DESIGN MODIFICATION REQUEST
CONTRACT NO.; ....643A/2014
CONTRACTOR: .....Siemens WLL FCR No : FCR-BHS-01-0005
CONSULTANT: .....Energoprojekt Date: 20/10/2016
‘SUBSTATION NAME: .....Bul Hemmaid
MODIFICATION REQUESTED BY: ....... Siemens WLL
SIGNATURE:
Details of Requested Modification:
Locations of Surge Arrestors are revised in latest revision (Rev.B) based on comments received for DSS
‘substation.
However, 6 nos. of SA foundations are already cased on site based on previous, already approved, location.
Please find enclosed revised drawing were position of SA is revised (red cloud) based on previous revision (3m
from the Gantry CL).
‘Affected drawings:
4. PH12-3A-11-01-0003
Received By: . ee Requested By: EVAR. Ate! C
Contractor Signature: Originator Signature:
Contractor
Modification Done & Checked By:
Name:
Signature:
Dates / |
KAHRAMAA Representative:
Signature:
Unrestricted
[OTe eare: | tssue:0 15.04.2012 Page tof 1ft
F-08088
H] s=274301 30
os
"PALMS 9 UME om RS EW MI (LS ND ON
ERENCE oan
2 Rowe a gee 99-9
5S at facie ea 3
as
‘o_coweucroR nes
Sein
coro
Tm | PHASE 12
kana
oan lo Abi ealale gl
Lo -st<= Qatar General Eleciicty & Water Corporation
| QATAR POWER TRANSMISSION SYSTEM EXPANGION-PHASE SUBSTATIONS |"
PACKAGES. S, 2,957
CONTRACT No. GTC! BGN/2018
————s.
{400/131 TRY BUL HEMWAD SUBSTATION PH12-34-11-01-0008