON MAINTENANCE WORK MPPTCL MPPTCL R
595 400 400 KV MAIN BUS-II AT 400KV INDORE 18-May-17 6:00 18-May-17 14:00 daily MAINTENANCE & RELAY TESTING WORK MPPTCL MPPTCL R
596 220 200 KV PADURNA-KALMESHWAR 18-May-17 6:00 18-May-17 15:00 daily LINE MAINTENANCE WORK MPPTCL MPPTCL R
597 220 220KV DAMOH-DAMOHI/C -I 18-May-17 6:00 18-May-17 15:00 daily LINE MAINTENANCE WORK MPPTCL MPPTCL R
598 400 Korba Tie Transformer-01 18-May-17 08:30 hrs 20-May-17 17:30 Hrs. Continuous For annual maintenance of bay equipments and Tie NTPC NTPC
599 400 400kV AURANGABAD (PG) -AKOLA II 18-May-17 6:00 18-May-17 15:00 Daily For AMP Works at Aurangabad WRTS-I WRTS-I R LINE
600 400 ICT#1 Tie bay 402 at Bilaspur PS 18-May-17 6:00 18-May-17 15:00 Daily AMP works (CB Grading capacitor cap/tandelta meas. WRTS-I WRTS-I R Bay
601 765 765kV D'JAIGARH-RANCHI I 18-May-17 6:00 19-May-17 15:00 Continuous Replacement of Al.tube inplace of Quad Bull WRTS-I WRTS-I R LINE
602 765 765 kV MAIN BAY_AT1_KOTRA PS 18-May-17 5:30 18-May-17 14:30 Daily AMP 2017 - 18 WRTS-I WRTS-I R BAY
603 400 400Kv PARLI-PUNE(GIS)_2 18-May-17 10:00 18-May-17 18:00 Daily For AMP works of line terminating equipments at Reliance WRTS-I R Line
211 BAY (Main bay of 220KV Chakan Line # 2) at Talegaon.
604 220 18-May-17 6:00 18-May-17 15:00 Daily For AMP works WRTS-I WRTS-I R Bay
Presently 220KV Chakan Line # 2 does not exists.
605 765 ICT1_765/400kv_SOLAPUR 18-May-17 6:00 18-May-17 15:00 DAILY For parrallel operation of ICT WRTS-1 POWERGRID R ICT Parallel operation reason
606 765 ICT2_765/400kv_SOLAPUR 18-May-17 6:00 18-May-17 15:00 DAILY For parrallel operation of ICT WRTS-1 POWERGRID R ICT
607 400 400kV BHATAPARA-KORBA 18-May-17 6:00 19-May-17 15:00 Daily Rectification of open spacer cum damper, Installation WRTS-I WRTS-I R Line
608 400 400 kv Tamnar 1 Tie Bay at Raipur ss 18-May-17 9:30 18-May-17 17:30 Daily AMP work at Raipur WRTS-I WRTS-I R BAY
609 400/220 400/220 KV ICT-II at Dichpally 18-May-17 6:00 18-May-17 13:00 Daily Measuring of IR vales and other maintenence works SRPC PGCIL
610 400 Mundra Bhachau Line-1 19-May-17 8:00 19-May-17 20:00 Daily Protection testing and trials PGCIL CGPL It shall be deferred due to
611 400 400kV DHARIWAL TPP-PARLI II 19-May-17 8:00 20-May-17 18:00 Daily Replacement of Porcelain insulators & Other Ckt is in WRTS-I WRTS-I R LINE
Routine Maintenance & Dignostic testing work(CB
612 400 400KV Parli-Lonikand Ckt1 @ Parli 19-May-17 6:00 19-May-17 15:00 Daily MSETCL MSETCL -
DCRM &Reactor Bushing Tan D measurement)
REPLACEMENT OF PENTAGRAPH ISOLATERS OF
613 400 400 KV MAIN BUS II AT 400 KV NAGDA 19-May-17 8:00 21-May-17 18:00 CONTINUOUS MPPTCL MPPTCL R
COMPLETE MAINTENANCE OF BUS & BUS CVT
614 400 400/220KV ICT 2 at Bachau 19-May-17 6:00 19-May-17 15:00 Daily AMP Work POWERGRID WR-II C BHACHAU
615 220 Bay no-202 Main Bay of 220 Boisar-Boisar-III at Boisar 19-May-17 6:00 19-May-17 15:00 Daily AMP POWERGRID WR-II R BOISAR
616 765 765kV PUNE(GIS)-SOLAPUR 19-May-17 8:00 19-May-17 18:00 Daily For attending Tightening of Jumper, VD, Corona, etc. WRTS-I WRTS-I R LINE
617 765 Gwalior-2 line reactor at Bina 19-May-17 9:30 19-May-17 18:00 Daily For commissioning of NGR by pass circuit breaker. POWERGRID WR-II C BINA
618 400 ICT#2 Tie Bay at Dehgam (Bay 408) 19-May-17 6:00 23-May-17 14:00 Continuous O/H of CB work POWERGRID WR-II R DEHGAM
619 220 Kakrapar-Vapi 1 19-May-17 10:00 19-May-17 17:00 Daily Balance replacement of disc insulator strings with POWERGRID WR-II C NAVSARI
620 765 765KV Satna-Gwalior Line#2 Main Bay (715 Bay) at Satna SS 19-May-17 6:00 20-May-17 15:00 Daily For AMP work POWERGRID WR-II R SATNA
621 765 Main-Bay(709) of Future ICT at Vadodara GIS 19-May-17 10:00 19-May-17 16:00 Daily AMP Work of CB POWERGRID WR-II R VADDDAR
622 765 765kV ICT#2 at Gwalior 19-May-17 10:00 19-May-17 13:00 Daily switching Spare ICT with R-Phase POWERGRID WR-II R GWALIOR
Replacement of all porcelain disc insulator strings with
623 400 Navsari - Magarwada Ckt.1&2 19-May-17 8:00 20-May-17 18:00 Daily CLR Polymer insulators in complete line to avoid POWERGRID WR-II C
tripping due to heavy pollution. Outage required in
Offline washing activity of Navsari Line 2 (bay 405)
624 400 400 KV DGEN NAVSARI LINE 2 (BAY 405) 19-May-17 8:00 19-May-17 18:00 Daily TPL TPL R
including LA and Gantry Insulators. Line outage
625 220 Bhilad - Ambheti- 1 19-May-17 0:00 19-May-17 18:00 Daily Maintenance Work. GETCO GETCO
626 400 Chornia- Kosamba -1 19-May-17 6:00 19-May-17 17:00 Daily Line Maintenance work GETCO GETCO
400 kV
Koradi-
Bhusaw
al, 400
Faulty String Replacement work detected in PID by kV
627 400 400 kV Akola- Nandgaonpeth Line 19-May-17 8:00 19-May-17 16:00 Daily agency. Routine Maintenance & Dignostic testing MSETCL MSETCL Akola-
work. Bhusaw
al &
400 kV
Koradi-
Nandga
628 400 408 Bay (Main Bay of Wardha Ckt-1) at 400 kV Akola 19-May-17 8:00 19-May-17 18:00 Daily Annual Maintenance of bays equipment MSETCL MSETCL
629 400/220 500MVA, ICT 3 @ Waluj 19-May-17 8:00 25-May-17 18:00 Daily Maintenance work MSETCL MSETCL
630 400 Jaigad-Karad Ckt -2 19-May-17 8:00 19-May-17 18:00 Daily Coldline washing & Maintenance work JPTL JPTL
631 400 400kV Deepnagar-Aurangabad Line @Deepnagar 19-May-17 6:00 19-May-17 14:00 Daily Maintenance work & routine testing MSETCL MSETCL Outage will be feasible
632 400/220 167 MVA, Spare ICT 2 @ Nagothane 19-May-17 6:00 19-May-17 14:00 Daily To carry out Routine Maintenance work MSETCL MSETCL
633 400 Padghe-Tarapur2 @Padgha 19-May-17 8:00 19-May-17 18:00 Daily Routine R&M work MSETCL MSETCL
634 400 400 KV NAGDA-RAJGARH-II 19-May-17 6:00 19-May-17 15:00 daily PREMANSOON MAINTENANCE WORK MPPTCL MPPTCL R
635 765 Bay-12 -SATNA LINE#1-Main Bay at Sasan 19-May-17 08:00 19-May-17 18:00 Daily Bay Yearly maintenance SASAN RELIANCE
636 400 ICT#2 main bay 404 at Bilaspur PS 19-May-17 6:00 19-May-17 15:00 Daily AMP works (CB Grading capacitor cap/tandelta meas. WRTS-I WRTS-I R Bay
637 400 400 kV BUS 1 SECTIONALISER_KOTRA PS 19-May-17 5:30 19-May-17 14:30 Daily AMP 2017 - 18 WRTS-I WRTS-I R BAY
638 220 Transfer Bus 19-May-17 6:00 19-May-17 15:00 Daily For AMP works WRTS-I WRTS-I R BUS
639 400 400 kv Tamnar 1 Main Bay at Raipur ss 19-May-17 9:30 19-May-17 17:30 Daily AMP work at Raipur WRTS-I WRTS-I R BAY
640 765 707 Main Bay of 765 kV Bus Reactor at BDTCL Bhopal 19-May-17 8:00 20-May-17 18:00 Daily For AMP works BDTCL BDTCL R
641 400 400kV Raipur-1 Tie Bay (411 Bay) at Bhadravati 20-May-17 6:00 21-May-17 15:00 Continuous OLD BHEL CT Replacement By new CT under R&M WRTS-I WRTS-I R BAY
Mundra - Jetpur Ckt.1 with non auto operation of Auto reclosure of BHACHAU Subjected to CGPL
642 400 20-May-17 8:00 21-May-17 18:00 Daily To attend opened spacer dampers POWERGRID WR-II R
Mundra - Jetpur ckt-2 TLM generation
643 400 400kV BHADRAVATI-PARLI I 20-May-17 8:00 21-May-17 18:00 Daily Replacement of Porcelain insulators & Other Ckt is in WRTS-I WRTS-I C LINE
644 400 400 KV Bhadrawati 1 Main Bay at Raipur SS 20-May-17 9:30 20-May-17 17:30 Daily AMP work at Raipur WRTS-I WRTS-I R BAY
645 765 Gwalior-3 line reactor at Bina 20-May-17 9:30 20-May-17 18:00 Daily For commissioning of NGR by pass circuit breaker. POWERGRID WR-II C BINA
646 220 Kakrapar-Vapi 2 20-May-17 10:00 20-May-17 17:00 Daily Balance replacement of disc insulator strings with POWERGRID WR-II C NAVSARI
647 765 765kV ICT#1 at Gwalior 20-May-17 10:00 20-May-17 13:00 Daily Degasing of Oil in R-Ph ICT POWERGRID WR-II R GWALIOR
648 765 765 kv satna 2 line Reactor (bay-707LR) at Vchal PS 20-May-17 6:00 23-May-17 15:00 Continuous Breaker rectification work continuous POWERGRID WR-II C VCHAL
Shifting of 220 Vapi-Sayali & Vapi-Khadoli lines DNH Consent to be
649 220 Vapi - Sayali & Vapi - Khadoli 20-May-17 6:00 24-May-17 15:00 Continuous POWERGRID WR-II C RHQ-AM
between loc.no. 56-61 to facilitate clearance for Sayali submitted by WR-II in D-
Power line crossing of 400 KV D/C (Twin) Korba-
650 400 400 KV D/C (Twin) Korba-Khedamara LILO line at Marwa 20-May-17 8:00 20-May-17 19:00 Daily CSPTCL CWRTL Routine
Khedamara LILO line at Marwa at Tower No. 155 &
Offline washing activity of Navsari Line 1 (bay 406)
651 400 400 KV DGEN NAVSARI LINE 1 (BAY 406) 20-May-17 6:00 20-May-17 17:00 Daily TPL TPL R
including LA and Gantry Insulators. Line outage
652 220 Bhilad - Ambheti- 2 20-May-17 8:00 20-May-17 18:00 Daily Maintenance Work. GETCO GETCO
653 400 400kV AURANGABAD(PG)-AURANGABAD(MSETCL) II 20-May-17 6:00 20-May-17 15:00 Daily For AMP Works at Aurangabad WRTS-I WRTS-I R LINE
208 BAY (Main bay of 220KV Urse Line # 2) at Talegaon. Presently
654 220 20-May-17 6:00 20-May-17 15:00 Daily For AMP works WRTS-1 POWERGRID R Bay
220KV Urse Line # 2 does not exists.
655 400 400 kv NSPCL 2 Tie Bay at Raipur SS 20-May-17 9:30 20-May-17 17:30 Daily AMP work at Raipur WRTS-I WRTS-I R BAY
Powerline crossing of 400 kV DC Wardha-Parli-LILO Said line is a S/C. Which
656 400 400 kV DC Wardha-Warora 20-May-17 8:00 20-May-17 18:00 Daily MSETCL WRTS-I C LINE
Line at Loc No. AP 10/0 and AP 11/0 Loop IN) and Loc line to be made LILO??
657 220 Bay no-209, Main Bay of 500 MVA ICT-III at Boisar 21-May-17 6:00 21-May-17 15:00 Daily AMP POWERGRID WR-II R BOISAR
Auto
reclose
658 400 Asoj - SSP 21-May-17 8:00 22-May-17 18:00 Daily PMM work GETCO GETCO
of
Kasor -
For Jumpering of Reactor NGR Breaker & Wiring of
659 765 765KV Sasan-Satna#1 Line at Satna SS 21-May-17 6:00 21-May-17 15:00 Daily POWERGRID WR-II C SATNA
Single Phase Breaker for Switching scheme.
765KV Jabalpur-DMJY#1 Line along with Reactor at Pooling Erection of Circuit Breaker & BPI for implementation JABALPU
660 765 21-May-17 10:00 21-May-17 18:00 Daily POWERGRID WR-II C
station,jabalpur of NGR Bypass Scheme R PS
Providing 66KV HV Insulation on Gandhar - Kosamba
661 400 Gandhar - Navsari Ckt.2 21-May-17 8:00 21-May-17 18:00 Daily & Gandhar- Navsari line between loc.no. 92-93, to POWERGRID WR-II C
maintain electrical clearance at the crossing point of
Providing 66KV HV Insulation on Gandhar - Kosamba
662 220 Gavasad - Mangrol D/C 21-May-17 8:00 22-May-17 18:00 Daily & Gandhar- Navsari line between loc.no. 92-93, to POWERGRID WR-II C
maintain electrical clearance at the crossing point of
663 220 Bhilad - Ambheti- 3 21-May-17 8:00 21-May-17 18:00 Daily Maintenance Work. GETCO GETCO
664 400 J P NIGRIE-SATNA-1 21-May-17 9AM 21-May-17 5PM Daily Fixing of missing Arcing Horns,Twin Spacers & Rigid JP NIGRIE JP NIGRIE
665 400 Main Bus II and BC @ Kalwa 21-May-17 8:00 21-May-17 18:00 Daily Routine Maintenance & testing work MSETCL MSETCL
666 765 SWITCHABLE LR_765kV_JABALPUR 1_D'JAIGARH 21-May-17 6:00 21-May-17 15:00 Daily Scheme checking for 1ph switching of Reactor CB for WRTS-I WRTS-I C LR
667 400 400 kv BUS 1 at Raipur SS 22-May-17 9:30 22-May-17 17:30 Daily AMP work at Raipur WRTS-I WRTS-I R BUS
668 400 400KV Chandrapur II -Nanded Ckt-II 22-May-17 8:00 23-May-17 18:00 Daily PID testing of Line ( A/R switch is kept off position MSETCL MSETCL
Mundra - Mansar with non auto operation of Auto reclosure of BHACHAU
669 400 22-May-17 8:00 22-May-17 18:00 Daily To attend opened spacer dampers POWERGRID WR-II R
Mundra - Limbdi TLM
670 400 Chandrapur 2 - Nanded ckt 2 22-May-17 8:00 22-May-17 17:00 Daily Line Routine Maintenance & Dignostic testing work MSETCL MSETCL
671 400 400kV AURANGABAD(PG)-AURANGABAD(MSETCL) I 22-May-17 6:00 22-May-17 15:00 Daily For AMP Works at Aurangabad WRTS-I WRTS-I R LINE
672 765/400 AURANGABAD (PG)_ ICT1_765/400kV_1500 MVA 22-May-17 6:00 23-May-17 18:00 Daily for RTV coating on HV Bushings WRTS-I WRTS-I C ICT
673 765 765KV Jabalpur-DharamjayGarh#2 Line Reactor at Jabalpur PS 22-May-17 10:00 22-May-17 12:00 Daily Swapping of Oil leakaged Y-Ph Reactor with spare POWERGRID WR-II C JABALPU
674 765 Tie bay of 765kv ICT 1 & sasan line ( bay 702) at Vchal PS 22-May-17 6:00 22-May-17 17:00 Daily FOR AMP WORK POWERGRID WR-II R VCHAL
675 400 403,1200KV/400KV ICT Main bay at Bina 22-May-17 9:30 22-May-17 18:00 Daily AMP WORKS POWERGRID WR-II R BINA
765KV Jabalpur-DMJY#2 Line along with Reactor at Pooling Erection of Circuit Breaker & BPI for implementation JABALPU
676 765 22-May-17 10:00 22-May-17 18:00 Daily POWERGRID WR-II C
station,jabalpur of NGR Bypass Scheme R PS
677 765 715LRB (Bina#2 L/R Bay) at Gwalior 22-May-17 10:00 22-May-17 18:00 Daily AMP WORKS and NGR LA Replacement & NGR POWERGRID WR-II C GWALIOR
Providing 66KV HV Insulation on Gandhar - Kosamba
678 400 Gandhar - Kosambha 22-May-17 8:00 22-May-17 18:00 Daily & Gandhar- Navsari line between loc.no. 92-93, to POWERGRID WR-II C
maintain electrical clearance at the crossing point of
Off line washing activity for GT-52 (bay 407) including
679 400 400 KV DGEN GT-52 (BAY 407) 22-May-17 8:00 22-May-17 18:00 Daily TPL TPL R
transformer bushings, LA, EMVT and Gantry
400 kV
Akola-
Bhusaw
al, 400
PID testing of insulator strings by Hot line Uint Akola. kV
680 400 400 kV Koradi- Bhusawal Line 22-May-17 12:00 24-May-17 18:00 Daily MSETCL MSETCL Akola-
( A/R shall be kept in non auto mode)
Nandga
onpeth
& 400
kV
Koradi-
681 400 411 Bay (Main Bay of Wardha Ckt-2) at 400 kV Akola 22-May-17 8:00 22-May-17 18:00 Daily Annual Maintenance of bays equipment MSETCL MSETCL
682 220 200kV Wardha(Deoli)-Badnera-S/c 22-May-17 8:00 25-May-17 18:00 Daily PID testing of Line ( A/R switch is kept off position MSETCL MSETCL
683 400 400KV DHL- SSNNL line I & II 22-May-17 6:00 23-May-17 14:00 daily PID testing . A/R in Non Auto mode . MSETCL MSETCL
684 400 400kV New Koyna -Karad Ckt 2 @ New koyna 22-May-17 8:00 22-May-17 18:00 Daily Routine Maintenance & Relay testing work MSETCL MSETCL
685 400 400 KV BINA- 315 MVA ( BHEL) ICT-II 22-May-17 6:00 22-May-17 14:00 DAILY PREMANSOON MAINTENANCE WORK MPPTCL MPPTCL R
REPLACEMENT OF PENTAGRAPH ISOLATERS OF
686 400 400 KV MAIN BUS I AT 400 KV NAGDA 22-May-17 8:00 23-May-17 17:00 CONTINUOUS MPPTCL MPPTCL R
COMPLETE MAINTENANCE OF BUS & BUS CVT
687 765 Bay-11 -SATNA LINE#1-Tie Bay at Sasan 22-May-17 08:00 22-May-17 18:00 Daily Bay Yearly maintenance SASAN RELIANCE
688 765 765kV BR main bay 701-52 at Aurangabad 22-May-17 6:00 22-May-17 15:00 Daily For AMP Works at Aurangabad WRTS-I WRTS-I R Bay
689 400 400 Kv Main Bay 420 of GMR # 1 at Durg PS 22-May-17 6:00 22-May-17 15:00 Daily AMP of Bay WRTS-I WRTS-I R Bay
690 400 400 kV BUS 2 SECTIONALISER_KOTRA PS 22-May-17 5:30 22-May-17 14:30 Daily AMP 2017 - 18 WRTS-I WRTS-I R BAY
691 400 400KV Wardha -2 & Pune-2 Tie Bay (405) 22-May-17 10:00 22-May-17 18:00 Daily For Bay AMP works at Parli WRTS-I WRTS-I R Bay
692 400 400 kv Line Reactor of Raipur Raigarh CKt 2 at Raipur 22-May-17 9:30 24-May-17 17:30 Daily Conservator Aircell is to be Replaced. Line will be WRTS-I WRTS-I R BR
693 400 SOLAPUR_BAY 407_MAIN BAY ICT#2 22-May-17 6:00 23-May-17 15:00 Continuous SF6 LEAKAGE ARRESTING WORKS WRTS-1 POWERGRID R BAY
694 400 400 KV Akola - Aurangabad ckt-1 LR 22-May-17 6:00 22-May-17 15:00 Daily AMP of Line Reactor. Line may take into service after WRTS-I WRTS-I R LR
695 765/400 AURANGABAD (PG)_ ICT2_765/400kV_1500 MVA 22-May-17 6:00 23-May-17 18:00 Daily for RTV coating on HV Bushings WRTS-I WRTS-I R ICT
696 765 708 Tie Bay of 765 kV Bus Reactor at BDTCL Bhopal 22-May-17 8:00 23-May-17 18:00 Daily For AMP works BDTCL BDTCL R
697 400 AWL 6 by pass link , at Vindyachal HVDC BTB 22-May-17 9:30 25-May-17 20:30 Daily Yet to Inform by NRPC NRPC Powergrid
698 765 SWITCHABLE LR_765kV_JABALPUR 2_D'JAIGARH 22-May-17 6:00 22-May-17 15:00 Daily Scheme checking for 1ph switching of Reactor CB for WRTS-I WRTS-I C LR
699 400 400 kv Bus 4 at Raipur SS 23-May-17 9:30 23-May-17 17:30 Daily AMP work at Raipur WRTS-I WRTS-I R BUS
Mansar - Limbi with non auto operation of Auto reclosure of Mundra - BHACHAU
700 400 23-May-17 8:00 23-May-17 18:00 Daily To attend opened spacer dampers POWERGRID WR-II R
Limbdi TLM
701 400KV BUS-B & BUS COUPLER AT 400 KV ISP S/S 23-May-17 8:00 24-May-17 17:00 CONTINUOUS MAINTENANCE WORK NHDC(ISP) NHDC(ISP)
400kV
Babhal
702 400 Babhaleshwar-Padghe-Ckt-2 @BBLR 23-May-17 6:00 23-May-17 14:00 Continuous Servicing and allignment of PG isolators work MSETCL MSETCL eshwar-
Padghe-
Ckt-1
703 400 400kV PARLI(PG)-PARLI(MSETCL) II 23-May-17 10:00 23-May-17 18:00 Daily For AMP works of line terminating equipments at WRTS-I WRTS-I R Line
400 kV
Bhusaw
al,
Dhule- Outage will be feasible
704 400 Babhaleshwar-Aurangabad @BBLR 23-May-17 6:00 23-May-17 14:00 Daily Servicing and allignment of PG isolators work MSETCL MSETCL
Ckt-1, on 22.05.2017
Dhule-
Ckt-2,
Ektuni-
705 400 400kV BHADRAVATI-PARLI I 23-May-17 8:00 23-May-17 18:00 Daily Replacement of Porcelain insulators & Other Ckt is in WRTS-I WRTS-I C LINE
706 765 765KV Vchal-Satna Line#2 Main Bay (716 Bay) at Satna SS 23-May-17 6:00 24-May-17 15:00 Daily For AMP work POWERGRID WR-II R SATNA
707 400 400kV RAIPUR-RAIGARH II 23-May-17 9:30 25-May-17 10:30 Daily Outage For Taking L/R Shutdown at Raipur WRTS-I WRTS-I R LINE
765KV JABALPUR 03 MAIN BAY(724) AT DCRM and travel measurement of CIRCUIT
708 765 23-May-17 6:00 23-May-17 15:00 Daily WRTS-I WRTS-I R BAY
DHARAMJAYGARH(KORBA) SS BREAKER
709 400 400kv D/C Satna-Bina ckt#1&2 23-May-17 8:00 24-May-17 18:00 Continuous Stringing work of 765KV D/C JBP-ORAI line at POWERGRID WR-II C DAMOH
400KV Mundra Jetpur Line Reactor 1 at Jetpur end. (Line will be in
710 400 23-May-17 6:00 23-May-17 15:00 Daily AMP Work POWERGRID WR-II C BHACHAU
service after isolation of Line Reactor)
711 400 402,Bina-2 & 1200KV/400KV ICT Tie bay at Bina 23-May-17 9:30 23-May-17 18:00 Daily AMP WORKS POWERGRID WR-II R BINA
765KV Jabalpur-DMJY#3 Line along with Reactor at Pooling Erection of Circuit Breaker & BPI for implementation JABALPU
712 765 23-May-17 10:00 23-May-17 18:00 Daily POWERGRID WR-II C
station,jabalpur of NGR Bypass Scheme R PS
713 400 TBC-Bay(415) at Asoj 23-May-17 10:00 23-May-17 16:00 Daily AMP Work of CB POWERGRID WR-II R VADDDAR
714 765 713LRB (Satna#1 L/R Bay) at Gwalior 23-May-17 10:00 23-May-17 18:00 Daily NGR Bypass Scheme POWERGRID WR-II C GWALIOR
Offline washing activity for ICT-1 (bay 408) including
715 400 400 KV DGEN ICT-1 (BAY 408) 23-May-17 8:00 23-May-17 18:00 Daily TPL TPL R
transformer bushings, LA, EMVT and Gantry
716 400 Asoj Kosamba Line 23-May-17 8:00 23-May-17 18:00 Daily Yearly maintenance & testing activity GETCO GETCO
717 400 Soja-Kansari Line 23-May-17 8:00 23-May-17 18:00 Daily PMM Work GETCO GETCO
718 400 400 kV Station Transformer 3 at Tiroda plant 23-May-17 6:00 24-May-17 15:00 Continuous Staion Transformer & Bay Equipment Testing & APML APML
719 400 400KV Girwali-PGCIL ckt 2 @ Girwali 23-May-17 6:00 23-May-17 14:00 Daily Bay maintenance & CB DCRM & CVT Testing Tan MSETCL MSETCL -
720 400 400 KV BINA 50 MVAR BUS REACTOR 23-May-17 6:00 23-May-17 14:00 DAILY PREMANSOON MAINTENANCE WORK MPPTCL MPPTCL R
721 400 400KV RAJGARH-SSP -I 23-May-17 6:00 23-May-17 14:00 daily LINE MAINTENANCE WORK MPPTCL MPPTCL R
722 220 220 KV RAJGARH-SHUJALPUR(PGCIL)-II 23-May-17 6:00 23-May-17 14:00 daily LINE MAINTENANCE WORK MPPTCL MPPTCL R
723 220 220KV ANNUPPUR-KOTMIKALA-I 23-May-17 6:00 23-May-17 15:00 daily LINE MAINTENANCE WORK MPPTCL MPPTCL R
724 220 220KV DAMOH-DAMOHI/C -II 23-May-17 6:00 23-May-17 15:00 daily LINE MAINTENANCE WORK MPPTCL MPPTCL R
725 400 Korba Tie Transformer-04 23-May-17 08:30 hrs 25-May-17 17:30 Hrs. Continuous For annual maintenance of bay equipments and Tie NTPC NTPC
726 765 765kV BR tie bay 702-52 at Aurangabad 23-May-17 6:00 23-May-17 15:00 Daily For AMP Works at Aurangabad WRTS-I WRTS-I R Bay
727 400 ICT#2 Tie bay 405 at Bilaspur PS 23-May-17 6:00 23-May-17 15:00 Daily AMP works (CB Grading capacitor cap/tandelta meas. WRTS-I WRTS-I R Bay
728 400 400 kV MAIN BAY_AT1_KOTRA PS 23-May-17 5:30 23-May-17 14:30 Daily AMP 2017 - 18 WRTS-I WRTS-I R BAY
729 400 400KV Pune-2 Main Bay (406) 23-May-17 10:00 23-May-17 18:00 Daily For Bay AMP works at Parli WRTS-I WRTS-I R Bay
730 400 400kV KORBA-VANDANA 23-May-17 6:00 23-May-17 15:00 Daily For attending various shutdown nature defects WRTS-I WRTS-I R Line
731 400 400kV KORBA-BIRSINGHPUR 23-May-17 6:00 23-May-17 15:00 Daily Non auto mode required WRTS-I WRTS-I R Line
732 765 SWITCHABLE LR_765kV_A'BAD 1_WARDHA 23-May-17 6:00 25-May-17 15:00 Continuous All 6 poles CB Mechanism Boxes Replacement Work WRTS-I WRTS-I R LR
733 400 400 KV Akola - Aurangabad ckt-2 LR 23-May-17 6:00 23-May-17 15:00 Daily AMP of Line Reactor. Line may take into service after WRTS-I WRTS-I R LR
During PID Testing A/R relay to be kept as Non- ER-II/Odisha/
734 400 A/R Non-Auto oprtaion in 400 KV Sundergarh-raigarh-II 23-May-17 8:00 31-May-17 17:00 Daily ERPC
automode Sundergarh
735 400 400kV RANCHI-SIPAT I & II 24-May-17 6:00 29-May-17 15:00 continuous For attending rectification for Bend Leg at Tower 664 WRTS-1 POWERGRID R LINE
736 400 400 Kv Main Bay 418 of Raipur # 1 at Durg PS 24-May-17 6:00 24-May-17 15:00 Daily AMP of Bay WRTS-I WRTS-I R Bay
Routine Maintenance & Dignostic testing work(CB Outage will be feasible
737 400 400kv Girwali-Chandrapur ckt-3 bay @ Girwali 24-May-17 6:00 24-May-17 15:00 Daily MSETCL MSETCL -
DCRM &Reactor Bushing Tan D measurement) on 18.05.2017
738 400 400KV Chandrapur GCR-Parli Ckt-III 24-May-17 8:00 25-May-17 18:00 Daily PID testing of Line ( A/R switch is kept off position MSETCL MSETCL
Mundra - Limbdi Ckt.1 with non auto operation of Auto reclosure of BHACHAU
739 400 24-May-17 8:00 24-May-17 18:00 Daily To attend opened spacer dampers POWERGRID WR-II R
Mundra - Mansar-Limbdi TLM
740 400 Amreli Chorania 24-May-17 6:00 24-May-17 17:00 Daily Line Maintenance work GETCO GETCO It will be availed on
VINDHYACHAL-JABALPUR#1 BAY ALONG WITH REACTOR
741 400 24-May-17 6:00 26-May-17 15:00 Continuous BAY EQUIPMENT MAINTENANCE AND TESTING. NTPC NTPC
MAINTENANCE
742 400 401,Bina-2 main bay at Bina 24-May-17 9:30 24-May-17 18:00 Daily AMP WORKS POWERGRID WR-II R BINA
743 400 ICT#2 Main Bay at Dehgam (Bay 407) 24-May-17 6:00 27-May-17 14:00 Continuous O/H of CB work POWERGRID WR-II R DEHGAM
744 765 765KV Vchal-Satna Line#1 Tie Bay (717 Bay) at Satna SS 24-May-17 6:00 25-May-17 15:00 Daily For AMP work POWERGRID WR-II R SATNA
745 765 Tie bay of 765kv ICT 2 & satna 1 line (tie bay 702) at Vchal PS 24-May-17 6:00 24-May-17 17:00 Daily FOR AMP WORK POWERGRID WR-II R VCHAL
Offline washing activity for ICT-2 (bay 409) including
746 400 400 KV DGEN ICT-2 (BAY 409) 24-May-17 8:00 24-May-17 18:00 Daily TPL TPL R
transformer bushings, LA, EMVT and Gantry
747 400 Soja-Kansari Line 24-May-17 8:00 24-May-17 18:00 Daily PMM Work GETCO GETCO
748 400 Amreli Chorania 24-May-17 6:00 24-May-17 17:00 Daily Line Maintenance work GETCO GETCO
749 400 500MVA, ICT 1 ,Bay-402&403 @ Khaperkheda 24-May-17 8:00 24-May-17 18:00 Daily Premansoon testing & Maintenance work. MSETCL MSETCL
750 400 Karad-Solapur (PGCIL) 24-May-17 10:00 27-May-17 18:00 Daily Conversion of SSN locations to DSN MSETCL MSETCL
751 400 400kV New Koyna -Jaigad Ckt 2 @ New koyna 24-May-17 8:00 24-May-17 18:00 Daily Routine Maintenance & Relay testing work MSETCL MSETCL
752 400 400 KV Bus A with bus Coupler @ Nagothane 24-May-17 8:00 24-May-17 18:00 Daily Routine R&M work MSETCL MSETCL
FOR REPLACEMENT OF BAY ISOLATORS AND
753 400 400 KV NAGDA- 315 MVA ( BHEL) ICT-III 24-May-17 8:00 26-May-17 17:00 CONTINUOUS MPPTCL MPPTCL R
COMPLETE PAINTING OF ICT & ITS
754 400 400 KV MAIN BUS-II AT 400KV INDORE 24-May-17 6:00 24-May-17 14:00 daily MAINTENANCE & RELAY TESTING WORK MPPTCL MPPTCL R
755 400 400KV RAJGARH-SSP -II 24-May-17 6:00 24-May-17 14:00 daily LINE MAINTENANCE WORK MPPTCL MPPTCL R
756 220 220 KV SHUJALPUR-I/C FEEDER -I 24-May-17 6:00 24-May-17 14:00 daily LINE MAINTENANCE WORK MPPTCL MPPTCL R
757 765 765kV ICT-1 main bay 703-52 at Aurangabad 24-May-17 6:00 24-May-17 15:00 Daily For AMP Works at Aurangabad WRTS-I WRTS-I R Bay
758 400 ICT#3 Tie bay 408 at Bilaspur PS 24-May-17 6:00 24-May-17 15:00 Daily AMP works (CB Grading capacitor cap/tandelta meas. WRTS-I WRTS-I R Bay
759 400 400 Kv TIE BAY_AT1_KOTRA PS 24-May-17 5:30 24-May-17 14:30 Daily AMP 2017 - 18 WRTS-I WRTS-I R BAY
760 400/220 ICT2_400/220kv_SEONI 24-May-17 8:00 24-May-17 18:00 Daily For AMP testing work WRTS-I WRTS-I R ICT
761 400 SOLAPUR_BAY 412_ MAIN BAY KARAD LINE 24-May-17 6:00 25-May-17 15:00 Continuous SF6 LEAKAGE ARRESTING WORKS WRTS-1 POWERGRID R BAY
762 765 765 kV Bus Reactor at BDTCL Bhopal 24-May-17 8:00 24-May-17 18:00 Daily For AMP works BDTCL BDTCL R
763 765 765kV Bus-1, at Agra 24-May-17 9:30 24-May-17 18:00 Daily Yet to Inform by NRPC NRPC POWERGRID
765KV Jabalpur-Bhopal switchable Reactor along with Reactor Erection of Circuit Breaker & BPI for implementation JABALPU
764 765 24-May-17 10:00 24-May-17 18:00 Daily POWERGRID WR-II R
bay(824 Reactor Bay) at Pooling station,jabalpur of NGR Bypass Scheme R PS
765 400 Chandrapur - Parli Ckt-3 24-May-17 8:00 24-May-17 17:00 Daily Line Routine Maintenance & Dignostic testing work MSETCL MSETCL
766 765 765 kV BUS 1 AT KOTRA PS 25-May-17 5:30 25-May-17 14:30 Daily AMP 2017 - 18 WRTS-I WRTS-I R BUS
767 400 400kV RAIPUR-RAIGARH III 25-May-17 9:30 25-May-17 17:30 Daily Relay testing and AMP work at Raipur SS & TLM. WRTS-I WRTS-I R LINE
Bhachau - Ranchodpura Ckt.1 with non auto operation of Auto BHACHAU
768 400 25-May-17 8:00 25-May-17 18:00 Daily To attend opened spacer dampers POWERGRID WR-II R
reclosure of Bhachau - Ranchodpura Ckt.2 TLM
769 400 400KV BUS-A AT 400KV ISP S/S 25-May-17 8:00 26-May-17 18:00 CONTINUOUS MAINTENANCE WORK NHDC(ISP) NHDC(ISP) R
770 765 765kV Gwalior-Satna#2 Line 25-May-17 10:00 25-May-17 16:00 Daily NGR Bypass Scheme POWERGRID WR-II C GWALIOR
771 400 Kasor-SSP Line 25-May-17 8:00 26-May-17 18:00 Daily Line maintenance work GETCO GETCO
772 765 SWITCHABLE LR_765kV_JABALPUR 4_D'JAIGARH 25-May-17 6:00 25-May-17 15:00 Daily Scheme checking for 1ph switching of Reactor CB for WRTS-I WRTS-I C LR
773 400 427,Satna-3 EXT. Main bay at Bina 25-May-17 9:30 25-May-17 18:00 Daily AMP WORKS POWERGRID WR-II R BINA
765KV Jabalpur-DMJY#4 Line along with Reactor at Pooling Erection of Circuit Breaker & BPI for implementation JABALPU
774 765 25-May-17 10:00 25-May-17 18:00 Daily POWERGRID WR-II C
station,jabalpur of NGR Bypass Scheme R PS
775 765 712 LRB (Bina#1 L/R Bay) at Gwalior 25-May-17 10:00 25-May-17 18:00 Daily AMP WORKS and NGR LA Replacement & NGR POWERGRID WR-II C GWALIOR
776 765 Seoni - Wardha Ckt.1 25-May-17 8:00 26-May-17 18:00 Continuous Stringing of new 765kV Gadarwara - Warora line WR-I/WR-II POWERGRID C
777 400 Vindhyachal - Jabalpur Ckt.1 25-May-17 8:00 26-May-17 18:00 Daily AMP of line and bay terminal equipment POWERGRID WR-II R
Power line crossing of 400 kV S/C Korba to Bhilai
778 400 400 kV S/C Korba to Bhilai CKT 2 25-May-17 8:00 25-May-17 19:00 Daily PGCIL STL Routine
CKT 2 at Tower No. 168 & 169 by 765 KV S/C Sipat-
Power line crossing of 400KV D/C (Sipat-Rachi) Line
779 400 400KV D/C Sipat-Rachi 25-May-17 8:00 25-May-17 19:00 Daily PGCIL CWRTL Routine
at Tower No. 101 & 102 by 765 KV S/C Champa -
Offline washing activity for GT-53 (bay 410) including
780 400 400 KV DGEN GT-53 (BAY 410) 25-May-17 8:00 25-May-17 18:00 Daily TPL TPL R
transformer bushings, LA, EMVT and Gantry
781 400 Kosamba Ukai-3 Main+Tie Bay 25-May-17 0:00 25-May-17 18:00 Daily Yearly maintenance & testing activity GETCO GETCO
782 400 Soja-Kansari Line 25-May-17 8:00 25-May-17 18:00 Daily PMM Work GETCO GETCO
783 400 Kasor Chorania 25-May-17 6:00 25-May-17 17:00 Daily Line Maintenance work GETCO GETCO
784 400/220/33 (3* 105) MVA , ICT-II @400KV S/S Chandrapur 25-May-17 8:00 25-May-17 18:00 Daily Pre Mansoon Maintenance work MSETCL MSETCL
785 400 Talandge - Alkud @ Talandge 25-May-17 10:00 25-May-17 18:00 Daily Quarterly bay Maintenance work MSETCL MSETCL
786 400 400kV Jejury-Stage IV line 25-May-17 8:00 25-May-17 16:00 Daily Half yearly Bay n line maint. by Lonikand I Staff MSETCL MSETCL
787 400 400 KV BINA 25 MVAR LINE REACTOR -I 25-May-17 6:00 25-May-17 14:00 DAILY PREMANSOON MAINTENANCE WORK MPPTCL MPPTCL R
788 220 220 KV BAROD-KOTA 25-May-17 6:00 25-May-17 15:00 daily LINE MAINTENANCE WORK MPPTCL MPPTCL R
789 220 220 KV SHUJALPUR-I/C FEEDER -II 25-May-17 6:00 25-May-17 14:00 daily LINE MAINTENANCE WORK MPPTCL MPPTCL R
790 765 Bay-12 R -SATNA LINE#1 Reactor at Sasan 25-May-17 8:00 26-May-17 18:00 Continuous Bay Yearly maintenance SASAN RELIANCE
791 765 765kV Dhule main bay 704-52 at Aurangabad 25-May-17 6:00 25-May-17 15:00 Daily For AMP Works at Aurangabad WRTS-I WRTS-I R Bay
792 400 Mahan#1 main bay 409 at Bilaspur PS 25-May-17 6:00 25-May-17 15:00 Daily AMP works (CB Grading capacitor cap/tandelta meas. WRTS-I WRTS-I R Bay
793 765 765kV Bus-2, at Agra 25-May-17 9:30 25-May-17 18:00 Daily Yet to Inform by NRPC NRPC POWERGRID
794 765 765 kV BUS 2 AT KOTRA PS 26-May-17 5:30 26-May-17 14:30 Daily AMP 2017 - 18 WRTS-I WRTS-I R BUS
Mundra - Jetpur Ckt.2 with non auto operation of Auto reclosure of BHACHAU
795 400 26-May-17 8:00 26-May-17 18:00 Daily To attend opened spacer dampers POWERGRID WR-II R
Mundra - Jetpur ckt-1 TLM
796 400 400kV Bus -2 (Bus Outage) at Bhadravati 26-May-17 6:00 30-May-17 15:00 Daily Replacement of old WSI make CVTs under R&M WRTS-I WRTS-I R BUS
797 765 765 kv bus #1 at Vchal PS 26-May-17 6:00 26-May-17 15:00 Daily 765kV bus#1 for CRM of Bus Isolater POWERGRID WR-II R VCHAL
798 765 Indore-Bina line 26-May-17 10:00 26-May-17 18:00 Daily For implementation of NGR bypassing scheme at POWERGRID WR-II C INDORE
799 765 765KV Bus Reactor#2 Main Bay (718 Bay) at Satna SS 26-May-17 6:00 27-May-17 15:00 Daily For AMP work POWERGRID WR-II R SATNA
800 765 701LRB (Jaipur#2 L/R Bay) at Gwalior 26-May-17 10:00 26-May-17 17:00 Daily NGR LA Replacement & NGR Bypass Scheme POWERGRID WR-II C GWALIOR
801 765 Main bay of ICT 2 - bay 706 at Vchal PS 26-May-17 6:00 26-May-17 17:00 Daily FOR AMP WORK POWERGRID WR-II R VCHAL
Offline washing activity for ICT-3 (bay 411) including
802 400 400 KV DGEN ICT-3 (BAY 411) 26-May-17 6:00 26-May-17 17:00 Daily TPL TPL R
transformer bushings, LA, EMVT and Gantry
803 400 Zanor Kosamba Main+Tie Bay 26-May-17 8:00 26-May-17 18:00 Daily Yearly maintenance & testing activity GETCO GETCO
804 220 Bhilad Tarapur 26-May-17 8:00 26-May-17 18:00 Daily Maintenance Work. GETCO GETCO
805 400 400kVGirwali Lonikand-Ckt-II S/C line @Girwali 26-May-17 10:00 26-May-17 18:00 daily Hardware tightening & fitting work MSETCL MSETCL -

806 400 KORADI - NANDGAONPETH (RPL) CKT 26-May-17 8:00 26-May-17 17:00 Daily Line signature test, broken disc replacement
work,tightning and fixing of jumper nutbolts &
400KV Chandrapur II -Nanded Ckt-I (previously Chandrapur II- Parli PID testing of Line ( A/R switch is kept off position
807 400 26-May-17 8:00 27-May-17 18:00 Daily MSETCL MSETCL
CKT-I) during PID work )
808 400 400kV Deepnagar-Thapti Tanda Line @Deepnagar 26-May-17 6:00 26-May-17 14:00 Daily Maintenance work & routine testing MSETCL MSETCL
809 400/220/33 3x105MVA ,ICT-1 @ Padgha 26-May-17 8:00 26-May-17 18:00 Daily Routine R&M work MSETCL MSETCL
810 220 220 KV BAROD-MODAK 26-May-17 6:00 26-May-17 15:00 daily LINE MAINTENANCE WORK MPPTCL MPPTCL R
811 765 765kV Padghe-2 tie bay 708-52 at Aurangabad 26-May-17 6:00 26-May-17 15:00 Daily For AMP Works at Aurangabad WRTS-I WRTS-I R Bay
812 400 Mahan#2 Tie bay 411 at Bilaspur PS 26-May-17 6:00 26-May-17 15:00 Daily AMP works (CB Grading capacitor cap/tandelta meas. WRTS-I WRTS-I R Bay
813 400 400kV Tie bay of Pune(F) - Kolhapur ckt-1 (408) 26-May-17 10:00 26-May-17 18:00 Daily For AMP works of Main bay WRTS-I WRTS-I R Bay
814 765 SWITCHABLE LR_765kV_A'BAD 2_WARDHA 26-May-17 6:00 29-May-17 15:00 Continuous All 6 poles CB Mechanism Boxes Replacement Work WRTS-I WRTS-I R LR
815 765 765 kV Main Bus -2 at BDTCL Bhopal 26-May-17 8:00 26-May-17 18:00 Daily For AMP works BDTCL BDTCL R
816 400 400KV Bus 1 at Bhachau 27-May-17 6:00 27-May-17 15:00 Daily Replacement of CC ring at 419 89A POWERGRID WR-II C BHACHAU
817 400 400 KV ISP-INDORE -I 27-May-17 8:00 28-May-17 17:00 CONTINUOUS PREMANSOON MAINTENANCE WORK & CB MPPTCL NHDC(ISP) R
400kV
Babhal
818 400 Babhaleshwar-Ektuni-Ckt-1 @BBLR 27-May-17 6:00 27-May-17 14:00 Daily Servicing and allignment of PG isolators work MSETCL MSETCL eshwar-
Ektuni-
Ckt-2
819 400 400KV BUS#I at MPPTCL, Indore 27-May-17 10:00 28-May-17 18:00 Continuous For replacement of Itarsi ckt #II, Bus #I isolator MPPTCL WR-II R INDORE
for Overhead Stringing of U/C 765KV D/C Raipur-
820 400 400KV D/C Korba-Raipur CKT 3&4 27-May-17 6:00 28-May-17 16:00 Daily PGCIL OGPTL C
Sundargarh Transmission line(of OGPTL) at OGPTL
821 400 Kasor - Chorania 27-May-17 6:00 27-May-17 17:00 Daily Line Maintenance work GETCO GETCO
822 400 SOLPAUR_BAY 415_ MAIN BAY KOLAHAPUR#1 LINE 27-May-17 6:00 28-May-17 15:00 Continuous SF6 LEAKAGE ARRESTING WORKS WRTS-1 POWERGRID R BAY
VINDHYACHAL-JABALPUR#2 BAY ALONG WITH REACTOR
823 400 27-May-17 6:00 29-May-17 15:00 Continuous BAY EQUIPMENT MAINTENANCE AND TESTING. NTPC NTPC
MAINTENANCE
824 765 Indore-Bhopal line 27-May-17 10:00 27-May-17 18:00 Daily For implementation of NGR bypassing scheme at STERLITE WR-II C INDORE
825 765 704LRB (Jaipur#1 L/R Bay) at Gwalior 27-May-17 10:00 27-May-17 17:00 Daily NGR LA Replacement & NGR Bypass Scheme POWERGRID WR-II C GWALIOR
826 765 Seoni - Wardha Ckt.2 27-May-17 8:00 28-May-17 18:00 Continuous Stringing of new 765kV Gadarwara - Warora line WR-I/WR-II POWERGRID C
827 400 Vindhyachal -Jabalpur Ckt.2 27-May-17 8:00 28-May-17 18:00 Daily AMP of line and bay terminal equipment POWERGRID WR-II R
828 220 Vapi - Tarapur 27-May-17 8:00 27-May-17 18:00 Daily maintenance Work. GETCO GETCO
829 400/220 400/220/33KV, 500MVA ICT-3 @ Girwali 27-May-17 6:00 27-May-17 15:00 Daily Dignostic testing work(CB DCRM measurement) MSETCL MSETCL
830 400/132 200 MVA ICT-I at 400 KV Bhusawal 27-May-17 8:00 27-May-17 12:00 Daily Pre-monsoon maintenance work MSETCL MSETCL Please replace ICT-II
831 400/132 200 MVA ICT-I at 400 KV Bhusawal 27-May-17 14:00 27-May-17 18:00 Daily Pre-monsoon maintenance work MSETCL MSETCL
832 400 400 KV BINA 25 MVAR LINE REACTOR -II 27-May-17 6:00 27-May-17 14:00 DAILY PREMANSOON MAINTENANCE WORK MPPTCL MPPTCL R
833 765 765 kV Wardha-Nizamabad I 27-May-17 8:00 27-May-17 18:00 Daily For Replacement of damaged insulators. A/R in N/A WRTS-I WRTS-I R LINE
834 765 765kV Wardha-3 tie bay 717-52 at Aurangabad 27-May-17 6:00 27-May-17 15:00 Daily For AMP Works at Aurangabad WRTS-I WRTS-I R Bay
835 400 400kV BHILAI-BHADRAVATI I 27-May-17 9:30 27-May-17 17:30 Daily AMP work at Raipur SS & TLM. Other Ckt is in Non WRTS-I WRTS-I R LINE
836 765 402 Tie Bay of 400 kV Bus Reactor at BDTCL Bhopal 27-May-17 8:00 27-May-17 18:00 Daily For AMP works BDTCL BDTCL R
837 400 Bus-2 Chorania 28-May-17 6:00 28-May-17 17:00 Daily PMM Work GETCO GETCO
400kV
Babhal
838 400 Babhaleshwar-Ektuni-Ckt-2 @BBLR 28-May-17 6:00 28-May-17 14:00 Daily Servicing and allignment of PG isolators work MSETCL MSETCL eshwar-
Ektuni-
Ckt-1
839 765 765kV D'JAIGARH-BILASPUR 28-May-17 6:00 28-May-17 15:00 Daily For attending open spacer cum damper, Arcing horn, WRTS-I WRTS-I R Line
840 400 J P NIGRIE-SATNA-2 28-May-17 6:00 28-May-17 #VALUE! Daily Fixing of missing Arcing Horns,Twin Spacers & Rigid JP NIGRIE JP NIGRIE JP Nigri not to bid on PX
841 400 Padghe-Babhaleshwar 1 @ Padgha 28-May-17 8:00 28-May-17 18:00 Daily Routine R&M work MSETCL MSETCL
842 765 765 kV Wardha-Nizamabad II 28-May-17 8:00 28-May-17 18:00 Daily For Replacement of damaged insulators. A/R in N/A WRTS-I WRTS-I R LINE
843 400 400kV KORADI-SATPURA 28-May-17 8:00 29-May-17 18:00 Continuous Powerline crossing of 400 kV DCMouda-Betul TL WRTS-I WRTS-I C LINE
to be
844 400 Mundra Chorania 29-May-17 6:00 29-May-17 17:00 Daily Conditioning Monitoring Work PGCIL GETCO
merged
845 400 400Kv PARLI-PUNE(GIS)_1 29-May-17 10:00 29-May-17 18:00 Daily For AMP works of line terminating equipments at Reliance WRTS-I R Line
400KV Mundra Jetpur Line Reactor 2 at Jetpur end. (Line will be in
846 400 29-May-17 6:00 29-May-17 15:00 Daily AMP Work POWERGRID WR-II C BHACHAU
service after isolation of Line Reactor)
847 400 400KV BUS#II at MPPTCL, Indore 29-May-17 10:00 30-May-17 18:00 Continuous For replacement of itarsi ckt #I, Bus #II isolator MPPTCL WR-II R INDORE
for Overhead Stringing of U/C 400KV D/C OPGC-
848 400 400KV D/C Rourkela-Raigarh CKT1&2 29-May-17 6:00 30-May-17 16:00 Daily PGCIL OGPTL C
Sundargarh Transmission line(of OGPTL) at OGPTL
849 400 400 KV Kalwa-Talegaon Line 29-May-17 6:00 29-May-17 15:00 Daily Schedule R&M Work and Dignostic testing work MSETCL MSETCL
850 765 706,ICT-2 Main bay at Bina 29-May-17 9:30 29-May-17 18:00 Daily AMP WORKS POWERGRID WR-II R BINA
For implementation of NGR bypassing scheme at
851 765 Indore-Vadodara line reactor at Indore 29-May-17 10:00 29-May-17 18:00 Daily POWERGRID WR-II C INDORE
Indore PS. Line will be charged without line reactor at
852 765 765KV Bus Reactor#2 at Satna SS 29-May-17 6:00 29-May-17 15:00 Daily For AMP work POWERGRID WR-II R SATNA
853 765 765kV Gwalior-Bina#3 Line 29-May-17 10:00 29-May-17 16:00 Daily NGR LA Replacement & NGR Bypass Scheme POWERGRID WR-II C GWALIOR
854 765 765/400 KV ICT-II at Vchal PS 29-May-17 6:00 29-May-17 17:00 Daily FOR AMP WORK POWERGRID WR-II R VCHAL
855 400 400 kV Station Transformer 4 at Tiroda plant 29-May-17 6:00 30-May-17 15:00 Continuous Staion Transformer & Bay Equipment Testing & APML APML
765 kV Shunt reactor of Akola-II ektuni line-2 at MSETCL 765/400KV For taking repaired B-phase reactor in service in 703
856 765 29-May-17 10:00 29-May-17 18:00 Daily MSETCL MEGPTCL
Ektuni SS(Aurangabad-III) Nonswicthable Bay Shunt Reactor (765KV Akola-II ektuni line-2 ) at
857 400 400KV DHL- SSNNL line I & II 29-May-17 6:00 30-May-17 14:00 daily PID testing . A/R in Non Auto mode . MSETCL MSETCL
858 400 400kV Khadka-Akola Line Bay at 400 KV Bhusawal 29-May-17 8:00 29-May-17 12:00 Daily Pre-monsoon maintenance work MSETCL MSETCL
859 400/220 501MVA, ICT 3 @ Talandage 29-May-17 10:00 29-May-17 18:00 Daily Quarterly Maintenance work MSETCL MSETCL
860 400 400 KV BHOPAL- 315 MVA ( BHEL) ICT-II 29-May-17 6:00 29-May-17 14:00 DAILY PREMANSOON MAINTENANCE WORK MPPTCL MPPTCL R
861 220 220KV ANNUPPUR-KOTMIKALA-II 29-May-17 6:00 29-May-17 15:00 daily LINE MAINTENANCE WORK MPPTCL MPPTCL R
862 765 765kV Wardha-4 tie bay 720-52 at Aurangabad 29-May-17 6:00 29-May-17 15:00 Daily For AMP Works at Aurangabad WRTS-I WRTS-I R Bay
863 400 Mahan#2 Main bay 412 at Bilaspur PS 29-May-17 6:00 29-May-17 15:00 Daily AMP works (CB Grading capacitor cap/tandelta meas. WRTS-I WRTS-I R Bay
864 400 SOLAPUR_400KV_BUS#1 29-May-17 6:00 29-May-17 15:00 DAILY STATCOM Construction Works WRTS-1 POWERGRID C BUS
865 765 403 Main Bay of 400 kV Bus Reactor at BDTCL Bhopal 29-May-17 8:00 29-May-17 18:00 Daily For AMP works BDTCL BDTCL R
Bhachau - Ranchodpura Ckt.2 with non auto operation of Auto BHACHAU
866 400 30-May-17 8:00 30-May-17 18:00 Daily To attend opened spacer dampers POWERGRID WR-II R
reclosure of Bhachau - Ranchodpura Ckt.1 TLM
867 400 400kV RAIPUR-SIPAT I 30-May-17 9:30 30-May-17 17:30 Daily Relay testing and AMP work at Raipur SS & TLM. WRTS-I WRTS-I R LINE
868 400 400KV Bus-2 & Allied equipments at Nanded 30-May-17 8:00 30-May-17 11:00 Daily Quarterly Maintenance of bays equipment MSETCL MSETCL
869 765 765kV D'JAIGARH- JHARSUGUDA I 30-May-17 6:00 31-May-17 15:00 Continuous Replacement of Al.tube inplace of Quad Bull WRTS-I WRTS-I R LINE
870 765 707,Satna-1 main bay at Bina 30-May-17 9:30 30-May-17 18:00 Daily AMP WORKS POWERGRID WR-II R BINA
871 400 Bay No-410, Main Bay of 400kv Boisar-Tarapur-I Line at Boisar 30-May-17 6:00 30-May-17 15:00 Daily AMP POWERGRID WR-II R BOISAR
872 765 765KV Satna-Gwalior#2 Line Reactor at Satna SS 30-May-17 6:00 30-May-17 15:00 Daily For Switching of Spare Reactor & attending oil POWERGRID WR-II R SATNA
POWERGRID-
873 400 Seoni - Sarni S/C 30-May-17 8:00 31-May-17 18:00 Continuous Stringing of new 765kV Gadarwara - Warora line MPPTCL C
WR-II
Power line crossing of 400 KV S/C Singrauli -
874 400 400 KV S/C Singrauli - Fatehpur 30-May-17 8:00 30-May-17 19:00 Daily PGCIL CWRTL Routine
Fatehpur at Tower No.113 & 114 by 400 kV D/C
875 400 Ukai- Kosamba1 Main+Tie Bay 30-May-17 8:00 30-May-17 18:00 Daily Yearly maintenance & testing activity GETCO GETCO
876 400 Vadinar Hadala No.1 30-May-17 8:00 30-May-17 18:00 Daily Bay Water washing Work GETCO GETCO
877 400 400kV Khadka-Koradi Line Bay at 400 KV Bhusawal 30-May-17 8:00 30-May-17 12:00 Daily Pre-monsoon maintenance work MSETCL MSETCL
878 400 400 KV BHOPAL- 315 MVA ( BHEL) ICT-II 30-May-17 6:00 30-May-17 14:00 DAILY PREMANSOON MAINTENANCE WORK MPPTCL MPPTCL R
879 220 220 KV BINA-Bina PG-S/c 30-May-17 6:00 30-May-17 14:00 daily LINE MAINTENANCE WORK MPPTCL MPPTCL R
For attending hot spot in bus jumper between
Korba 400KV Bus-3 S/D with Tie transformer-3 in Transfer bus
880 400 30-May-17 8:30 30-May-17 17:30 Continuous Buscoupler-2 (between bus-3 & 4 which shall be in NTPC NTPC
coupler (TBC)-2
SD due to outage of bus-4) & Tie Transformer-2
881 400 400kV Aurangabad-Aurangabad-1 main bay 412-52 at Aurangabad 30-May-17 6:00 30-May-17 15:00 Daily For AMP Works at Aurangabad WRTS-I WRTS-I R Bay
882 400 Lanco#1 Main bay 419 at Bilaspur PS 30-May-17 6:00 30-May-17 15:00 Daily AMP works (CB Grading capacitor cap/tandelta meas. WRTS-I WRTS-I R Bay
883 765 404 Main Bay of ICT-2 at BDTCL Bhopal 30-May-17 8:00 30-May-17 18:00 Daily For AMP works BDTCL BDTCL R
884 400 Talandge - Solapur -2 @ Talandage 31-May-17 10:00 31-May-17 18:00 Daily Quarterly bay Maintenance work PGCIL MSETCL Outage will be feasible
885 220 220 KV Khedamara-PGCIL Line at 400 KV S/s Khedamara. 31-May-17 6:00 31-May-17 14:00 Daily Annual Maintenance Programme. CSPTCL CSPTCL CSPTC
Power line crossing of 400 KV D/C Sasan- Vindhychal
886 400 400 KV D/C Sasan- Vindhychal Pooling Station 31-May-17 8:00 31-May-17 19:00 Daily PGCIL CWRTL Routine
Pooling Station line at Tower No.20 & 21 by 765 kV
887 400 Vadinar Hadala No.2 31-May-17 8:00 31-May-17 18:00 Daily Bay Water washing Work GETCO GETCO
888 765 708,Satna-1 & Indore Tie bay Bina 31-May-17 9:30 31-May-17 18:00 Daily AMP WORKS POWERGRID WR-II R BINA
889 765 765/400 KV ICT-I at Vchal PS 31-May-17 6:00 31-May-17 17:00 Daily FOR AMP WORK POWERGRID WR-II R VCHAL
Power line crossing of 765 kV S/C Sipat to Bilaspur
890 765 765 kV S/C Sipat to Bilaspur line CKT 2 31-May-17 8:00 31-May-17 19:00 Daily PGCIL STL Routine
line CKT 2 at Tower No.10 & 11 by 765 KV S/C Sipat-
Power line crossing of 400 kV S/C Korba -Raita Line
891 400 400 kV S/C Korba -Raita line 31-May-17 6:00 31-May-17 16:00 Daily CSPTCL STL Routine
at Tower No. 178 & 179 by 765 KV S/C Sipat-Bilaspur
Power line crossing of 400 KV D/C Rihand- Singrauli
892 400 400 KV D/C Rihand- Singrauli 31-May-17 8:00 31-May-17 19:00 Daily PGCIL CWRTL Routine
at Tower No. 111 & 112 by 400 kV D/C Vindhychal -IV
Power line crossing of 400 KV S/C Vindhyachal-Korba
893 400 400 KV S/C Vindhyachal-Korba line Ckt-I 31-May-17 8:00 31-May-17 19:00 Daily PGCIL CWRTL Routine
line Ckt-I at Tower No. 46 & 47 by 765 kV S/C Sasan -
Power line crossing of 765 KV S/C Sasan -
894 400 765 KV S/C Sasan - Vindhyachal Pooling Station 31-May-17 8:00 31-May-17 19:00 Daily PGCIL CWRTL Routine
Vindhyachal Pooling Station at Tower No. 16 & 17 by
895 400 400 KV DGEN BUS A 30-May-17 8:00 31-May-17 18:00 Daily OFF LINE WASHING JOB FOR BUS A GANTRY TPL TPL R
896 400 500MVA, ICT 2 Bay - 405& 406 @ Khaperkheda 31-May-17 8:00 31-May-17 18:00 Daily Premansoon testing & Maintenance work. MSETCL MSETCL
897 400 400kV 50 MVAR Bus Reactor at 400 KV Bhusawal 31-May-17 8:00 31-May-17 12:00 Daily Pre-monsoon maintenance work MSETCL MSETCL
898 400 400kV Aurangabad-Aurangabad-2 main bay 415-52 at Aurangabad 31-May-17 6:00 31-May-17 15:00 Daily For AMP Works at Aurangabad WRTS-I WRTS-I R Bay
Powerline crossing of 765 kV DC GADARWARA- IEPL Generation should
899 400 400 kV Koradi(II)--IEPL Ckt 1 & IEPL-Warora 2 TL 31-May-17 8:00 31-May-17 18:00 Daily MSETCL WRTS-I C LINE
WARORA TL between Tower No. 147/0 and 148/0 be zero
900 765 400 kV Main Bus-1 at BDTCL Bhopal 31-May-17 8:00 31-May-17 18:00 Daily For AMP works BDTCL BDTCL R
For the tightening of clamps & connectors of droppers
from Main Bus to isolators of different 765KV Bays
901 765 765 KV Bus-B at 765 kV GSS Phagi 31-May-17 6:00 31-May-17 15:00 Daily NRPC POWERGRID
connected to Main Bus-B.There will be no interruption
during shut-down period as all the765KV Lines, ICT-
Anaulagnak 3.3

ApOla 2017 AaOr ma[- 2017 maah ko ilayao Apoixat maMaga evMa }jaa- kI AavaSyakta

ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR APRIL 2017 AND MAY 2017

maaMga }jaa- kI AavaSyakta


rajya State DEMAND ENERGY REQUIREMENT
maogaavaaT (MW) imailayana yauinaTsa (MUs)
ApOla 2017 ma[- 2017 ApOla 2017 ma[- 2017
APRIL 2017 MAY 2017 APRIL 2017 MAY 2017

1 gaujarat GUJARAT

saIimat RESTRICTED 15500 15750 9900 10200


AsaIimat UNRESTRICTED 15550 15800 9925 10225

2 maQya p`doSa MADHYA PRADESH

saIimat RESTRICTED 12000 12200 5800 5900


AsaIimat UNRESTRICTED 12000 12200 5800 5900

3 C<aIsagaZ, CHHATISGARH

saIimat RESTRICTED 3950 3617 2372 2081


AsaIimat UNRESTRICTED 3950 3617 2372 2081

4 maharaYT/ MAHARASHTRA

saIimat RESTRICTED 22100 22250 14350 14500


AsaIimat UNRESTRICTED 22150 22300 14400 14550

5 gaaovaa GOA

saIimat RESTRICTED 545 550 345 350


AsaIimat UNRESTRICTED 545 550 345 350

6 dmana dIva DD

saIimat RESTRICTED 305 310 205 208


AsaIimat UNRESTRICTED 305 310 205 208

7 DI ena eca DNH

saIimat RESTRICTED 760 765 505 510


AsaIimat UNRESTRICTED 760 765 505 510

8 piScama xao~ WESTERN REGION

saIimat RESTRICTED 50350 50400 32000 32150


AsaIimat UNRESTRICTED 50400 50450 32100 32250
Anaulagnak 4.1
maah maaca- 2017 kI yaaojanaabaQd banaama vaastivak ]%padna evaM ]plabQata
ACTUAL GENERATION & AVALABILITY FOR MARCH 2017
Schedule yaaojanaa Actual vaastivak
k`maaMk sToSana ka naama }jaa- carma }jaa- carma Auxillary
Sr. Station Name Energy Peak Energy Peak Consumption
No. (Gwh) (Mw) (Gwh) (Mw) (Gwh)
k (A) gaujarat GUJARAT
jalaIya HYDRO
1. ]k[- Ukai - 1 20.99 75
]k[- Ukai - 2 5.87 75
]k[- Ukai - 3 6.00 75
]k[- Ukai - 4 28.06 75
]k[- Ukai (Total) 42 150 60.91 150 0.000
2. ]k[- ela baI saI eca Ukai LBCH - 1 1.84 3
]k[- ela baI saI eca Ukai LBCH - 2 1.85 3
]k[- ela baI saI eca Ukai LBCH (Total) 2 3 3.69 4 0.000
3. kDanaa Kadana - 1 4.30 60 0.000
kDanaa Kadana - 2 0.00 0 0.000
kDanaa Kadana - 3 0.74 59
kDanaa Kadana - 4 0.96 59 0.003
kDanaa Kadana (Total) 16 120 4.93 60 0.003
4. pnama PANAM & Madhuban Dam 1 & 2 0 0 4.31 9 0.031
6. kula jalaIya TOTAL(H) 60 273 73.84 225 0.478
tapIya THERMAL
1 TaoronT pavar ilaimaToD yauinaT saI 42 60 0.00 0 0.062
2 TaoronT pavar ilaimaToD yauinaT DI 85 120 80.90 124 6.912
3 TaoronT pavar ilaimaToD yauinaT [- 0 0 75.63 124 6.312
4 TaoronT pavar ilaimaToD yauinaT ef 74 121 73.52 124 6.642
5 TaoronT pavar ilaimaToD yauinaT jaI TI 1 0.00 0
6 TaoronT pavar ilaimaToD yauinaT jaI TI 2 0 0 0.00 0
7 TaoronT pavar ilaimaToD yauinaT esa TI jaI 0.00 0
8 Qauvarna tapIya Dhuvaran - 5 0 0 0.00 0 0.000
9 Qauvarna tapIya Dhuvaran - 6 0 0 0.00 0 0.000
10 Qauvarna tapIya Dhuvaran - GT 1 0.00 0 0.883
11 Qauvarna tapIya Dhuvaran - GT 2 0 0 0.00 0 1.721
12 Qauvarna tapIya Dhuvaran - STG 45.26 98
13 ]ka[- yauinaT 1 Ukai -1 70 100 0.00 0 0.156
14 ]ka[- yauinaT 2 Ukai -2 70 100 0.00 0 0.052
15 ]ka[- yauinaT 3 Ukai -3 36 200 125.37 205 12.501
16 ]ka[- yauinaT 4 Ukai -4 140 200 0.00 0 0.188
17 ]ka[- yauinaT 5 Ukai -5 19 50 7.75 195 1.428
18 ]ka[- yauinaT 6 Ukai -6 295.35 507 16.047
19 gaaMQaInagar 1 Gandhinagar - 1 70 100 0.00 0 0.000
20 gaaMQaInagar 2 Gandhinagar - 2 70 100 0.00 0 0.000
21 gaaMQaInagar 3 Gandhinagar - 3 136 210 53.36 216 5.662
22 gaaMQaInagar 4 Gandhinagar - 4 145 210 1.54 155 0.799
23 gaaMQaInagar 5 Gandhinagar - 5 37 210 147.72 218 13.724
24 vaNakbaaorI 1 Wanakbori - 1 0 0 86.27 212 0.000
25 vaaNakbaaOrI 2 Wanakbori - 2 145 210 53.54 212
26 vaaNakbaaOrI 3 Wanakbori - 3 145 210 75.69 213
27 vaaNakbaaOrI 4 Wanakbori - 4 89 150 111.18 213
28 vaaNakbaaOrI 5 Wanakbori - 5 145 210 84.83 213
29 vaaNakbaaOrI 6 Wanakbori - 6 145 210 0.00 0
30 vaaNakbaaOrI 7 Wanakbori - 7 145 210 138.92 215
31 ]%trna Utran GT 1 0 0 0.00 0 0.000
32 ]%trna Utran GT 2 0 0 0.00 0 0.000
33 ]%trna UTRAN - GT- 3 0 0 0.00 0 0.000
34 ]%trna UTRAN - GT-4 0 0 12.07 229 0.136
35 ]%trna UTRAN - STG-I 0 0 0.00 0 1.161
36 ]%trna UTRAN - STG-II 0 0 8.40 144 0.000

Schedule yaaojanaa Actual vaastivak


k`maaMk sToSana ka naama }jaa- carma }jaa- carma Auxillary
Sr. Station Name Energy Peak Energy Peak Consumption
No. (Gwh) (Mw) (Gwh) (Mw) (Gwh)
37 isa@ka Sikka - 1 70 110 268.50 0 0.237
38 isa@ka Sikka - 2 70 110 306.15 540 26.891
39 kcC ilagnaa[-T Kutch Lignite - 1 45 70 42.07 71 10.295
40 kcC ilagnaa[-T Kutch Lignite - 2 45 70 17.43 70
41 kcC ilagnaa[-T Kutch Lignite - 3 47 75 42.93 77
42 kcC ilagnaa[-T Kutch Lignite - 4 0 0 29.68 63 6.381
43 saUrt ilagnaa[-T Surat Lignite - 1 50.98 120 5.779
173 240
44 saUrt ilagnaa[-T Surat Lignite - 2 82.12 126 8.516
45 saUrt ilagnaa[-T Surat Lignite - 3 86.35 128 9.008
46 saUrt ilagnaa[-T Surat Lignite - 4 77.77 129 8.216
47 e@rImaaoTa ilagnaa[-T Akrimota Lignite - 1 69.88 104 10.295
60 100
48 e@rImaaoTa ilagnaa[-T Akrimota Lignite - 2 70.59 103
49 jaI Aa[- pI saI ela GIPCL GT - 1 17.95 32 0.000
50 jaI Aa[- pI saI ela GIPCL GT - 2 15.81 34
95 140
51 jaI Aa[- pI saI ela GIPCL GT - 3 19.59 34
52 jaI Aa[- pI saI ela GIPCL ST - 1 27.36 149
53 jaI Aa[- pI saI ela GIPCL GT - 4 0.00 0 0.000
95 140
54 jaI Aa[- pI saI ela GIPCL ST - 2 0.00 0
55 [- esa esa e Aar ESSAR GT - 1 0.00 0 0.000
56 [- esa esa e Aar ESSAR GT - 2 0.00 0
350 480
57 [- esa esa e Aar ESSAR GT - 3 0.00 0
58 [- esa esa e Aar ESSAR STG 0.00 0
59 jaI pI [- saI GPEC GT - 1 1.35 146 0.055
60 jaI pI [- saI GPEC GT - 2 1.80 150 0.055
430 600
61 jaI pI [- saI GPEC GT - 3 5.46 151 0.095
62 jaI pI [- saI GPEC STG 1.29 72
63 jaI esa [- jaI GSEG GT - 1 0.00 0 0.000
64 jaI esa [- jaI GSEG GT - 2 90 150 0.00 0
65 jaI esa [- jaI GSEG STG 28.35 350
66 Sugen (GT 1 + GT 2) 0 0 247.10 392 6.899
67 saIpIpI sao Aayaat Imp from CPP+MUNDRA 50 100 2425.19 3368

kula tapIya Total (T) 5277 7992 5412.96 11285 406.664


kula jalaIya+tapIya Total (H+T) 6130 9359 5486.80 13350 407.142
ivaMD [najaI- Wind Energy 769.09
kula jalaIya+tapIya+hvaa Total (H+T+Wind) 6255.89 14533
ivainamaya Exchanges (+) 3316.28
saIimat }jaa- maaMga Restricted Energy Req. 9900 9572.17
K (B) MADHYA PRADESH maQya p`doSa
jalaIya HYDRO
1 cambala pir Chambal Pr.(50%share) 50 114 66.51 194
1.1 gaaMQaI saagar Gandhi Sagar 59.74 116 0.070
1.2 raNaa p`tap sagar R.P.Sagar 44.32 172 0.030
1.3 javaahr sagar Jawahar Sagar 28.95 99 0.020
2 ponca Pench 40 75 11.95 156 0.050
3 baargaI Bargi 50 90 24.22 87 0.060
4 baargaI Bargi (LBCH) 0.00 0
5 banasaagar Toansa Bansagar-1 (Tons) 130 315 100.39 323 0.026
6 banasaagar Bansagar-2 (Deolondh) 0 0 4.35 21
7 banasaagar Bansagar-3 (Silpara) 30 60 10.45 31 0.050
8 banasaagar Bansagar-4 (Zinaha) 0 0 12.52 22 0.050
9 maoDIKoDa Medikheda 30 60 6.42 56
10 ibarisaMGapur Birsingpur 15 20 0.00 0 0.010
11 Tavaa Tawa 0 0 0.00 0
12 rajaGaaT Rajghat 20 30 0.00 0 0.070
13 Omkareshwar 210 360 76.54 401 0.409
14 [Midra saagar Indira Sagar 610 990 163.51 1022 0.683
kula jalaIya TOTAL(H) MPPGCL 1185 2114 464.91 2202 0.925

Schedule yaaojanaa Actual vaastivak


k`maaMk sToSna ka naama }jaa- carma }jaa- carma Auxillary
Sr. Station Name Energy Peak Energy Peak Consumption
No. (Gwh) (Mw) (Gwh) (Mw) (Gwh)
tapIya THERMAL
1 AmarkMTk II AMK II Unit -1 0.00 0 13.360
61 82
2 AmarkMTk II AMK II Unit -2 0.00 0
3 AmarkMTk III AMK III Unit -5 0 0 148.13 220 0
4 satpura I Satpura-I(60%Share) 50 67 0.00 0 0.000
5 satpura II Satpura-II Unit 6 0.00 0 4.390
128 163
6 satpura II Satpura-II Unit 7 37.15 195
7 satpura II Satpura-II Unit 8 0.00 0 0.880
122 163
8 satpura II Satpura-II Unit 9 0.00 0
9 satpura III Satpura-III Unit 10 163.25 268 29.840
10 satpura III Satpura-III Unit 11 45.14 190 15.460
11 esajaITIpIesa 1 SGTPS Unit - 1 45.14 190 15.460
142 191
12 esajaITIpIesa 2 SGTPS Unit - 2 107.70 207
13 esajaITIpIesa 3 SGTPS Unit - 3 86.92 188 22.040
144 194
14 esajaITIpIesa 4 SGTPS Unit - 4 118.57 207
15 esajaITIpIesa 5 SGTPS Unit - 5 291 390 333.06 507
16 SSTPS 99.15 612 10.720
kula tapIya Total (T) 1057 1409 1443.73 2449 117.010
kula jalaIya+tapIya Total (H+T) 2572 4036 1908.64 4848 117.935
Injection from WIND 428.42 0
kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 2337.06 4848
ivainamaya Exchanges (+) 3144.72
saIimat }jaa- maaMga Rest. En. Req. 5800 5481.78
ga (C) CHHATTISGARH C<aIsagaZ,
jalaIya HYDRO
1 hsadova baaMgaao Hasdeo Bango 55 120 2.24 120 0.060
2 Gangrel 6 19 19.40 10 0.020
3 Mini Micro KWB 0.00 7
kula jalaIya TOTAL(H) CSEB 61 139 21.64 137 0.080
tapIya THERMAL
1 kaorbaa (pU) Korba (E) Unit-1 30 50 27.64 37 8.330
2 kaorbaa (pU) Korba (E) Unit-2 30 50 27.64 34
3 kaorbaa (pU) Korba (E) Unit-3 30 50 27.64 0
4 kaorbaa (pU) Korba (E) Unit-4 30 50 27.84 40
5 kaorbaa (pU) Korba (E) Unit -5 71 120 36.85 120 12.760
6 kaorbaa (pU) Korba (E) Unit -6 71 120 66.82 120
7 kaorbaa (p) Korba (W) Unit -1 125 210 116.93 210 0.000
8 kaorbaa (p) Korba (W) Unit -2 125 210 116.93 210
9 kaorbaa (p) Korba (W) Unit -3 125 210 116.93 210 26.360
10 kaorbaa (p) Korba (W) Unit -4 125 210 116.93 210
11 KORBA(EB) Extn - 1 (DSPM 1) 0 250 166.11 254 13.700
12 KORBA(EB) Extn - 2 (DSPM 2 149 250 42.94 253 4.660
kula tapIya Total (T) 1664.06 1993 135.220
13 baalakao sao Aayaat BALCO Import 0.00 0
14 ijandla sao Aayaat JINDAL Import 0.00 0
kula tapIya Total (T+IPP) 911 1780 1664.06 2310
kula jalaIya+tapIya Total (H+T) 966 1900 1685.70 2447 135.300
ivainamaya Exchanges (+) 763.19 0
saIimat }jaa- maaMga Rest. En. Req. 2372 2448.89 2447
Ga (D) MAHARASHTRA maharaYT/
jalaIya HYDRO
1 kaoyanaa 1AaOr 2 Koyna 1 & 2 74 300 113.15 590 3.105
2 kaoyanaa III Koyna III 49 150 50.91 302
3 kaoyanaa IV Koyna IV 165 600 119.38 950
4 kaoyanaa DIpIeca Koyna DPH 10 20 22.41 36
5 TaTa jalaIya TATA Hydro 120 444 103.89 459 2.793
6 vaOtrNaa Vaitarna 3 60 38.47 61
7 eladarI Eldari 5 10 3.35 12
8 BaTgar AaOr vaIr Bhatgar & Vir 3 5 6.70 13
9 pOzana Paithan 0 0 0.94 34
10 itlaarI Tillari 0 0 7.52 64
11 BaIra Tola rosa Bhira Tail Race 9 80 6.33 80
12 GaTGar Ghatghar 37 250 20.05 250
13 Anya CaoTo jalaIya Small Hydro (others) 32 47 69.64 0
kula jalaIya TOTAL(H) 506 1966 554.70 459 5.898

Schedule yaaojanaa Actual vaastivak


k`maaMk sToSana ka naama }jaa- carma }jaa- carma Auxillary
Sr. Station Name Energy Peak Energy Peak Consumption
No. (Gwh) (Mw) (Gwh) (Mw) (Gwh)
tapIya THERMAL
3 naaisak 3 Nasik Unit -3 105 140 129.39 200
4 naaisak 4 Nasik Unit -4 85 115 100.02 206
5 naaisak 5 Nasik Unit -5 133 180 28.04 200
6 T/ambao 4 Trombay Unit -4 0 0 0.00 0
7 T/ambao 5 Trombay Unit -5 250 500 290.04 499
8 T/ambao 6 Trombay Unit -6 130 500 0.00 0
9 T/ambao 8 Trombay Unit -8 0 0 163.22 250
10 T/ambao 7A gaOsa Trombay -7A (Gas) 88.52 124 3.809
0 0
11 T/ambao 7ba Trombay -7B (WHR) 49.44 69
12 kaoraD,I 5 Koradi Unit -5 65 85 0.00 0
13 kaoraD,I 6 Koradi Unit -6 75 100 0.00 0
14 kaoraD,I 7 Koradi Unit -7 75 100 734.80 1478
15 Bausaavala 2 Bhusawal Unit -2 110 150 0.00 0
16 Bausaavala 3 Bhusawal Unit -3 100 135 40.20 200
17 Bausaavala 4 Bhusawal Unit -4 250 335 311.43 510
18 Bausaavala 4 Bhusawal Unit -5 0 0 323.54 510
19 parlaI 3 Parli Unit -3 0 0 0.00 0
20 parlaI 4 Parli Unit -4 0 0 0.00 0
21 parlaI 5 Parli Unit -5 0 0 0.00 0
22 parlaI 6 Parli Unit -6 155 210 171.12 255
23 parlaI 7 Parli Unit -7 40 55 197.63 477
24 KaprKoD,a 1 Khaperkheda Unit -1 80 110 44.54 195
25 KaprKoD,a 2 Khaperkheda Unit -2 100 135 91.56 200
26 KaprKoD,a 3 Khaperkheda Unit -3 350 470 70.41 202
27 KaprKoD,a 4 Khaperkheda Unit -4 46.69 191
28 KaprKoD,a 5 Khaperkheda Unit -5 135 180 286.63 520
30 parsa Paras-3 135 180 81.37 260
31 parsa Paras-4 200 430 155.93 261
32 ]rna Uran (Gas) 200 430 319.09 472
33 ]rna Uran (WHR) 100 220 0.00 0 5.592
34 caMd`pur 1 Chandrapur Unit -1 100 135 0.00 0
35 caMd`pur 2 Chandrapur Unit -2 100 135 0.00 205
36 caMd`pur 3 Chandrapur Unit -3 90 120 139.74 200
37 caMd`pur 4 Chandrapur Unit - 4 70 95 126.10 460
38 caMd`pur 5 Chandrapur Unit -5 80 110 314.62 458
39 caMd`pur 6 Chandrapur Unit -6 190 255 285.92 1015
40 caMd`pur 7 Chandrapur Unit -7 150 200 432.28 0
41 DhaNaU 1 Dahanu Unit-1 165.99 250 15.479
372 500
42 DhaNaU 2 Dahanu Unit-2 165.48 250 15.479
43 CPP 0.00 0.00 3381.40 4696.39
44 RGPPL Share 200 300 0.00 0
kula tapIya Total (T) 6290 9090 7704.07 10585 349.045
MAH. Wind + Solar Generation 282.20 0
kula jalaIya +tapIya Total (H+T+Wind) 6966 9960 8540.97 11514 395.302
ivainamaya
TOTAL (H+T) Exchanges (+) 4635.94
saIimat }jaa- maaMga Rest. En. Req. 14350 13176.91
ca (E) gaaovaa GOA
Aa[- pI pI irlaayaMsa IPP Reliance 18.55 31
ivainamaya Exchanges 328.83
saIimat }jaa- maaMga Rest. En. Req. 345 545 351.41 530
C (F) dmana AaOr dIva DAMAN & DIU 221.90 344
ja (G) dadra nagar hvaolaI DNH 515.02 763
kula DD &DNH (T) 133 242 736.93 1107

Schedule yaaojanaa Actual vaastivak


k`maaMk sToSana ka naama }jaa- carma }jaa- carma Auxillary
Sr. Station Name Energy Peak Energy Peak Consumption
No. (Gwh) (Mw) (Gwh) (Mw) (Gwh)
(H) koMd`Iya xao~ Central Sector
1. ena pI saI N.P.C.
1.1 tara`pur 1 TAPS Unit -1 80 160 96.19 160 10.921
1.2 tara`pur 2 TAPS Unit -2 80 160 119.54 160
1.3 tara`pur 3 TAPS Unit -3 300 480 407.97 552 73.060
1.4 tara`pur 4 TAPS Unit -4 300 480 402.28 551
1.5 kakrapr 1 KAPS Unit -1 125 200 0.00 552 3.172
1.6 kakrapr 2 KAPS Unit -2 125 200 0.00 551
kula ena pI saI NPC Total 1010 1680 1025.98 2526
2. ena TI pI saI N.T.P.C.
2.1 kaorbaa esaTIpIesa 1 KSTPS Unit-1 114.81 213
2.2 kaorbaa esaTIpIesa 2 KSTPS Unit-2 153.27 209
2.3 kaorbaa esaTIpIesa 3 KSTPS Unit-3 123.99 215
2.4 kaorbaa esaTIpIesa 4 KSTPS Unit-4 368.91 515
2.5 kaorbaa esaTIpIesa 5 KSTPS Unit-5 375.14 516
2.6 kaorbaa esaTIpIesa 6 KSTPS Unit-6 373.38 515
2.7 kaorbaa esaTIpIesa 7 KSTPS Unit-7 373.03 513
kula kaorbaa KSTPS Total 1510 2600 1882.53 2696 112.356
2.7 ivanQa esaTIpIesa 1 VSTPS Unit-1 149.64 224
2.8 ivanQa esaTIpIesa 2 VSTPS Unit-2 151.48 215
2.9 ivanQa esaTIpIesa 3 VSTPS Unit-3 116.92 216
2.10 ivanQa esaTIpIesa 4 VSTPS Unit-4 150.22 218
2.11 ivanQa esaTIpIesa 5 VSTPS Unit-5 117.41 219
2.12 ivanQa esaTIpIesa 6 VSTPS Unit-6 155.61 218
2.13 ivanQa esaTIpIesa 7 VSTPS Unit-7 367.34 515
2.14 ivanQa esaTIpIesa 8 VSTPS Unit-8 358.29 516
2.15 ivanQa esaTIpIesa 9 VSTPS Unit-9 351.52 517
2.16 ivanQa esaTIpIesa 10 VSTPS Unit-10 365.94 515
2.17 ivanQa esaTIpIesa 11 VSTPS Unit-11 333.44 515
kula ivanQayaacala VSTPS Total 2294 4260 3321.30 #REF! 204.96
3.1 saIpt -1 -SIPAT-1 490.46 685.00
3.2 saIpt -2 -SIPAT-2 492.03 678.00
3.3 saIpt -3 -SIPAT-3 482.28 676.00
3.4 saIpt -4 -SIPAT-4 369.78 517.00
3.5 saIpt -5 SIPAT-5 370.14 518.00
kula saIpt -SIPAT TOTAL 2204.69 3074.00 117.09
4.1 kvaasa gaOsa 1e Kawas GT-1A 67.63 107
4.2 kvaasa gaOsa 1baI Kawas GT-1B 66.64 107
4.3 kvaasa esaTI 1saI Kawas ST-1C 75.72 117
4.4 kvaasa gaOsa 2e Kawas GT-2A 0.20 105
4.5 kvaasa gaOsa 2baI Kawas GT-2B 0.20 104
4.6 kvaasa esaTI 2saI Kawas ST-2C 0.00 0
kula kvaasa KGPS Total 193 630 210.38 540 4.470
5.1 gaMQaar gaOsa 1 Gandhar GT-1 75.10 144
5.2 gaMQaar gaOsa 2 Gandhar GT-2 88.55 146
5.3 gaMQaar gaOsa 3 Gandhar GT-3 26.77 142
5.4 gaMQaar esaTI 4 Gandhar ST-4 98.06 221
kula gaMQaar GGPS Total 80 630 288.48 653 6.842
6.1 maaOda 1 Mauda -1 236.02 516 0.000
6.2 maaOda 2 Mauda -2 627.91 1208 0.000
kula maaOda MAUDA Total 186 500 863.93 1724 66.500
6.1 RGPPL Block I 0.00 0
6.2 RGPPL Block II 0.44 30
6.3 RGPPL Block III 402.27 650
RGPPL TOTAL 540 750 402.71 500 11.276
7.1 esa esa pI SSP RBPH - 1 4.43 188
7.2 esa esa pI SSP RBPH - 2 3.92 187
7.3 esa esa pI SSP RBPH - 3 0.11 0
7.4 esa esa pI SSP RBPH - 4 0.00 0
7.5 esa esa pI SSP RBPH - 5 2.94 184
7.6 esa esa pI SSP RBPH - 6 4.13 187
7.7 esa esa pI SSP CHPH - 1 7.72 34
7.8 esa esa pI SSP CHPH - 2 3.26 34
7.9 esa esa pI SSP CHPH - 3 16.16 35
7.10 esa esa pI SSP CHPH - 4 22.88 35
7.11 esa esa pI SSP CHPH - 5 22.23 35
kula esa esa pI SSP Total 580 900 87.77 919 0.878
8.1 kula poMca Pench Total 40 75 11.95 156 0.050
8.2 Jindal Injection 0.00 0
8.3 Amarkantak Lanco 0.00 0

(I) piScamaI xao~ WESTERN REGION


ga`aosa ]%padna Gross generation 28755.31
(J) ]plabQata Availability #REF!
naoT ivainamaya Net Exchanges (+) -6516.47
]plabQa }jaa- Energy Availability 32000 #REF!
maah maaca- 2017 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 4.2
PEAK DEMAND - SCHEDULE VS ACTUAL FOR MARCH 2017 ANNEX-4.2

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRi<a


Apoixat AapUit- Date Time Frequency
(MW) Catered UNSCH LS FC SCH LS kula Total
gaujarat GUJARAT
pMjaIkRt Registered 15203 - - - 15203 28.03.2017 15:00 49.99
saIimat Restricted 15500
AsaIimat Unrestricted 15550 15203 0 4.79 0 15208 28.03.2017 15:00 49.99
nyaUnatma pMjaIkRt maaMga Min. Registered Demand 7787 7787 14.03.2017 0500 50.06
maQya p`doSa MADHYA PRADESH
pMjaIkRt Registered 10029 - - - 10029 02.03.2017 08:45 49.95
saIimat Restricted 12000
AsaIimat Unrestricted 12000 10029 0 17.55 0 10047 02.03.2017 08:45 49.95
nyaUnatma pMjaIkRt maaMga Min. Registered Demand 5492 5492 19.03.2017 1700
C<aIsagaZ, CHHATTISGARH
pMjaIkRt Registered 3830 3830 31.03.2017 1900 49.93
saIimat Restricted 3950
AsaIimat Unrestricted 3950 3703 187.2 5.18 0 3895 30.03.2017 1900 49.96
nyaUnatma pMjaIkRt maaMga Min. Registered Demand 2341 2341 13.03.2017 1600 50.08
maharaYT/ MAHARASHTRA
pMjaIkRt Registered 22746 - - - 22746 30.03.2017 16:00:00 49.95
saIimat Restricted 19600
AsaIimat Unrestricted 19650 22517 538 0.00 0 23055 30.03.2017 13:00:00 50
nyaUnatma pMjaIkRt maaMga Min. Registered Demand 14508 14508 14.03.2017 0300 50.03
gaaovaa *GOA
pMjaIkRt Registered 545 530 - - 530 27.03.2017 20:00 49.97
AsaIimat Unrestricted 545 530 15 0.56 - 545.56 27.03.2017 20:00 49.97
nyaUnatma pMjaIkRt maaMga Min. Registered Demand
essaar ESSAR(ESIL)
pMjaIkRt Registered 789 - - 789 30.03.2017 1300 50.00
AsaIimat Unrestricted 789 0 0 - 789 30.03.2017 1000 50.00
nyaUnatma pMjaIkRt maaMga Min. Registered Demand
dmana evaM dIva DD
pMjaIkRt Registered 327 - - 327 21.03.2017 10:00 49.94
AsaIimat Unrestricted 327 0 0 - 327 21.03.2017 10:00 49.94
nyaUnatma pMjaIkRt maaMga Min. Registered Demand
dadra va na hvoalaI DNH
pMjaIkRt Registered 753 - - 753 09.03.2017 12:00 49.99
AsaIimat Unrestricted 753 0 - - 753 09.03.2017 12:00 49.99
nyaUnatma pMjaIkRt maaMga Min. Registered Demand
piScama xao~ WESTERN REGION
pMjaIkRt Registered 50018 - - - 50018 30.03.2017 16:00 49.95
saIimat Restricted 50350
AsaIimat Unrestricted 50400 49795 424 17 0 50236 30.03.2017 12:00 49.99
nyaUnatma pMjaIkRt maaMga Min. Registered Demand 32045 32045 14.03.2017 0500
NOTE: LS = Load Shedding
PC/RM = Power Cuts/Regulatory Measures
FC = Frequency Correction
Registered = Actual Demand Met
Restricted = Registered + LS + FC
Unrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering.
2017 ANNEXURE 4.3
Mar-17
. . / PARALLEL / RADIAL OPERATION TOTAL OPERATING HOURS

1 HVDC back-to back link(WR-NR)-Pole 1 739:06:00

2 HVDC back-to back link(WR-NR)-Pole 2 739:13:00

3 HVDC back-to back link(WR-SR) 744:00:00


TIE LINE

1
765 -I 765kV Seoni to Wardha-I 682:14:00

2
765 -II 765kV Seoni to Wardha-II 682:54:00

3
765 -I 765kV Seoni to Bilaspur-I 740:34:00

4
765 -II 765kV Seoni to Bilaspur-II 744:00:00

5
765 -I 765kV Durg to Wardha I 580:44:00

6
765 -II 765kV Durg to Wardha II 702:11:00

7
400 400kV Bhilai to Koradi 734:36:00
400
8 400kV Bhilai to Bhadravati 744:00:00

9
400 -I 400kV Raipur to Bhadravati-I 744:00:00

10
400 II 400kV Raipur to Bhadravati-II 744:00:00

11
400 III 400kV Raipur to Bhadravati-III 744:00:00

12
400 400kV Satpura to Koradi 744:00:00

13
400 -I 400kV Khandwa-Dhule-I 744:00:00

14
400 -II 400kV Khandwa-Dhule-II 744:00:00

15
400 -I 400kV Indore to Asoj-I 744:00:00

16
400 -II 400kV Indore to Asoj-II 740:29:00

17
400 -III 400kV Indore to Asoj-III 744:00:00

18
400 -I(GIS) 400kV Kolhapur-Mapusa-I(GIS) 611:55:00

19
400 -II(GIS) 400kV Kolhapur-Mapusa-II(GIS) 550:27:00

20
400 400kV Vapi-Boisar 744:00:00

21
400 400kV Raigarh to IBEUL 708:32:00

22
400 400kV Raigarh to Sterlight 744:00:00

23
400 400kV Sterlight to Rouerkela 744:00:00

24
400 400kV Raigarh to Jharsuguda 744:00:00

25
400 -I 400kV Nagda to Dehgam 744:00:00

26
400 -II 400kV Nagda to Dehgam 744:00:00

27
400 I 400kV Raipur to Wardha-I 744:00:00

28
400 II 400kV Raipur to Wardha-II 744:00:00

29
400 III 400kV Raipur to Wardha-III 739:33:00

30
400 IV 400kV Raipur to Wardha-IV 693:52:00

31 220 -III 220kV K(E) to Budhipadar-III 712:09:00

, WRLDC, Mumbai
Anaulagnak 4.7
Annex-4.7
maah maaca- 2017 ko AMt maoM piScama xao`~ ko mau#ya jalaaSayaaoM ko str
LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF MARCH 2017

ivavarNa Particulars gau ] iva ina ila


map`iva]kM ila MPPGCL ena eca DI saI NHDC maraiva]kM ila MSEGCL
kmaaMk GUVNL

Sl. No. ]ka[- Ukai gaaMQaIsaagar Gandhisagar [Midra saagar Indira Sagar kaoyanaa Koyna

1 Levels in Mtrs. str maITr maoM

1.1 maah ko AMt maoM 99.27 395.30 253.72 639.81


At the end of the month

1.2 ipClao vaYa- [sa maah ko Anau$p AaMkD,oM


94.09 393.03 252.00 637.79
Corresponding Figure of the
month Last Year
ANNEXURE 5
Grid Disturbance Report
Details of Grid Disturbance (GD) during the Month of (March 2017), in _Western_Region
Category of Grid Time and Date of Loss of generation / loss of load
Time and Date of
Sl No. Disturbance Affected Area occurrence of Grid Duration during the Grid Disturbance Brief details of the event ( pre fault and post fault system conditions)
Restoration
( GD-I to GD-V) Disturbance (MW)
Tripping of
1. 400/220kV ICT 2 at Jabalpur
2. 400/220kV ICT 1 at Jabalpur

2. 220kV Sukha Jabalpur 1
Load Loss: NIL, Generation Loss: 3. 220kV SukhaJabalpur2
1 GI-2 Sukha 02-03-17, 21:17:00 02-03-17, 23:10:00 1:53
NIL 4. 220kV SukhaNarsinghpur 2
5. 220kV SukhaPanagar 2
6. 220kV Bus 2
due to B Ph CT bursted on 220kV Side of 400/220kV ICT 2

(Jabalpur_PG) at Sukha(MP)
Tripping of
1. 400 kV Bus 2
2. 400 kV Vadodra-Pirana 1
3. 400 kV Vadodra-Pirana 2
Load Loss: NIL, Generation Loss: 4. 400 kV Vadodra-Asoj 1
2 GD-1 Vadodara 14-03-17, 18:19:00 14-03-17, 19:33:00 1:14
NIL 5. 400 kV Vadodra-Asoj 2
6. 765/400 ICT 1
7. 765/400 ICT 2
due to configuration issue in Busbar Bay units of Extension bays leading
to Blackout at 400 kV Vadodara S/S.
Tripping of
1. 220 kV Mapusa-Ponda
Load Loss: 140 MW, Generation
3 GD-1 Goa 16-03-17, 06:18:00 16-03-17, 06:56:00 0:38 2. 220 kV Mapusa-Amona
Loss: NIL
3. 220 kV Amona-Ponda-1
due to faults (B-N)
Tripping of
1. Babaleshwar-Dhule-2
2. Babaleshwar-Aurnagabad
Load Loss: NIL, Generation Loss: 3. Babaleshwar-Padghe-2
4 GI-2 Bableshwar 18-03-17, 16:30:00 18-03-17, 17:33:00 1:03
NIL 4. 400/220 kV ICT-2
5. 400/220 kV ICT-3
due to operation of busbar protection due to Ektuni-Bableshwar-2
conductor snapping on Bableshwar bus 1
Tripping of
1. 220/66 kV 100 MVA Transformer-1
2. 220/66 kV 100 MVA Transformer-2
Load Loss: 298 MW, Generation 3. 220/66 kV 100 MVA Transformer-3
5 GD-1 Vav 21-03-17, 17:15:00 21-03-17, 17:40:00 0:25
Loss: NIL 4. 220/66 kV 100 MVA Transformer-4
5. 220/66 kV 100 MVA Transformer-5
6. 220/66 kV 100 MVA Transformer-6
due to blasting of 10 MVAr capacitor bank
Tripping of
Load Loss: NIL, Generation Loss: 1. 220 kV Chorania-Limbdi-1
6 GI-1 Chorania 22-03-17, 00:42:00 22-03-17, 14:00:00 13:18
NIL 2. 220 kV Chorania-Limbdi-2
due to fire in R-Ph CVT of 220 kV Chorania-Limbdi-1
Tripping of
1. 220 kV Gwalior(Mahalgaon-MP)-Gwalior(PG)-2
2. 220 kV Gwalior(MP)-Gwalior(PG)-1
Load Loss: 70 MW, Generation
3. 220 kV Gwalior(MP)-Datia
7 GD-1 Mahalgaon 24-03-17, 21:57:00 24-03-17, 22:24:00 0:27 4. 220 kV/132 kV ICT-1
Loss: NIL
5. 220 kV/132 kV ICT-2
6. 220 kV/132 kV ICT-3
due to R-Phase CT of Gwalior(Mahalgaon-MP)-Gwalior(PG)-2 blasted
at Mahalgaon-MP
Tripping of
Load Loss: 300 MW, Generation 1. 400/220 kV ICT-1
8 GD-1 Solapur 29-03-17, 16:25:00 29-03-17, 16:31:00 0:07
Loss: NIL 2. 400/220 kV ICT-2
at Solapur-MS, tripped while checking Bus Bar Protection
Tripping of
1. 220 kV Mapusa-Ponda
Load Loss: 200 MW, Generation 2. 220 kV Mapusa-Amona
9 GD-1 Goa 31-03-17, 04:37:00 31-03-17, 05:03:00 0:26
Loss: NIL 3. 220 kV Mahalaxmi-Ammona
4. 220 kV Tillari-Ammona
due to fault
ANNEXURE-8.1
REPORT ON MOCK DRILL FOR CRISIS
MANAGEMENT PLAN IN POWER SECTOR
for the quarter ending .

1. Name of Power Utility / Generating Station :

2. Date / Time of Mock-drill :

3. Location site of Mock-drill :

4. Observers :
(Indicate names of Team designated
Leader / Members to handle crisis
situation)

5. Scenario of mock emergent situation :

6. Objective :

7. Chronological order of events logged :

Time Events Response Time

8. Observations on effectiveness of Mock Drill :

9. Recommendations / Suggestions on the observations (S. No. 8) :

Signature of Designated Signature of


(Safety / Security Officer) (Head O & M of Plant)

Dated Dated
ANNEXURE 10

SR NO UTILITIES OCC NO. MONTH STATUS REMARK


HELD ON 08.02.2016 AT NTPC
1 NTPC VINDHYACHAL 480 Feb-16 VINDHYACHAL
HELD ON 11.03.2016 AT
2 PGCIL RAIPUR 481 Mar-16 PGCIL RAIPUR
HELD ON 12.04.2016 AT
3 WRPC 482 Apr-16 WRPC MUMBAI
HELD ON 12.05.2016 AT MB
4 M B POWER 483 May-16 POWER
HELD ON 14.06.2016 AT
RAIPUR BY GMR
5 GMR CHHATTISHGARH 484 Jun-16 CHHATTISGARH
HELD ON 15.07.2016 AT
BILASPUR BY KSK MAHANADI
6 KSK 485 Jul-16 CHHATTISGARH
HELD ON 17.08.2016 AT
VARANASHI BY JAYPEE
7 JAYPEE NIGRIE STPP 486 Aug-16 NIGRI(JNSTPS)
HELD ON 16.09.2016 AT
8 APL 487 Sep-16 AHMEDABAD
9 WRTS-II 488 Oct-16 HELD ON 17.10.2016
10 WRPC MUMBAI 489 Nov-16 HELD ON 11.11.2016
11 RELIANCE INFRA(DTPS) 490 Dec-16 HELD ON 15.12.2016
12 NTPC, WRHQ-I, MUMBAI 491 Jan-17 HELD ON 25.01.2017
HELD ON 17.02.2017 AT
13 D B POWER 492 Feb-17 RAIGARH
14 NTPC VINDHYACHAL 493 Mar-17 HELD ON 10.03.2017
15 WRPC 494 Apr-17 HELD ON 12.04.2017
16 WRPC 495 May-17 TO BE HELD ON 12.05.2017
17 TORRENT POWER 496 Jun-17
18 DNH 497 Jul-17
19 NHDC 498 Aug-17
20 CHHATTISHGARH 499 Sep-17
21 KWPCL 500 Oct-17
22 GUJARAT 501 Nov-17
23 SUGEN 502 Dec-17
24 MAHARASHTRA 503 Jan-18
25 JPL 504 Feb-18
26 WRTS-I 505 Mar-18
27 RKM POWER GEN 506 Apr-18
28 TAPS-1&2 507 May-18
29 NTPC Gandhar/Kawas 508 Jun-18
30 RELIANCE SASAN 509 Jul-18
31 MADHYA PRADESH 510 Aug-18
32 ESSAR TRANSMISSION 511 Sep-18
33 BDTCL/JBTCL 512 Oct-18
34 RELIANCE TRANSMISSION 513 Nov-18
35 NTPC KORBA 514 Dec-18
36 TATA POWER 515 Jan-19
37 ADANI POWER(TIRODA) 516 Feb-19
38 NTPC SIPAT, CG 517 Mar-19
39 TAPS-3&4 518 Apr-19
40 CGPL 519 May-19
41 RATTAN INDIA POWER LTD 520 Jun-19
SLD of 400kV Kansari S/S
Planning for outage
of
Bus Bar Protection Scheme
at
400kV Kansari S/S
From 17.04.17 to 16.05.17

GETCO, Gujarat

SLD of 220kV Kansari S/S Proposed Bus Bar arrangement


400 KV Bus-I 400 KV Bus-II

ICT-1 ICT-3

ICT-2 400KV Kansari Kankroli line

400KV Kansari Bhinmal line 400KV Kansari Vadavi line-2

400KV Kansari APL line 400KV Kansari Varsana line

400KV Kansari Vadavi line-1 400KV Kansari Soja line

220 KV Bus-I 220 KV Bus-II


All 220/66KV Transformers
220KV Kansari Palanpur line-1 220KV Kansari Palanpur line-2
220KV Kansari Jangral line-1 220KV Kansari Jangral line-2
220KV Kansari Agathala line-1 220KV Kansari Tharad line
220KV Kansari Deodar line-1 220KV Kansari Deodar line-2

3 ICT-1 & 2 ICT-3 4


220KV Kansari Thavar line-1 220KV Kansari Thavar line-2

1 1
Precautionary Measures List of Outages required
SPS is under implementation:
Following outages will be required for shifting busbar protection wiring in new panel.

During tripping of any ICT at Kansari S/S, either from HV or LV side,


Lines / Elements From To Reason
there shall be tripping of
Date Time Date Time
(1) Both 220KV Kansari Palanpur line No. 1 & 2 .

(2) Approx. 50 to 60 MW load shedding at kansari S/S 400/220KV , 315 MVA ICT No. 3 22-Apr-17 08:00 22-Apr-17 18:00 New 400KV
Busbar protection
Total load relief would be around 200 MW. 400KV Kansari Vadavi line-1 24-Apr-17 08:00 24-Apr-17 18:00 scheme logic test

400KV / 220KV Bus Coupler at Kansari S/S will remain close. 400KV Kansari Vadavi line-2 25-Apr-17 08:00 25-Apr-17 18:00 and
commissioning
400KV Kansari Varsana line 26-Apr-17 08:00 26-Apr-17 18:00 work
No outages of 400/220KV ICT will be permitted at Soja & Vadavi S/S.
400KV Kansari APL line 27-Apr-17 08:00 27-Apr-17 18:00
400KV Kansari Soja line 28-Apr-17 08:00 28-Apr-17 18:00
400/220KV , 315 MVA ICT No. 2 29-Apr-17 08:00 29-Apr-17 18:00
400KV Kansari Bhinmal line 01-May-17 08:00 01-May-17 18:00
5 6
400KV Kansari Kankroli line 01-May-17 08:00 01-May-17 18:00

Activity Chart Activity Chart


400 KV KANSARI
400 KV Busbar protection-ALSTOM NUMERICAL
Planning of Commissioning of 4000 KV Busbar protection- Panel Make ALSTOM NUMERICAL Protection Scheme Total
Time
st Sr.No Details of Activity Ref. Activity days of 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
TENTATIVE DATE OF PLANNING 1 WEEK of -APRIL-2 0 1 7 Frame
work
Total
Sr.No Details of Activity
Time 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
Ref. Activity days of Erection of New 400KV BUS BAR Panels 4B01A,1B & 1C
Frame
work including grouting of panels jointing with (PU-1 to 18 Nos.) 11.04.17
6
Erection of New 400KV BUS BAR Panels adjoining panels.
in the 400KV Control Room and Work Planning 1
Execution and completion of work as per 4B01A,1B & 1C Actual work done
Total
requirment under i.e. cable laying,bay (PU-1 to 18 Nos.) 32 400KV new Bus Bar Protection
1 Days
wise cable termination,Ferruling etc. as termination with each Inter panel circuit
per GETCO's standardised guide line and 4B01A,1B & 1C 12.04.17
7 status as per new bus bar Drg. And same 16 Days
terms and condition as per A/T. (PU-1 to 16 Nos.) to
outages required under following details
29.04.17
Work Planning planning per day for 03 Nos in sequence
Actual work done wise Name of Bays.
Old 400KV BUS BAR Out of Service (1) All Termination of all Control Cable/De-
4B01C (PU-1)
External LBB Fused rack out each panels termination of Old Control Cable 400KV 12.04.17
3.04.17
(2) Bus Bar switch Off and AC DC Supply 50MVAr Bus Reactor 1
to
3 source rack out (3) 400KV CT Shorting Termination of all Control Cable/De-
5.04.17 4B01C (PU-2)
link providing each CT BMK Box at 400KV termination of Old Control Cable 400KV 13.04.17 1
8
Yard ICT-1 HV
Work Planning 3 Termination of all Control Cable/De-
Actual work done termination of Old Control Cable 400KV 2RBB14C (PU-3) 14.04.17 1

Dismentalling & Determination of control Bus Coupler/ BUS-B


cable of Old 400KV BUS BAR Panels (1) Work Planning 3
Yard to BBP(Old Cable 7C X2.5sqmm ) (2) Actual work done
6.04.17 Termination of all Control Cable/De-
RP PANEL TO BBP(Old cable 19C X
to termination of Old Control Cable 400KV 4B01C (PU-4) 15.04.17
4 2.5sqmm (3) DCDB to DC BBP (2C X 2.5
8.04.17 Soja
sqmm Old Cable) (4) LT Panel to AC (Old 1
Cable 4C X 2.5sqmm) (5) CT MK to RP/BB Termination of all Control Cable/De-
Protn (Old Cable 4C/12C X 4sqmm ) termination of Old Control Cable Future 4B01C (PU-5) 0
9
400 Bay-1
Work Planning 3
Termination of all Control Cable/De-
Actual work done 0
termination of Old Control Cable Future 4B01C (PU-6)
Dismentaling of Old 400KV Bus BAR
10.04.17 400 Bay-2
5 Panels & stacked at store.
Work Planning 1
Work Planning 1
Actual work done Actual work done

7 8

1 2
Activity Chart Activity Chart
Total
Sr.No Details of Activity
Time 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
Ref. Activity days of
Frame
work
Total Termination of all Control Cable/De-
Sr.No Details of Activity
Time 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
Ref. Activity days of termination of Old Control Cable 400KV 4B01B (PU-14) 27.04.17 1
Frame
work Adani-4 (Mundra)
Termination of all Control Cable/De- Termination of all Control Cable/De-
termination of Old Control Cable 400KV 4B01B (PU-7) 17.04.17 termination of Old Control Cable 125MVAr 4B01A (PU-17) 28.04.17 1
13
ICT-2 HV 1 Bus Reactor & TBC
Termination of all Control Cable/De- Termination of all Control Cable/De-
termination of Old Control Cable 400KV 4B01A (PU-15) 18.04.17 1 termination of Old Control Cable 400KV 4B01A (PU-18) 29.04.17 1
10
Vadavi-1 Bus Coupler/ BUS-A
Termination of all Control Cable/De- Work Planning 3
termination of Old Control Cable 400KV 4B01A (PU-16) 19.04.17 Actual work done
Vadavi-2 1 400KV New Bus Bar Protection panels 4B01A,B & C 1.05.17
Work Planning 3 wiring checking, testing and each bays (PU-1 to 18 Nos.) to
Actual work done 14
status configrantion checking. 3.05.17
Termination of all Control Cable/De-
termination of Old Control Cable 400KV 4B01B(PU-9) 20.04.17 1 Work Planning 3
Bhinmal Actual work done
Termination of all Control Cable/De- 400KV CTShorting link removed and CT
400 KV CT Each
termination of Old Control Cable 400KV 4B01B (PU-8) 21.04.17 1 injection test check each CT BMK Box at 4.05.17
15 Bays
11 400KV Yard
Kankroli
Work Planning 1
Termination of all Control Cable/De-
Actual work done
termination of Old Control Cable 400KV 4B01B (PU-10) 22.04.17
ICT-3 HV 1 Panel configuration and Testing of 400KV
Work Planning 3 Peripheral unit at site by Alstom Engineer
4B01A,B & C 5.05.17
Actual work done (1) AC and DC Supply source 1&2 put in
(PU-1 to 18 Nos.) to
Termination of all Control Cable/De- 16 service (2) New BUS BAR panel ensure
1
6.05.17
termination of Old Control Cable 400KV 4B01B (PU-11) 24.04.17 pre - commissioning healthiness work
Adani-1 completed and then taken in service
Termination of all Control Cable/De-
1
Work Planning 2
termination of Old Control Cable 400KV 4B01B (PU-12) 25.04.17
12 Actual work done
Adani-2
Termination of all Control Cable/De- 400KV Scheme to be kept under 4B01A,B & C 8.05.17
17
termination of Old Control Cable 400KV 4B01B (PU-13) 26.04.17 observation after commissioning i.e. CT (PU-1 to 18 Nos.) to
Adani-3(Varsana) 1
circuit in service with trip isolator 9.05.17
Work Planning 3 2
Actual work done
32

9 10

Thank you

1 3
24/04/2017

Major Highlights of Western Region in 2016-17


Power System Operation Corporation Ltd. WR-SR connectivity strengthened with another parallel 765 KV line of Wardha-Nizamabad D/c.
WR-NR connectivity strengthened with commissioning of 800 KV HVDC Champa-Kurukshetra pole-I.
494 OCC Meeting Frequency in IEGC band improved to 75.15 % of the time in 2016-17 compared to 70.49% of the time in the
year 2015-16. All time best FVI 0.023 was observed on 19th July 2016.
Western region maximum Demand crossed 50 GW.
Maharashtra crossed 22 GW.
Gujarat achieves highest demand of 15203 MW.
Madhya Pradesh achieved demand of 11617 MW.
Capacity growth in Renewables -
19% growth in wind installed capacity.
5% growth in Solar installed capacity.
At WRPC, Mumbai Growth in renewable generation
12th April, 2017 21% growth in Max Wind generation.
10% growth in Max Solar Generation.
Grid Operation Highlights Total 8004 Nos of STOA transactions approved in 2016-17 compared to 3276 Nos in last year 2015-16.
WRLDC POSOCO 14279 Mus energy approved during this year.

Highlights of 2016-17 Regional Demand Met


FY 2016-17
Energy Maximum : 50018 MW
Demand Max.1151 MU on 30thMar 2017 (30th Mar 2017, 16:00 hrs )
Frequency Profile Max. 50018 MW on
30th Mar 2017 at 16:00 %Growth w.r.t. last year on Max Minimum: 29104 MW
Average Freq for 2016-17 49.99 Hz
Avg FVI- 0.043 hrs energy 1.7% (1131 Mu) (8th Aug16, 04:00 hrs)
Lowest FVI- 0.023 % Growth in Average Demand Open Access
Met w.r.t. last year- 1.9% STOA transactions approved - % Growth in Average Demand
Max- 50.44Hz on 18th May 16 8004 nos Met w.r.t. last year- 1.9%
Min- 49.53 Hz on 30th Nov 16
Renewables Energy Approved-
83.36% of the time freq was in Wind 11522 MW 14279 MUs
IEGC Band on 19th July 2016. 19 % growth w.r.t last year % Change % Change Regional Demand met in
Avg. 75.15 % in Sept16 (70.49%
(9652 MW) New Element Demand Met Mar-17 Feb-17 Mar-16 w.r.t last w.r.t last Mar17
Generating Units- 2558 MW month Year
in Feb16 in 2015-16) Solar 2285 MW Max : 50018 MW
5 % growth w.r.t last year Transmission Lines- 3860 ckt Km. Average 44181 43543 37148 1.46 18.93 (30th Mar 17 at 16:00 hrs. )

(2174 MW) ICTs - 12775 MVA Max 50018 49519 45283 1.01 10.46 Min : 32045 MW
Line/Bus Reactors- 726 MVAR Date when (14th Mar17, 05:00 hrs)
~ ~
Max. 30-Mar-17 20-Feb-17 26-Mar-16 POSOCO, WRLDC 4

1
24/04/2017

Maharashtra achieved so far highest Gujarat achieved so far highest Demand


Demand Met-22746 MW on 30th Mar17 Met-15203 MW on 28th Mar17

Average Demand in
2016-17- 40861 MW
In 2015-16- 40087 MW
50 % of the time load
was above 41000 MW
in 2016-17 compared
to 40350 MW in
2015-16

WRLDC -POSOCO

Demand crash
15th Aug : 52 MU Max- 50.44 Hz
On 18th May at 17:31 hrs
30th Oct: 50 MU Min- 49.54
15th Jan: 61 MU On 30th Nov at 17:43 hrs
26th Jan: 79 MU
13th Mar: 116 MU
Average FVI (16-17) 0.043

Maximum Energy
Consumption
1151 MU
on 30th Mar 2017
Minimum Energy
Consumption :

Energy 858 MU
% Change w.r.t % Change w.r.t on 13th Mar 2017 (Holi Day)
Consumption Mar-17 Feb-17 Mar-16
last month last Year
MU/Day Min Energy Consumption
Average 1060 1045 892 1.46 18.93 in 2016-17
Max 1151 1089 1013 5.74 13.64 750 Mus on 7th Aug 2016
Date When Max. 30-Mar-17 28-Feb-17 26-Mar-16 ~
POSOCO, WRLDC ~ 7

2
24/04/2017

Improved Operational Frequency

Frequency
Fluctuation
0.4 Hz

Average
Frequency
variation index-
0.04

Further
improvement
primary and
secondary
control

Wind Gen in WR 2016-17 (Apr16 - Mar17) Highest Wind generation (as on 31.03.2017) PLF in %
State Gen (in MW) Date & Time Constituent
Apr'16 May'16 June'16 July'16 Aug'16 Sept'16 Oct'16 Nov'16 Dec'16 Jan'17 Feb'17 Mar'17
Maharashtra 2578 3rd Aug 2016 at 06:00 hrs Gujarat 18.23 33.93 36.24 34.23 29.88 35.37 8.50 8.79 12.72 19.44 20.07 15.36
Gujarat 3114 15th June 2016 at 09:00 hrs Maharashtra 12.08 20.65 26.34 27.36 32.58 28.28 6.65 4.95 6.74 4.97 6.58 6.20
MP 1399 13th Jan 2017 at 24:00 hrs Madhya
20.86 40.54 29.11 20.07 22.30 20.74 8.65 4.14 6.36 10.98 14.77 13.55
WR 6431 15th June 2016 at 09:00 hrs Pradesh
WR 15.61 28.44 30.51 28.45 29.50 29.40 7.74 6.21 8.89 11.58 13.26 11.30

Wind PLF in WR 2016-17


35.00
30.51
30.00 28.44 28.45 29.50 29.40

25.00

20.00
PLF in %

15.61
15.00 13.26
11.58 11.30
10.00 7.74 8.89
Jan17 Mar17 6.21
5.00
Oct16 Dec16
0.00
July16 Sept16

Apr16 June16

3
24/04/2017

Solar Gen in WR 2016-17 (Apr16- Mar17)


PLF in %
Highest Solar generation (as on 31.03.2017) Constituent
Apr'16 May'16 June'16 July'16 Aug'16 Sept'16 Oct'16 Nov'16 Dec'16 Jan'17 Feb'17 Mar'17
State Gen (in MW) Date & Time
Gujarat 46.76 40.11 34.84 25.12 23.10 25.96 35.80 36.92 36.76 36.02 40.95 42.44
Gujarat 868 7th Apr 2016 at 12:00 hrs
Maharashtra 30.84 31.14 22.38 17.68 19.90 18.27 26.38 28.39 27.62 26.90 30.48 31.70
Maharashtra 297 21st Mar 2017 at 13:00 hrs
Madhya Pradesh 42.98 41.33 34.10 25.97 23.98 26.83 39.87 41.10 40.84 38.40 45.75 49.11
MP 709 12th Mar 2017 at 12:00 hrs
WR 1807 12th Mar 2017 at 13:00 hrs WR 42.74 39.12 32.54 24.17 22.86 24.98 35.71 37.02 36.74 35.40 40.98 43.09

Solar PLF in WR- 2016-17


50
45 42.74 43.09
40.98
39.12
40 35.71 37.02 36.74 35.40
Jan17 Mar17 35 32.54
30

PLF in %
Oct16 Dec16 24.17 22.86 24.98
25
20
July16 Sept16
15
10
Apr16 June16
5
0

Growth in Max Wind


Generation in WR in the year
2016-17 compared to 2015-16
20.9 %

Maximum Wind Energy


Penetration in WR 16.38 % on
9th July 2016

Growth in Max Solar


Generation in WR in the year
2016-17 compared to 2015-16
9.98 %

Maximum Solar Energy


Penetration in WR 1.45 % on
14th Mar 2017

4
24/04/2017

New Elements integrated in the WR grid (Apr16 to Mar17) Mock Black start Exercise
Generating Units (2558 MW) In 2016, Blackstart mockdrill was conducted at 18 stations out of 29 Blackstart stations (Kadana HPS did 2
Transmission lines (3860 Ckt.km) times.). Stations where black start drill was conducted
Commercial Operation Sl.No Generating station Date of Black start mock drill
done
685 MW GMR Chhatisgarh-2 765 kV Durg Wardha -III (357 ckt.km) Black Start Capability Tested (status)
Black start 1 Gandhi Sagar, Madhya Pradesh 6th Jan, 2016
600 MW M B Power -2 765 kV Durg Wardha IV (357 ckt.km) State Sources (as 2 Ukai, Gujart 14th June 2016
600MW Jhabua Power -2 765 kV Wardha Nizamabad I (291 ckt.km) Reported) 2011 2012 2013 2014 2015 2016 3 Kadana, Gujarat 16th May 2016
4 CLIPL, Gujarat 13th June 2016
660MW Mauda-3 765 kV Wardha Nizamabad II (291 ckt.km) 5 Kawas, NTPC, Gujarat 27th August 2016
300 MW TRN Energy- 1 Madhya
800 KV HVDC Champa-Kurukshetra Pole-1 9 1 3 4 4 7 6 Jhanor, NTPC, Gujarat 27th August 2016
660 MW Koradi-10
10 Nos generating (1306 ckt.km)
Pradesh
7 Bango, Chhattisgarh 25th Sept 2016

500MW Marwa-2
units completed 400 KV Khandwa-Indore I (168.8 ckt.km)
8 Bargi, Madhyapradesh 28th Sept,2016
Maharashtra 9 3 2 3 4 4 9 Pench, Madhyapradesh 6th Oct,2016
50 MW Spectrum- 2 COD 400 KV Khandwa-Indore II (168.8 ckt.km) 10 Bhira,Maharashtra 6th Oct 2016
Gujarat 10 2 3 2 6 7 11 Khopoli,Maharashtra 6th Oct 2016
600MW JPL-2 400 KV Khandwa-Betul II ( 168.5 ckt.km)
12 Indira Sagar, Madhyapradesh 14th Oct 2016
Synchronized 400 KV Magarwada-Boisar (98 ckt.km) Chhattisgarh 1 1 1 1 1
13 Omkareshwar,Madhyapradesh 15th Oct 2016
(262 + 126 )MW Pioneer Gas Pvt Ltd-I & 2 400 KV Kala-Boisar ( 63 ckt.km) 14 TON HPS, Madhya Pradesh 20th Oct 2016
Total
660 MW Mauda-4 29 1 9 5 10 15 19 15 Ghatghar,Maharashtra 18th Nov 2016
16 SSP,Gujarat 14th Dec 2016
500 MW Solapur 1
17 Koyana,Maharashtra 18th Dec 2016
18 Kadna Hydro,Gujarat 26th Dec 2016
19 Birshingpur HPS, Madhya Pradesh 28th Dec 2016

9.1 Remedial Measures for loss of SCADA data and Hot


line voice communication at WRLDC
Complete loss of SCADA data at WRLDC
24th Feb 17, Outage Time: 16 Hrs
25th Feb 17, Outage Time: 1 Hr Current Status of Orange Phone Integration
Remedial measures for Complete loss of
SCADA data

Agenda
Alternate communication link of STM-1
between WRLDC and Asoj
Deployment of ULDC engineer at WRLDC
Establishment of Terminal server links and
ICCP links up to Back up control Centre
Swift Integration of Orange Hotline phones.
POWERGRID to apprise Current Status

5
24/04/2017

9.2 Installation of PMU at Champa HVDC 9.3 Telemetry of Renewable Energy Sources in WR
RES Installed Telemetered RES % of RES
Pole-I of 800 kV Champa-Kurukshetra WR RES Installed Capacity State/Region
Capacity Capacity at WRLDC Visibility/
commissioned Wind: 11523 MW (Wind+Solar) in (Wind+Solar) in Observability at
Kurukshetra MW MW SLDC/WRLDC
High Capacity corridor between WR and NR Solar: 2287 MW
5740 5734
Power order Variations: 150 MW to 1500 MW
Visibility/Observability of Gujarat
(4622+1118) (4616+1118) 99%
PMU installation at Champa HVDC RES at WRLDC: 60% 5024
Better visibility of Transients
Maharashtra
(4662+362)
0 0%
Maharashtra RES visibility Madhya 3036 2564
Better understanding of HVDC Controller actions 84%
Champa at WRLDC: 0% Pradesh (2239+797) (2076+488)
Discussed during Meeting held at NLDC 76 66
chaired by CMD (POWERGRID) on 14th Mar Maharashtra SLDC to Chhattisgarh
(0+76) (0+66) 87%
17 update the current status 9
Alternate means to
Diu
(0+9)
0 0%
Agreed for installation of PMU 1
telemeter data from RES Daman 0 0%
POWERGRID to apprise current status to SLDC/WRLDC ?
(0+1)
13810 8364
WR
(11523+2287) (6692+1672) 60%

9.4 Compliance to Low Voltage Ride Through (LVRT) by 9.5 Opening of Interim connectivity arrangement of
Wind Generators Vandana Vidyut Ltd
WR Wind Installed Capacity > 11 GW Vandana Vidyut Ltd (VVL) interim
SLDCs to connectivity through
Indicate present methodology of checking LVRT compliance in vogue for giving clearance for LILO of one ckt of KSTPS-Birsingpur D/C
integration CTU advised WRLDC to remove the
Update the status of LVRT compliance interim connectivity of VVL
Format for Compilation of LVRT Details POWERGRID to apprise
If turbine
If turbine
commissioned
Date for availing the Shutdown of Birsingpur
commissioned before 400 kV Korba-Vandana
Pooling Turbine Turbine Turbine after 15.04.2014
Location Developer 15.04.2014, Expected 400 kV Vandana-Birsinghpur
Station make type Capacity whether
date of completion of for removal of LILO
compliant to LVRT
retrofitting
(Yes/No)
Restoring the KSTPS
400 kV Korba-Birsinghpur to its original VANDANA
configuration.

Coordination with MPPTCL/MPPGCL and
NTPC Ltd for shifting of PLCC panels and
revising the Protection settings.

6
24/04/2017

9.6 Frequency Response Characteristics 9.6 Frequency Response Characteristics


Event-1 Event-2 Event-3 Event-4
Inferences from Average frequency NR-900 MW SR-1000 MW SR-1058 MW SR-1000 MW
21-02-17 15:58:50 23-02-17 16:15:00 02-03-17 01:57:30 05-03-17 15:14:30
Generators whose frequency response is in the range of (0-10%)
Response of last four events Generator/Station
49.96
49.86
49.92
49.85
50.07
49.94
50.08
49.98 Average
-0.10 -0.07 -0.13 -0.11 Response NTPC Stations IPPS/ISGS
Response as % of Response as % of Response as % of Response as % of Response as %
Response of NTPC Mouda-I was 1
S.No
Mouda(2x500)
Ideal
79%
Ideal
62%
Ideal
101%
Ideal
97%
of Ideal
85%
VSTPS-II (2x500) KWPCL (1x600) Balco (4x300)
consistently above 60 %. The average 2
3
MB Power(1x600)
Essar Mahan(1x600)
2%
17%
1%
0%
11%
35%
91%
35%
26%
22% VSTPS-V (1x500) KSK (2x600) JP Nigrie (2x660) Non-Compliance to
response was 85 %. 4
5
Lanco (2x300)
SIPAT-II(2x500)
9%
0%
16%
16%
32%
9%
18%
42%
19%
17% KSTPS-III (1x500) DB Power (2x600) GMR Warora (2x300)
IEGC 5.2.f
6 KSTPS-II(3x500) 18% 14% 11% 4% 12%

Generators average response in the


7
8
JPL Tamnar (Stage II)(3x600)
VSTPS-IV(2x500)
0%
0%
0%
0%
9%
32%
34%
10%
11%
10%
VSTPS-III (2x500) CGPL (5x830) JPL-I (4x250)
9 APML Tiroda(5x660) 7% 23% 5% 4% 10%
range of 10-20% 10 NSPCL (2x250) 7% 3% 11% 17% 10% Sipat-I (3x660) Sasan (6x660) GMR Raipur (2x685)
11 JPL I (4x250) 0% 24% 4% 8% 9%
MB Power, Lanco 12 EMCO (2x300) 1% 15% 9% 10% 9%
13 APL-III(3x660) 15% 8% 0% 0% 6%
Essar Mahan, Sipat-II 14 SIPAT-I(3x660) 0% 0% 1% 21% 5% May apprise OCC for inadequate/Poor response and issues faced in FGMO/RGMO Implementation
15 JP NIGRIE(2x600) 5% 12% 2% 0% 5%
Korba-II, JPL Tamnar 16
17
APL-II(2x660)
VSTPS-III(2x500)
9%
6%
2%
0%
7%
0%
0%
10%
5%
4%
VSTPS-IV, APML Tiroda 18 Balco (4x300)
KSTPS-III(1x500)
0% 1% 1% 13% 4% For the benefit of Total WR
19 4% 0% 0% 11% 4%
NSPCL 20 VSTPS-V(1x500) 0% 0% 0% 10% 2% NTPC Mouda may share the details of FGMO/RGMO logic implemented and df/dt measurement etc,
21 KWPCL(1x600) 8% 0% 0% 0% 2%
22 DB Power(1x600)
SASAN(6x660)
0% 5% 1% 1% 2% through small presentation
23 0% 1% 0% 5% 2%
The response of all the other stations 24 VSTPS-II(2x500) 0% 0% 6% 0% 2%
25 CGPL(5x830) 1% 4% 0% 0% 1%
was either zero or between 0-10 %. 26 KSK(2x600) 0% 0% 0% 0% 0% All SLDCs are requested to analyze the performance of state generators & observations may be presented.
27 GMR Raipur(2x685) 0% 0% 0% 0% 0%
28 Mouda-II(1x660) 0% 0% 0%

9.7 Extension of RGMO status to SLDC / WRLDC 9.8 Telemetry Issues


As on 11th Apr 17 POWERGRID IPPS Maharashtra
21 Generating Stations
1. Ektuni
57 Units
RGMO status signals are mapped Primary link is
1. Lanco
at WRLDC. unreliable
Communication link is GPRS
Wardha Secondary link to be
Extension of RGMO status signals to Status of Primary link ?
WRLDC is pending from following Slow updation of Established
2. GMR Chhattisgarh
stations data 2. Warora
Primary link is unreliable
Miscalculation in Data not available since
TRN Energy Secondary link to be
GMR Warora SCADA drawl 22nd Mar 17
Established
MCCPL Intermittent computations of 3. IEPL
3. RKM
Nodes Maharashtra 4. Mahalaxmi
Mouda Communication link is GPRS
Balco Current status of Data not available
Status of Primary link ?
VSTPS (U#1 to U#10) OPGW up to Miscalculation in drawl
4. Balco
Wardha? computations of Goa
SLDCs may update the current Communication link is GPRS
status of mapping of RGMO signals 5. Tillari
Status of Primary link ?
of State generators in SLDC SCADA. Data not available
Miscalculation in drawl
computations of Goa

7
24/04/2017

9.8 Telemetry Issues 9.9 Preparedness for power supply position during summer
IMD predicted that during summer
Temperature > 4-6 degrees above normal

Last year generation was affected at


Goa DNH Parli,
Goa telemetry not Tirora,
SCADA Telemetry of 220 kV Stations Chandrapur,
updating
Intermittent During recent tripping in
of DNH are not updating at NTPC-Mouda, due to water shortage
Nodes WRLDC
Goa, visibility is NIL
All constituents were advised to take following measures
Water conservation measures
Hydro stations for peaking condition only
Forecast of demand
Availability of thermal generating stations with adequate
water supply
Rescheduling or deferment of generator outages
Maintaining the load generation balance
Advance planning of load shedding measures if required. Source: IMD

9.10 Controlling High Voltage during off-peak hours 9.11 Forecasting of RE before onset of the monsoon
Switchable Shunt Reactors are taken in service during high
voltage conditions by WRLDC. Koradi U#8
WR Wind Capacity > 11 GW
Due to inadequate shunt reactive compensation, generators
are advised to contribute in voltage regulation. High penetrations of Wind
Generators injecting reactive power into the grid when energy in May to September
bus voltage is above nominal
IPPS ISGS Generators Under control of SLDCs In April16-Sept16 maximum
Gujarat: percentage of energy through
DB Power Essar Vadinar (U#1 & U#2) wind is 16.38%.
Wanakbori (U#4, U#5 & U#6) Koradi U#8
KSTPS-I Maharashtra : For smooth and reliable system
(U#2 Koradi (U#8 & U#9) operations.
Essar Mahan & Forecasting of RE
Bhuswal (U#4 & U#5)
U#3)
Jaigad (U#3 & U#4) generation is utmost
important
GMR Chhattisgarh Madhya Pradesh
KSK Mahanadi Satpura (U#10 & U#11)

8
24/04/2017

9.12 Status of extending 765 kV Gwalior-Agra SPS signal to Sasan 9.13 N-1 adequacy of 765/400 kV ICT at 765 kV Akola (2) and 765 kV Tiroda
BR Koradi-I Koradi-II
765 kV Agra-Gwalior SPS
Sudden loss of import of 1500 MW and above on 765 kV Gwalior-Agra-1 & 2
SPS Actions:
Generation back down in WR
VSTPS N-1 inadequacy of 765/400 kV ICT at Akola
KSTPS Akola
CGPL
Sasan
Tirora
Load Shedding in NR ICT Ektuni-2 Ektuni-1

Discussed in OCC-476 held on 14th Oct 15 Gen-4 BR Gen-5


SPS signals are extended from Agra to VSTPS, KSTPS and CGPL through OPGW
SPS signal to Sasan is extended through PLCC link via 765 kV Gwalior-Satna-Sasan.
MEGPTCL and SLDC Kalwa to update the
POWERGRID may apprise

Current status of OPGW works and the terminal equipment on 765 kV Gwalior-Agra, 765 kV Gwalior-
present status. Tirora
Satna and 765 kV Satna-Sasan.
Status of SPS signal transfer between Agra and Gwalior over OPGW
Availability of Spare Card module at Gwalior station in case of failure of card
Koradi-1 Koradi-2 ICT

Max Freq 50.44 Hz on 18th May 16


At 17:31 hrs, 400KV Bawana-Mundka-2
in NR tripped on three phase fault due to
which induction machines (Motor), ACs
(Self-starting) in nearby load tripped
simultaneously. Total NR load dropped by
about 3700MW and frequency jumped
from 50.05 to 50.44 Hz. All loads were
restored within 5 to 6 mins.

Thank you! Min Freq 49.54 Hz on


30th Nov 2016
System frequency remained below IEGC
band for most of the time on 30.11.2016
due to following incidents
Agra-Gwalior-ckt 1 tripped- Dense Fog
Tripping at Anpara generating complex
(with Generation loss of 2300MW) -
Due to Dense Fog
Vindhyachal pole-1 tripped- DC Over-
current protection
Also due to tripping of JITPL and Barh
units.

9
24/04/2017

10
24/04/2017

11
24/04/2017

12
24/04/2017

13
24/04/2017

14
24/04/2017

15
24/04/2017

16

Potrebbero piacerti anche