PIT CLEANING TIMELINE

Date: 15-Sept-2017
From To
00:00 01:00
01:00 06:00
06:00 12:00
12:00 13:00
13:00 18:00
18:00 20:30

20:30 21:00

21:00 00:15

Date: 16-Sept-2017
From To

00:15 01:15

01:15 02:30
02:30 05:30

Pits Capacity
PIT#1 580
PIT#2 580
PIT#3 380
PIT#4 A 170
PIT#4 B 94
PIT#4 C 94
PIT#6 80
PIT#7 360
PIT#8 225
PIT#9 150
PIT#10 460
PIT#11 460
PIT#12 500
PIT#13 480
Sand traps 600
Reserve PIT#1 460
Reserve PIT#2 460
Brine Tank 2300
TRIP Tank 50
Mixing Pump Manifold
STRIP TANK
Transfer Pump Manifold
Mud Pump Manifold/Buffe
Choke Manifold
Kill Manifold
Marine Manifold
PIT CLEANING TIMELINE

017
Details
Opening PTW and mobilizing equipment to clean Pit 3.
Cleaning Pit-3 , Gumbo box, ditches, shakers with 8 personnel.
Cleaning tanks Pit 3 & Pit 7 & Manifold
Filtration unit made ready
Filtration of Brine
Preparing Brine 11.2 ppg , inspecting lines , Pits ( density & NTU )

Held PJSM for Filtered Brine Displacement while circulating SW ( NTU out of the well
-13 )
Displaced the well with Filtered CaCl2 brine 11.2 ppg ( Pits Avg NTU - 14 ). Total
strokes 12000. Filtered CaCl2 brine out of the well - NTU 27.

017
Details

Closed overboard discharge valves. Lined up surface circulation system bypassing


gumbo box, shakers. Taking the return direct to Pit # 2 & Mud Pump suction from Pit
# 1. Flushing Transfer line from Pit # 2 to Filtration Unit.

Circulated 866 bbl (7250 stk) of Filtered brine from the well to Pit # 2 > Filtration
Equipment > Pit # 1 > Mud Pumps. Filtration Equipment were capable to handle 450 -
500 gpm on the fly. NTU out of the well : 01:30 = 25 , 02:00 = 25 , 02:15 = 21 , 02:30 =
19 . NTU out of the Filtration Eqpt = 7.
P.O.O.H.

Details Vol (bbls)


FILTERED BRINE - NTU 14 350
RETURN FROM THE WELL
Empty
DEAD VOLUME HIGH VISCOSITY PILL
DEAD VOLUME HI-VIS PILL
DEAD VOLUME WASHING PILL II
DEAD VOLUME THIN PILL
Empty
Empty
Empty
Empty
Empty
Empty
Empty
Empty
DIRTY BRINE 400
Empty
CALCIUM CHLORIDE BRINE 1500
FILTERED BRINE - NTU 14 20
FILTERED BRINE - NTU 14
EMPTY

CLEANED
CLEANING IS IN PROGRESS
DIRTY
MW (ppg)
11.2
10.5

11.4
11.2
PIT CLEANING TIMELINE
Date: 19-Aug-2017
From To
18:00 24:00
Date: 20-Aug-2017
From To
0000 10:00
10:00 20:00
20:00 24:00
Date: 21-Aug-2017
From To
0000 06:00
06:00 20:00
20:00 24:00
Date: 22-Aug-2017
From To
0000 03:00
03:00 06:00
06:00 12:00
12:00 24:00
Date: 23-Aug-2017
From To
0000 10:30
09:30 10:30
10:30 12:00

Pits Capacity
PIT#1 580
PIT#2 580
PIT#3 380
PIT#4 A 170
PIT#4 B 94
PIT#4 C 94
PIT#6 80
PIT#7 360
PIT#8 225
PIT#9 150
PIT#10 460
PIT#11 460
PIT#12 500
PIT#13 480
Sand traps 530
Reserve PIT#1 460
Reserve PIT#2 460
Brine Tank

Note: We have TEN more tanks yet to be cleaned denoted by Red Colour.
PIT CLEANING TIMELINE
017
Details
Cleaning Pit-1
017
Details
Cleaning Pit-1
Cleaning Pit-2
Mixed PHG in Pit-1 & Pit-2
017
Details
Mixed PHG & clear the Bentonite plugged line
Cleaning Pit-3
Cleaning Pit-4A
017
Details
Cleaning Pit-4A
Backload SOBM to OSV Fulmar
Resumed Cleaning Pit-4A & Sand Traps, Gumbo Ditch
Cleaning Pit-4B
017
Details
Cleaning Pit-4C & WBM mixing in Pit-3 (Personnel working on Mud Pumps)
Cleaning Santrap Tanks (Personnel Moved to Rig floor)
Cleaning Pit-4C & Filling Seawater / Baraklean in Pit # 4A & 4B

Details Vol (bbls)MW (ppg)


Gel/Polymer WBM 400 8.6
Gel/Polymer WBM 500 8.6
Gel/Polymer WBM 350 11.6
Empty
Empty
Empty
Empty
Empty
Empty
Empty
Empty
Empty
Empty
Empty
Empty
Empty
Empty
Empty 1980 11.4

CLEAN TANKS
CURRENTLY CLEANING IN PROGRESS
YET TO BE CLEANED

Note: We have TEN more tanks yet to be cleaned denoted by Red Colour.