NETWORK CHANGE REQUEST / N

A. ACTIVITY DESCRIPTION

NMC Control No: MOP Status Open Other Ref No


Activity Name/Description: Khales 04
Full Outage DY2841
Planned actions:

1- Check BFU Operation


2- Check Charging operation
Justification: 3- Replace BFU if required
4- Replace faulty batteries

Activity Date & Time: 13-Sep-17 5:00:AM Duration: 120 Minutes


Intiated by: Ali Hassan 0750 1100631 Company / Title:

With Planned Outage Required Skill Center Approval Required PTW (Permit To Work or access Korek facilities)
B. TECHNICAL DESCRIPTION

Software Change
Technical Description / Details of the activity :
Hardware Change
Planned actions:

1- Check BFU Operation


2- Check Charging operation
3- Replace BFU if required
4- Replace faulty batteries

With Attachment /s ( Please attach necessary documents including Roll Back Plan )

Change Category No: Network Element/s Involved

Perform by: Company / Title:


Osama Nuri 0750 1100616

Resources Needed (Tools / Test Equipment / Personnel / Others )


Persoanl and other

Supervision Required: Risk Assesment by

Roll Back Plan


Roll Back Trigger / Criteria

C. NETWORK / SERVICE IMPACT


Site ID Affected Sites

DY2841 N/A

09/12/2017 MOP
Affected Service/s Full Outage
Estimated Outage Duration 120 Minutes Actual Outage Duratio
Planned Outage Start Planned Outage End Actual Outage Start (NMC U
Date Time Date Time Date
13-Sep-17 5:00 AM 13-Sep-17 7:00 AM 13-Sep-17
D. APPROVAL AND NOTIFICATION
Approver Name Approve Signature
Y N
SKILL CENTER

Operations Manager Y N

NMC Manager Y N

Regional Director Y N

CTIO Y N

Y N

Y N

Y N
Notification To
NMC Core NSS IN / IT Planning Power Customer Care Revenue Assuran

BSS Core IN VAS IT Optimization RN Team Sales / Marketing Transmission

09/12/2017 MOP
REQUEST / NEW MOP FORM

Other Ref No
A

Date Rqstd: 12-Sep-17


Korek

PTW NO :

Routine Maintenance
Hardware Change

Halabja telecom services

09/12/2017 MOP
Outage
Actual Outage Duration 60 Minutes
Actual Outage Start (NMC Use) Actual Outage End
Time Date Time
5:00 AM 13-Sep-17 7:00 AM

Signature Date Required

Revenue Assurance Supplier / Vendor

Transmission Subcintractor

09/12/2017 MOP