12.

4 CASE STUDIES
Two complete sections are presented as typical for Atlanta (Figure 2.70) and Boston (Figure
2.71) that meet the requirements for environmental separation net zero buildings in Climate
Zone 3 and Climate Zone 5 respectively.

Soil gas stack vented through


flashed roof penetration
Owens Corning Shingles
WeatherLock Ice & Water control layer
raft-R-mate prevents wind blowing Roof flashing
through insulation and maintains 1"
clearance under roof sheathing
R-7.5 Rigid insulation Attic ventilation
(FOAMULAR XPS) notched through VentSure
around roof rafters to act as Exhaust Ventilation
wind shield for roof insulation,
with joints taped/sealed with
JointSealR Foam Joint Tape

PROPINK EcoTouch PINK


FIBERGLAS Insulation or PROPINK Energy-
VentSure
L77 Loosefill Insulation (R-38) Complete
Intake Ventilation
EnergyComplete Sealant Sealant
Wood or fiber at all
Gypsum board with semi-permeable penetrations
cement siding (latex) paint
Furring or spacer strip Unfaced cavity insulation (PROPINK Soil gas
Figure 2.70: EcoTouch PINK FIBERGLAS\ ventilation stack
Atlanta Climate Zone 3 Insulation or PROPINK L77 Loosefill
case study profile. Building paper, housewrap
Insulation) R-13
or building wrap EnergyComplete Sealant
(PINKWRAP Housewrap) Energy-
Sill gasket (FoamSealR
Plastic L-bracket for Complete
Sill Plate Gasket)
insect/rodent protection Sealant
Masticed membrane strip at all
of rigid insulation
Concrete slab penetrations
For insect protection
provide 3'-0" of mulch and
then drought-resistant plants

Ground slopes away from Polyethylene vapor barrier Perforated drain


wall at 5% (6 in. per 10 ft.) Granular capillary break and pipe added to "T"
drainage pad (no fines) in order to couple
sub-slab pressure
Concrete foundation wall Rigid insulation (FOAMULAR field to vent stack
XPS) as bond break material

Rigid insulation (FOAMULAR XPS)

Concrete footing below frost depth

137