fn les A Oeil gl
p= Qatar General Electricity & Water Corporation
Technical Affairs - Electricity Projects Department
DESIGN MODIFICATION REQUEST
CONTRACT NO.: ....643N.2014
CONTRACTOR. .....Siemiens WLL FCR No : FCR-BHS-62-0002
CONSULTANT: .....Energoprojekt Date — = 20/09/2016
‘SUBSTATION NAME: ......Bul Hemmaid
MODIFICATION REQUESTED BY: ....... Siemens WLL
‘SIGNATURE:
Details of Requested Modification:
Due to shortage of supply of 80x5mm Cu Flat, 2 nos. x 50x6mm Cu Flat is proposed as replacement, The same
shall be fixed on the ceiling of basement and welded every 5.
‘Affected drawings:
1. PH12-3A-11-62-0321, Sheet 1
a 2 SIAR A€iC
Received By: Requested By:
SIEMERS
Contractor Signature: Originator Signature’... 4 MEW...
Remarks:
Availability of Modified Drawings / Documents at site: Ml Yes [1] No
KAHRAMAA
Contractor
Modification Done & Checked By:
Name:
Signature:
Dates |
Unrestricted
Tesue: 0 16.06.2012
TEPaFa
Modification Verified & Tested By:
Consuitant: EPG
Name:
Signature:
Signature:
Page 1 ofah FS
vithehekt a=
PHASE 12|"" |
|
we Fen Wop tlle q
=o = Qalar General Flectilty & Water Corporation
‘QNTAR POWER TRANSMISSION SISTEM EXPANSION PHASE 12 SUBSTATIONS
FARTING OF oREUT BREAKTR
oral 9