Sei sulla pagina 1di 49

Appendix- II

Form-E2/T3

FIRMS REFERENCES
Relevant Services Carried out in the Last Seven Years (2009-10 onwards)
Which Best Illustrate Qualifications

The following information should be provided in the format below for each reference assignment
for which your firm, either individually as a corporate entity or as one of the major companies
within a consortium, was legally contracted by the client:

Assignment Name: Country:


Location within Country : Professional Staff Provided
by your firm:
Name of Client : No. of Staff :
Address : No. of Staff Months :
Start Date Completion Date Approx. Value of
(Month / (Month / Year) Services : (in INR/current USD) :
Year)
Name of JV/Association Firm(s) if any : No. of Months of Professional
Staff provided by Associated Firm(s)
Status of your Company in the Assignment i.e., Sole/Lead Member/Other Member/Associate
Narrative Description of Project :
Description of Actual Services Provided by your Company:

Signature of Authorised Representative

(ATTACHED SEPARATELY)

(Certificate from Employer regarding experience should be furnished)

113
APPENDIX-II

Form- E3

Financial Capacity of the Applicant

Name of Applicant:

S.No. Financial Year Annual Revenue


(Rs/US $ in million)
1 2015-16
2 2014-15
3 2013-14
4 2012-13
5 2011-12
$
Certificate from the Statutory Auditor
This is to certify that --------------(name of the Applicant) has received the
payments shown above against the respective years on account of Consultancy
Services.

Name of the audit firm Seal of

the audit firm Date

(Signature, name and designation of the authorized signatory)

$
In case he Applicant does not have a statutory auditor, it shall provide the
certificate from its chartered accountant that ordinarily audits the annual account of the
Applicant.

Note:

Please do not attach any printed Annual Financial Statement.

(ATTACHED SEPARATELY)

114
APPENDIX-II
Form- E4

BANK GUARANTEE FORMAT FOR BID SECURITY


(To be stamped in accordance with Stamp Act if any, of the country of issuing bank)

Ref.: Tender No. , dated


Bank Guarantee:
Date:
WHEREAS, (Name of Bidder) (hereinafter called "the bidder") has submitted his
bid dated (date) for the Tender No. , dated (hereinafter called "the
Bid". KNOW ALL MEN by these presents that We, [Name of Bank] of
[Name of Country] having our registered office at (hereinafter called "the
Bank") are bound unto Divisional Engineer (NH) Nagercoil( on behalf of Superintending Engineer
(NH) Tirunelveli, the Employer") in the sum of Rs. (Rupees Lakhs only) for which
payment will and truly to be made to the Divisional Engineer (NH) Nagercoil the bank binds himself,
his successors and assigns by these presents. SEALED with the Common Seal of the said Bank this
day of 201_.
THE CONDITIONS of this obligation are:
1. If the Bidder withdraws his Bid during the period of bid validity specified in the Bid
document;
or
2. If the Bidder does not accept the correction of arithmetical errors of his Bid Price in
accordance with the Instructions to Bidder; or
3. If the Bidder having been notified of the acceptance of his Bid by the Employer during
the period ofbid validity,
a. fails or refuses to execute the Form of Agreement in accordance with the Instructions
to Bidders, if required; or
b. fails or refuses to furnish the Performance Security, in accordance with the letter of invitation,
we undertake to pay the Employer up to the above amount upon receipt of his first written
demand, without the Employer having to substantiate his demand, provided that in his demand the
Employer will note that the amount claimed by him is due to him owing to the occurrence of one
or any of the conditions, specifying the occurred condition or conditions.
This Guarantee will remain in force up to and including the date 150 (one hundred and fifty) days
after the deadline for submission of bids as such deadline is stated in the Instructions to Bidders or as
it may be extended by the Employer, notice of which extension(s) to the Bank is hereby waived. Any
demand in respect of this Guarantee should reach the Bank not later than the above date.
Notwithstanding anything contained herein before, our liability under this guarantee is restricted to
Rs. (Rs. ) and the guarantee shall remain valid till .
Unless a claim or a demand in writing is made upon us on or before all our liability
under this guarantee shall cease
DATE _
SIGNATURE OF THE BANK
SEAL OF THE BANK _
SIGNATURE OF THE WITNESS
Name and Address of the Witness
The bank guarantee shall be issued by a bank (Nationalized/Scheduled) located in India

115
Appendix III

(Form-T1)

TECHNICAL PROPOSAL

FROM: TO:

M/s.Sonne Infra Structure Pvt Ltd, Superintending Engineer(H),


S1 A, Second Floor,Amar Sindur Complex, National Highways,
43, Pantheon Road, Egmore, A31,Municipal colony,
Chennai -600008. 2nd street, MaharajaNagar,
Tirunelveli - 627 011.

Sir:

Subject : Consultancy Service for Preparation of Detailed Project Report for


construction of flyover at Km 619/2 to 620/2 of NH 47.

Regarding Technical Proposal

M/s.Sonne Infra Structure Pvt Ltd Consultancy firm herewith enclose Technical Proposal for
selection of our firm/organization as Consultant for " Preparation of Detailed Project Report for
construction of flyover at Km 619/2 to 620/2 of NH 47".

Yours faithfully,

Signature
Full Name : MSL.Prabahar
Designation : Managing Director
Address:
(Authorized Representative)
SONNE INFRASTRUCTURE PVT LTD ,
S1 A, Second Floor,Amar Sindur Complex,
43, Pantheon Road, Egmore,
Chennai -600008.
Contact:-+91 44-28552445 / 9840626489

116
(Form-T-2)

Details of projects for which Technical and Financial Proposals have been submitted

Sl.No. Name of Project Consultancy Package No. Names of Proposed


Key Personnel

1 Consultancy Services for preparation of Detailed Project Report for M.S.L.Prabahar


construction of flyover at Km 619/2 to 620/2 of NH 47

2 Consultancy Services for preparation of Detailed Project Report for A.Vanuvamalai


construction of flyover at Km 619/2 to 620/2 of NH 47

3 Consultancy Services for preparation of Detailed Project Report for Praba Chandran
construction of flyover at Km 619/2 to 620/2 of NH 47

4 Consultancy Services for preparation of Detailed Project Report for V.Balachandran


construction of flyover at Km 619/2 to 620/2 of NH 47

5 Consultancy Services for preparation of Detailed Project Report for Esakkimuthu


construction of flyover at Km 619/2 to 620/2 of NH 47

6 Consultancy Services for preparation of Detailed Project Report for K.Jagadeesh


construction of flyover at Km 619/2 to 620/2 of NH 47

7 Consultancy Services for preparation of Detailed Project Report for Rema Thankappan
construction of flyover at Km 619/2 to 620/2 of NH 47

8 Consultancy Services for preparation of Detailed Project Report for Durai Raj
construction of flyover at Km 619/2 to 620/2 of NH 47

117
Form-E2/T3

FIRMS REFERENCES
Relevant Services Carried out in the Last SevenYears
Which Best Illustrate Qualifications

The following information should be provided in the format below for each reference assignment
for which your firm, either individually as a corporate entity or as one of the major companies
within a consortium, was legally contracted by the client:

Assignment Name: Sillahalla pumped storage Country:India


Hydro electric projects.

Location within Country : Nilgirs Professional Staff Provided


by your firm:

Name of Client : CE/TANGEDCO/Chennai No. of Staff : 25


Address : HEAD OFFICE,CHENNAI. No. of Staff per Months : 10
Start Date Completion Date Approx. Value of
SEP 2015 SEP 2017 Services : (in INR/current USD) :

Name of JV/Association Firm(s) if any : aarvee No. of Months of Professional


associates,Hydrabad. Staff provided by Associated Firm(s): 14

Status of your Company in the Assignment i.e., Sole/Lead Member/Other Member/Associate

Narrative Description of Project: Detailed project report for statutory clearance and offering
Engineering consultancy services for preparation and other pre contract services for sillahalla
pumped storage hydro electric project phase-I comprising sillahalla dam and interconnecting Tunnel
between Sillahala & Emerald reservoirs in Nilgiris.

Description of Actual Services Provided by your Company:

Signature of Authorised Representative

(Certificate from Employer regarding experience should be furnished)

118
Form- T4

SITE APPRECIATION

Shall give details of site as per actual site visit and data provided in RFP and collected from
site supported by photographs to demonstrate that responsible personnel of the Consultant
have actually visited the site and familiarized with the salient details/complexities and scope
of services.

(PROVIDED LATER)

119
Form- T5

COMMENTS/ SUGGESTIONS OF CONSULTANT ON THE TERMS OF REFERENCE

1. DURATION PERIOD OF PROJECT SHOULD BE INCREASED

2.

3.

4.

5.

120
Form- T6

Composition of the Team Personnel and the task


Which would be assigned to each Team Member

Technical/Managerial Staff

S.No. Name Position & Task Assignment

1. MSL.Prabahar Team Leader cum Senior Highway Engineer

A.Vanuvamalai Sr Bridge Engineer


2.

Prabaha Chandran Highway cum Pavement Engineer


3.

V.Balachandran Material Engineer cum Geotechnical


4.
Engineer cum Geologist
S.Essakimuthu Senior Survey Engineer
5.

K.Jagadeesh Traffic and Safety Expert


6.

Rema Thangappan Environmental Specialist


7.

Quantity Surveyor/Documentation Expert


8.
Durai Raj

121
Support Staff :

LIST OF SUPPORTING STAFF

Name of the Expert Qualification Experience Task


assignment
1. Dr.Akanksha Shukla M.com.,Ph.D., 05 years Accountant
Head
2. R .Muthumanickam B.E.,Civil 05 years Quantity
Surveyor
3. Maruthupandi B.E.,Civil 05 years Site Engineer

4. P. Anantharaj B.E.,Civil 03 years Design


Engineer
5. K.Dhanaraj M.E(CEM)., 01 years Field Surveyor

6. K.Manjula Dip in Architecture 03 years Engineer

7. R. Sruthi Dip in Architecture ., B.E.,Civil 02 years Architect

8. R.Dhanalakshmi Dip in Architecture 05 years Architect

9. S.Iyyammal B.E.,Civil 01 years Engineer

10. V.Amsa MBA FINANCE 10 years Accountant

11. P.Sarala MBA HR 04 years HR


Administration
12. Daniel Sunny B.E.,Civil 01 years Engineer

13. L.Joshua B.E.,Civil 01 years Engineer

122
Form- T7

APPROACH PAPER ON METHODOLOGY PROPOSED FOR PERFORMING THE


ASSIGNMENT

The approach and methodology will be detailed precisely under the following topics.
1) Composition of the team [not more than 1 page]
2) Methodology for services, surveying, data collection [not more than 2 pages]
and analysis
3) Quality Assurance system for consultancy assignment [not more than 1 page]

1. COMPOSITION OF THE TEAM :

Started in the year 2011, the self sufficient company comprises senior professionals of 25 to 40 years of
experience, young engineers and consultants. Projects undertaken include investigation, structural
designs and construction of multi storied residential and commercial complexes, consultancy and
construction monitoring of hydro power structures like dams, tunnels, power houses both surface and
underground and Water Conductor Systems such as power tunnels, Canals and Channels, Penstocks both
surface and underground including design in the entire country including Himalayas. Also carries out
preparation of complete DPR, Project monitoring and quality control, trouble shooting, and riveted on
professional efficiency and integrity.

2. METHODOLOGY:

SITE RECONNAISSANCE
SURVEY AND INVESTIGATION
GEOTECHNICAL
PLANNING CONSIDERATIONS
STRUCTURAL SYSTEM & DRAWINGS
BILL OF QUANTITIES AND COST ESTIMATES
REVIEW MEETING
DRAFT SUBMISSION
FINAL REPORT SUBMISSION

123
3. QUALITY ASSURANCE SYSTEM FOR CONSULTANCY ASSIGNMENT

Safety Health, Environment and Quality Management

M/s. Sonne Infrastructure Pvt Ltd is committed to the delivery of quality workmanship, and therefore
embarked on the implementation of a Quality Management System on all our Projects.

We ensure that the highest standards of health and Safety are being upheld on all our Projects.

Quality, health, Safety & Environment Policy

Sonne Infrastructure Pvt Ltd will strive to:

Provide Products and services to the highest possible standard of Quality, Reliability and
conformance;
Achieve customer satisfaction through understanding the customer requirements and
exceeding their expectation by employee involvement and team work;
Apply all applicable legislation, rules and regulation;
Prevent pollution of all types;
Measure and monitor working processes and company objectives to continuously improve its
performance;
Provide safe working environment for our employees, customers, sub-contractors and
society;
Communicate the policy to all employees, customers, suppliers, interested parties and staff
working on behalf of Sonne Infrastructure Pvt Ltd;
Review the policy periodically to ensure that it remains appropriate to the organization and
its objectives.

124
Form- T8

Details of Material Testing Facility

1 . State whether the Applicant has in-house Material Testing Facility Available /
Outsourced / Not Available

2. In case answer to 1 is Available, attach a list of Lab equipment and facility for testing of
materials and location of laboratory

3. In case laboratory is located at a distance of more than 400 km from the project site, state
arrangements made/proposed to be made for testing of materials

4. In case answer to 1 is Outsourced/ Not Available state arrangements made/proposed to be


made for testing of materials

GEOMARINE SOIL LABORATORY,CHENNAI.

Sonne Infra Lab Equipments

Sl.No Equipments Number of Units

1. Compression testing machine 1

2. Slump Cone 1

3. Cube moulds 40

4. Sieve sets C A 1 set

5. Sieve Sets F A 1 set

6. Mortar cubes 6

125
Form- T9
Facility for Field investigation and Testing

1. State whether the Applicant has in-house Facility for

a) Geo-technical investigation Available/ Outsourced/ Not Available


b) Pavement investigation Available/ Outsourced/ Not Available

2. In case answer to 1 is Available a list of field investigation and testing equipments


available in-house

3. In case answer to 1 is Outsourced/ Not Available arrangements made/proposed to be made


for each of above Field investigation and testing

4. For experience in LiDAR or equivalent technology for topographic survey, GPR and
Induction Locator or equivalent technologies for detection of sub-surface utilities and
digitization of cadastral maps for land acquisition, references need to be provided in
following format:

126
REFERENCES
Relevant Services Carried
Which Best Illustrate Qualifications

The following information should be provided in the format below for each reference assignment
for which your firm, either individually as a corporate entity or as one of the major companies
within a consortium, was legally contracted by the client:
Assignment Name: GEOFINY Country:INDIA
Location within Country : KOLLIMALAI Professional Staff Provided
by your firm:3
Name of Client :TNEB No. of Staff :5
Address : No. of Staff Months :2
Technology Used: LPS-ERDAS, ERDAS/ARC GIS,
MICROSTATION-V8 and AUTOCAD ,MAP 2010

Start Date Completion Date Approx. Value of


NOV2016 JAN 2017 Services : (in INR/current USD) : 2.5 LAKHS

Name of JV/Association Firm(s) if any :NILNo. of Months of Professional


Staff provided by Associated Firm(s)
Status of your Company in the Assignment i.e., Sole/Lead Member/Other Member/Associate
Narrative Description of Project : Hydro Projects- KHEP- Conducting Topographical and Land
acquisition surveys for the land acquisition for the Weirs, Tunnel, Flumes etc. Complete, for the
Kollimalai Hydro Electric Project (1 X 20MW) at Kollimalai
Description of Actual Services Provided by your Company: Topographic surveys of the proposed area
for the flume between weir4 and weir 5.
Ii.Topographical surveys for the weir 1,2,3,4 water spread area up to MWL

Signature of Authorised Representative

(Certificate from Employer regarding experience should be furnished)

127
Form- T10
Office Equipment and software
Attach a list of office equipment and software owned by the Applicant

List of Equipments owned By Company

Sl.No Equipment Number of Units


1. 10*7 Mixer Machine 4
2. Material Lifts/ Hoists 10
3. Petrol Vibrators 7
4. Electrical Vibrators 5
5. Dewatering Pumps 7
6. Curing Pumps 10

7. Jockey, MS props 1500


8. Shutter Plate 2500
9. Spans 400
10. H-Frames 200 sets
11. Rod cutting machines 10

12. Column Boxes 50

13. Wood cutting machines 15


14. Breakers 5

1. AUTOCAD

128T11
Form-
Curriculum Vitae

Photo

1. Proposed Position : Team Leader cum Senior Highway Engineer

2. Name of Staff : M.S.LOORDHURAJ PRABAHAR

3. Date of Birth : 05/08/1966

4. Nationality : Indian

5. Educational Qualification:

Education Institution Year of passing


Masters In Structural Engineering Anna University 1990

1988
Bachelor in Civil Engineering Madurai-Kamaraj
University
Diploma In Civil Engineering Anna University 1984

Contact Address with Phone and mobile numbers : S-1a, Amar Sindur Complex,
43, Pantheon Road, Egmore,
Chennai 600008.
(044-28552445), 9443857754,

6. Membership of Professional Societies :M.I.E., CHARTERED ENGINEER

7. Employment Record: 128


Organization Designation Experience period

Sonne Infrastructure Private Limited Company- Managing Director 2011- Till Date
Chennai

Navayuga Quazigund Expressway Limited-India, General Manager 2010- 2011


Hyderabad

Associated with construction of HRT and Dams


in Teesta -India, Hyderabad Project Leader 2008- 2009

Bhima Lift Irrigation Project, Stage-I and II, AP Project Leader/ 2005-2010
Manager

Pykara Ultimate Stag Hydroz Electric Project (3


X50MW), Nilgiris Tamil Nadu Assistant Engineer 1991-2004

Summary of the CV:

Employment record relevant to the assignment:

Period : Till date from Aug -2011


Employing organization : Sonne Infrastructure Private Limited Company
And your title/position. : Managing Director.

Summary of activities :
Detailed designs, construction and development of multistoried residential Buildings
Detailed designs, construction and development of commercial projects on its own and also in joint
ventures
Consultancy assignments in areas of all hydro power components like tunnel,dam water channels,
Pipe lines delivery mains/ Penstocks, Substation Civil works, Preparation for Feasibility studies,
DPR, detailed designs and cost estimates.
Prebid and tender advisory for the Mega tenders on EPC and BOOT projects related to Hydro Power
projects, Irrigation projects, Road tunnels and Railway tunnels etc., preliminary designs, Preparation
of BOQ, Cost estimates, construction methodology, equipment planning etc., complete..
Detailed design and detailing of the structural128
designs for the Residential and commercial buildings
Period : 20102011
Cost of Project : 2300 Cr
Employing organization
And your title/position. : General Manager Navayuga Engineering Company
and Director of Navayuga Quazigund Expressway Limited.

Project : Survey, design and Construction and operation and maintenance of 4 lane NH1A from
Quazigund Bani hal section in Jammu and Kashmir having Elevated viaduct of 7 Kms and Twin Road
way tunnel in Pirpanjal Range for 8.50 Kms :

Project lead and Project Manager (Construction) and the portfolios handled include Tendering, Etc
Survey, Geotechnical Investigation, Co-ordination of Design and Detailed Engineering and Detailed
Planning,
Construction equipment planning and procurement of equipments and assistance
Man power planning and Recruiting the man power technical and non technical
Tender and subcontracting and PRW appointment
Co ordination with the client and consultants for the execution of the works
LA and coordination with the local Collector and administration
Client Billing and all coordination with client for LA, Design submissions, approvals, progress etc.
Project management and Project in charge for the execution of the works as under
Twin 16m diameter, horse-shoe tunnel by NATM method in the hazardous and high stress region of
Pir Panjal Range of Kashmir Himalayas for NHAI on BOT basis.

Period : 2008-2010
Employing organization
And your title/position. : Project Leader of Associated with construction of HRT and Dams in
Teesta Hydro electric Project 1200 MW
COST OF PROJECT : 800 Cr
Country : India, Hyderabad.

Summary of activities :
Project lead and Project Manager (Construction) and the portfolios handled include Tendering, Etc
Survey, Geotechnical Investigation, Co-ordination of Design and Detailed Engineering and Detailed
Planning,
Construction equipment planning and procurement of equipments and assistance
Man power planning and Recruiting the man power technical and non technical
Tender and subcontracting and PRW appointment
Co ordination with the client and consultants for the execution of the works
LA and coordination with the local Collector and administration
All roads in the Project areas
Client Billing and all coordination with client for LA, Design submissions, approvals, progress etc.
Project management and Project in charge for the execution of the works as under
Head Race tunnel, Desilting chambers, Silt flushing tunnel, Gate shaft, Approach roads, Head race
ftunnel from Adit 1 to Adit 2 cutoff wall for the CFRD dam by trench cutting etc. complete.

.
Period : 2004-2007
Cost of Project : 400 Cr
Employing organization 128
And your title/position. : Project Leader/ Manager, Bhima Lift Irrigation Project, Stage-I
and II, AP
Country : India

Summary of activities :
Project lead and Project Manager (Construction) and the portfolios handled include Tendering, Etc
Survey, Geotechnical Investigation, Co-ordination of Design and Detailed Engineering and Detailed
Planning,
Construction equipment planning and procurement of equipments and assistance
Man power planning and Recruiting the man power technical and non technical
Tender and subcontracting and PRW appointment
Co ordination with the client and consultants for the execution of the works
LA and coordination with the local Collector and administration
All roads in the Project areas
Client Billing and all coordination with client for LA, Design submissions, approvals, progress etc.
Project management and Project in charge for the execution of the works as under
Tunnels of 2 Kms length, Canal approaches, Pumping stations 3 x 12 Mw, and 3 X 4 MW all civil
works, Hydro mechanical Gates, delivery/ pumping mains of 2.50m dia for all the pumps, surge
chambers, substation works 132/11 Kv 2 nos, 132 KV tower lines 35 Kms all civil, electrical and
mechanical works etc complete from survey to commissioning of the plants.

Period : 2005-2009
Cost of Project : 800 Cr
Employing organization
And your title/position. : Project Leader Manager, Kalwakurthy Lift Irrigation Project,
Stage-II AP
Country : India

Summary of activities :
Project lead and Project Manager (Construction) and the portfolios handled include Tendering, Etc
Survey, Geotechnical Investigation, Co-ordination of Design and Detailed Engineering and Detailed
Planning,
Construction equipment planning and procurement of equipments and assistance
Man power planning and Recruiting the man power technical and non technical
Tender and subcontracting and PRW appointment
Co ordination with the client and consultants for the execution of the works
All roads in the Project areas
LA and coordination with the local Collector and administration
Client Billing and all coordination with client for LA, Design submissions, approvals, progress etc.
Project management and Project in charge for the execution of the works as under
Tunnels of 5 Kms length, Canal approaches, Pumping stations 5 x 30 Mw, and 3 X 4 MW all civil
works, Hydro mechanical Gates, delivery/ pumping mains of 3.00m dia for all the pumps, surge
chambers, substation works 230/11 Kv 3 nos, 230 KV tower lines 85 Kms all civil, electrical and
mechanical works etc complete from survey to commissioning of the plants.

Period : 2004-2005
Cost of Project : 100 Cr
Employing organization
And your title/position. : Tunnel Consultant/ Manager, DRDO tunnel project Rajasthan
Country : India 128
Summary of activities :
Project lead and Project Manager (Construction) and the portfolios handled include Tendering, Etc
Survey, Geotechnical Investigation, Co-ordination of Design and Detailed Engineering and Detailed
Planning,
Construction equipment planning and procurement of equipments and assistance
Man power planning and Recruiting the man power technical and non technical
Tender and subcontracting and PRW appointment
All roads in the Project areas
Co ordination with the client and consultants for the execution of the works
LA and coordination with the local Collector and administration
Client Billing and all coordination with client for LA, Design submissions, approvals, progress etc.
Project management and Project in charge for the execution of the works as under
Tunnels of 2 Kms length, Tunnel approaches, all Underground caverns, all civil, electrical and
mechanical works etc complete from survey to commissioning of the Project

Period : 1991-2004
Employing organization
And your title/position. : Assistant Engineer and Assistant Executive Engineer civil
Country : India.

Summary of activities :
As a Section officer in Charge at Pykara Ultimate Stage Hydro Electric Project (3 X50MW), Nilgiris
Tamil Nadu
carried out complete Control surveying for the entire project layout including pressure shaft,
powerhouse cavern and its appurtenances and TRT
During construction stageof the project was in charge of excavation, erection of supports and steel
liners, concreting, grouting both contact and consolidation in the inclined pressure shaft,
Excavation of the complete underground powerhouse, concurrent supporting, grouting, concreting,
machine erections,
Installation of instruments and monitoring.
Supervision of excavation of the 6.8km long Tail Race Tunnel, checking up alignment and
concreting,
Besides in the office attended to billing and seen to adherence to contractual obligations by all parties
concerned..
Overall EPC billing for the contractor coordination with all the section officers and preparation of
monthly work bills.
Membership in Professional Associations and Publications:

M.I.E., CHARTERED ENGINEER

Language Skills (indicate only languages in which you can work):

Tamil can read, write and speak fluently


English can read, write and speak fluently
Hindi can speak fluently
Telugu can speak fluently

A) 128
B)
C) Education:
i) Field of graduation and year
ii) Field of post-graduation and year
iii) Any other specific qualification
D) Experience:
i) Total experience in highways: Yrs.
ii) Responsibilities held: a) Yrs.
Yrs.
Yrs.
iii) Relevant experience: Yrs.

E) Permanent Employment with the firm :


6 Yrs. If yes, how many years:
If no, what is the employment?
Arrangement with the firm?

Certification:

1. I am willing to work on the project and I will be available for entire duration of the
project assignment and I will not engage myself in any other assignment during the
currency of this assignment on the project

2. I, the undersigned, certify that to the best of my knowledge and belief, this biodata
correctly describes myself my qualification and my experience.

Signature of the Candidate

Place
Date

Signature of the Authorized Representative of thefirm

Place
Date

128
Curriculum Vitae

1. Proposed Position : Sr Bridge Design Engineer

2. Name of Staff : Vanuvamalai.A

3. Date of Birth : 20/04/1988

4. Nationality : Indian

5. Educational Qualification:

Research Work in Progress leading to Doctoral degree, Anna University, Chennai, India

Thesis submission in progress on: Seismic Performance of tunnel Strucutres.


M.Tech (Structures), First class, SRM University, Chennai, Tamil Nadu, India- 2011.
B.E., First class, ANNA University, Chennai, Tamil Nadu, India- 2009.
Training Undergone:
Training in the office of Superintending Engineer, TNPWD,Planning & Design Circle
(Buildings),Chepauk,Chennai, India.
Training on Construction of New Road Alignment & Methodologies, Highways Government
Contractor,Tirunelveli, India.

Contact Address with Phone and mobile numbers : S-1a, Amar Sindur Complex,
43, Pantheon Road, Egmore,
Chennai 600008.
(044-28552445), 9443857754,
6. Membership of Professional Societies:

Member of the Indian Concrete Institute


Member of the Institution of Structural Engineers
Chartered Structural Engineer
Member of the Institution of Engineers, India
Chartered Engineer
Member of the Indian Society for Rock Mechanics & Tunnelling Technology.
Summary of the CV:

Employment record relevant to the assignment:

Working as Manager Design from October 2016 to Till Date in M/s.Sonne Infrastructure Pvt Ltd,
Chennai,Tamil Nadu, India.
Worked as Assistant Manager Design from September 2014 to September 2016 in M/s.Sonne
Infrastructure Pvt Ltd, Chennai,Tamil Nadu, India.
Worked as Sr.Design Engineer from July 2012 to August 2014 in M/s.Sonne Infrastructure Pvt Ltd,
Chennai,Tamil Nadu, India.
Worked as Project Officer (Design) from June 2011 To June 2012 in Anna University, Chennai,Tamil
Nadu, India.
128
Worked as Graduate Engineer Trainee from April 2009 - Sep 2009 in PATEL-KNR JOINT
VENTURE, NH-7, Tamil Nadu, India.

Professional Experience :

Detailed designs, construction and development of multistoried residential and commercial projects on its own
and also in joint ventures besides carrying out Consultancy assignments in areas of tunnel and hydro power
projects

Publication:

Submitted project reports pertaining to Hydel, Irrigation, Communication, Water supply projects, and Natural
Hazards investigations Published about 20 technical papers in various national and international seminars and
symposia, journals.

A) Education:
iv) Field of graduation and year
v) Field of post-graduation and year
vi) Any other specific qualification
B) Experience:
iv) Total experience in highways: Yrs.
v) Responsibilities held: a) Yrs.
Yrs.
Yrs.
vi) Relevant experience: Yrs.

C) Permanent Employment with the firm :


6 Yrs. If yes, how many years:
If no, what is the employment:
Arrangement with the firm?

Certification:

1. I am willing to work on the project and I will be available for entire duration of the project assignment
and I will not engage myself in any other arrangement during the currency of this assignment of the
project

2. I, the undersigned certify that to the best of my knowledge and belief, this bio data correctly describes
myself my qualification and my experience.

Signature of the Candidate

Place
Date

Signature of the Authorized Representative of the firm

Place
128 Date
Curriculum Vitae

Proposed Position : Highway Cum Pavement Engineer


Name of Firm : Sonne Infrastructure Pvt Ltd
Name of Staff : Mrs. Prabha Chandran
Profession : Transportation Engineer
Nationality : INDIAN

Membership in Professional Societies: NIL.

Key Qualifications:

Education:
Masters in Transportation Engineering, 2006, Anna University, Tamil Nadu.
Bachelor in Civil Engineering, 2004, Madras University, Kanchipuram.

Employment Record:
Employment record relevant to the assignment:
Period : Till date-2012
Employing organization
And your title/position. : Transportation Engineer
Country : India, Chennai.

Summary of activities

Transportation Planner
Sunshine Transit Inc.,
February 2007 - September 2010

Devised and implemented inbound and outbound transportation plans


Managed transportation events and ensured clients satisfaction
Developed and coordinated transportation plans for industrial clients
Delivered presentations on proposed transportation options
Designed and deployed methods for survey and research
Prepared forecast travel patterns and delivered growing travel demand

Transportation Planner
Aarvee Associates ,
October 2010 - 2012

Meeting clients and discussing transportation needs and performing land survey
Visiting construction sites and developing potential solutions for congestion and ease of
movement
Coordinating with environmental scientists and discussing impact of road and highway
construction on the environment
Preparing and presenting traffic flow models to clients using computer applications
Collecting and analyzing data from the traffic department and assessing future needs
Working on existing transportation system and planning for the upgrade for next 100 years
128
Language Skills (indicate only languages in which you can work):
Speaking Reading Writing
English Good Good Good
Tamil Excellent Excellent Good

Certification:

I, the undersigned, certify that to the best of my knowledge and belief, these data correctly
describe me, my qualifications, and my experience.

Date:

[Signature of staff member and authorized representative of the Firm] Day/Month/Year

Full name of staff member:

Full name of the authorized representative:

128
Curriculum Vitae

1. Proposed Position : Geo-technical Engineer

2. Name of Staff : Viswanathan Balachandran

3. Date of Birth : 08/06/1950

4. Nationality : Indian

5. Educational Qualification:

Research Work in Progress leading to Doctoral degree, Osmania University, Hyderabad,


India
Thesis submission in progress on: Permeability Characteristics of Foundation Media
Yellampalli Dam Project (AP)
M.Sc. (Geology), First class, Annamalai University, Chidambaram, Tamil Nadu, India- 1972.
Training Undergone:
Transfer of Technology Program on Landslides, National Resources (Canada) and Geological Survey of
Canada at Vancouver, Calgary and Ottawa, Canada (2008)
Advanced Training in Natural Hazard studies and Mitigation, Geological Survey of India (2000)
Transfer of Technology Program - Hydro-electric plant design module, Harza Engineering Company,
Chicago, USA (1996)
Advanced Training in Soil and Rock Mechanics, Geological Survey of India (1989)
Executive Development Program in Engineering Geology, Indian School of Mines, Dhanbad (1984)
In-service training, Geological Survey of India (1975-76)
Geological and Geohydrological studies, Neyveli Lignite Corporation Dissertation for M.Sc. Degree (1971)

Contact Address with Phone and mobile numbers : S-1a, Amar Sindur Complex,
43, Pantheon Road, Egmore,
Chennai 600008.
(044-28552445), 9443857754,

6. Membership of Professional Societies:

Member Geology, Dam Safety Committee, Govt. of Andhra Pradesh 2010


Member on Extraordinary flood and consequential damages to Srisailam, right bank
powerhouse, AP Genco (2010)
Member, High power Committee on external flooding hazard, Madras atomic power plant,
BARC
Member, Site selection Committee for Indian Neutrino Observatory, BARC
Core group member for Conservation of Archaeological monuments of Ajanta and Ellora
Caves 128
Member, Dam Safety and Rehabilitation projects, Govt. of Tamil Nadu

Summary of the CV:

Employment record relevant to the assignment:

Since October 2010 to till date : Executive Director, Sonne Infrastructure Private Limited,
Chennai.
Area of Specialization:- Geotechnical Investigations, Foundation Evaluation, Assessment of Permanent
Supports Underground Utilities, Nuclear Power Projects Hydro Power Irrigation and Communication
Projects, Tunnels, Dams, Surface Powerhouses Multi-Storied Buildings in difficult terrain, Natural Hazards-
Earthquakes and Landslides Investigations

Employing organization
And your title/position. : Consultant / Advisor
Country : India, Southern Region
Summary of activities : Guided and supervised work of 45 directors and a host of senior officers in
the fields of Engineering Geology, Geological Mapping, Mineral Exploration, Geophysics, Geochemistry and
drilling.

Period :
Employing organization
And your title/position. : Deputy Director General and HOD, Geological Survey of India,
Southern Region (Retired
Country : India, Abroad
Summary of activities : Engineering Geology Projects in India/ Abroad- Machalgo Irrigation
Project, Afghanistan: National Highway Tunnel Project, Jammu and Kashmir, India Anik-Panjarapole Link
Road Project (Tunnel 19m dia) Bombay under construction.

Employing organization
And your title/position. : Director (SG) and Head of Office, Geological Survey of India Training
Institute, Hyderabad
Country : India, Hyderabad
Summary of activities : In charge of administration of entire training institute besides course
coordinator for programs on advanced courses on petrology, engineering geology, nuclear power plant site
investigations and waste disposal sites, natural hazard studies.

Employing organization
And your title/position. : Director (SG), Technical Coordination, GSI, Southern Region
Country : India, Southern Region
Summary of activities : Initiated technical programs, implemented and coordinated investigations of
entire southern states of India including Goa. Supervising, Review of work and facilitating programs of entire
Southern Region Geological Survey of India.

Employing organization
And your title/position. : Director (SG), Engineering Geology, AP
Country : Andhra Pradesh
Summary of activities : Cleared technically difficult projects under investigation for protracted
period such as Gorakallu, Polavaram, Pulichintala, Yellampalii Supervised construction stage geotechnical
work of 75 Jalayagnam projects of AP, power projects of AP Genco and Miscellaneous projects such as
Seismic Hazard Micro Zonation of Vishakapattanam, Pondicherry and Chennai. (2005-08) Member State Dam
Safety Committee, Government of Andhra Pradesh and 128associated with Dam Safety related issues. Carried out
studies and suggested remediation for some of the dam failures.

Employing organization
And your title/position. : Director, Engineering Geology Division, Tamil Nadu, Kerala, Pondicherry

Country : Tamil Nadu, Kerala, Pondicherry.


Summary of activities : Supervised the work of all engineering projects of TN and Kerala, including
Projects under Dam Safety Assurance and Rehabilitation, palaeo- seismological studies, environmental
projects on containment of pollution and landfill arrangements for Waste Disposal (2004-05), Responsible for
locating Indian Neutrino Observatory Project for a Lab Cavern at a depth of 2km with access tunnel in Tamil
Nadu.

Employing organization
And your title/position. : Director, Engineering Geology Division, Eastern Region, Kolkata
Country : Eastern Region, Kolkata
Summary of activities : Supervised the work of irrigation and power projects in the states of Bihar,
Jharkhand and Andaman and Nicobar islands, including post-construction studies (2002-04). Recommended
measures resurrected the Neora-Khola water Supply Project of Kalimpong, West Bengal.

Employing organization
And your title/position. : Geologist (Sr.)
Country : UP, Haryana and Delhi
Summary of activities : Carried out quaternary geological investigations in Ganga, Yamuna, Gaggar
River basins in the states of UP, Haryana and Delhi. Carried out limnological studies of TsoKar lake, Ladakh
district, J & K and geotechnical investigations, earthquake and landslide investigations in the states of UP and
HP.

Professional Experience :

36 years of experience in the fields of Geology


30 years of experience in Engineering Geology Conducted preliminary investigations to post construction
stage investigations spread all the over the country including Supervision and guidance of associated younger
officers.
To cite some of the important projects and critical inputs, the following are listed
Facilitated smooth negotiation of Chibro, - Khodri hydroelectric tunnel between two regional thrusts
transected by tear faults in the trifurcated tunnel reaches.
Facilitated smooth negotiation of twin tunnels of Khara hydel scheme, UP in Upper Siwalik incoherent sand
rock resembling river sand with plethora of problems of seepage, collapse and daylighting of the tunnel
Selection of Dam site of 230 m high rock fill dam for Kishau dam project which was under investigation for a
protracted period (4 decades)
Identifying source and arresting of seepage through the pressure shafts thereby saving millions of power units
a day at Kadamparai pumped Storage Hydro Electric Project. Carried out post construction stage geotechnical
investigations of the Kadamparai Dam under the Dam Safety Rehabilitation programme and brought the Dam
under Stage II inspection and remediation.
Identifying Hydraulic jacking as the cause of failure for Upper Kodayar tunnel and suggestion of remedies for
emergency and long term and tunnel put back into operation successfully
Arresting of enormous leakage through the HRT of Kakkad Hydro-Electric project, Kerala located in a major
shear zone and remedies led to putting back the tunnel into operation and commissioning of the power house
successfully

Associated with the Pykara ultimate stage hydro electric project right from investigation to arriving of an
appropriate layout for the underground power project128
Complex. Carried out construction stage investigations
recommending a series of support measures for HRT, Surge Shaft, and Pressure Shaft, Access tunnel, PH
cavern, Transformer Cavern, Bus duct tunnels, Draft tube tunnels and TRT.

Arrival of additional spillway location for additional three vents for this 100 year old Mullai Periyar Dam as a
part of Dam safety Rehabilitation measure.

Arrival of appropriate spillway location for Chalipuzha irrigation project, Kerala in a difficult foundation
media.
Assessed the health status of 95 large dams of both PWD and TNEB of Tamil Nadu and brought out
deficiencies for remediation and renovation under Dam Safety Assurance and Rehabilitation Programme.

Arrival of appropriate dam site for Punat sangchu hydroelectric project, Bhutan
Cleared difficult dam sites for construction such as Pulichintala, Gorakallu, Yellampalli, Sreesailam, left bank
tunnel project etc. and devised ways and means to tackle geotechnical issues of Jalayagnam Projects.
These projects were under investigation for more than 2-3 decades prior to association.
Post construction investigations of Neora Khola, Karia Koil, Karlapalli vagu, vottivagu, Kodai projects led to
putting back the structures in operation after total failures.

Extensive field investigations, identification and classification of faults and lineaments carried out with special
reference to Seismological inputs led to clearance of Kudankulam Atomic power plant.

Initiated studies on field identification and classification of lineaments for Proto type Fast Breeder Reactor
project of Madras Atomic Power plant. The studies led to clearance of the same.

Carried out EIA and EMP studies for the hexavalent chromium pollution in Ranipet area, Chennai resulted in
identifying the source of pollution and recommended simple and effective remedial solutions.

Carried out Megathrust Tsunami Hazard Studies in South India and came out with Tsunami Hazard Zonation
inputs.

Assessed damages to MAPS,Kalpakkam due to Tsunami as Hi-power committee Member and suggested
control and corrective measures

Abroad

Arrival of appropriate site, type of dam, recommendations of additional exploration, orientation of the
underground powerhouse site, location of Spillway, desilting chamber, prognostication of geology along the
Water Conductor System of Punatsangchchu Hydel Project, Wangdu Podrung, Bhutan

Identification of appropriate site for a 60m high dam, planning and programming of exploration for arrival of
layout for the dam and its appurtenances, interaction with Minister of Water Resources and senior officers of
Government of Afghanistan, launching the project into construction phase at the Machalgo Irrigation Project
of Afghanistan

Publication
Submitted more than 200 project reports pertaining to Hydel, Irrigation, Communication, Water supply
projects, Nuclear Power Projects and Natural Hazards investigations. Scrutinized and edited innumerous
scientific reports and technical papers on geotechnical, seismic and environmental aspects pertaining to hydro-
electric, nuclear power, Irrigation, Water Supply Projects, landfill arrangement and waste disposal, active fault
studies, pollution studies and landslide/earthquake investigations. Published about 20 technical papers in
various national and international seminars and symposia besides being the technical editor of seminar and
symposia volumes. 128
D) Education:
vii) Field of graduation and year
viii) Field of post-graduation and year
ix) Any other specific qualification
E) Experience:
vii) Total experience in highways: Yrs.
viii) Responsibilities held: a) Yrs.
Yrs.
Yrs.
ix) Relevant experience: Yrs.

F) Permanent Employment with the firm :


6 Yrs. If yes, how many years:
If no, what is the employment:
Arrangement with the firm?

Certification:

1..I am willing to work on the project and I will be available for entire duration of the project assignment
and I will not engage myself in any other arrangement during the currency of this assignment of the
project.

2. I, the undersigned certify that to the best of my knowledge and belief, this bio data correctly describes
myself my qualification and my experience.

Signature of the Candidate

Place
Date

Signature of the Authorized Representative of the firm

Place
Date

128
Curriculum Vitae

Proposed Position : Senior Survey Engineer


1. Name : Shanmugam Esakkimuthu
2. Date of Birth : 26.10.1955
3. Nationality : Indian
4.Qualification : B.E. (Civil), MBA, FIE, FIV.
Position Last Held : 1) Additional Chief Engineer TamilNadu Generation &
Distribution Corporation (TNEB) up to 31.10.13.
2) Officer on Special Duty for Underground Hydro Electric
Project up to 31.10.14.
Positions and Experience
1) Assistant Engineer: (a) Hydro Project Investigation.

(b) In charge of precision survey for


Kadamparai UG pumped storage HE project
(4x100MW) in Coimbatore district/TamilNadu.
(c) Executed UG Tunnelling works in Kadamparai
PUSHEP for 8 years.
2) Assistant Executive Engineer: (a) Executed Pykara Micro Hydel Project (2MW) in
Nilgiris District for 3 years from the beginning to
Commissioning.
(b) In charge of Pykara USHE Project (3x50MW)
Formulation works in Nilgiris District and other
works
in the Projects for 5 years.
3) Executive Engineer: (a) Executed the Pykara USHE Project (3x50 MW
Underground) from the beginning to commissioning
for 10 years, in Nilgiris District.
(b) Execution of initial works for the Bavani Barrage
Power House-I & II (2x5 MW) across Bavani River
in
Coimbatore District for one year.
4) Superintending Engineer: (a) Execution of Civil works for the Maintenance of
TNEB Power House, Tunnels, Dams and Weirs of
TNEB spreading all Over TamilNadu.
5) Additional Chief Engineer: (a) Execution of World Bank Tender Dam safety works
and Civil works for the maintenance of TNEB Power
House, Tunnels, Dams and other water contractor
System.
6) Special fields of Experience: (a) Hydro Project formulation, Planning Execution.
(b) Execution of Underground components like
128
Caverns, Tunnels and shafts.
(c) Knowledge in precise surveying for underground
Components.
(d) Executed Two Major underground Power Houses of
TNEB.
(e) Entire service of 35 years in the construction of
Hydro Electric Projects and Maintenance.
(f) Received Award for Best Engineer during 2007 from
TNEB.
(g) Attended many National and International seminars/
Workshops related to underground structures.
(h) Knowledge in World Bank Tender Project
Formulation and Execution.
Language Skills (indicate only languages in which you can work):

English can read, write and speak fluently


Hindi can read, write, speak fluently
Telugu can read, write ,speak fluently

Certification:

I, the undersigned, certify that to the best of my knowledge and belief, these data correctly describe
me, my qualifications, and my experience.

Signature of the Candidate

Place
Date

Signature of the Authorized Representative of the firm

128
Curriculum Vitae

Proposed Position : Traffic and Safety Expert


1. Name of Staff : K.JAGADEESH

2. Date of Birth : 02/05/1987

3. Nationality : Indian

4. Educational Qualification:

Post Graduation MURP from Jawaharlal Nehru Technological University, School


of Planning and Architecture, Hyderabad, 2006.
Bachelor in Planning from Jawaharlal Nehru Technological University, School of
Planning and Architecture, Hyderabad, 2004.

5. Membership of Professional Societies : A.I.T.P (Associate Member of the


Institute of Town Planners, India.

Contact Address with Phone and mobile numbers: S-1a, Amar Sindur
Complex,43, Pantheon Road,
Egmore,Chennai 600008.
(044-28552445),
9443857754.

6. Employment Record:

Summary of the CV:

Employment record relevant to the assignment:


Since October 2006 to till date : Sonne infra structures Pvt. Ltd.
Manager in Urban Planning
Division.
Master Plans:
Master Plan and Zonal Development Plans for the extended region of Vijayawada Guntur
Tenali Mangalagiri Urban Development Authority (Client: Vijayawada Guntur Tenali Mangalagiri
Urban Development Authority)
Preparation of Master Plan/ General Town Planning Scheme for Rajahmundry Municipal
Corporation Area (Client: Rajamundry Municipal Corporation, Government of Andhra Pradesh)
Revision of Master Plan / General Town Planning Scheme for Kakinada Municipal
Corporation Area (Client: Kakinada Municipal Corporation)
128
Preparation of Master Plan / General Town Planning Scheme for Nellore Municipal
Corporation Area (Client: APUSP, Commissioner and Director of Municipal Administration)
Preparation of Master Plan for Kurnool Municipal Corporation Area (Client: Kurnool
Municipal Corporation, Government of Andhra Pradesh)
Master Plan for Kathau town, Jammu (Client: Jammu Town Planning Organization)
Preparation of Master Plan for Srisailam (Client: Endowment Department, Government of
Andhra Pradesh

General town planning (GTP) or Master plans of urban areas are important tools for integrated
development through spatial, economic and infrastructure planning. GTP is a long-term plan for the
development of a city with a perspective of about 20 -30 years. It is prepared for an Urban Area to
serve as a tool to guide the process of Urban Development. It defines land use for all the areas in the
city. It Major involve in problem identification in each and every ward of the municipal Corporation
area with the help of respective councilors and the public. After the collection of data the analysis
was done in such a way that problem can be solved.
Responsibilities:
Prepared task and schedules for the project, Consultant with the clients, Collection of secondary
data, Conducted ground level surveys, land use & household surveys, Data Analysis, Conducted two
stakeholders meeting and Prepared final draft land use report and maps.
GIS Base Map:
Preparation of GIS Based Map for 31 ULB's of Andhra Pradesh [Client: Andhra Pradesh
Municipal Development Project (APMDP), CMDA, Govt. of AP (World Bank Funded)].
With large scale urbanization, most urban settlements in Andhra Pradesh require immediate
planning and adequate servicing to avoid problems associated with unplanned and adhoc growth.
One of the major requirements for urban development is to have the accurate and timely information
of the social and economic environment, physical environment, services and amenities of the urban
areas. Up-to date and detailed base maps of the urban areas are the immediate requirement to
strengthen municipal governance and improve the performance ability of municipalities/urban local
bodies, so that they would be able to discharge their duties efficiently in the planning and
development of the infrastructure and economy of urban areas.
These GIS Base Map will represent information not only the existing Building Footprints, Cadastral
Boundary and landuse of the ULB area but also represent the information about the physical
infrastructure units such as water supply, drainage, sewerage, sanitation, transportation, hoardings
128
and street Lights at a scale of 1:000 through interpretation recent date satellite imagery and
integrated existing Physical and Social infrastructure and environmental parameters of the ULB.
Finally these GIS Base Map will be superimposition on Existing Master Plan, which will help
ULB's to track the development on ground and take effective decision.
Responsibilities:
Prepared task and schedules for the project, Collection of secondary data, preparation of modulus
for collection of land use information, Conducting ground level surveys, Conducting stakeholders
meeting and Prepared of GIS Base Map.
Zonal Development Plan:
Preparation of Zonal Development Plan for 7 Zones of Pilkhuwa Master Plan, 2021 (Client: Hapur-
Pilkhuwa Development Authority, Hapur).
Zonal Development Plan is a detailed plan for a Zone conceived and prepared within the framework
of a Master Plan containing proposals for various land uses, roads and streets, parks and open
spaces, community facilities, services and public utilities, etc. Uttar Pradesh Urban Planning and
Development Act, 1973 provides for preparation of Zonal Development Plans. As per section- 9 (i)
of the above Act the Development Authority is required to proceed with preparation of the Zonal
Development Plan for each of the zones simultaneously with the preparation of the Master Plan or
as soon as may be thereafter.
Responsibilities:
Prepared task and schedules for the project, Consultant with the clients, Collection of secondary
data, Conducting ground level surveys, land use & household surveys, Data Analysis, Conducting
stakeholders meeting and Prepared final draft land use report and maps.
City Development Plans:
Preparation of City Development Plans for Barela, Barhi, Bhedaghat, Patan, Sahapura, Majholi &
Katangi towns of Jabalpur District In Madhya Pradesh.
Preparation of City Development Plan for Kotma Town in MP State
reparation of City Development Plan for Pasan Town in MP State
(Client: Urban Administration and Development Department, Government of Madhya Pradesh)
The CDP should provide a comprehensive long term strategy (Vision 2035) as well as a City
Investment Plan (CIP), based on which the concerned ULB will be able to access funds under GoI
/GoMP schemes as well as from own and other sources based on priority actions and projects
identified in the CDP .The document should also provide Financial Operating Plan (FOP) to direct
the ULBs for mobilizing various financial resources to implement the identified projects. The scope
of the services would include all necessary steps formulated in JNNURM Toolkit 2, that would help
to complete the CDP, such as Data Collection and
128Field Visits, Meeting all the Municipal Staff and
all other Stakeholders, Sector Analysis, conducting necessary workshops and completing the CDP
Report.
Responsibilities:
Preparation of land use map, infrastructure map base maps, proposed landuse map, data collection
and analysis, preparation of reports and conducting stakeholders workshop.
Other Projects:
Traffic Impact Assessment for NCC Urban Proposed Township Project at Narsinghi, Hyderabad.
To address the potential traffic impacts of the proposed project on the adjacent street system.
Responsibilities:
Collection of secondary data and primary Traffic surveys, Data Analysis, development and
prediction of trip rates for the various land use, Traffic management measures for the projected
traffic, Prepared draft report and maps.
Comprehensive Infrastructure Investment Plan for Nagari Municipality, Chittoor District :

(Client: Commissioner and Director of Municipal Administration)


The government of Andhra Pradesh is proposing to prepare Comprehensive Infrastructure
Investment Plan (CIIP) for all the newly created municipalities in Andhra Pradesh. As part of the
project, it is proposed to take up the preparation of upto data base map, utility maps, infrastructure
analysis and identification of proposals for ULBs. This study involves updating of basemaps and
records for municipal infrastructure services and preparation of a Comprehensive Infrastructure
plan. The study is defined in three stages. Stage one is preparation of base map and utilities maps
and stage two preparation of infrastructure investment plan. Stage three involves preparation of
detailed project reports for identified prioritized projects.
Responsibilities:
Preparation of proposed land use map and utility maps, Find out the deficiency in infrastructure
facility for present and future needs, Identifying the projects and Preparing the draft report.
Parking and Commercial demand assessment for GHMC Markets:
(Client: Greater Hyderabad Municipal Corporation(GHMC) and IL&FS)
Understanding the constraints of land resources with the Corporation for development of parking
spaces in the major congested areas within the twin cities and the phenomenal costs involved in
acquisition of prime land parcels in such areas, GHMC is considering addressing this requirement
by proposing to re-develop its existing markets complexes in to an Integrated Market cum Multi-
level parking facility and/or by identify Government land parcels at strategic locations, that have
been in the possession of various Government Departments or its agencies that could be jointly
developed by the GHMC as Multi-level parking facilities. These facilities are proposed to be
128
developed on public private partnership (PPP) format, where a private developer would be required
to bring in the investments and technological expertise for construction, operation and management.
Responsibilities
Prepared task and schedules for the project, Consultant with the clients, Collection of secondary
data, Conducted parking survey, activity place survey, user opinion survey and land use survey
within 250 meters radius, Data Analysis, Recommended parking system with respective to demand
and Hyderabad Building regulations G.O.86, Finance estimated and calculated NPV and B/C Ratio
for the project, Prepared draft report and maps, Conducted two review meeting with the clients and
Prepared final report and maps.
Comprehensive Traffic Study for Mahabubnagar Municipality (Client: Commissioner and Director
of Municipal Administration).
Comprehensive Traffic study (CTS) involves assisting selected Class 1 towns of Andhra Pradesh to
identify and implement traffic management improvements in the towns. The focus is specially on
analyzing the existing traffic scenario, the pattern of growth of the town in all its aspects and the
traffic and transportation requirements in the next 25-30 years, identifying the causative factors for
the traffic impediments and to suggest relief and improvement measures, both from technical and
traffic management perspective, keeping in view the increase in population, considering the
environmental, ecological, archaeological, religious issues and green city concepts.
Responsibilities
Meeting with the clients, Analyzed the primary and secondary data of the study, Presented draft
proposal of the study before expert committee of CTS, Prepared final draft report and maps,
Presented final draft proposal for the Study before expert committee of CTS, Conducted one
stakeholders meeting for finalization of CTS proposed of the town at Municipal office and Prepared
final report and maps.

OTHER PROFESSIONAL INVOLMENTS:

Worked as Research Associate for AICTE March 2006 to Sep 2006 Research project on
Urban Mapping for protection of sensitive ecosystem for Hyderabad and Tirupathi areas, under
principal advisor of Dr.P.Padmavathi Director JNTU SPA.
Worked as Urban Planner in GIT (consultant to MCH) for Nov 2005 to Feb 2006 - updated
base map, land use and preparing date base for slum of Hyderabad using GIS and also Cad operator
in Rajendra Nagar Municipality..
Worked as a Trainee Urban Planner in preparing Master Plan for VGTMUDA for May
2004 to Sep 2004 in Speck System Limited. 128
G) Permanent Employment with the firm : 6 Yrs.
Language Skills (indicate only languages in which you can work):

English can read, write and speak fluently


Hindi can read, write, speak fluently
Telugu can read, write ,speak fluently

Certification:

I, the undersigned, certify that to the best of my knowledge and belief, these data correctly describe
me, my qualifications, and my experience.

Signature of the Candidate

Place
Date

Signature of the Authorized Representative of the firm

128
Curriculum Vitae

1. Proposed Position :Environmental Specialist

2. Name of Staff : Rema Thankappan

3. Date of Birth : 26/12/1976

4. Nationality : Indian

5. Educational Qualification:

Qualification
2007- PhD (Environmental Technology- Central Leather Research Institute
synopsis submitted) Adyar, Chennai-600020(Affiliated
to University of Madras, India
1999-2002 M.Sc Environmental Technology Cochin University of Science and
Technology

Contact Address with Phone and mobile numbers: S-1a, Amar Sindur Complex,43,Pantheon Road,
Egmore,Chennai 600008.
(044-28552445), 9443857754.

AREA OF INTEREST AND EXPERTISE

Solid waste management, Bioenergy, Life Cycle Analysis, Environmental Impact assessment.

PhD thesis
Studies on removal of synthetic organic chemicals in tannery wastewater using Advanced Oxidation
Process coupled with biological and adsorption process 2007-2016
Supervisor: Dr.S V Srinivasan
Environmental Technology Division
Central Leather Research Institute
Adyar, Chennai-20, India

M.Sc. Dissertation
Removal of Sulphate and recovery Sulphur recovery from tannery waste water by biological and
chemical method. 2001-2002

Supervisor: Dr. E Ravindranath


Environmental Technology Division
Central Leather Research Institute
Adyar, Chennai-20, India
128
Award and Honors

Women Scientist Fellowship program (WOS-C by DST) under KIRAN-IPR 2016

NABET accredited Functional Area Expert in WP (category A), MSW&ISW category B)-
2015

German Federal Ministry for Education and Research (BMBF- DAAD) fellowship for IGCS
summer School program on sustainability (Solid and liquid waste management) - 2014, at
University of Stuttgart, Germany

Robert S Mc. Namara Fellowship (World Bank Institute, USA)-2012 (University of


Technology, Sydney)

CSIR-Senior Research Fellowship (Council of Scientific and Industrial Research,


NewDelhi-2007)

Commonwealth Fellowship 2006 (MA Sustainable development, Part time-Madras University


Staffordshire University Partnership program

Research Experience
Year Organization Designation Nature of Work
Environmental Project Fellow Isolation and identification of
June2002- Technology (New millennium fermentative bacteria from
April 2006 Division Indian Technology UASB, Studies on the reduction
Central Leather Leadership Initiative of coliforms from the domestic
Research Institute, Council of Scientific sewage treated with UASB
Adayr, Chennai, and Industrial Research followed by waste stabilization
India NMITLI-CSIR) ponds, decolorization of
secondary treated effluent by
white rot fungus, decolorization
of leather dyes using ozonation,
Performance and evaluation of
common effluent treatment
plants (tannery). Tannery
wastewater treatment using
MBR, Sulfur recovery and
reduction of sulfur in tannery
wastewater using UASB.

Centre for Project fellow (Swedish Screening of Hazardous organic


May 2006- Environmental International compounds in urban municipal
Nov 2006 Studies, Anna Development solid waste
University, Authority-SIDA)
Chennai-India

128
April 2006- Environmental Senior Research Fellow Studies on removal of synthetic
April 2010 Technology (CSIR-SRF) organic chemicals in tannery
Division PhD thesis wastewater using Advanced
Central Leather oxidation process followed by
Research Institute, biological treatment in various
Adayar, Chennai, treatment process
India
May 2012- University of Visiting PhD Student Degradation of synthetic
Nov-2012 Technology, (RSM fellowship, tanning agent using Fenton
Sydney World bank) followed by bio- filtration and
Toxicity studies using
Microtox.

Environmental PhD Student Studies on removal of synthetic


Dec 2012- Technology organic chemicals in tannery
May 2015 Division wastewater using Advanced
Central Leather oxidation process followed by
Research Institute, biological treatment,
Adayr, Chennai, Minimization of sludge
India production using ozone,
Nitrification/ Denitrification
process in nutrient removal
from tannery wastewater.
Nutrient removal from tannery
wastewater using algae and
energy recovery.

June 2015- Suriya Mining Environmental Evaluation of Environmental


Mar 2016 Service, Scientist/Functional parameters on air, water and
Salem/Chennai, Area Expert in water soil before and after mining,
Tamilnadu, India pollution and Industrial Preparation of mining plan and
Solid waste (NABET) EIA report for mineral mining

April-2016- Lakshmikumaran Women Scientist as Preparation of Patentability


April2017 and Sridharan IPR trainee under report, Patent drafting for
Attorneys, WOS-C (TIFAC_PFC, provisional and Complete
Chennai -83, India Department of Science Specification for filing patent in
and Technology, India and Patent Treaty
Cooperation, Patent Mapping

PUBLICATIONS

1. Rema Thankappan, Anne Colville, Fluer Pablo, S V Srinivasan ,Tien Vinh Nguyen, Jaya
Kandasamy, Saravanamuth Vigneswaran, Effects of Fenton oxidation and GAC adsorption
on the toxicity and organic carbon content of an aromatic sulfonic acid syntan, Chemical
Engineering journal (Submitted)
128
2. G.Sivasankari, T Rema, SV Srinivasan, R Suthanthararajan, Phycoremediation for removal
of nutrients from wastewater, Ecotoxicology and Environmental safety (communicated)

3. RemaThankappan, S V Srinivasan, R Suthantharajan, Mika.Sillanpaa Removal of phenol


sulfonic acid syntan using ozonation and its Kinetics, Environmental Technology
(accepted)

4. Nazeeha Ayaz, Rema Thankappan, Srinivasan SV, Tamil Selvi A Studies on


decolorization of Acid Blue 113 using Staphylococcus aureus and Escherichia coli isolated
from tannery wastewater, International Journal of Innovative Research in Science,
Engineering and Technology.

5. V Dhanalakshmi Sridevi, T Rema, SV Srinivasan,Studies on biogas production from


vegetable market wastes in two phase anaerobic reactor, Clean Technologies and
Environmental Policy 17(1-3), 2015, 1689-1697 IF 1.934

6. Rema Thankapan, Vinh Tien Nguyen, Srinivasan S V, Vigneswaran. S, Jaya Kandasamy, P


Loganathan Removal of leather tanning agent syntan from aqueous solution using Fenton
oxidation followed by GAC Journal of Industrial chemistry and engineering 21, 2015, 483-
488 .IF 4.179

7. Rema Thankappan, R.A.Ramanujam Decomposition of aromatic sulphonic acid syntan in


aqueous solution using ozone. International Journal of scientific and industrial research.71
(03) 2012, 363-368. IF 0.5

8. S. V. Srinivasan, T. Rema, K.Chithra, K. Sri Balakameswari, R.


Suthanthararajan.Umamaheswari, E. Ravindranath, and S. Rajamani 2009, Decolorization
of Leather dye by Ozonation, Desalination, 235(1-3), 2009, 88-92.IF 4.412

9. Swati M, Rema.T, Kurian Joseph 2008 Hazardous Organic compounds in Urban Muncipal
Solid Waste from Developing Country. Journal of Hazardous materials 2008, 160 (1) 213-
219. IF 4.529

10. T. Rema, S. V. Srinivasan, B. Umamaheswari, K. Sri Balakameswari, E. Ravindranath,R.


Suthanthararajan and S. Rajamani , Colour Removal of Tannery Effluent using Trametes
versicolor Indian Journal of Environmental Protection, Vol. 25, No. 9, September 2005, 784

International and National Conference

1. G.Sivasankari, T.Rema, S. V. Srinivasan, R.Suthanthararajan, Phycoremediation for


removal of nutrients from wastewater, International Conference on Green Technology for
Environmental Pollution Prevention and control (ICGTEPC 2014) National Institute of
Technology Tiruchirapalli (NITT), India, 27th -29th September 2014.

2. Aneteh Genet, T.Rema,S. V. Srinivasan, R.Suthanthararajan, E.Ravindranath, Reduction of


excess bio-sludge generated from tannery wastewater treatment plant using ozonation,
Third international conference on advanced oxidation processes AOP-2014, M Mahatma
128
Gandhi University, Kottayam, 26-28th September 2014
3. K. Priyadharshini, T. Rema, S. V. Srinivasan, E. Ravindranath, S. Sivaraja and R. Parthiban,
Simultaneous Nitrification and Denitrification of Tannery Wastewater in Sequencing Batch
Reactor, International Conference IPHE-ENVISION 2025, Chennai, TN, March 12- 14,
2014.

4. Anne Collville, Rema Thankappan, Fluer Pablo, Sangeev Santhirasegaram, Vinh Tien
Nguyen, Saravanmuthu Vigneswaran, Effect of treatment with Fentons reagent and
granular activated carbon on the toxicity of synthetic tanning agents (syntan) poster
presentation in SETAC Australasia - Melbourne 2013

5. Rema Thankappan, Srinivasan S V S. Vigneswaran, R Alwar Ramanujam Degradation of


Phenol Naphthalene Condensation Product Used in Leather Processing By Ozonation" at the
ICEPI 2012 International Conference on Environmental Pollution and Impacts, Paris, France
during November 28-29,2012.

6. Rema Thankapan, Vinh Tien Nguyen, Srinivasan S V, Jaya Kandasamy, S. Vigneswaran, R


Alwar Ramanujam Fentons oxidation as a pre-treatment for the degradation of phenolic
Syntan followed by activated carbon adsorption Proceedings of the International conference
on Challenges in Environmental Science & Engineering 9 - 13 September 2012, Melbourne,
Australia

7. T.Rema, B.Parivallal, R.A.Ramanujam Studies on Degradation of syntan used in Leather


Tanning process Proceedings of the International conference on Environmental Science
and Technology (ICEST 2010), Bangkok, Thailand 2010, pp-573-576.

8. S.Shamshath Begum, R.A.Ramanujam, S.Sadulla, T.Rema, Lima Rose Miranda, Removal of


Remazol Red 5B Using Rubber Wood Activated Carbon, Proceedings of 23rd International
Conference on Solid Waste Technology and Management, Philadelphia, PA USA, March
30-April 2, 2008
9. M.Swati, T. Rema and Kurian Joseph, Hazardous oranic pollutants in municipal solid waste
Qualitative screening and batch studies on co-disposal of phenol, Proceedings of the
International conference on cleaner technologies and environmental management, PEC,
Pondicherry, India, January 4-6, 2007, pp- 264-269

10. B.Umamaheswari, T.Rema, R.Suthanthararajan, Chitrakalyanaraman, E.Ravindranath,


S.Rajamani., Role of sulphate reducing bacteria in sulfate reduction National conference
on Recent trends in industrial wastewater management for Sustainable Development March
17,2004 Annamalai University, Tamilnadu, India.

Scientific and Technical Skills,

Scientific paper writing, Scientific project proposal writing, Project report preparation,
Patent drafting for provisional and complete specification, Patent mapping and Patent
analysis
128
MS Office, Origin pro, Chemdraw, Chemsketch ACD labs, Minitab

Chemical analysis of BOD, COD, sulphide, Sulphate, Chloride, Chromium, Hardness,


Acidity, Alkalinity, Solids, TKN and Volatile Fatty acids. Identification and quantification
of organic compounds using different method (Solid phase Extraction, Solid phase Micro
extraction).

Instruments Handled

HPLC (Dionex, Jasco), GC-MS (Agilent), LC MS ( Wat er s- Aquit y) , Io n


chro mat ogr aph ( Met ro hm), I CP - OES ( Prodig y) , ( FT-IR (Perkin Elmer, Shimadsu),
TOC analyser (SGE Anatoc, Shimadsu, Analytik Jena), Toxicity Analyser Microtox M500.

Scientific leadership in Academic setting

Guided 11students in the research area of Environmental Science and Technology for B.Tech
/ M.Tech / M.Sc students of Environmental Engineering & Environmental Science of Anna
University, India and Cochin University of Science and Technology, India, Jawaharlal Nehru
University of Technology, Kakinada India and Columbia University
Languages Known

English (Read, Write, Speak- Fluent), Malayalam (Read, Write, Speak-Fluent), Hindi
(Read, Write, speak- Limited), Spanish (Read, Write, Speak- Basic), Tamil (Speak-
Basic)

Certification :
I, the undersigned, certify that to the best of my knowledge and belief, these data correctly describe
me, my qualifications, and my experience.

Permanent Employment with the firm : 6 Yrs.

Signature of the Candidate

Place
Date

Signature of the Authorized Representative of the firm

128
Curriculum Vitae

Proposed Position : Quantity Surveyor

1. Name of Staff : S.DURAIRAJ

2. Date of Birth : 12/07/1966

3. Nationality : Indian

4. Educational Qualification:

Bachelors Degree in Civil Engineering from Madurai Kamaraj University in 1988.

Technical:

P G Diploma in Computer Applications.


Building Safety Supervisor Course, Singapore.
Certificate Course in Lifting Supervisor Course, Singapore.

Contact Address with Phone and mobile numbers: S-1a, Amar Sindur Complex,
43, Pantheon Road, Egmore,
Chennai 600008.
(044-28552445), 9443857754
5. Employment Record:

Organization Designation Experience Reference


Sonne Infrastructure Private
Limited Company Director 2012-Till Date
Construction Of Chennai One
Phase II Project At Chennai GM - Projects 2010- 2012
Integreat PMC PVT LTD,
Bangalore

Satyasree Developers (I) Pvt Ltd Gm - Technical 2009 - 2010


E.S Project Management Senior Project 2008 - 2009
Consultants Pvt Ltd Manager
Pro Max Management
Consultants (I) Pvt Ltd. Project Manager 2007 - 2008
Alnaboodah Contracting Llc, Senior Project 2004 - 2007
Dubai Engineer

Ssang Yong Engg. & Const. Co. Project Engineer 2000 - 2002
Ltd., Seoul, South Korea
SsangYong GuanHo J/V, Project Engineer & 1996 -1999
Singapore Asst. to the
Construction 128
Manager \
Taisei Corporation, Singapore. Assistant Engineer 1994 - 1996

E.S Consultancy Services, Site Engineer 1988- 1994


Madurai

Summary of the CV:

Employment record relevant to the assignment:

Period : Till date-2011


Employing organization
And your title/position. : Director of Sonne Infrastructure Private Limited Company.
Country : India, Chennai.
Summary of activities : Detailed designs, construction and development of multistoried residential
and commercial projects on its own and also in joint ventures besides carrying out Consultancy assignments in
areas of tunnel and hydro power projects. The turnover for the financial year 2014-15 is Rupees 14 Crores

Period : 2010-2012
Employing organization
And your title/position. : GM - Projects of Integreat PMC PVT LTD, Bangalore.
Country : India, Bangalore.
Summary of activities : Entirely responsible for the Design Coordination and the Construction
Management for the Construction of 25.0 lac sqft building . The work consists of the Construction of G+11
floors of each 2.5 lakh sq.ft and the Services such as Firefighting, PHE, Electrical including DG, LT/HT etc.,
Lifts, HVAC and BT Roads, Soft-soaping and the Landscaping and the other External Services such as Water
tank and Sewage Treatment Plant.

Period : 2009-2010
Employing organization
And your title/position. : GM - Technical of SATYASREE DEVELOPERS (I) PVT LTD
Country : India, Madurai
Summary of activities : Entirely responsible for the Design Coordination and the Management of
Construction of the Satya Elite Residential Building at Natham, Madurai. The work consists of the
Construction of 7 Buildings having a net built up area of 2.5 lakh sqft and the Services such as Firefighting,
PHE, Electrical including DG, LT etc., Lifts, HVAC and BT Roads, Softscaping and the Hardscaping and the
other External Services such as Water tank and Sewage Treatment Plant.

Period : 2008-2009
Employing organization
And your title/position. : Senior Project Manager E.S Project Management Consultants PVT LTD
Country : India, Madurai
Summary of activities : Entirely responsible for the Design Coordination and the Construction of
the Engineering College Building at Madurai and other amenities such as Hostel building and other
Infrastructure works. The work consists of the Construction of Buildings and the Services such as, PHE,
Electrical & etc., BT Roads, Softscaping and the Hardscaping and the other External Services such as Water
tank and Sewage Treatment Plant.
128
Period : 2007-2008
Employing organization
And your title/position. : Project Manager
Country : India, Hyderabad.
Summary of activities : Entirely responsible for the Construction of the Basement + G + 3 Facilities
Building on behalf of the General Managers. The work consists of completing the Buildings (Shell & Core)
and the High Side for Services such as Firefighting, PHE, Electrical including DG, UPS, LT/HT etc., Lifts,
HVAC and Structural Glazing along with Cladding, Softscaping and the Hardscaping and the External
Services

Period : 2004-2007
Employing organization
And your title/position. : Senior Project Engineer
Country : India, Dubai
Summary of activities : Responsible for the Construction of the Four floor Car park + 28 floor
residential buildings on behalf of the Project Manager. The work consisted of completing the Buildings (Shell
& Core) and the High Side for Services such as Firefighting, PHE & etc., Lifts and Structural Glazing along
with Cladding, Softscaping and the Hardscaping and the External Services.

Period : 2000-2002
Employing organization
And your title/position. : Senior Project Engineer
Country : India, Dubai
Summary of activities : Responsible for the Construction of the Four floor Car park + 28 floor
residential buildings on behalf of the Project Manager. The work consisted of completing the Buildings (Shell
& Core) and the High Side for Services such as Firefighting, PHE & etc., Lifts and Structural Glazing along
with Cladding, Softscaping and the Hardscaping and the External Services.

Period : 1994-1996
Employing organization
And your title/position. : Assistant Engineer
Country : India, Singapore
Summary of activities : Responsible for Structural RCC Works, Architectural (both wet & dry walls)
and Finishing Works included Flooring, Suspended Ceiling Works, Timber Doors, Fire Rated Doors, Metal
Doors & Windows, Aluminum Doors & Windows, Tiling Works, Water-Proofing, Plumbing and Sanitary,
Aluminum Cladding Works, Raised Access Floors, Fire Rated Dry & Glass.

A) Education:
x) Field of graduation and year
xi) Field of post-graduation and year
xii) Any other specific qualification
B) Experience:
x) Total experience in highways: Yrs.
xi) Responsibilities held: a) Yrs.
Yrs.
Yrs.
xii) Relevant experience: Yrs.

C) Permanent Employment with the firm :


6 Yrs. If yes, how many years:
If no, what is the employment:
Arrangement with the firm? 128
Certification:

1. I am willing to work on the project and I will be available for entire duration of the project assignment
and I will not engage myself in any other arrangement during the currency of this assignment of the
project

2. I, the undersigned certify that to the best of my knowledge and belief, this bio data correctly describes
myself my qualification and my experience.

Signature of the Candidate

Place
Date

Signature of the Authorized Representative of the firm

Place
Date

128

Potrebbero piacerti anche