Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
1.00 2.79 2.12 2.35 2.20 2.14 1.99 2.09 2.22 2.26 2.36 2.23 2.27 Parmetros Ene. Feb. Mar. Abr. May. Jun. Jul. Ago. Set. Oct. Nov. Dic.
2.00 2.37 2.14 2.36 2.18 2.11 1.96 2.05 2.19 2.25 2.37 2.26 2.30 TMC 21.15 23.05 22.65 22.45 20.25 18.65 18.10 18.55 19.20 19.80 21.05 22.45
3.00 2.35 2.15 2.36 2.17 2.08 1.92 2.03 2.17 2.25 2.39 2.29 2.34 TMF 70.07 73.49 72.77 72.41 68.45 65.57 64.58 65.39 66.56 67.64 69.89 72.41
4.00 2.39 2.17 2.36 2.15 2.05 1.89 1.99 2.15 2.24 2.40 2.32 2.37 HR 70.00 71.00 72.00 72.00 71.00 70.00 68.00 69.00 72.00 73.00 74.00 74.00
5.00 2.42 2.19 2.36 2.13 2.02 1.85 1.96 2.13 2.23 2.41 2.35 2.41 CH 0.91 0.89 0.88 0.88 0.89 0.91 0.94 0.92 0.88 0.86 0.85 0.85
6.00 2.45 2.21 2.36 2.12 1.98 1.82 1.98 2.10 2.23 2.42 2.37 2.44 CE 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
7.00 2.48 2.22 2.36 2.10 1.96 1.79 1.89 2.08 2.22 2.43 2.40 2.48 MF 1/ 2.67 2.31 2.34 1.97 1.75 1.55 1.67 1.91 2.15 2.49 2.55 2.69
8.00 2.51 2.24 2.36 2.08 1.93 1.75 1.86 2.05 2.21 2.44 2.42 2.51 Eto 170.64 152.53 150.43 125.88 107.58 93.08 101.50 115.88 126.32 145.78 151.82 165.67
9.00 2.54 2.25 2.36 2.06 1.90 1.72 1.82 2.03 2.20 2.45 2.45 2.54 Das 31.00 28.00 31.00 30.00 31.00 30.00 31.00 31.00 30.00 31.00 30.00 31.00
10.00 2.57 2.27 2.36 2.04 1.86 1.68 1.79 2.00 2.49 2.46 2.47 2.58 Eto mm/dia 5.50 5.45 4.85 4.20 3.47 3.10 3.27 3.74 4.21 4.70 5.06 5.34 4.41
11.00 2.60 2.28 2.35 2.02 1.83 1.64 1.75 1.98 2.18 2.47 2.50 2.61 Prec. Efec mm/da 0.03 0.03 - - - - - - - - - - Metodo de FAO
12.00 2.63 2.29 2.35 2.00 1.80 1.61 1.72 1.95 2.17 2.48 2.52 2.64
13.00 2.65 2.31 2.35 1.98 1.77 1.57 1.68 1.92 2.16 2.48 2.54 2.68 Eto mm/dia (Maximo) 5.50
14.00 2.68 2.32 2.34 1.96 1.73 1.54 1.65 1.90 2.14 2.49 2.57 2.71 Eto mm/dia (Minimo) 3.10
15.00 2.71 2.33 2.33 2.94 1.70 1.50 1.61 1.87 2.13 2.50 2.59 2.74 Eto mm/dia (Promedio) 4.41
16.00 2.73 2.34 2.32 1.91 1.67 1.46 1.58 1.84 2.12 2.50 2.61 2.77
17.00 2.76 2.35 2.32 1.89 1.63 1.43 1.54 1.81 2.16 2.50 2.63 2.80 1/ Promedio de los valores de 6 y 8 de Latitud Sur de la Tabla "FACTOR DE EVAPOTRANSPIRACIN POTENCIAL"
18.00 2.79 2.36 2.31 1.87 2.60 1.39 1.50 1.78 2.09 2.51 2.65 2.83 Frmulas Empleadas : ETo = MF x TMF x CH X CE; TMF = (9/5)TMC + 32; CE = 1.0 + 0.04(E/3000)
19.00 2.81 2.37 2.30 1.84 1.56 1.35 1.47 1.75 2.07 2.31 2.67 2.86 CH = 0.166 x ( 100 - HR )1/2 , para HR>64%; para HR<64%, CH = 1.
Donde:
ETo = Evapotranspiracin potencial (mm/da) MF = Factor mensual de latitud
TMF = Temperatura media mensual (F) CE = Factor de correccin para la altura del lugar
TMC = Temperatura media mensual (C)
HR = Humedad relativa media mensual (%) E = Altitud o elevacin del lugar (msnm)
DESCRIPCION UND Ene Feb Mar Abr May Jun Jul Ago Sep Oct Nov Dic PROM
ANUAL
Evotranspiracin ETO (mm/dia) 5.50 5.45 4.85 4.20 3.47 3.10 3.27 3.74 4.21 4.70 5.06 5.34 4.41
Dias del mes dia 31.00 28.00 31.00 30.00 31.00 30.00 31.00 31.00 30.00 31.00 30.00 31.00
ETO del Mes mm/mes 170.64 152.53 150.43 125.88 107.58 93.08 101.50 115.88 126.32 145.78 151.82 165.67 133.93
Fuente: Estacion Meteorologica Palpa
PRECIPITACION EFECTIVA (METODO FAO -AGLW)
PROM
Descripcin Ene Feb Mar Abr May Jun Jul Ago Sep Oct Nov Dic ANUAL
Precipitacion efectiva (mm/mes) 2.30 4.30 2.10 0.10 0.10 - - - 0.20 0.20 - 0.10 0.78
Precipitacion efectiva (mm/dia) 0.07 0.15 0.07 0.00 0.00 - - - 0.01 0.01 - 0.00 0.03
Descripcin Has Ene Feb Mar Abr May Jun Jul Ago Sep Oct Nov Dic
Tuna 36.00 36.00 36.00 36.00 36.00 36.00 36.00 36.00 36.00 36.00 36.00 36.00 36.00
AREA CULTIVADA 151.45 36.00 36.00 36.00 36.00 36.00 36.00 36.00 36.00 36.00 36.00 36.00 36.00
Fuente: Elabortacion Propia
CEDULA DE CULTIVO MENSUAL SIN PROYECTO - KC
Descripcin Has Ene Feb Mar Abr May Jun Jul Ago Sep Oct Nov Dic
Descripcin Has Ene Feb Mar Abr May Jun Jul Ago Sep Oct Nov Dic
Tuna 36.00 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60
AREA CULTIVADA 36.00 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60
Fuente: Elabortacion Propia
CALCULO DE LA DEMANDA SIN PROYECTO ( Maiz y Algodon)
Descripcion Unidad Ene Feb Mar Abr May Jun Jul Ago Sep Oct Nov Dic Total
Eto mm/dia 5.50 5.45 4.85 4.20 3.47 3.10 3.27 3.74 4.21 4.70 5.06 5.34
Kc Maiz Amarillo Duro - - - 0.75 0.85 0.80 0.75 - - - - -
Kc Algodn 0.95 0.75 0.80 - - - - 0.75 0.80 0.90 0.90 0.90
Uso Consultivo Etc mm/dia 5.23 4.09 3.88 3.15 2.95 2.48 2.46 2.80 3.37 4.23 4.55 4.81
Precipitacion Efectiva mm/dia 0.07 0.15 0.07 0.00 0.00 - - - 0.01 0.01 - 0.00
Necesidades Netas del Cultivo (Lamina Neta) mm/dia 5.16 3.93 3.81 3.14 2.95 2.48 2.46 2.80 3.36 4.23 4.55 4.81 43.68
Eficiencia de Aplicacin % 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40
mm/dia 12.89 9.83 9.54 7.86 7.37 6.21 6.14 7.01 8.40 10.56 11.39 12.02 109.20
Necesidades Totales de cultivo
m3-ha/dia 128.88 98.30 95.36 78.59 73.66 62.05 61.39 70.09 84.04 105.64 113.87 120.16 1,092.04
Area de Riego Has. 36.00 36.00 36.00 36.00 36.00 36.00 36.00 36.00 36.00 36.00 36.00 36.00
Demanda Total unitario - Mensual m3/ha/mes 3,995.17 2,752.41 2,956.11 2,357.81 2,283.59 1,861.53 1,903.15 2,172.75 2,521.31 3,274.96 3,415.97 3,725.06 33,220
Demanda Total - Mensual m3/mes 143,825.98 99,086.86 106,419.81 84,881.23 82,209.32 67,015.25 68,513.49 78,219.03 90,767.04 117,898.44 122,975.04 134,102.29 1,195,914
Fuente: Elaboracion Propia
Descripcion Unidad Ene Feb Mar Abr May Jun Jul Ago Sep Oct Nov Dic Total
Demanda Total - Mensual m3/mes 143,825.98 99,086.86 106,419.81 84,881.23 82,209.32 67,015.25 68,513.49 78,219.03 90,767.04 117,898.44 122,975.04 134,102.29 1,195,914
Demanda Total unitario - Mensual m3/ha/mes 3,995.17 2,752.41 2,956.11 2,357.81 2,283.59 1,861.53 1,903.15 2,172.75 2,521.31 3,274.96 3,415.97 3,725.06 33,220
Demanda Total - Diario m3/ha/dia 128.88 98.30 95.36 78.59 73.66 62.05 61.39 70.09 84.04 105.64 113.87 120.16 1,092.04
TUNA TUNA
Lamina a reponer Maxima 12.89 mm/dia Demanda unitaria anual 33,220 m3/ha/ao
Minima 6.14 mm/dia Demanda total anual 1,195,914 m3/ao
Promedio 9.10 mm/dia
Modulo de riego Tr= 24 horas 1.49 L/s - Ha
Tr= 16 horas 2.24 L/s - Ha
Tr= 14 horas 2.56 L/s - Ha
Tr= 12 horas 2.24 L/s - Ha
CALCULO DE LA DEMANDA CON PROYECTO (Tuna)
Descripcion Unidad Ene Feb Mar Abr May Jun Jul Ago Sep Oct Nov Dic TOTAL
Eto mm/dia 5.50 5.45 4.85 4.20 3.47 3.10 3.27 3.74 4.21 4.70 5.06 5.34 52.90
Kc Granado 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60
Uso Consultivo Etc mm/dia 3.30 3.27 2.91 2.52 2.08 1.86 1.96 2.24 2.53 2.82 3.04 3.21
Precipitacion Efectiva mm/dia 0.07 0.15 0.07 0.00 0.00 0.00 0.00 0.00 0.01 0.01 0.00 0.00
Necesidades Netas del Cultivo (Lamina Neta) mm/dia 3.23 3.11 2.84 2.51 2.08 1.86 1.96 2.24 2.52 2.82 3.04 3.20 31.42
Eficiencia de Aplicacin % 90.00% 90.00% 90.00% 90.00% 90.00% 90.00% 90.00% 90.00% 90.00% 90.00% 90.00% 90.00%
mm/dia 3.59 3.46 3.16 2.79 2.31 2.07 2.18 2.49 2.80 3.13 3.37 3.56 34.92
Necesidades Totales de cultivo
m3-ha/dia 35.87 34.61 31.60 27.94 23.10 20.68 21.83 24.92 28.00 31.28 33.74 35.59 349.15
Area de Riego ha 36.00 36.00 36.00 36.00 36.00 36.00 36.00 36.00 36.00 36.00 36.00 36.00
Demanda Total unitario - Mensual m3/ha/mes 1,112.03 969.08 979.54 838.11 716.09 620.51 676.68 772.53 839.88 969.62 1,012.14 1,103.35 10,609.57
Demanda Total - Mensual m3/mes 40,033.26 34,886.88 35,263.27 30,171.99 25,779.39 22,338.42 24,360.35 27,811.21 30,235.68 34,906.20 36,437.05 39,720.68 381,944.39
Fuente: Elaboracion Propia
Descripcion Unidad Ene Feb Mar Abr May Jun Jul Ago Sep Oct Nov Dic Total
Demanda Total - Mensual m3/mes 40,033.26 34,886.88 35,263.27 30,171.99 25,779.39 22,338.42 24,360.35 27,811.21 30,235.68 34,906.20 36,437.05 39,720.68 381,944.39
Demanda Total unitario - Mensual m3/ha/mes 1,112.03 969.08 979.54 838.11 716.09 620.51 676.68 772.53 839.88 969.62 1,012.14 1,103.35 10,609.57
Demanda Total unitario - Dia m3/ha/dia 35.87 34.61 31.60 27.94 23.10 20.68 21.83 24.92 28.00 31.28 33.74 35.59 349.15
Tuna
Maxima 3.59 mm/dia Tuna
Lamina a reponer Minima 2.07 mm/dia Demanda unitaria campaa 10,609.57 m3/ha/ao
Promedio 3.29 mm/dia Demanda total campaa 381,944.39 m3/ao
Tr= 24 horas 0.42 L/s - Ha
Tr= 16 horas 0.62 L/s - Ha
Modulo de riego
Tr= 14 horas 0.71 L/s - Ha
Tr= 12 horas 0.83 L/s - Ha
OFERTA DE AGUA SIN PROYECTO
AUTORIDAD LOCAL DE AGUAS ICA
JUNTA DE USUARIOS DEL DISTRITO DE RIEGO DEL VALLE DE NASCA
MESES
VARIABLE UNIDAD ANUAL
ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC
N de das del mes das 31 28 31 30 31 30 31 31 30 31 30 31 365.00
l/s 16.00 16.00 16.00 16.00 16.00 16.00 16.00 16.00 16.00 16.00 16.00 16.00
Caudal Asignado del Pozo IRHS - 08 .
m3/hr 57.60 57.60 57.60 57.60 57.60 57.60 57.60 57.60 57.60 57.60 57.60 57.60
Tiempo de Riego por dotacion Hrs 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 288.00
Area Proyecto GGE "Pozo IRHS N 08" Has 36.00 36.00 36.00 36.00 36.00 36.00 36.00 36.00 36.00 36.00 36.00 36.00
Tiempo de Riego Total por dotacion para el area de proyecto Hr 864.00 864.00 864.00 864.00 864.00 864.00 864.00 864.00 864.00 864.00 864.00 864.00 10,368.00
Frecuencia de cada dotacion de riego parcelario das 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00
Numero de Riegos al Mes N 16.00 14.00 16.00 15.00 16.00 15.00 16.00 16.00 15.00 16.00 15.00 16.00 186.00
M3 22,118.40 19,353.60 22,118.40 20,736.00 22,118.40 20,736.00 22,118.40 22,118.40 20,736.00 22,118.40 20,736.00 22,118.40 257,126.40
Volumen Ofertado para el Poyecto M3/ha 614.40 537.60 614.40 576.00 614.40 576.00 614.40 614.40 576.00 614.40 576.00 614.40 7,142.40
M3ha/dia 19.82 19.20 19.82 19.20 19.82 19.20 19.82 19.82 19.20 19.82 19.20 19.82 234.74
Fuente. Elaboracion propia (Expediente Tecnico Pozo IRSH - 44,41,38,39,40 JUVN)
CUADRO N - BALANCE DE AGUA - SIN PROYECTO (MAIZ - ALGODON)
PARAMETRO UNIDAD ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV DIC
Demanda (m3/ha/mes) 3,995.17 2,752.41 2,956.11 2,357.81 2,283.59 1,861.53 1,903.15 2,172.75 2,521.31 3,274.96 3,415.97 3,725.06
(m3/ha/dia) 128.88 98.30 95.36 78.59 73.66 62.05 61.39 70.09 84.04 105.64 113.87 120.16
Oferta (m3/ha/mes) 1,190.40 1,075.20 1,190.40 1,152.00 1,190.40 1,152.00 1,190.40 1,190.40 1,152.00 1,190.40 1,152.00 1,190.40
(m3/ha/dia) 19.82 19.20 19.82 19.20 19.82 19.20 19.82 19.82 19.20 19.82 19.20 19.82
Balance (m3/ha/mes) -2,804.77 -1,677.21 -1,765.71 -1,205.81 -1,093.19 -709.53 -712.75 -982.35 -1,369.31 -2,084.56 -2,263.97 -2,534.66
(m3/ha/dia) -109.06 -79.10 -75.54 -59.39 -53.84 -42.85 -41.57 -50.27 -64.84 -85.82 -94.67 -100.34
Variacion % -70.20% -60.94% -59.73% -51.14% -47.87% -38.12% -37.45% -45.21% -54.31% -63.65% -66.28% -68.04%
Fuente. Elaboracion propia
TVolum en de agua m3/ha/dia
4,000.00
3,500.00
3,000.00
1,500.00
1,000.00
500.00
0.00
ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV DIC
PARAMETRO UNIDAD ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV DIC
Demanda (m3/ha/mes) 1,112.03 969.08 979.54 838.11 716.09 620.51 676.68 772.53 839.88 969.62 1,012.14 1,103.35
(m3/ha/dia) 35.87 34.61 31.60 27.94 23.10 20.68 21.83 24.92 28.00 31.28 33.74 35.59
Oferta (m3/ha/mes) 1,190.40 1,075.20 1,190.40 1,152.00 1,190.40 1,152.00 1,190.40 1,190.40 1,152.00 1,190.40 1,152.00 1,190.40
(m3/ha/dia) 38.40 38.40 38.40 38.40 38.40 38.40 38.40 38.40 38.40 38.40 38.40 38.40
Balance (m3/ha/mes) 78.37 106.12 210.86 313.89 474.31 531.49 513.72 417.87 312.12 220.78 139.86 87.05
(m3/ha/dia) 2.53 3.79 6.80 10.46 15.30 17.72 16.57 13.48 10.40 7.12 4.66 2.81
Variacion % 6.58% 9.87% 17.71% 27.25% 39.84% 46.14% 43.16% 35.10% 27.09% 18.55% 12.14% 7.31%
Fuente. Elaboracion propia
Volumen de agua (m3/Ha/dia)
1,200.00
1,000.00
BALANCE HIDIRCO CON PROYECTO
3,500.00
800.00
3,000.00
Demanda
(m3/ha/mes )
2,500.00
600.00 Oferta (m3/ha/mes)
2,000.00
400.00
1,500.00
1,000.00
200.00
500.00
0.00 Demanda
ENE
0.00 FEB MAR ABR MAY JUL ma Mes
JUNOferta Maxi AGO SET OCT NOV DIC
ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV DIC
OFERTA DE A
AGUA DE POZO
UNID ENE FEB MAR
Caudal lts/seg 16 16 16
Caudal m3/h 58 58 58
Tiempo Disponible por da horas 20 20 20
N das del mes das 1 1 1
Hctares Ha 36.00 36.00 36.00
Volumen Ofertado m /mes
3
1,152 1,152 1,152
Fuente: Elaboracin propia 32
OFERTA DE A
AGUA SUBTERRANEA
POZO N. E. (mts.) N. D. (mts.)
IRHS 08 4 22
TOTAL
OFERTA DE AGUA con proyecto
AGUA SUPERFICIAL
CAUDAL por Tiempo
Prof. (mts) Caudal (lps.) FUENTE Parcelero horas/ha
35 38 RIO 150 5
38 LAGUNA 50 1
NOV DIC
16 16
58 58
20 20
1 1
36.00 36.00
1,152 1,152
FRECUENCIA
(riegos/mes)
1
1