CURRICULUM VITAE

ENGR. ABDUL NOMAN MALIK

PERSONAL DATA AND CONTACT DETAILS:

Father Name Abdul Mannan Malik


Nationality Pakistani
Passport Available (Expiry 2018)
Date & Place of Birth 13 June 1981 / Pakistan
Marital Status Married; Two (2) Children
(a) Member Saudi Council of Engineers
Affiliation with Professional Institute
(b) Member Pakistan Engineering Council
Driving License Issued from Saudi Arabia & Pakistan
Contact No: (a) +966-594976174
Email ID: noman708@hotmail.com
Skype ID: abdul.noman.malik
Permanent Address 169-D/II, Wapda Town, Lahore-54770,Pakistan
Current Residence Riyadh, Saudi Arabia

TARGETED JOB AREAS:

1. Project Management (Projects Control / Planning / Scheduling)

EDUCATION:

Sr. No. Degree Institution Session Grade

University of Engineering &


1 B.E Mechanical 2001 - 2004 A
Technology, Lahore, Pakistan

F.Sc Pre- Govt. F.C Collage, Lahore,


2 1998-1999 A
Engineering Pakistan

Crescent Model Higher


3 Matriculation Secondary School, Lahore, 1996-1997 A+
Pakistan

Page 1 of 11
CERTIFICATION:
Certification in Engineering Project Management from University of Engineering &
Technology, Lahore, Pakistan

PROFESSIONAL TRAINING & COURSES:


Time Management Course conducted by THE KONSULTANTS.
HFO / L.O Purification and separation course conducted by ALFA LAVAL.
Training on complete operation & maintenance of Jenbacher JGS 620 GS engines.

SKILLS & COMPETENCIES:


Plan and manage projects, prepare material, cost & timing estimates and reports for
machinery and systems.
Review all electrical, electro-mechanical & civil base & detail designs / calculations /
drawings / documents received from design consultant, vendors/manufacturers and to
ensure that these have been prepared as per applicable codes / standards / TMSS / TES
/ TCS / TSD / SEED-II and finalized PTS.
Preparation of BOQ from detailed drawings.
Preparation of complete work packages for sub-contracting of MEP works.
Well conversant with IEC, IEEE, API, ASTM & ASME standards.
Supervise and inspect the installation, modification and commissioning of electrical &
mechanical systems at construction sites or in industrial facilities.
Make the detailed Project Operating Budget for each project & review the same on
quarterly bases to ensure that slippage remains controlled.
Monitor and control periodic operating expenditure to improve performance and
prepare accountability reports.
Develop maintenance standards, schedules and programs and provide guidance to
industrial maintenance crews.
Prepare contract documents and evaluate tenders for power plant/substation projects.
Supervise technicians, technologists and other engineers and review and approve
designs, calculations and cost estimates.
Good team player & able to work under strict deadlines. Also, capable of performing
jobs independently within the narrow time frame.
Routine operation & maintenance of thermal power plant (including all
accessories/equipment like air compressors, R.O Plant, purifiers, clarifiers, viscometer,
viscotherm, heat exchangers, positive displacement & centrifugal pumps, air distributor
etc).
Monitor and inspect plant equipment, computer terminals, switches, valves, gauges,
alarms, meters and other instruments to measure temperature, pressure and fuel flow,
to detect leaks or other equipment malfunctions and to ensure plant equipment is
operating at maximum efficiency.
Maintenance of generators, steam turbines, pumps, compressors & HVAC PACU
(Precision Air-Conditioning) units using appropriate lubricants and hand, power and
precision tools.
Analyze and record instrument readings and equipment malfunctions.
Analyze dynamics and vibrations of mechanical systems and structures.
Investigate mechanical failures or unexpected maintenance problems.
Prepare units/equipment preventive maintenance schedules & execute accordingly.
Also perform corrective actions and minor repairs to prevent equipment or system
failure.
Maintain a daily log of operation, maintenance and safety activities, and write reports
about plant operation.
Development of operation, maintenance and safety procedures. Also enhancing self
knowledge of industry and international codes & standards for pumps, compressors,
cooling water system equipment, piping material selections & testing etc.

Page 2 of 11
DETAILED PROFESSIONAL WORK EXPERIENCE:

I. Name of Sponsor : Al-Othman Consultants


Title of position : Planning EngineerSEC (Saudi Electricity Co.)
Location of Job : Riyadh, Saudi Arabia
Duration : August 2015 till date
Reporting to : Group Leader Transmission Lines, EHVPD-COA

EMPLOYER PROFILE
Al-Othman (ORA) Group of Compnies ORA was established by Mr. Othman R. Al-Othman ,in
1987 who is an Engineer started his first venture in Engineering Consultancy with sole aim
of providing professional services in the field of engineering geared to meet man's needs for
a better living. As of now, ORA operate in diversified fields like Health, IT and Engineering
Project Management Services. Its major clients for Engineering Project Management
Services are Saudi ARAMCO, Saudi Electricity Company and Saudi Telecom Company.

JOB RESPONSIBILITIES
Al-Othman Consultants have out-sourced my services to SEC (Saudi Electricity Company) in
Central Operating Area (COA). I am currently working in Extra High Voltage Transmission
Line Project Department (EHVPD-TL) and I have been assigned three (3) projects - 380 kV
Under Ground Cable specially for Metro Supply & one (1) 380 kV Under Ground Cable
project in ERQA area for increasing overall capacity of grid. My current job responsibilities
includes but are not limited to:

Provide Project Planning / Scheduling support services for the Projects.


Establish and maintain Project control plans and schedules, including Project Master Plan,
Gant Charts, progress S-Curves and risk register for reporting to SEC Senior Management.
Review the Project Plan & Schedule provided by contractors and monitor the Project
Performance.
Analyze and propose improvements to contractor schedules, including use of critical path
analysis and resource loading.
Monitor and report progress against the Project control schedules.
Closely monitor the contractor procurement schedule and periodically highlight the
critical and important deliveries.
To make sure the contractor has required resources available as per available work front.
To make sure the RFIs are raised by contractor immediately after deliveries of
equipment. Also to ensure the RFIs are attended by SEC Consultants within proper time
frame.
To ensure that work is being executed at site exactly as per approved design and quality.
Generate plan and schedule summaries and similar presentational material as required by
the SEC Higher/Top Management.
Update overall progress, preparing detailed daily, weekly and monthly reports for SEC
Senior and Top Management.
Check and verify the contractor monthly invoices.
Review and approve the Project Plans and Schedules for other projects as instructed from
SEC Head Office.
Hold Weekly Progress Meetings with Contractors at all four (4) Project Sites.
Guide contractor well ahead about any unforeseen issues related to designs, procurement
and construction activities.

Page 3 of 11
Properly guide the contractor about trouble shooting issues related to coordination with
other Government agencies.
Maintain the record (both in hard and soft form) for all approved drawings and submittals
from SEC.
To make sure the contractor is executing all project jobs in-line with PTS and SEC
Standard requirements.

II. Name of employer : e2e Business Enterprises


Title of position : Project Engineer & In-charge Planning Deptt.
Location of Job : Muredke, Pakistan
Duration : March 2013 to May 2015
Reporting to : Project Manager/Plant & Operation Manager

EMPLOYER PROFILE
Formed in 2006, e2e group is one of the Pakistan's leading and largest business houses
specialized in to end logistics services, international and local Air / Ocean freight and
associated supply chain management solutions that include warehousing. The groups global
partnership with GEODIS WILSON enables clients to benefit from a package tailored to their
individual needs and time requirements.
At the core of the group lies e2e Business Enterprises that was established in 2009 and it
has introduced a pioneering agriculture value addition project, Pakistans 1st Rice Bran Oil
Refining & Extraction Unit, which started its commercial production during March 2015. The
pioneering project called, Project Basanti, generates untapped income for farmers from
waste products. It produces refined Rice Bran Oil by bringing specialized processing
technology to Pakistan. Also, it has its own independent co-generation power plant which
has remove reliance on the national grid.

JOB RESPONSIBILITIES
I had been involved in the project from its inception phase. My job responsibilities included
but were not limited to:

Provide Project Planning / Scheduling support services for the Projects.


Act as material control engineer and to ensure the availability of required construction
and erection material at site within proper time.
Establish and maintain Project control plans and schedules, including Project Contract
Plan, Gant Charts and progress S-Curves.
Prepares all calculations of the Bill of Quantities (B.O.Q), cost of Accessories and other
necessary items included in RFQ (request for quotation) for all Electrical, Mechanical &
Plumbing Works.
Supervise the civil works, piping & storage tanks fabrication, installation of steel
structure and plant machinery like pumps, pressure leaf filters, press filters, rotary sieve,
absorption tower, water solvent separator, miscella holding tank, Dry Cooler, deodorizer,
zero vent, cooling towers, steam turbine, boiler, fuel handling unit, cooker, palletizer,
extractor, Heat exchangers etc. Ensure quality of workmanship & maintain good quality
of work at site.
Analyze and propose improvements to schedules, including use of critical path analysis
and resource loading.
Monitor and report progress against the Project control schedules.
To ensure that work is being executed at site exactly as per approved design and quality.
Generate plan and schedule summaries and similar presentational material as required by
the top management.
Review and audit contractors planning procedures.
Manage changes in project scope, identify potential crisis and devise contingency plans.
Provide support for the administration of contracts including scope of works &
tender/contract preparation.

Page 4 of 11
Ability to initiate and promote the discipline of planning engineering.
Prepares or directs preparation and modification of reports, specifications, plans and
construction schedules, for project. Reviews preliminary plans and specifications of
construction contracts. Prepares authorizations for change orders regarding construction
revisions.
Update overall progress, preparing daily, weekly and monthly reports for top
management.
Prepare look ahead schedules, analyzing the delays & suggesting corrective actions to
higher management.
Load resources to schedule, preparing man power and resource histograms, preparing S-
Curve.
Advance study all Storage Tanks drawings and make BOQ of all required material in order
to calculate the material for which procurement process is yet not initiated.
Advance study P & IDs for all systems and make list of required equipment. Compare this
list with the updated lists of received equipment and calculate the balance required
equipment; Initiate procurement process for the same.
Advance study all piping isometric drawings. Prepare BOQs for all piping & fittings and
calculate the balance required equipment; initiate procurement process for the same.
Study all steel structural drawings and make BOQ of all required structural material like
H-Beams, I-Beams, Channels, Angles, M.S plates etc; co-ordinate and discuss with
consultant about alteration in steel structure specifications and design for cost saving
purpose.
Calculate the daily OPC consumed quantity as per drawings (i.e., in 1:2:4, 1:4:8, 1:3:6 &
1:1.5:3 concrete).
Inspects construction site to monitor progress and ensure conformance to engineering
plans, specifications, and construction and safety standards. Resolves design or
construction problems and meets with contractors and the public.
Responsible for maintaining coding system/code register for company fixed assets.
Responsible for receiving foreign shipments and unloading them in warehouse as per
approved procedures.
Coordinate with different external parties that are involved in project like consultant for
EIA report, insurance company, foreign local representative who is also the authorized
equipment inspection team on our behalf.
To recheck the quality of material used in construction.
To review contractor monthly progress report, verify it against actual progress and then
approves the invoice.
Calculating the estimated quantity & costs for non-BOQ Mechanical/civil erection
equipment in project and initiate the procurement process for the same.
Performing miscellaneous technical works like pipe material/dia. selection, selection of
utilities pumps, selection of angle iron etc.
Ensure that there was no shut down of any kind of erection/construction activity at site.
Other departmental works as and when assigned.

III Name of employer : Al-Gihaz Co. Ltd


Title of position : Planning & Cost Control Engineer
Location of Job : Riyadh, Saudi Arabia
Duration : March 2009 to February 2013
Report to : Planning & Cost Control Engineer

EMPLOYER PROFILE
The group (Al-Gihaz Holding) comprises of a number of firms, which collaborate to form a
prominent entity of various activities that include power, electrical, civil, environmental,
petrochemical, structural, commercial, industrial, high end technology products,
information technology security and solution, communications, value added services,
geographic information systems (GIS), Value added Services (VAS), visualization and real
estate development.

Page 5 of 11
At the core of the group lies Al-Gihaz Company, with successful history in the Engineering,
supply, erection, and commissioning of 132 KV transmission lines, 380 kV & 132 KV sub-
stations (GIS type), indoor and outdoor equipment, large power transformers up to 100MVA,
HV/MV switch gears, and 33 kV & 13.8 kV distribution networks.
JOB RESPONSIBILITIES
Job responsibilities included but were not limited to:
Deal with client, preparing master plan (design/engineering, procurement,
installation/construction, testing & commissioning) using Primavera Project Management-
P6.7 at tender stage.
Make the above mentioned master plan more comprehensive, once the contract is
awarded, and finalize the same after detailed discussions with all concerned
departments/engineers/vendors.
Prepare a separate comprehensive/detailed system design/procurement schedule (while
considering the milestones in finalized master plan) after detailed negotiations &
discussions with finalized suppliers/vendors & our design office.
Prepare a separate comprehensive/detailed testing & commissioning schedule (while
considering the milestones in finalized master plan) after detailed discussions with our
companys T & C engineers and proposed/finalized T & C subcontractor.
Get the client approval on finalized master plan, design/procurement schedule and
testing & commissioning schedule. Assign all schedules as baselines for future controlling
& monitoring.
Prepare separate detailed schedules for 132 kV Underground transmission lines projects
and co-ordinate directly with Deputy General Manager of company for all project related
issues, as these were classified as urgent/important projects from MOHE (Ministry of
Higher Education).
Review all electrical, electro-mechanical & civil base & detail designs / calculations /
drawings / documents received from design consultant, vendors/manufacturers and to
ensure that these have been prepared as per applicable codes / standards / TMSS / TES /
TCS / TSD / SEED-II and finalized PTS. Also to provide the necessary feedback, if
required, to my direct manager & company project director.
Highlight the critical & important designs in the initial phase of the project & suggesting
the corrective actions for the same to project managers to avoid severe delays in project
execution.
Go to all assigned project sites (Hail University 132 kV SS project, SWCC 132 kV & 33 SS
projects, Iskan 132/33/13.8kV SS project, Al-Andulus & Bani Nejjar 110/13.8 kV SS
projects, KKUC-1/2 SS projects) every 2 times per month to monitor the work progress &
to trouble shoot the major issues that causes the slow work progress.
Co-ordinate with SEC/AJEC site engineer regarding the variance between planned/actual
work progress percentage & deficit/surplus of project manpower etc.
Ensure that there is no communication/co-ordination gap between client engineers,
project team, site managers/engineers & subcontractors, so that project progress
smoothly.
Update overall progress, preparing daily, weekly and monthly reports for higher
management as well as for client.
Prepare look ahead schedules, analyzing the delays & suggesting corrective actions to
higher management.
Make the detailed Project Operating Budget for each assigned project & review the
same on quarterly bases to ensure that slippage remains controlled.
Support the budget department/higher management in preparation/revising of overall
annual budget for company.
Prepare reports separately for manpower, testing equipments, and logistics of project
team.
Load resources to schedule, preparing man power and resource histograms, preparing S-
Curve.
Assign schedules to sub-contractors & reviewing sub contractors progress and reports.
Make cost break down structure from the awarded contractual lump sump prices and
getting its approval from client.

Page 6 of 11
Loading the approved cost break down into approved master plan.
Preparing progress weight factor report and get its approval from client.
Calculating the estimated quantity & costs for electrical & mechanical erection
equipment in substations.
Prepare project progress measurement report, get its approval from client & hence
prepare/raise project invoices accordingly.
Work on special assignments related to project closure. E.g., (a) Availability of all final
As-Built drawings / spare parts; (b) Rectification of punch list items and also get their
respective approvals from client.
Pre-qualify sub-contractors for electro-mechanical & civil works.
Prepare bid documents (technical/commercial) for Saudi Aramco & Samsung projects.
Perform different HR & administration tasks that are interlinked with project
management.
Perform any other work related task, as and when required by higher management. E.g.,
Attending Job-Ex meetings & site visits for bidding/tendering of Saudi Aramco projects.
In addition to the above, I was also responsible for maintenance of all construction
machinery at projects under my responsibility.

IV. Name of employer : Star Power Generation Ltd


Title of position : Technical Executive
Location of Job : Lahore, Pakistan
Duration : From October 2007 to January 2009.
Report to : Chief Technical & Commercial Officer

EMPLOYER PROFILE
Established & financed by AL-Ghurair Group of Companies / ETA Ascon, UAE, Star Power
Generation Ltd. (SPGL) was a special purpose built company for construction of 133.5 MW
combined cycle power plant in Sindh province of Pakistan.
The complex was designed to operate on 2+1 configuration i.e. 2 Gas Turbines (each 43.25
MW, GE, Frame 6B) designed for low BTU gas utilization, 1 Steam Turbine (47 MW Siemens
condensing steam turbine), Heat Recovery Steam Generator, Step-up Sub-Station for
interconnection with National Grid and associated control, protection and instrumentation
systems.

JOB RESPONSIBILITIES
Job responsibilities included but were not limited to:
Preparing RFP for EPC contractors for execution of project on turnkey bases; analyze the
proposals, and assisting the top management in detailed financial / commercial /
technical negotiations with selected contractors.
Preparing RFP for laying and commissioning of Mari Deep Gas pipeline on EPC contract
bases, analyze the proposals and finalizing the contractor after detailed financial /
commercial /technical study and negotiations.
Invite proposals from different contractors for operation & maintenance of power plant,
analyze the proposals, hold detailed financial / commercial / technical discussions &
finalize the agreement with most suitable one.
Correspondence with power purchaser (Water & Power Development Authority) for
technical issues related to power purchase agreement.
Support the budget department in preparation of overall annual budget for company.
Correspondence with different companies regarding all technical issues of power plant
project.
Correspondence with different government agencies for different agreements etc.
Assist the Chief Technical and Commercial Officer on different technical & commercial
issues.
Making proposed cash flows for contractors.

Page 7 of 11
V. Name of employer : Rupafil Ltd. & Rupali Polyester Ltd.
Title of position : Project Engineer
Location of Job : Shekhupura, Pakistan
Duration : From December 2006 to September 2007
Report to Group Manager

EMPLOYER PROFILE
Rupali polyester Ltd own and operates composite facilities to manufacture Polyester Fiber
and Filament Yarn. The Company has the privilege of being one of the pioneers in Pakistan
for manufacture of Staple Fiber of highest quality. Since its inception, the Company has
been growing steadily through expansion and diversified operations and hence the assets of
the Company have been increased to over Rs. 2,931 million from the initial capital outlay of
Rs. 150 million. Understanding the future economic situations, the group planned in year
2004 to install 2 No. Gas fired power houses for self-consumption at their two production
plants.

JOB RESPONSIBILITIES
Job responsibilities included but were not limited to:
Lead & manage the construction of 2 No. gas fired power houses constituting 2 x 3.0 MW
Jenbacher (JGS 620 GS) engines & waste heat recovery boiler of capacity 3.8 TPH @ 10
bars at each production plant.
Lead & manage the installation of chiller unit in production facility.
Prepare detailed project schedule using Primavera (P3) and assign resources and
expenses.
Update overall progress, preparing daily, weekly and monthly reports for higher
management.
Prepare look-ahead schedules, analyzing the delays & suggesting corrective actions to
higher management.
Prepare project operating budget and review it every two months so that slippage
remains minimum.
Prepare reports separately for manpower & equipment. Also prepare manpower
histogram.
Coordination/dealing with all contractors and to make sure that milestones are achieved
as per planned schedule.
Co-ordination with SNGPL (Sui Northern Gas Pipelines Ltd) for erection/installation of
main gas supply station.
Co-ordination with concerned roads/transportation departments for cross road
installation of plant main gas pipe line.
Ensure the execution of jobs exactly according to the manufacturer/designer
recommendations.
Ensure quality of workmanship & maintain good quality of work at site.
Calculating the estimated quantity & costs for Mechanical/civil erection equipment in
Power House.
Performing miscellaneous technical works like pipe material/dia selection, selection of
utilities pumps, selection of angle iron for overhead trusses etc.
Ensure the availability of all necessary and proper material required for various erection
activities and to assist Purchase/Procurement department for purchasing parts from local
as well as from off shore sources.
Ensure that there was no shut down of any kind of erection/construction activity at site.

VI. Name of employer : Kohinoor Energy Limited (KEL)


Title of position : Trainee Engineer/Assistant Shift Engineer
Location of Job : Raiwind Road Lahore, Pakistan
Duration : From March 2005 to November 2006
Report to : Dy. Manager O & M.

Page 8 of 11
EMPLOYER PROFILE
Kohinoor Energy Limited (KEL) has paid-up capital of Rupees 1,695 million and is a joint
venture of Saigols Group of Companies (a well-known multi-industrial group of Pakistan)
and Toyota Tsusho Corporation (an eminent consortium of multi-industrial undertakings of
Japan.) KEL one of the pioneer projects of Independent Power Producers in Pakistan. The
principle activity of the Company is to own, operate and maintain a furnace oil power
station with the net capacity of 124 MW (gross capacity 131.44 MW) and WAPDA (Water &
Power Development Authority) is the sole customer of KEL.
The main equipment at power complex includes three ABB 63 MVA Step-Up Transformers
converting the Electrical Output from 11 kV to 132 kV, Eight WARTSILA Diesel 18V46 Type
Diesel Generators having rated capacity of 15.68 MW each and a Combined Cycle Heat
Recovery System capable of delivering an output of 8 MW through Peter Brotherhood Steam
Turbine.

JOB RESPONSIBILITIES
Job responsibilities included but were not limited to:
Engine Cylinder Head overhauling and replacements.
Engine Fuel injection pumps overhauling.
Engine Fuel injector overhauling (Pressure Tests of nozzles etc and overall cleaning of
injector).
Engine Intake valves and exhaust valves tappet adjustments.
Engine Intake valves and exhaust valves inspections.
Engine Exhaust bellows replacement.
Engine Intake air bellows replacement.
Engine Fuel Oil traps overhauling.
Engine alignments
Controlled Engine vibrations by balancing the engine taking self-decisions.
Fuel rack adjustments after overhauling
Taking peak pressure data for checking engines cylinder performance.
Taking static pressure for checking engine cylinder head for possible leakages.
Blow off the engines before start and after stop.
Overhauling of Charge Air Coolers.
Maintenance of Alfa Laval HFO Purifier FOPX 613 & Lube Oil Separators LOPX 710SFD-34.
Maintenance of Alfa Laval Plate type Heat Exchangers. Both on HT and LT sides.
Maintenance of Pumps of different types like Centrifugal pump, screw type pump, gear
type pump, pneumatic type pumps (diaphragm pumps).
Maintenance of Reciprocating compressors
Maintenance of Turbocharger (VTR 564-P32)
Maintenance of Fuel Supply/Booster Unit.(AMB-P 18000 SS)
Maintenance of Viscosity controller.
Assisting the manufacturer team in checking alignment of steam turbine.
Condenser maintenance.
Boiler Washing
Maintenance of Boiler Bypass damper (Pneumatically controlled)
Steam Drum inspection
Soot Blower Overhauling
Performing Suit Blowing.
Managing the Engine 500 HRS PMS, 1000 HRS PMS, 2000 HRS PMS & 5000 HRS PMS.

While working at KEL, I had on hand experience working in very critical situations like:
Restarting of Power Plant after the blackout due to major Break down in 500 KV
transmission line in year 2006.
Restarting of Engine (Unit # 1) in record timing after the major Turbocharger accident
completely destroying the casing and Rotor.
2 months experience of independently leading/supervising the operation shift as assistant
Shift Engineer. Under my supervision, no forced/partial forced outage occurred.

Page 9 of 11
INTERNSHIPS:

Sr.
Company Location From To
No
th
Japan Power Generation Ltd. Raiwind, 30 August
1 1st July 2003
(JPGL) Lahore 2003
30th August
2 Sheikh Zaid Medical Complex Lahore 1st June 2004
2004

IT LITERACY:

Experience Level
Software Description
Beginner Mid-Level Expert

Primavera versions: P6-Version 6.0,P6


Version 7, P6 Pro-Version 8.1

Primavera P3
Primavera Contract Manager (Oracle)
MS Project 2003/2007/2010
M.S Office 2003/2007/2010 (Word,
Excel, Power Point)
MP2 (CMMS software)
Microsoft Dynamic GP
Windows 95/98/2000 Pro/XP/7
Installation & troubleshooting
CAD-Computer Aided Designing (Solid
Edge, Pro/E)

LANGUAGES:

Experience Level

Language Speak Write Read / Understand

Basic Avg. Fluent Basic Avg. Proficient Fair Good Proficient

English
Urdu Native language Native language Native language
Arabic
Punjabi

EXTRA CURRICULAR ACTIVITIES:


Reading blogs on Mechanical/Electrical Engineering latest technologies that are related to
power & energy sector.

Page 10 of 11
WORK EXPERIENCE SUMMARY:
I have total 11+ Years solid and diversified experience in field of Project Management &
Mechanical Engineering which includes (a) Operation & maintenance of thermal power
plant including all accessories (up to 131.44 MW) (b) Supervision of construction / erection
/ testing / commissioning of gas fired power houses (c) Technical/ financial / commercial
study & negotiations with different companies & government agencies for construction of
124.43 MW combined cycle power plant (d) Planning & cost controlling for 380 kV & 132 kV
Substation projects & 132 kV overhead transmission lines / 380 kV underground cable
projects. (e) Planning, cost controlling and supervision of construction & erection of 400
TPD rice bran extraction Unit and edible oil refinery. In KSA, while working with contractor,
I have experience of Planning & Controlling projects (Substation & transmission lines) of
value appx. 700,000,000.00 SR.

REFERENCES:
References will be furnished upon demand.