Sei sulla pagina 1di 6

Arsiteknya : Estudio M/SG/S/S/S und

Urgell/Fazio/Penedo/Urgel
Introduction
Ministro Pistarini International Airport, commonly known as Ezeiza Airport, is the
international air terminal quintessential Argentina. It is named after the main
promoter of the project.

It was officially opened on April 30, 1949, during the first presidency of Juan
Domingo Peron. At the time, it was the worlds largest airport. Currently accounts
for 85% of the international traffic in Argentina, which is devoted almost
exclusively, since domestic flights to neighboring countries and preferably use
the central Aeroparque Jorge Newbery.

Took over the airport in 1998, Argentina Airports 2000, as part of the privatization
of the National Airport System.

The expansion and renovation was in charge of M / SG / S / S / S Architects


study.

From the award worked on program development in collaboration with the SEA
Milan, member of the dealer group of 32 airports in Argentina.

On the 12th. Editing the World Travel Awards (2005) held in London, was named
the best airport in South America.

Currently, next to the International Airport of Guarulhos in Sao Paulo (Brazil), has
the privilege of being the only Latin American airports connected with five
continents: Africa, America, Asia, Europe and Oceania.

In 2008, with an investment of $ 400 million, began a new extension of 160


thousand square meters on the platform sector. To open in 2012 is expected.

Location
It is located in Ezeiza, Buenos Aires province, on the outskirts of the City
of Buenos Aires.

It is accessible by private car or bus Riccheri highway, on lines 8 and 51 that


reach the interior of the property.

Concept
An air terminal is a landmark building. There, the visitor receives the first image
of the country. In the first remodeling of 1998, the basic premise was to create
this change from presenting in front of the existing building and along the road a
new technology solution architecture that was in line with the times and space
requirements of an international airport.

The proposal raises spatial Terminal cleaning, eliminating the existing visual
pollution.
The important architectural joint parts has been performed with the aim of
improving the movement and direction of movement stress to be taken by
passengers.
Architectural ideas consider the need for non-stop operation of the Terminal,
emphasizing the idea precise makeover shortly. It was a major project for the
development of the impossibility of reducing the functionality of the Terminal by
more than 25%, as required by international standards concept. Based on this
premise was necessary to consider passenger comfort during the making of the
work, trying to get the same cause the least possible inconvenience.

The lay out provides for the possibility of a phased development work. The
proposal states clearly differentiate traffic flows of passengers, departures and
arrivals.

Spaces
The central space of the first remodeling is the great departure hall of Terminal A:
a single area of 160 meters long and 32 meters deep, covered by a metal
structure covering the light cross 32 meters without intermediate supports. The
volume has a sloping roof designed a variable height between 20 and 15 meters,
which arises from the need to splice the new building with the existing Terminal.
The skylights are generated between the slightly curved metal panels that act as
suspended ceilings, skylight sifting.

From the platform that leads to the level of loading, the large window lets you see
the planes taking off. Access to the building is from the longitudinal facade. The
great hall welcomes the traveler facing with 90 counters check-in. There is one
open space where the escalators are strategically located, glazed lifts, corporeal
signs and all the elements that serve passenger trade circumstantial, bars and
wait.

Since the completion of this work, the arrivals and departures areas were
separated by using the new building as departures hall and the old arrivals hall.
This flow problem preventing the departing passenger will cross with that comes,
also resolving the difficulty of designing two movements at the same level is
solved. Architectural decisions were related to the communication needs of the
passenger. An airport needs spaces for visual communication, resolved through
signposting monitors, etc. Thus, the location of these elements determines the
architecture, since surfaces that contain them must be created.

Taking advantage of the road project, which commands the passage of vehicles,
the entries are emphasized with the addition of a large canopy that precedes and
dialogues by technological similarity with the departures hall, a ship with a large
interior glazed specialty.

At the same time in the arrivals hall space with a central glazed roof, which
retrieves the lost ground luminosity was proposed. In relation to the functional
aspects, the ground floor is organized and designed so that the passenger pass
and do not stop. Instead upstairs reverse result occurs: it opens outward toward
the outside, which is where the plane carrying it.

The building of the hall consists of two elements: a base where the access,
shops and offices, and the great ship that expresses the metal structure 32
meters clear span.
The airport is divided into two terminals, and Aerolineas Argentinas terminal
Internacional.Las two terminals have a commercial sector as well as medical
services, banks, pharmacy and a tourist information center. It also operates a
food sector.

System monitoring and control individual lights are also installed. Later the two
main tracks were renewed. The lighting system of the airport was equipped with
a new system approach, new indicator start and end runway lights, a full landing
area and a central line system, systems PAPI, new side and center lights for
taxiways new constant current regulators and electric transformers. Work on the
crossing of the two tracks was a challenge, since they were carried out without
disrupting air traffic operations. As a result of works, since December 2002, both
runways were recategorized to CAT IIIa by ICAO. The next step was the
installation of a new ALCS (Airfield Lighting and Control System or Lighting and
Control System Airport) and an update to the system monitoring and control
individual lights (a DOS version to an interface-based operating system
Windows).

Traffic flows
Circulatory flows of passengers, departures and arrivals are clearly different.
Cash Games: The road linearly organizes the location of the access to the
Terminal. Before them, in the great ship glass banks are organized check in, then
go up two cores located in the great hall. The furthest from the existing building
communicates with a rolling road going balconeando offering a ride to the new
hall before reaching the pre-Games respective controls areas. After the
sequence of security checks and passports (PAN), you access the waiting room,
waiting hall flights, with access to shopping areas, free shop, confectionery, VIP
rooms, etc.
Finally you access gateways to address aircraft.

Streams items (aircraft remote option)

After security checks and immigration, the passenger floor to a waiting room
boarding aircraft that are far from the jetty.
Flow Arrivals

He entered for any of the sleeves go down to ground floor; by vertical circulation
cores at passport control and, after passing through the free trade area of shop,
you enter the courtyard baggage drop. After made the customs formalities, you
reach the arrivals hall passing laterally to the central area where the food court
double height develops.

Flow arrivals (aircraft remote option)

The passenger bus descends and enters the hall Arrivals Control North and
South on ground floor.

Arrivals cabotage

A dock is used only for the platform bus: passengers collect luggage at the port
basin and enter the arrivals hall with the same possibilities egress of passengers
who landed international flights.

New Roads, ground transportation, vehicular parking within the Airport


connection between Building Passenger and access roads

It takes as its premise the flow separation Arrivals and Departures in the
vehicular system, the separation criteria for the type of transport: private cars,
taxis, limos and buses.

Parking: A three-level building was projected, two covered and one


uncovered a total of 528 vehicles. However, the expansion of the parking
lot, the volume of the new emerging departures hall stars in the
perspective you get when you get to the air terminal, setting a new image
of it.

The new configuration creates greater perimeter sidewalks and efficient and
convenient connection between the building and the new passenger ingress and
egress routes.
Materials
The basement hall building was realized with a carpenter sanding horizontally
striped glass, topped with a silver metalic alpolic valance that runs the entire
length of the building to the west. The great ship has a metal frame glass
enclosure evergreen color.

Ahead of western marquee above parts unfolds: metal frame with lights support
of 40 meters and a roof made of prepainted sheet rajas including polycarbonate
panel. With lesser lights takes place in the front of the marquee this air zone with
similar characteristics.

Structure
The highlight of the building is the metal roof structure, developed based on the
design of an articulated truss allows light cover 32 meters without intermediate
supports.

Sumber : https://en.wikiarquitectura.com/building/page/5/

Potrebbero piacerti anche