ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT (AED)

All MEP works should be as per drawings and


specifications
Quantities are indicative only.
Tenderer to check quantities in accordace with the
drawings and specs

D.1 HVAC INSTALLATION


Supply and Installation of complete HVAC systems as detailed
in the drawings.

D1.1 Ductworks
Sheet metal ductwork, fittings, accessories and specialities
complete with insulation in accordance with drawings and
specifications
Main Level
D1.1.1 SAD m 282
D1.1.2 FAD m 163
D1.1.3 KED m 100
Lower Level
D1.1.4 SAD/RAD m 45

D1.2 Fire dampers

D1.2.1 200x150 No 2

D1.2.2 300x150 No 2

D1.2.3 500x300 No 1

D.1.3 Volume Control Dampers, VCD

D.1.3.1 250x150 No 2

D.1.3.2 250x250 No 1

D.1.3.3 300x100 No 2

D.1.3.4 300x150 No 3

D.1.3.5 300x300 No 1

D.1.3.6 350x200 No 1

D.1.3.7 450x350 No 2

D.1.3.8 500x250 No 1

D.1.3.9 500x300 No 3

D.1.3.10 600x250 No 4

D.1.3.11 600x400 No 2

D.1.3.12 650x400 No 2

D.1.3.13 700x500 No 1

D.1.3.14 800x350 No 1

D.1.3.15 850x600 No 1

Sheet metal duct work fitting, accessories with black paint


D.1.4
in accordance with drawings and specificaions
Main Level (Sports Bar)
D.1.4.1 SAD m 51

Sub-total(AED)

MEP Works 1
JUMEIRAH GOLF ESTATE
CLUB HOUSE REMAING WORKS - PHASE 03
BILLS OF QUANTITIES
BILL D - MEP WORKS

ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT (AED)


HVAC INSTALLATION Total carried forward
Diffusers, Registers, Grilles and Louvers in accordance
D.1.5
with drawings and specifications
Supply, Exhaust & Return ceiling diffuser, Type SCD / EAD /
RCD, Size
D.1.5.1 150x150 No 2

D.1.5.2 225x225 No 11

D.1.5.3 300x300 No 12

D.1.5.4 450x450 No 4

D.1.5.5 500X500 M 23

Supply & return air linear diffuser type SALD/RALD, Size in


length and capacity

D.1.5.6 4000mm length, 610l/s No. 12

D.1.5.7 2500mm length, 375l/s No. 4

D.1.5.8 8500mm length, 1282l/s No. 2

Plenum box
D.1.5.9 2000 x 400 x 350 No 12

D.1.5.10 2500 x 400 x 350 No 2

D.1.5.11 2200 x 400 x 350 No 4

Flexible Duct
D.1.5.12 150 Dia.(1 mtr length) No 115

Fans including motorised dampers, pressure relief


D.1.6 dampers, non return dampers, attenuators all in
accordance with drawings and specifications

D.1.6.1 Kitchen exhaust fan , KFAF-01 No 1

D.1.6.2 Kitchen exhaust fan , KFAF-02 No 1

D.1.6.3 Kitchen exhaust fan , KFAF-03 No 1

D.1.6.4 Kitchen exhaust fan , KEXF-01 No 1

D.1.6.5 Kitchen exhaust fan , KEXF-02 No 1

D.1.6.6 Kitchen exhaust fan , KEXF-03 No 1

D.1.6.7 Kitchen exhaust fan , DWEXF-01 No 1

Sub-total(AED)
TOTAL of HVAC Installation (AED)

MEP Works 2
JUMEIRAH GOLF ESTATE
CLUB HOUSE REMAING WORKS - PHASE 03
BILLS OF QUANTITIES
BILL D - MEP WORKS

ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT (AED)


HVAC INSTALLATION Total carried forward
Fan coil units including valves, isolating valves, 2 point control
valve package test point, unions, wiring control and
D.1.7
accessories, connection to pipes, condensate drain pipe work
and fittings in accordance with specifications and drawings
D.1.7.1 FCU-LL-16 No 1

D.1.7.2 FCU-LL-17 No 1

D.1.7.3 FCU-LL-18 No 1

D.1.7.4 AHU-ML-01 No 1

D.1.7.5 AHU-ML-02 No 1

D.1.7.6 FCU-ML-03 No 1

D.1.7.7 AHU-ML-04 No 1

D.1.7.8 AHU-ML-05 No 1

D.1.7.9 AHU-ML-08 No 1

D.1.7.10 FCU-ML-09 (with Black Paint) No 1

D.1.7.11 AHU-ML-9 No 1

D.1.8 Chilled water pipes


Supply & installation of ABS Chilled water pipe in accordance
with drawing and specifications

D.1.8.1 20mm dia m 10

D.1.8.2 25mm dia m 41

D.1.8.3 32mm dia m 6

D.1.8.4 50mm dia m 12

D.1.8.5 65mm dia m 21

D.1.8.6 100mm dia m 45

D.1.8.7 125mm dia m 16

D.1.8.8 150mm dia m 8

D.1.8.9 200mm dia m 5

Supply & installation of pipe fittings for Chilled water pipework

D.1.8.10 Supply & installation of pipe fittings for Chilled water pipework item 1

Supply & installation of hangers and supports for Chilled water


pipework
Supply & installation of hangers and supports for Chilled water
D.1.8.11 item 1
pipework

Isolation valves
D.1.8.12 20mm dia No 1

D.1.8.13 25mm dia No 1

D.1.8.14 65mm dia No 2

D.1.8.15 100mm dia No 1

D.1.8.16 125mm dia No 1

Sub-total(AED)

MEP Works 3
JUMEIRAH GOLF ESTATE
CLUB HOUSE REMAING WORKS - PHASE 03
BILLS OF QUANTITIES
BILL D - MEP WORKS

ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT (AED)


HVAC INSTALLATION Sub-total carried forward
Pipe cladding and insulation works for Chilled water pipe ;
Chilled water pipework and fitting insulation complete, thermally
insulated as per drawings & specification

D.1.8.17 20mm dia m 10

D.1.8.18 25mm dia m 41

D.1.8.19 32mm dia m 6

D.1.8.20 50mm dia m 12

D.1.8.21 65mm dia m 21

D.1.8.22 100mm dia m 40

D.1.8.23 125mm dia m 16

D.1.8.24 150mm dia m 8

D.1.8.25 200mm dia m 5

Pipe cladding and insulation works for Chilled water pipe with
D.1.9
Black paint
D.1.9.1 100mm dia m 5

D.1.10 Thermostat
Supply & installation of Thermostats in accordance with drawing
and specifications

D.1.10.1 Thermostat No 9

D.1.11 Sand trap louvers for frish air intake as necessary item 1

D.1.11.1 Bird screens, Sizes item 1

Supply & installation of Air Grille in accordance with


D.1.12
drawings and specifications
D.1.12.1 700 x 200 No 5
D.1.12.2 600 x 150 No 1

Supply & installation of VAV in accordance with drawings


D.1.13
and specifications
D.1.13.1 VAV No 3

Tenderer to include any missing item (s) which are necessary


D.1.14
and appropriate to complete the Works.

Sub-total(AED)
TOTAL of HVAC Installation (AED)

MEP Works 4
JUMEIRAH GOLF ESTATE
CLUB HOUSE REMAING WORKS - PHASE 03
BILLS OF QUANTITIES
BILL D - MEP WORKS

ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT (AED)


HVAC INSTALLATION Total carried forward

D.2 FIRE PROTECTION


Fire Fighting

Sprinkler pipe network system galvanised mild steel ASTM


D.2.1 A53 Grade B, Schedule 40, in accordance with the
Drawings and Specifications, diameter

D.2.1.1 25 mm m 161

D.2.1.2 40 mm m 50

D.2.1.3 50 mm m 50

D.2.1.4 65 mm m 45

D.2.1.5 80 mm m 6

D.2.1.6 100 mm m 13

Sprinkler pipe network system galvanized mild steel ASTM


D.2.2 A53 Grade B, schedule 40 with Black paint subject to
approval of the DCD (sport bar area)
D.2.2.1 80mm dia m 3.6

D.2.2.2 65mm dia m 4.5

D.2.2.3 50mm dia m 4.0

D.2.2.4 40mm dia m 17.4

D.2.2.5 25mm dia m 51.3

Fire extinguishers in accordance with the Drawing and


D.2.3
Specification.

D.2.3.1 5 KG CO2 fire extinguisher no 2

D.2.3.2 6kg ceiling mounted DCP automatic fire extinguisher No 2

D.2.4 Valves and accessories associated with sprinkler pipe


system in accordance with the Drawing and Specification.

D.2.4.1 Upright sprinkler head No 119

D.2.4.2 Pendent sprinkler head, No 117

Checking of equipment, pipe work, connections, accessories


D.2.4.3
and fitting to R.C.C fire water storage tank. Item 1

Sub-total(AED)

MEP Works 5
JUMEIRAH GOLF ESTATE
CLUB HOUSE REMAING WORKS - PHASE 03
BILLS OF QUANTITIES
BILL D - MEP WORKS

ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT (AED)


FIRE PROTECTION sub-total carried forward
Fire Alarm System
Supply, install, test, commission and maintain in
accordance with the Drawings and Specification the
D.2.5 complete Fire Alarm System, including cabling, conduiting
and power connections, but not necessarily limited to the
following.

Cable and conduit in concealed installation to the followings

D.2.5.1 Smoke detector with standard base No 23


D.2.5.2 Addressable Smoke Detector with Buil-in isolator base
above false ceiling with LED indicator light No 19

D.2.5.3 Multi sensor with base No 5

D.2.5.4 adressable sounder No 1

D.2.5.5 adressable sounder with flasher W/P No 3

D.2.5.6 Ceiling mounted speaker No 15

D.2.5.7 wall mounted speaker No 2

D.2.5.8 Heat detector No 9

D.2.5.9 Break glass No 6

D.2.5.10 fire phone jack No 1

D.2.5.11 Addressable dual input / output module No 8

Equipment
D.2.5.12 Smoke detector with standard base No 22

D.2.5.13 Addressable Smoke Detector with Buil-in isolator base


above false ceiling with LED indicator light No 19

D.2.5.14 Multi sensor with base No 5

D.2.5.15 adressable sounder No 1

D.2.5.16 adressable sounder with flasher W/P No 3

D.2.5.17 Ceiling mounted speaker No 16

D.2.5.18 wall mounted speaker No 2

D.2.5.19 Heat detector No 8

D.2.5.20 Break glass No 6

D.2.5.21 fire phone jack No 1

D.2.5.22 Addressable dual input / output module No 8

Cable

D.2.5.23 2x2.5mm2 FP200 Fire Rated Cable for speaker riser item 1
D.2.5.24 2 x 1 mm2 FP200 Fire Rated cables for Fire Detector item 1

Building Management System in accordance with the


D.2.5
Drawings and Specification.

D.2.5.1 Integration of ELV & Mechanical Systems into the current


BMS PS 130,000.00

D.2.5.2 Percentage overhead & profit %

Tenderer to include any missing item (s) which are necessary


D.2.6
and appropriate to complete the Works.
Sub-total(AED)
Total of FIRE PROTECTION (AED)

MEP Works 6
JUMEIRAH GOLF ESTATE
CLUB HOUSE REMAING WORKS - PHASE 03
BILLS OF QUANTITIES
BILL D - MEP WORKS

ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT (AED)

FIRE PROTECTION total carried forward to MEP Summary


D.3 ELECTRICAL INSTALLATION

Low voltage Distribution in accordance with the Drawing


D.3.1
and Specification.

Sub-switchboards and Distribution boards complete with circuit


breaker, in accordance with the Drawing and Specification
including cable, cable termination and cable tray.

D.3.1.1 Distribution Boards, DB No 3

Supply, install Isolator, final termination includes supports and


related accessories; all in accordance with Drawings and
Specification.

D.3.1.2 TPN Isolator (WET AREA IP65 ISOLATOR) No 6


D.3.1.3 3 Phase (IP65) No 31
D.3.1.4 1 Phase (IP65) No 12

Supply and install the following electrical power final sub circuit
cable including conduit and all necessary accessories; all in
accordance with Drawings and Specification

D.3.1.3 TPN Isolator (WET AREA IP65 ISOLATOR) No 6

Supply and install the following small power outlet complete


with back cover connection and all necessary accessories; all in
accordance with Drawings and Specification

D.3.1.4 13A, Single switched socket outlet No 46

D.3.1.5 13A, Twin switched socket outlet No 30

D.3.1.6 13A, Switched socket weather proof No 4

D.3.1.7 20A DP Switch with neon indicator for FCU No 6

D.3.1.8 13A, Floor flush mounted Single switched socket outlet No 8

D.3.1.9 Flex outlet for Kitchen Equipment (20A) No 60

D.3.2 Containment

Cable tray for power cable including fittings, support and all
necessary accessories; all in accordance with Drawings and
Specification

Generally

D.3.2.1 300mm wide item 1

D.3.2.2 450mm wide item 1

D.3.2.3 600mm wide item 1

D.3.2.4 100x100mm G.I Trunking item 1

MEP Works 7
JUMEIRAH GOLF ESTATE
CLUB HOUSE REMAING WORKS - PHASE 03
BILLS OF QUANTITIES
BILL D - MEP WORKS

ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT (AED)

Sub-total(AED)
ELECTRICAL INSTALLATION Sub-total carried forward
D.3.3 Lighting Installations

Supply and install the following light fittings; complete with


lamp, fixings, connections and all necessary accessories; all in
accordance with Drawings and Specifications.

Refer to Annex-A for light fitting schedule


.
D.3.3.1 LT-01 No 6

D.3.3.2 LT-05 No 1

D.3.3.3 LT-05a No 10

D.3.3.4 LT-06 No 86

D.3.3.5 LT-07 No 40

D.3.3.6 LT-08 No 5

D.3.3.7 LT-09 No 4

D.3.3.8 LT-10 No 70

D.3.3.9 LT-11 No 15

D.3.3.10 LT-12 (F-06) No 18

D.3.3.11 LT-13 No 101

D.3.3.12 LT-14 m 390

D.3.3.13 EMLT-01 No 10

D.3.3.14 Staircase Light No 2

D.3.4 Telephone & Data System

Supply, install, test, commission and maintain complete


Telephone and Data System to the Club house phase 3 in
accordance with th drawings and specification.

D.3.4.1 Consolidation point no 1

D.3.4.2 Dual RJ 45 no 29

D.3.4.3 floor box cosist of 2 RJ 45 no 1

D.3.4.4 RJ 45 out let for CCTV camera no 26

D.3.4.5 IPTV outlet no 13

D.3.4.6 wirless access point no 6

D.3.4.7 CAT 6 cables item 1

D.3.4.8 cabl tray for telephone system item 1

D.3.4.9 Public Address / Background Music System item 1

Sub-total(AED)

MEP Works 8
JUMEIRAH GOLF ESTATE
CLUB HOUSE REMAING WORKS - PHASE 03
BILLS OF QUANTITIES
BILL D - MEP WORKS

ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT (AED)


ELECTRICAL INSTALLATION Sub-total carried forward
Supply, install, test, commission and maintain complete Public
Address / Background Music System to the Club house phase 3
in accordance with the drawings and specification including
cabling and conduting.

D.3.4.10 Ceiling speaker No 11

D.3.4.11 Rak for PA system No 1

D.3.4.12 Cabling and containment as per drawings and specifications item 1

D.3.4.13 Allow for any other accessories required for thew completion item 1
and handing over of the PA system

Supply, install, test, commission and maintain complete Music


Sound System to the Club house Phase 3 and to be designed
and applied by a specialist in accordance with the drawings and
specification including cabling and conduting.

Sound System
Fully integrated Sound System for the Banquet Hall to serve 4
D.3.4.14 item 1
separate zones fully and/or partially as might be needed.

D.3.4.15 Fully integrated Sound System for the Sports Bar item 1

Supply, install, test, commission and maintain complete AV


System to the Club house Phase 3 and to be designed and
applied by a specialist in accordance with the drawings and
specification including cabling and conduting.

Ceiling mounted LCD projector with ceiling mounted rolling


D.3.4.16 No. 5
projection screen

D.3.5 Emergency Lightng System

Supply, install, test, commission and maintain complete


Emergency Lightng System to the Club house phase 3 in
accordance with th drawings and specification including cabling,
conduting, battery etc.

D.3.5.1 Emergency light TYPE E No 30


D.3.5.2 8W EL- Light No 33
D.3.5.3 Exit Light No 12

D.3.5.4 Allow for any accessories and materials required for the item 1
completion and handing over of the Emergency lighting system

D.3.6 Lightening Protection for whole Clubhouse PS 250,000.00

D.3.6.1 Percentage overhead & profit %

D.3.7 Dimmable Lighting Control System


Fully Integrated lighting control system. For the Banquet Hall to
D.3.7.1 Item 1
serve -3 Zone

Tenderer to include any missing item (s) which are necessary


D.3.8
and appropriate to complete the Works.

Sub-total(AED)
TOTAL of ELECTRICAL INSTALLATION AED)

MEP Works 9
JUMEIRAH GOLF ESTATE
CLUB HOUSE REMAING WORKS - PHASE 03
BILLS OF QUANTITIES
BILL D - MEP WORKS

ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT (AED)


ELECTRICAL INSTALLATION Total carried forward to MEP
summary
D.4 PLUMBING & DRAINAGE INSTALLATION

D.4.1 PLUMBING
MECHNICAL INSTALLATIONS

D.4.1.1 Domestic Cold and Hot Water System

PPR Pipe and fittings including insulations, hangers, supports


and accessories all in accordance with specification and
drawings

Domestic Cold Water pipe

D.4.1.1.1 20 mm m 64

D.4.1.1.2 25 mm m 9

D.4.1.1.3 32 mm m 32

D.4.1.1.4 40 mm m 17

D.4.1.1.5 50 mm m 13

D.4.1.1.6 65 mm m 0.5

Domestic Hot Water pipe

D.4.1.1.7 20 mm m 62

D.4.1.1.8 25 mm m 14

D.4.1.1.9 32 mm m 43

D.4.1.1.10 40 mm m 3

D.4.1.1.11 50 mm m 11

D.4.1.1.12 65 mm m 0.5

Domestic Hot water return pipe

D.4.1.1.13 20 mm m 75

D.4.1.1.14 25 mm m 12

D.4.1.1.15 32 mm m 32

D.4.1.1.16 40 mm m 13

D.4.1.1.17 65 mm m 0.5

PEX Pipe with conduits including necessary insulation, fittings,


supports and accessories in accordance with specification and
drawings

20mm dia m 200

D.4.1.2 Sundries

Isolating valves

D.4.1.2.1 20mm No 10

D.4.1.2.2 25mm No 7

D.4.1.2.3 32mm No 11

D.4.1.2.4 40 mm No 4

Sub-total(AED)

MEP Works 10
JUMEIRAH GOLF ESTATE
CLUB HOUSE REMAING WORKS - PHASE 03
BILLS OF QUANTITIES
BILL D - MEP WORKS

ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT (AED)


PLUMBING & DRAINAGE INSTALLATION Sub-total carried
forward
NRV

D.4.1.2.5 20 mm No 7

D.4.1.2.6 25 mm No 4

D.4.1.2.7 32 mm No 2

Tenderer to include any missing item (s) which are necessary


D.4.1.3
and appropriate to complete the Works.

D.4.2 SANITARY DRAINAGE

Sanitary drainage, Waste uPVC pipe work and fittings in


D.4.2.1
accordance with the drawings and specification
Installed above ground, diameter

D.4.2.1.1 50mm dia m 13

D.4.2.1.2 82mm dia m 10

D.4.2.1.3 110mm dia m 35

D.4.2.1.4 160mm dia m 18

Sanitary drainage, Waste uPVC pipe work and fittings in


accordance with the drawings and specification
Installed below ground, diameter

D.4.2.1.5 82mm dia m 20

D.4.2.1.6 110mm dia m 20

Sanitary drainage fittings and accessories in accordance with


D.4.2.2
drawings and specifications

D.4.2.2.1 Floor traps, Type FT No 23

D.4.2.2.2 Grease trap No 2

D.4.2.2.3 Floor cleanouts, FCO No 7

D.4.2.2.4 allow for clean out when ever there is change in pipe direction item 1

D.4.2.2.5 Trench Drain No 18

Tenderer to include any missing item (s) which are necessary


D.4.3
and appropriate to complete the Works.

Sub-total(AED)
TOTAL of PLUMBING & DRAINAGE INSTALLATION AED)

MEP Works 11
JUMEIRAH GOLF ESTATE
CLUB HOUSE REMAING WORKS - PHASE 03
BILLS OF QUANTITIES
BILL D - MEP WORKS

ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT (AED)


PLUMBING & DRAINAGE INSTALLATION Total carried
forward to MEP summary
D.5 CCTV SYSTEM AND SECURITY SYSTEM INSTALLATION

Supply, install, test, commission & complete CCTV system to


the phase 3 of Club house including cabling and conduting in
accordence with the drawings and specification

D.5.1 WP fixed camera No 6

D.5.2 Cabling and containment as per drawing and


specifications item 1

D.5.3 Allow for any materials and accessories required for the
completion and handing over of the CCTV system item 1

Tenderer to include any missing item (s) which are necessary


D.5.4
and appropriate to complete the Works.

Sub-total(AED)
TOTAL of CCTV SYSTEM & SECURITY SYSTEM
INSTALLATION AED)

MEP Works 12
JUMEIRAH GOLF ESTATE
CLUB HOUSE REMAING WORKS - PHASE 03
BILLS OF QUANTITIES
BILL D - MEP WORKS

ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT (AED)


CCTV SYSTEM & SECURITY SYSTEM INSTALLATION Total
carried forward to MEP summary
D.6 LPG SYSTEM INSTALLATION

Supply, install, test, commission and maintain LPG system to


Club house phase 3 including LPG cylinder, gas detection
panel, vaporiser, pressure reducing and distribution panel, pipe
works, gas meter, high pressure regulators, valves, gas switch,
gas detectors, siren, cables and all the necessary equipments
in accordance with drawings and specifications.

D.6.1 Emergency cylinder No 1

D.6.2 Gas detector No 5

D.6.3 anode for cathodic protection item 1

D.6.4 first stage PRDP No 1

D.6.5 Second stage PRDP No 1

D.6.6 Shut Off valve No 6

SC sch. 40 seamless gas supply line inside sleeve with gas


D.6.7 m 50
leak detection system - 50 mm Dia.

Allow for all works associated with LPG system to comply with
D.6.8 civil defense requirements and regulations and/or any other item 1
conserned authority

Tenderer to include any missing item (s) which are necessary


D.6.9
and appropriate to complete the Works.

Sub-total(AED)
TOTAL of LPG SYSTEM INSTALLATION AED)

MEP Works 13
JUMEIRAH GOLF ESTATE
CLUB HOUSE REMAING WORKS - PHASE 03
BILLS OF QUANTITIES
BILL D - MEP WORKS

ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT (AED)


LPG System Installation Total carried forward to MEP
summary
D SUMMARY - MEP WORKS

D.1 HVAC INSTALLATION

D.2 FIRE FIGHTING INSTALLATION

D.3 ELECTRICAL INSTALLATION

D.4 PLUMBING & DRAINAGE INSTALLATION

D.5 CCTV SYSTEM INSTALLATION

D.6 LPG SYSTEM INSTALLATION

GRAND TOTAL (AED)

MEP Works 14