Sei sulla pagina 1di 39

analisa harga satuan pekerjaan persiapan

No. URAIAN SATUAN VOLUME HARGA SAHARGA


(Rp) (Rp)
A-01 1 M' Pagar Sementara Dari Kayu Tinggi 2 m
- Dolken KayBtg 1.25 28,000.00 35,000.00
- Semen PorKg 2.5 1,406.00 3,515.00
- Pasir beto M3 0.005 ### 1,277.00
- Koral Beto M3 0.009 ### 1,899.90
- Kayu balokM3 0.072 ### ###
- Paku BiasaKg 0.06 23,400.00 1,404.00
- Residu Kg 0.4 8,100.00 3,240.00
- Pekerja Oh 0.4 42,000.00 16,800.00
- Tukang Ka Oh 0.2 65,000.00 13,000.00
- Kepala TukOh 0.02 75,000.00 1,500.00
- Mandor Oh 0.02 80,000.00 1,600.00
Jumlah ###
Dibulatkan ###
A-02 1 M' Pagar Sementara Seng Gelombang Tinggi 2 m
- Dolken KayBtg 1.25 28,000.00 35,000.00
- Semen PorKg 2.5 1,406.00 3,515.00
- Seng Gelo Lbr 1.2 62,900.00 75,480.00
- Pasir beto M3 0.005 ### 1,277.00
- Koral Beto M3 0.009 ### 1,899.90
- Kayu balokM3 0.072 ### ###
- Paku BiasaKg 0.06 23,400.00 1,404.00
- Meni Besi Kg 0.45 30,400.00 13,680.00
- Pekerja Oh 0.4 42,000.00 16,800.00
- Tukang Ka Oh 0.2 65,000.00 13,000.00
- Kepala TukOh 0.02 75,000.00 1,500.00
- Mandor Oh 0.02 80,000.00 1,600.00
Jumlah ###
Dibulatkan ###
A-03 1 M' Pagar SementaraKawat Duri Tinggi 1,80 m
- Dolken KayBtg 1 28,000.00 28,000.00
- Semen PorKg 2 1,406.00 2,812.00
- Kawat DuriKg 2.5 63,500.00 ###
- Pasir beto M3 0.005 ### 1,277.00
- Koral Beto M3 0.009 ### 1,899.90
- Paku BiasaKg 0.06 23,400.00 1,404.00
- Pekerja Oh 0.3 42,000.00 12,600.00
- Tukang Ka Oh 0.2 65,000.00 13,000.00
- Kepala TukOh 0.02 75,000.00 1,500.00
- Mandor Oh 0.02 80,000.00 1,600.00
Jumlah ###
Dibulatkan ###
A-04 1 M2 Pengukuran Dan Pasang Bouwplank
- Kayu kaso M3 0.012 ### 22,446.00
- Paku BiasaKg 0.02 23,400.00 468
- Kayu papanM3 0.007 ### 14,501.90
- Pekerja Oh 0.1 42,000.00 4,200.00
- Tukang Ka Oh 0.1 65,000.00 6,500.00
- Kepala TukOh 0.01 75,000.00 750
- Mandor Oh 0.005 80,000.00 400
Jumlah 49,265.90
Dibulatkan 49,266.00
A-05 1 M2 Pembuatan Kantor Sementara dgn Lantai Diplester
- Dolken KayBtg 1.25 28,000.00 35,000.00
- Kayu BalokM3 0.18 ### ###
- Paku BiasaKg 0.85 23,400.00 19,890.00
- Besi Strip Kg 1.1 26,800.00 29,480.00
- Semen PorKg 35 1,406.00 49,210.00
- Pasir Pasa M3 0.15 ### 35,010.00
- Pasir beto M3 0.1 ### 25,540.00
- Koral Beto M3 0.15 ### 31,665.00
- Bata Mera Bh 30 775 23,250.00
- Seng Plat m' 0.25 15,815.00 3,953.75
- Kawat har M2 2 35,900.00 71,800.00
- Kaca Polo M2 0.08 87,400.00 6,992.00
- Kunci Tan Bh 0.15 94,500.00 14,175.00
- Plywood 12Lbr 0.06 ### 8,400.00
- Pekerja Oh 2 42,000.00 84,000.00
- Tukang Ka Oh 2 65,000.00 ###
- Tukang BatOh 1 65,000.00 65,000.00
- Kepala TukOh 0.3 75,000.00 22,500.00
- Mandor Oh 0.05 80,000.00 4,000.00
Jumlah ###
Dibulatkan ###
A-06 1 M2 Pembuatan Gudang Semen dan Alat-alat
- Dolken KayBtg 1.7 28,000.00 47,600.00
- Kayu balokM3 0.21 ### ###
- Paku BiasaKg 0.3 23,400.00 7,020.00
- Semen PorKg 10.5 1,406.00 14,763.00
- Pasir Beto M3 0.03 ### 7,662.00
- Koral Beto M3 0.05 ### 10,555.00
- Seng Gelo Lbr 1.5 62,900.00 94,350.00
- Pekerja Oh 1 42,000.00 42,000.00
- Tukang Ka Oh 2 65,000.00 ###
- Kepala TukOh 0.2 75,000.00 15,000.00
- Mandor Oh 0.05 80,000.00 4,000.00
Jumlah ###
Dibulatkan ###
A-07 1 M2 Pembuatan Bedeng Buruh
- Dolken KayBtg 1.25 28,000.00 35,000.00
- Kayu balokM3 0.186 ### ###
- Paku BiasaKg 0.3 23,400.00 7,020.00
- Semen PorKg 18 1,406.00 25,308.00
- Pasir Beto M3 0.03 ### 7,662.00
- Koral Beto M3 0.05 ### 10,555.00
- Seng Gelo Lbr 1.5 62,900.00 94,350.00
- Pekerja Oh 1 42,000.00 42,000.00
- Tukang Ka Oh 2 65,000.00 ###
- Kepala TukOh 0.2 75,000.00 15,000.00
- Mandor Oh 0.05 80,000.00 4,000.00
Jumlah ###
Dibulatkan ###
A-08 1 M2 Membersihkan Lapangan dan Perataan
- Pekerja Oh 0.1 42,000.00 4,200.00
- Mandor Oh 0.05 80,000.00 4,000.00
Jumlah 8,200.00
Dibulatkan 8,200.00
A-09 1M2 Pembuatan Jalan Sementara
- Batu BelahM3 0.15 ### 30,825.00
- Batu PecahM3 0.09 ### 17,640.00
- Pasir Pasa M3 0.01 ### 2,334.00
- Pekerja Oh 1 42,000.00 42,000.00
- Mandor Oh 0.05 80,000.00 4,000.00
Jumlah 96,799.00
Dibulatkan 96,799.00
A-10 1 M3 Bongkaran Beton Bertulang
- Pekerja Oh 6.667 42,000.00 ###
- Mandor Oh 0.333 80,000.00 26,640.00
Jumlah ###
Dibulatkan ###
A-11 1 M3 Bongkaran Dinding Tembok Bata Merah
- Pekerja Oh 6.667 42,000.00 ###
- Mandor Oh 0.033 80,000.00 2,640.00
Jumlah ###
Dibulatkan ###
A-12 1 M Pagar beton Pracetak ( 5 x 50 x 213 ) cm
- Panel BetoLbr 0.986 ### ###
- Kolom BetoBtg 0.525 ### ###
- Pasir Beto M3 0.074 ### 18,899.60
- Koral 2/3 M3 0.146 ### 30,820.60
- Semen abuKg 45 1,406.00 63,270.00
- Pekerja Oh 0.375 42,000.00 15,750.00
- Tukang BatOh 0.125 65,000.00 8,125.00
- Kepala TukOh 0.012 75,000.00 900
- Mandor Oh 0.019 80,000.00 1,520.00
Jumlah ###
Dibulatkan ###
A-13 1 M Pagar kawat ayam tiang besi L50.50.5, tinggi 1 m'
- Kawat ramLbr 0.434 14,900.00 6,466.60
- Besi siku L Kg 6.786 18,300.00 ###
- Besi pelat Kg 0.0424 18,300.00 775.92
- Baut bh 4 600 2,400.00
- Semen PorKg 2.5 1,406.00 3,515.00
- Pasir beto M3 0.005 ### 1,277.00
- Koral Beto M3 0.009 ### 1,899.90
- Pekerja Oh 0.375 42,000.00 15,750.00
- Tukang BatOh 0.125 65,000.00 8,125.00
- Kepala TukOh 0.012 75,000.00 900
- Mandor Oh 0.019 80,000.00 1,520.00
Jumlah ###
Dibulatkan ###
A-14 1 M2 Pagar BRC lengkap dengan tiang
- BRC lengkaLbr 0.434 ### 74,344.20
- Semen PorKg 2 1,406.00 2,812.00
- Kawat DuriKg 2.5 63,500.00 ###
- Pasir beto M3 0.005 ### 1,277.00
- Koral Beto M3 0.009 ### 1,899.90
- Pekerja Oh 0.375 42,000.00 15,750.00
- Tukang BatOh 0.125 65,000.00 8,125.00
- Kepala TukOh 0.012 75,000.00 900
- Mandor Oh 0.019 80,000.00 1,520.00
Jumlah ###
Dibulatkan ###
A-15 1 M2 Steiger Werk / perancah dari Bambu
- Bambu 6btng 1 25,000.00 25,000.00
- Tali ijuk kg 0.25 23,400.00 5,850.00
- Pekerja org 0.25 42,000.00 10,500.00
- Tukang kayorg 0.017 65,000.00 1,105.00
- Kepala tukorg 0.002 75,000.00 150
- Mandor org 0.013 80,000.00 1,040.00
Jumlah 43,645.00
Dibulatkan 43,645.00
A-16 1 M' Cerucuk Bambu
- Bambu 7btng 1.25 25,000.00 31,250.00
- Pekerja org 0.5 42,000.00 21,000.00
- Mandor org 0.025 80,000.00 2,000.00
Jumlah 54,250.00
Dibulatkan 54,250.00
B. ANALISA HARGA SATUAN PEKERJAAN TANAH

No. URAIAN SATUAN VOLUME HARGA SAHARGA


(Rp) (Rp)
B-01 1 M3 Galian Tanah Biasa sedalam 1 m
- Pekerja Oh 0.4 42,000.00 16,800.00
- Mandor Oh 0.04 80,000.00 3,200.00
Jumlah 20,000.00
Dibulatkan 20,000.00
B-02 1 M3 Galian Tanah Biasa Sedalam 2 m
- Pekerja Oh 0.526 42,000.00 22,092.00
- Mandor Oh 0.052 80,000.00 4,160.00
Jumlah 26,252.00
Dibulatkan 26,252.00
B-03 1 M3 Galian Tanah Biasa Sedalam 3 m
- Pekerja Oh 0.735 42,000.00 30,870.00
- Mandor Oh 0.073 80,000.00 5,840.00
Jumlah 36,710.00
Dibulatkan 36,710.00
B-04 1 M3 Galian Tanah Keras Sedalam 1 m
- Pekerja Oh 0.625 42,000.00 26,250.00
- Mandor Oh 0.062 80,000.00 4,960.00
Jumlah 31,210.00
Dibulatkan 31,210.00
B-05 1 M3 Galian Tanah Lumpur Sedalam 1 m
- Pekerja Oh 0.823 42,000.00 34,566.00
- Mandor Oh 0.083 80,000.00 6,640.00
Jumlah 41,206.00
Dibulatkan 41,206.00
C. ANALISA HARGA SATUAN PEKERJAAN PONDASI

No. URAIAN SATUAN VOLUME HARGA SAHARGA


(Rp) (Rp)
C-01 1 M3 Pasanag Pondasi batu Kali adk 1pc : 3 ps
- Batu BelahM3 1.1 ### ###
- Semen PorKg 202 1,406.00 ###
- Pasir Pasa M3 0.485 ### ###
- Pekerja Oh 1.5 42,000.00 63,000.00
- Tukang BatOh 0.6 65,000.00 39,000.00
- Kepala TukOh 0.06 75,000.00 4,500.00
- Mandor Oh 0.075 80,000.00 6,000.00
Jumlah ###
Dibulatkan ###
C-02 1 M3 Pasang Pondasi Batu kali adk 1pc : 4ps
- Batu BelahM3 1.1 ### ###
- Semen PorKg 163 1,406.00 ###
- Pasir Pasa M3 0.52 ### ###
- Pekerja Oh 1.5 42,000.00 63,000.00
- Tukang BatOh 0.6 65,000.00 39,000.00
- Kepala TukOh 0.06 75,000.00 4,500.00
- Mandor Oh 0.075 80,000.00 6,000.00
Jumlah ###
Dibulatkan ###
C-03 1 M3 Pasang Pondasi Batu kali adk 1pc : 5ps
- Batu BelahM3 1.1 ### ###
- Semen PorKg 136 1,406.00 ###
- Pasir Pasa M3 0.544 ### ###
- Pekerja Oh 1.5 42,000.00 63,000.00
- Tukang BatOh 0.6 65,000.00 39,000.00
- Kepala TukOh 0.06 75,000.00 4,500.00
- Mandor Oh 0.075 80,000.00 6,000.00
Jumlah ###
Dibulatkan ###
C-04 1 M3 Pasang Pondasi Batu Kosong (aanstamping)
- Batu BelahM3 1.2 ### ###
- Pasir Urug M3 0.3 ### 52,590.00
- Pekerja Oh 0.78 42,000.00 32,760.00
- Tukang BatOh 0.39 65,000.00 25,350.00
- Kepala TukOh 0.039 75,000.00 2,925.00
- Mandor Oh 0.039 80,000.00 3,120.00
Jumlah ###
Dibulatkan ###
analisa pekerjaan beton
NO URAIAN SAT VOLUME HRG.SAT JUMLAH
D-17r2 1 M3 Sloof Beton Tulang 15/20 (180 kg besi + bekisting) 4dia. 12 ring 8-15
Kayu papan terentang M3 0.27 2,850,000 769,500
Paku Biasa 2" - 5" Kg 2 23,400 46,800
Besi Beton Kg 180 16,500 2,970,000
Kawat Beton Kg 3 27,700 83,100
Semen Portland Kg 323 1,200 387,600
Pasir Beton M3 0.52 225,000 117,000
Koral Beton 2/3 M3 0.78 200,000 156,000
Pekerja Oh 4.85 55,000 266,750
Tukang Batu Oh 0.35 70,000 24,500
Tukang Kayu Oh 1.56 70,000 109,200
Tukang Besi Oh 1.4 70,000 98,000
Kepala Tukang Oh 0.331 80,000 26,480
Mandor Oh 0.17 85,000 14,450
Jumlah 5,069,380
Dibulatkan 5,069,380

1 M3 Kolom Beton Tulang 15/20 (180 kg besi + bekisting) 4dia.12 8-15


Kayu papan terentang M3 0.4 2,850,000 1,140,000
Paku Biasa 2" - 5" Kg 4 23,400 93,600
Minyak Bekisting Ltr 40,500 -
Besi Beton Kg 180 16,500 2,970,000
Kawat Beton Kg 1.8 27,700 49,860
Semen Portland Kg 323 1,200 387,600
Pasir Beton M3 0.52 225,000 117,000
Koral Beton 2/3 M3 0.78 200,000 156,000
Kayu Balok Terentang M3 0.15 2,640,000 396,000
Dolken -8-10/4m Btg 20 15,000 300,000
Pekerja Oh 7.3 55,000 401,500
Tukang Batu Oh 0.35 70,000 24,500
Tukang Kayu Oh 3.3 70,000 231,000
Tukang Besi Oh 2.1 70,000 147,000
Kepala Tukang Oh 0.57 80,000 45,600
Mandor Oh 0.25 85,000 21,250
Jumlah 6.480.910
Dibulatkan 6.481.000

1 M3 Balok Beton Tulang 15/20 sofi-sofi, ring balk + balok poratl (180 kg besi + bekisting) 4dia. 12, 8-15
Kayu papan terentang M3 0.32 2,850,000 912,000
Paku Biasa 2" - 5" Kg 3.2 23,400 74,880
Besi Beton Kg 180 16,500 2,970,000
Kawat Beton Kg 2.25 27,700 62,325
Semen Portland Kg 323 1,200 387,600
Pasir Beton M3 0.52 225,000 117,000
Koral Beton 2/3 M3 0.78 200,000 156,000
Kayu Balok Terentang M3 0.14 2,640,000 369,600
Dolken -8-10/4m Btg 16 15,000 240,000
Pekerja Oh 5.96 55,000 327,800
Tukang Batu Oh 0.35 70,000 24,500
Tukang Kayu Oh 2.8 70,000 196,000
Tukang Besi Oh 1.4 70,000 98,000
Kepala Tukang Oh 0.455 80,000 36,400
Mandor Oh 0.208 85,000 17,680
Jumlah 6.412.865
Dibulatkan 6,413,000
D-29 1 M3 Tangga Beton Tulang (90 kg besi + bekisting)
Kayu papan terentang M3 0.25 2,850,000 712,500
Paku Biasa 2" - 5" Kg 3 23,400 70,200
Minyak Bekisting Ltr 1.2 40,500 48,600
Besi Beton Kg 90 16,500 1,485,000
Kawat Beton Kg 3 27,700 83,100
Semen Portland Kg 323 1,200 387,600
Pasir Beton M3 0.52 225,000 117,000
Koral Beton 2/3 M3 0.78 200,000 156,000
Kayu Balok Terentang M3 0.105 2,640,000 277,200
Dolken -8-10/4m Btg 14 15,000 210,000
Pekerja Oh 5.6 55,000 308,000
Tukang Batu Oh 0.35 70,000 24,500
Tukang Kayu Oh 2.3 70,000 161,000
Tukang Besi Oh 1.4 70,000 98,000
Kepala Tukang Oh 0.405 80,000 32,400
Mandor Oh 0.202 85,000 17,170
Jumlah 4,188,720
Dibulatkan 4,189,000
3 1 M3 Membuat Plat Lantai Tb. 10 Cm Beton Bertulang ( 90 Kg Besi + Bekisting )
Kayu Terentang M3 0.4 2,850,000 1,140,000
Paku Biasa 2" - 5" Kg 4 23,400 93,600
Minyak Bekisting Ltr 2 40,500 81,000
Besi Beton Polos Kg 90 16,500 1,485,000
Kawat Beton Kg 3 27,700 83,100
Kayu Balok Terentang M3 0.105 151,100 15,866
Plywood Tebal 9 mm Lbr 3.5 151,100 528,850
Dolken kayu Galam o - 8-10/4 m Btg 60 15,000 900,000
Semen Portland Kg 323 1,200 387,600
Pasir Beton M3 0.52 225,000 117,000
Koral Beton 2/3 M3 0.78 200,000 156,000
Pekerja Oh 5.2 55,000 286,000
Tukang Batu Oh 0.35 70,000 24,500
Tukang Kayu Oh 3.3 70,000 231,000
Kepala Tukang Oh 0.365 80,000 29,200
Mandor Oh 1.06 85,000 90,100
Jumlah 5,648,816
Dibulatkan 5,649,000
ekisting) 4dia. 12, 8-15
E. ANALISA HARGA SATUAN PEKERJAAN DINDING
No. URAIAN SATUAN VOLUME HARGA SAHARGA
(Rp) (Rp)
E-01 1 M2 Pasang Bata Merah Tebal 1 Bata, 1pc : 3ps
- Bata Mera Bh 140 775 ###
- Semen PorKg 32.95 1,406.00 46,327.70
- Pasir Pasa M3 0.091 ### 21,239.40
- Pekerja Oh 0.65 42,000.00 27,300.00
- Tukang BatOh 0.2 65,000.00 13,000.00
- Kepala TukOh 0.02 75,000.00 1,500.00
- Mandor Oh 0.03 80,000.00 2,400.00
Jumlah ###
Dibulatkan ###
E-02 1 M2 Pasang Bata Merah Tebal 1 Bata, 1pc : 4ps
- Bata Mera Bh 140 775 ###
- Semen PorKg 26.55 1,406.00 37,329.30
- Pasir Pasa M3 0.093 ### 21,706.20
- Pekerja Oh 0.65 42,000.00 27,300.00
- Tukang BatOh 0.2 65,000.00 13,000.00
- Kepala TukOh 0.02 75,000.00 1,500.00
- Mandor Oh 0.03 80,000.00 2,400.00
Jumlah ###
Dibulatkan ###
E-03 1 M2 Pasang Bata Merah Tebal 1 Bata, 1pc : 5ps
- Bata Mera Bh 140 775 ###
- Semen PorKg 22.2 1,406.00 31,213.20
- Pasir Pasa M3 0.102 ### 23,806.80
- Pekerja Oh 0.65 42,000.00 27,300.00
- Tukang BatOh 0.2 65,000.00 13,000.00
- Kepala TukOh 0.02 75,000.00 1,500.00
- Mandor Oh 0.03 80,000.00 2,400.00
Jumlah ###
Dibulatkan ###
E-04 1 M2 Pasang Bata Merah Tebal 1/2 Bata, 1pc : 3ps
- Bata Mera Bh 70 775 54,250.00
- Semen PorKg 14.37 1,406.00 20,204.22
- Pasir Pasa M3 0.04 ### 9,336.00
- Pekerja Oh 0.32 42,000.00 13,440.00
- Tukang BatOh 0.1 65,000.00 6,500.00
- Kepala TukOh 0.01 75,000.00 750
- Mandor Oh 0.015 80,000.00 1,200.00
Jumlah ###
Dibulatkan ###
E-05 1 M2 Pasang Bata Merah Tebal 1/2 Bata, 1pc : 4ps
- Bata Mera Bh 70 775 54,250.00
- Semen PorKg 11.5 1,406.00 16,169.00
- Pasir Pasa M3 0.043 ### 10,036.20
- Pekerja Oh 0.32 42,000.00 13,440.00
- Tukang BatOh 0.1 65,000.00 6,500.00
- Kepala TukOh 0.01 75,000.00 750
- Mandor Oh 0.015 80,000.00 1,200.00
Jumlah ###
Dibulatkan ###
E-06 1 M2 Pasang Bata Merah Tebal 1/2 Bata, 1pc : 5ps
- Bata Mera Bh 70 775 54,250.00
- Semen PorKg 9.68 1,406.00 13,610.08
- Pasir Pasa M3 0.045 ### 10,503.00
- Pekerja Oh 0.32 42,000.00 13,440.00
- Tukang BatOh 0.1 65,000.00 6,500.00
- Kepala TukOh 0.01 75,000.00 750
- Mandor Oh 0.015 80,000.00 1,200.00
Jumlah ###
Dibulatkan ###
F. ANALISA HARGA SATUAN PEKERJAAN PLESTERAN
No. URAIAN SATUAN VOLUME HARGA SAHARGA
(Rp) (Rp)
F-01 1 M2 Plesteran adk. 1pc : 2ps Tebal 15 mm
- Semen PorKg 8.52 1,406.00 11,979.12
- Pasir Pasa M3 0.017 ### 3,967.80
- Pekerja Oh 0.2 42,000.00 8,400.00
- Tukang BatOh 0.15 65,000.00 9,750.00
- Kepala TukOh 0.015 75,000.00 1,125.00
- Mandor Oh 0.01 80,000.00 800
Jumlah 36,021.92
Dibulatkan 36,022.00
F-02 1 M2 Plesteran adk. 1pc : 3ps Tebal 15 mm
- Semen PorKg 6.48 1,406.00 9,110.88
- Pasir Pasa M3 0.019 ### 4,434.60
- Pekerja Oh 0.2 42,000.00 8,400.00
- Tukang BatOh 0.15 65,000.00 9,750.00
- Kepala TukOh 0.015 75,000.00 1,125.00
- Mandor Oh 0.01 80,000.00 800
Jumlah 33,620.48
Dibulatkan 33,620.00
F-03 1 M2 Plesteran adk. 1pc : 4ps Tebal 15 mm
- Semen PorKg 5.2 1,406.00 7,311.20
- Pasir Pasa M3 0.02 ### 4,668.00
- Pekerja Oh 0.2 42,000.00 8,400.00
- Tukang BatOh 0.15 65,000.00 9,750.00
- Kepala TukOh 0.015 75,000.00 1,125.00
- Mandor Oh 0.01 80,000.00 800
Jumlah 32,054.20
Dibulatkan 32,054.00
F-04 1 M2 Plesteran adk. 1pc : 3ps Tebal 20 mm
- Semen PorKg 10.8 1,406.00 15,184.80
- Pasir Pasa M3 0.026 ### 6,068.40
- Pekerja Oh 0.25 42,000.00 10,500.00
- Tukang BatOh 0.2 65,000.00 13,000.00
- Kepala TukOh 0.02 75,000.00 1,500.00
- Mandor Oh 0.0125 80,000.00 1,000.00
Jumlah 47,253.20
Dibulatkan 47,253.00
F-05 1 M2 Plesteran adk. 1pc : 4ps Tebal 20 mm
- Semen PorKg 8.68 1,406.00 12,204.08
- Pasir Pasa M3 0.028 ### 6,535.20
- Pekerja Oh 0.25 42,000.00 10,500.00
- Tukang BatOh 0.2 65,000.00 13,000.00
- Kepala TukOh 0.02 75,000.00 1,500.00
- Mandor Oh 0.0125 80,000.00 1,000.00
Jumlah 44,739.28
Dibulatkan 44,739.00
F-06 1 M2 Plesteran adk. 1pc:5ps tebal 20 mm
- Semen PorKg 7.29 1,406.00 10,249.74
- Pasir Pasa M3 0.026 ### 6,068.40
- Pekerja Oh 0.25 42,000.00 10,500.00
- Tukang BatOh 0.2 65,000.00 13,000.00
- Kepala TukOh 0.02 75,000.00 1,500.00
- Mandor Oh 0.0125 80,000.00 1,000.00
Jumlah 42,318.14
Dibulatkan 42,318.00
F-11 1 M2 Acian Plesteran
- Semen PorKg 4 1,406.00 5,624.00
- Pekerja Oh 0.143 42,000.00 6,006.00
- Tukang batOh 0.107 65,000.00 6,955.00
- Kepala TukOh 0.0105 75,000.00 787.5
- Mandor Oh 0.0105 80,000.00 840
Jumlah 20,212.50
Dibulatkan 20,213.00
G. ANALISA HARGA SATUAN PEKERJAAN PENUTUP ATAP
No. URAIAN SATUAN VOLUME HARGA SAHARGA
(Rp) (Rp)
G-01 1 M2 Pasang Atap Genteng Palentong
- Genteng pBh 25 1,900.00 47,500.00
- Pekerja Oh 0.15 42,000.00 6,300.00
- Tukang kayOh 0.075 65,000.00 4,875.00
- Kepala tukOh 0.008 75,000.00 600
- Mandor Oh 0.008 80,000.00 640
Jumlah 59,915.00
Dibulatkan 59,915.00
G-02 1 M2 Pasang Genteng Bubung Palentong
- Genteng bBh 5 6,000.00 30,000.00
- Semen PorKg 8 1,406.00 11,248.00
- Pasir pasa M3 0.032 ### 7,468.80
- Pekerja Oh 0.4 42,000.00 16,800.00
- Tukang kayOh 0.2 65,000.00 13,000.00
- Kepala tukOh 0.02 75,000.00 1,500.00
- Mandor Oh 0.002 80,000.00 160
Jumlah 80,176.80
Dibulatkan 80,177.00
G-03 1 M2 Pasang Roof Light Fibreglass ( 180 x 90 ) cm
- Roof light Lbr 0.6 ### 60,000.00
- Paku biasaKg 0.05 23,800.00 1,190.00
- Pekerja Oh 0.14 42,000.00 5,880.00
- Tukang kayOh 0.067 65,000.00 4,355.00
- Kepala tukOh 0.007 75,000.00 525
- Mandor Oh 0.007 80,000.00 560
Jumlah 72,510.00
Dibulatkan 72,510.00
G-04 1 M2 Pasang Atap Asbes Gelombang ( 3,00 x 1,05 m ) x 4 mm
- Asbes gel Lbr 0.35 80,000.00 28,000.00
- Paku seng Kg 0.12 23,800.00 2,856.00
- Pekerja Oh 0.14 42,000.00 5,880.00
- Tukang kayOh 0.07 65,000.00 4,550.00
- Kepala tukOh 0.007 75,000.00 525
- Mandor Oh 0.007 80,000.00 560
Jumlah 42,371.00
Dibulatkan 42,371.00
G-05 1 M2 Pasang Atap Asbes Gelombang ( 2,70 x 1,05 m ) x 4 mm
- Asbes gel Lbr 0.42 73,300.00 30,786.00
- Paku seng Kg 0.12 23,800.00 2,856.00
- Pekerja Oh 0.14 42,000.00 5,880.00
- Tukang kayOh 0.07 65,000.00 4,550.00
- Kepala tukOh 0.007 75,000.00 525
- Mandor Oh 0.007 80,000.00 560
Jumlah 45,157.00
Dibulatkan 45,157.00
G-06 1 M2 Pasang Atap Asbes Gelombang ( 2,40 x 1,05 m ) x 4 mm
- Asbes gel Lbr 0.44 65,900.00 28,996.00
- Paku seng Kg 0.12 23,800.00 2,856.00
- Pekerja Oh 0.14 42,000.00 5,880.00
- Tukang kayOh 0.067 65,000.00 4,355.00
- Kepala tukOh 0.007 75,000.00 525
- Mandor Oh 0.007 80,000.00 560
Jumlah 43,172.00
Dibulatkan 43,172.00
G-07 1 M2 Pasang Atap Asbes Gelombang ( 2,10 x 1,05 m ) x 4 mm
- Asbes gel Lbr 0.51 58,500.00 29,835.00
- Paku seng Kg 0.12 23,800.00 2,856.00
- Pekerja Oh 0.14 42,000.00 5,880.00
- Tukang kayOh 0.067 65,000.00 4,355.00
- Kepala tukOh 0.007 75,000.00 525
- Mandor Oh 0.007 80,000.00 560
Jumlah 44,011.00
Dibulatkan 44,011.00
G-08 1 M2 Pasang Atap Asbes Gelombang ( 1,50 x 1,05 m ) x 4 mm
- Asbes gel Lbr 0.8 42,300.00 33,840.00
- Paku seng Kg 0.12 23,800.00 2,856.00
- Pekerja Oh 0.14 42,000.00 5,880.00
- Tukang kayOh 0.067 65,000.00 4,355.00
- Kepala tukOh 0.007 75,000.00 525
- Mandor Oh 0.007 80,000.00 560
Jumlah 48,016.00
Dibulatkan 48,016.00
G-09 1 M Pasang Nok Stel Gelombang 1,05 m
- Nok stel g Lbr 2.1 38,100.00 80,010.00
- Paku sekruBh 6 800 4,800.00
- Pekerja Oh 0.084 42,000.00 3,528.00
- Tukang kayOh 0.125 65,000.00 8,125.00
- Kepala tukOh 0.013 75,000.00 975
- Mandor Oh 0.004 80,000.00 320
Jumlah 97,758.00
Dibulatkan 97,758.00
G-10 1 M2 Pasang Atap Genteng Beton
- Genteng bbh 11 8,500.00 93,500.00
- Paku biasaKg 0.03 23,400.00 702
- Pekerja Oh 0.2 42,000.00 8,400.00
- Tukang kayOh 0.1 65,000.00 6,500.00
- Kepala tukOh 0.01 75,000.00 750
- Mandor Oh 0.01 80,000.00 800
Jumlah ###
Dibulatkan ###
G-11 1 M2 Pasang Atap Genteng Murando Natural
- Genteng mubh 18 2,700.00 48,600.00
- Pekerja Oh 0.15 42,000.00 6,300.00
- Tukang kayOh 0.075 65,000.00 4,875.00
- Kepala tukOh 0.008 75,000.00 600
- Mandor Oh 0.008 80,000.00 640
Jumlah 61,015.00
Dibulatkan 61,015.00
G-12 1 M2 Pasang Atap Genteng Murando Glazur
- Genteng mbh 18 4,000.00 72,000.00
- Pekerja Oh 0.15 42,000.00 6,300.00
- Tukang kayOh 0.075 65,000.00 4,875.00
- Kepala tukOh 0.008 75,000.00 600
- Mandor Oh 0.008 80,000.00 640
Jumlah 84,415.00
Dibulatkan 84,415.00
H. ANALISA HARGA SATUAN PEKERJAAN PENUTUP LANGIT-LANGIT
No. URAIAN SATUAN VOLUME HARGA SAHARGA
(Rp) (Rp)
(Rp) (Rp)
H-01 1 M2 Langit-langit Asbes ( 1,00 x 1,00 ) m, tebal 5 mm
- Pelat asbe m2 1.1 22,500.00 24,750.00
- Paku seng Kg 0.01 23,800.00 238
- Pekerja Oh 0.03 42,000.00 1,260.00
- Tukang kayOh 0.07 65,000.00 4,550.00
- Kepala tukOh 0.007 75,000.00 525
- Mandor Oh 0.0015 80,000.00 120
Jumlah 31,443.00
Dibulatkan 31,443.00
H-02 1 M2 Langit-langit Asbes ( 1,00 x 1,00 ) m, tebal 3,5 mm
- Pelat asbe Lbr 1.1 19,500.00 21,450.00
- Paku seng Kg 0.01 23,800.00 238
- Pekerja Oh 0.03 42,000.00 1,260.00
- Tukang kayOh 0.07 65,000.00 4,550.00
- Kepala tukOh 0.007 75,000.00 525
- Mandor Oh 0.0015 80,000.00 120
Jumlah 28,143.00
Dibulatkan 28,143.00
H-03 1 M2 Langit-langit Akustik ( 60 x 120 ) cm
- Akustik 60 Lbr 1.5 ### ###
- Paku Kg 0.05 23,800.00 1,190.00
- Pekerja Oh 0.06 42,000.00 2,520.00
- Tukang kayOh 0.1 65,000.00 6,500.00
- Kepala tukOh 0.01 75,000.00 750
- Mandor Oh 0.003 80,000.00 240
Jumlah ###
Dibulatkan ###
H-04 1 M2 Langit-langit Akustik ( 60 x 120 ) cm + Rangka Alluminium
- Profil Allu M 3.6 12,200.00 43,920.00
- Kawat f 4 Kg 0.15 28,200.00 4,230.00
- Ramset / dBh 1.05 7,200.00 7,560.00
- Akustik 60 Lbr 1.5 ### ###
- Pekerja Oh 0.15 42,000.00 6,300.00
- Tukang kayOh 0.5 65,000.00 32,500.00
- Kepala tukOh 0.05 75,000.00 3,750.00
- Mandor Oh 0.0075 80,000.00 600
Jumlah ###
Dibulatkan ###
H-05 1 M2 Langit-langit teakwood (60 x 120) cm, t = 4 mm + rangka kayu borneo super
- Kayu BalokM3 0.023 ### 60,720.00
- Paku biasaKg 0.06 23,400.00 1,404.00
- Teakwood L1br 0.39 ### 51,363.00
- Pekerja Oh 0.27 42,000.00 11,340.00
- Tukang kayOh 0.4 65,000.00 26,000.00
- Kepala tukOh 0.04 75,000.00 3,000.00
- Mandor Oh 0.0135 80,000.00 1,080.00
Jumlah ###
Dibulatkan ###
H-06 1 M2 Langit-langit Teakwood 3 mm + Rangka Kayu Borneo Super
- Kayu BalokM3 0.023 ### 60,720.00
- Paku biasaKg 0.06 23,400.00 1,404.00
- Teakwood L( br 0.39 ### 50,349.00
- Pekerja Oh 0.27 42,000.00 11,340.00
- Tukang kayOh 0.4 65,000.00 26,000.00
- Kepala tukOh 0.04 75,000.00 3,000.00
- Mandor Oh 0.0135 80,000.00 1,080.00
Jumlah ###
Dibulatkan ###
H-07 1 M2 Langit-langit Triplek 4 mm + Rangka Kayu Borneo Super
- Kayu BalokM3 0.023 ### 60,720.00
- Paku biasaKg 0.06 23,800.00 1,428.00
- Triplek 12 Lbr 0.39 64,400.00 25,116.00
- Pekerja Oh 0.27 42,000.00 11,340.00
- Tukang kayOh 0.4 65,000.00 26,000.00
- Kepala tukOh 0.04 75,000.00 3,000.00
- Mandor Oh 0.0135 80,000.00 1,080.00
Jumlah ###
Dibulatkan ###
H-08 1 M2 Langit-langit Gypsum Board, tebal 9 mm + rangka besi hollow
- Hollow 4/4Btg 0.415 29,200.00 12,118.00
- Hollow 2/4Btg 0.15 22,600.00 3,390.00
- Gypsum boa Lbr 0.364 79,800.00 29,047.20
- Paku gyps kg 0.11 17,500.00 1,925.00
- Ramset / dBh 4 7,200.00 28,800.00
- Cotton plasBh 0.072 15,000.00 1,080.00
- Compoun Zak 0.125 75,000.00 9,375.00
- Pekerja Oh 0.1 42,000.00 4,200.00
- Tukang kayOh 0.05 65,000.00 3,250.00
- Kepala tukOh 0.005 75,000.00 375
- Mandor Oh 0.005 80,000.00 400
Jumlah 93,960.20
Dibulatkan 93,960.00
H-09 1 M2 Langit-langit GRC t = 4 mm + rangka besi hollow
- Hollow 4/4Btg 0.415 29,200.00 12,118.00
- Hollow 2/4Btg 0.15 22,600.00 3,390.00
- GRC ( 120 Lbr 0.364 67,500.00 24,570.00
- Paku GRC kg 0.11 35,000.00 3,850.00
- Ramset / dBh 4 7,200.00 28,800.00
- Cotton plasBh 0.072 15,000.00 1,080.00
- Compoun Zak 0.125 75,000.00 9,375.00
- Pekerja Oh 0.1 42,000.00 4,200.00
- Tukang kayOh 0.05 65,000.00 3,250.00
- Kepala tukOh 0.005 75,000.00 375
- Mandor Oh 0.005 80,000.00 400
Jumlah 91,408.00
Dibulatkan 91,408.00
H-10 1 M2 Langit-langit gypsum t = 9 mm + Rangka Kayu Borneo Super
- Kayu BalokM3 0.023 ### 60,720.00
- Paku biasaKg 0.06 23,800.00 1,428.00
- Gypsum boa Lbr 0.39 79,800.00 31,122.00
- Paku sekrukg 0.11 17,500.00 1,925.00
- Pekerja Oh 0.27 42,000.00 11,340.00
- Tukang kayOh 0.4 65,000.00 26,000.00
- Kepala tukOh 0.04 75,000.00 3,000.00
- Mandor Oh 0.0135 80,000.00 1,080.00
Jumlah ###
Dibulatkan ###
H-11 1 M2 Langit-langit GRC t = 4 mm + Rangka Kayu Borneo Super
- Kayu BalokM3 0.023 ### 60,720.00
- Paku biasaKg 0.06 23,800.00 1,428.00
- GRC ( 120 Lbr 0.39 67,500.00 26,325.00
- Paku GRC kg 0.11 35,000.00 3,850.00
- Pekerja Oh 0.27 42,000.00 11,340.00
- Tukang kayOh 0.4 65,000.00 26,000.00
- Kepala tukOh 0.04 75,000.00 3,000.00
- Mandor Oh 0.0135 80,000.00 1,080.00
Jumlah ###
Dibulatkan ###
H-12 1 M List Langit-langit Kayu Profil 10 cm
- List Kayu prM 1.05 29,400.00 30,870.00
- Paku Kg 0.01 23,800.00 238
- Pekerja Oh 0.05 42,000.00 2,100.00
- Tukang kayOh 0.05 65,000.00 3,250.00
- Kepala tukOh 0.005 75,000.00 375
- Mandor Oh 0.003 80,000.00 240
Jumlah 37,073.00
Dibulatkan 37,073.00
H-13 1 M List Langit-langit Gypsum 10 cm
- List gypsu M 1.05 8,500.00 8,925.00
- Tepung gy Kg 0.15 12,500.00 1,875.00
- Pekerja Oh 0.05 42,000.00 2,100.00
- Tukang kayOh 0.05 65,000.00 3,250.00
- Kepala tukOh 0.005 75,000.00 375
- Mandor Oh 0.003 80,000.00 240
Jumlah 16,765.00
Dibulatkan 16,765.00
Analisa Harga Satuan Pekerjaan Penutup Lantai dan Dinding (AHS SNI 2011)

Berikut adalah analisa harga satuan pekerjaan penutup landat dan dinding untuk menghitung biaaya penutup lantai
No. URAIAN SATUAN VOLUME HARGA SAHARGA
(Rp) (Rp)
I-01 1 M2 Lantai Ubin Granito ukuran 40 x 40 cm Setara Essenza
- Granito 40m2 1.05 ### ###
- Semen porKg 9.8 1,406.00 13,778.80
- Pasir pasa M3 0.0215 ### 5,018.10
- Semen warKg 1.3 15,700.00 20,410.00
- Pekerja Oh 0.25 42,000.00 10,500.00
- Tukang batOh 0.12 65,000.00 7,800.00
- Kepala tukOh 0.012 75,000.00 900
- Mandor Oh 0.0125 80,000.00 1,000.00
Jumlah ###
Dibulatkan ###
I-02 1 M2 Lantai Ubin Granito ukuran 30 x 30 cm Setara Essenza
- Granito 30m2 1.05 ### ###
- Semen porKg 10 1,406.00 14,060.00
- Pasir pasa M3 0.0215 ### 5,018.10
- Semen warKg 1.5 15,700.00 23,550.00
- Pekerja Oh 0.26 42,000.00 10,920.00
- Tukang batOh 0.125 65,000.00 8,125.00
- Kepala tukOh 0.0125 75,000.00 937.5
- Mandor Oh 0.013 80,000.00 1,040.00
Jumlah ###
Dibulatkan ###
I-03 1 M Plint Ubin Granito ukuran 10 x 40 cm Setara Essenza
- Plint grani Bh 2.65 27,600.00 73,140.00
- Semen porKg 1.2 1,406.00 1,687.20
- Pasir pasa M3 0.003 ### 700.2
- Semen warKg 0.1 15,700.00 1,570.00
- Pekerja Oh 0.06 42,000.00 2,520.00
- Tukang batOh 0.03 65,000.00 1,950.00
- Kepala tukOh 0.003 75,000.00 225
- Mandor Oh 0.003 80,000.00 240
Jumlah 82,032.40
Dibulatkan 82,032.00
I-04 1 M Plint Ubin Granito ukuran 10 x 30 cm Setara Essenza
- Plint grani Bh 3.33 25,900.00 86,247.00
- Semen porKg 1.65 1,406.00 2,319.90
- Pasir pasa M3 0.0032 ### 746.88
- Semen warKg 0.1 15,700.00 1,570.00
- Pekerja Oh 0.09 42,000.00 3,780.00
- Tukang batOh 0.09 65,000.00 5,850.00
- Kepala tukOh 0.009 75,000.00 675
- Mandor Oh 0.0045 80,000.00 360
Jumlah ###
Dibulatkan ###
I-05 1 M2 Lantai Keramik Corak 10 x 20 cm setara Mulia
- Keramik com2 1 56,000.00 56,000.00
- Semen porKg 8 1,406.00 11,248.00
- Pasir pasa M3 0.0215 ### 5,018.10
- Semen warKg 0.013 15,700.00 204.1
- Pekerja Oh 0.25 42,000.00 10,500.00
- Tukang batOh 0.12 65,000.00 7,800.00
- Kepala tukOh 0.012 75,000.00 900
- Mandor Oh 0.0125 80,000.00 1,000.00
Jumlah 92,670.20
Dibulatkan 92,670.00
I-06 1 M2 Lantai Keramik corak 20 x 20 cm setara Mulia
- Keramik com2 1 62,500.00 62,500.00
- Semen porKg 8 1,406.00 11,248.00
- Pasir pasa M3 0.0215 ### 5,018.10
- Semen warKg 0.013 15,700.00 204.1
- Pekerja Oh 0.25 42,000.00 10,500.00
- Tukang batOh 0.12 65,000.00 7,800.00
- Kepala tukOh 0.012 75,000.00 900
- Mandor Oh 0.0125 80,000.00 1,000.00
Jumlah 99,170.20
Dibulatkan 99,170.00
I-07 1 M2 Lantai Keramik polos 30 x 30 cm setara Mulia
- Keramik pom2 1 53,000.00 53,000.00
- Semen porKg 8 1,406.00 11,248.00
- Pasir pasa M3 0.0215 ### 5,018.10
- Semen warKg 0.013 15,700.00 204.1
- Pekerja Oh 0.25 42,000.00 10,500.00
- Tukang batOh 0.12 65,000.00 7,800.00
- Kepala tukOh 0.012 75,000.00 900
- Mandor Oh 0.0125 80,000.00 1,000.00
Jumlah 89,670.20
Dibulatkan 89,670.00
I-08 1 M2 Lantai Keramik corak 30 x 30 cm Setara Mulia
- Keramik com2 1 58,000.00 58,000.00
- Semen porKg 8 1,406.00 11,248.00
- Pasir pasa M3 0.0215 ### 5,018.10
- Semen warKg 0.013 15,700.00 204.1
- Pekerja Oh 0.25 42,000.00 10,500.00
- Tukang batOh 0.12 65,000.00 7,800.00
- Kepala tukOh 0.012 75,000.00 900
- Mandor Oh 0.0125 80,000.00 1,000.00
Jumlah 94,670.20
Dibulatkan 94,670.00
I-09 1 M2 Lantai Keramik polos 40 x 40 cm Setara Mulia
- Keramik pom2 1 56,800.00 56,800.00
- Semen porKg 8 1,406.00 11,248.00
- Pasir pasa M3 0.0215 ### 5,018.10
- Semen warKg 0.013 15,700.00 204.1
- Pekerja Oh 0.25 42,000.00 10,500.00
- Tukang batOh 0.12 65,000.00 7,800.00
- Kepala tukOh 0.012 75,000.00 900
- Mandor Oh 0.0125 80,000.00 1,000.00
Jumlah 93,470.20
Dibulatkan 93,470.00
I-10 1 M2 Lantai Keramik corak 40 x 40 cm Setara Mulia
- Keramik com2 1 65,500.00 65,500.00
- Semen porKg 8 1,406.00 11,248.00
- Pasir pasa M3 0.0215 ### 5,018.10
- Semen warKg 0.013 15,700.00 204.1
- Pekerja Oh 0.25 42,000.00 10,500.00
- Tukang batOh 0.12 65,000.00 7,800.00
- Kepala tukOh 0.012 75,000.00 900
- Mandor Oh 0.0125 80,000.00 1,000.00
Jumlah ###
Dibulatkan ###
I-11 1 M2 Lantai Keramik Corak 10 x 20 cm setara Roman
- Keramik com2 1 72,200.00 72,200.00
- Semen porKg 8 1,406.00 11,248.00
- Pasir pasa M3 0.0215 ### 5,018.10
- Semen warKg 0.013 15,700.00 204.1
- Pekerja Oh 0.25 42,000.00 10,500.00
- Tukang batOh 0.12 65,000.00 7,800.00
- Kepala tukOh 0.012 75,000.00 900
- Mandor Oh 0.0125 80,000.00 1,000.00
Jumlah ###
Dibulatkan ###
I-12 1 M2 Lantai Keramik corak 20 x 20 cm setara Roman
- Keramik com2 1 75,200.00 75,200.00
- Semen porKg 8 1,406.00 11,248.00
- Pasir pasa M3 0.0215 ### 5,018.10
- Semen warKg 0.013 15,700.00 204.1
- Pekerja Oh 0.25 42,000.00 10,500.00
- Tukang batOh 0.12 65,000.00 7,800.00
- Kepala tukOh 0.012 75,000.00 900
- Mandor Oh 0.0125 80,000.00 1,000.00
Jumlah ###
Dibulatkan ###
I-13 1 M2 Lantai Keramik polos 30 x 30 cm setara Roman
- Keramik pom2 1 68,900.00 68,900.00
- Semen porKg 8 1,406.00 11,248.00
- Pasir pasa M3 0.0215 ### 5,018.10
- Semen warKg 0.013 15,700.00 204.1
- Pekerja Oh 0.25 42,000.00 10,500.00
- Tukang batOh 0.12 65,000.00 7,800.00
- Kepala tukOh 0.012 75,000.00 900
- Mandor Oh 0.0125 80,000.00 1,000.00
Jumlah ###
Dibulatkan ###
I-14 1 M2 Lantai Keramik corak 30 x 30 cm Setara Roman
- Keramik coM2 1 76,600.00 76,600.00
- Semen porKg 8 1,406.00 11,248.00
- Pasir pasa M3 0.0215 ### 5,018.10
- Semen warKg 0.013 15,700.00 204.1
- Pekerja Oh 0.25 42,000.00 10,500.00
- Tukang batOh 0.12 65,000.00 7,800.00
- Kepala tukOh 0.012 75,000.00 900
- Mandor Oh 0.0125 80,000.00 1,000.00
Jumlah ###
Dibulatkan ###
I-15 1 M2 Lantai Keramik polos 40 x 40 cm setara Roman
- Keramik pom2 1 72,500.00 72,500.00
- Semen porKg 8 1,406.00 11,248.00
- Pasir pasa M3 0.0215 ### 5,018.10
- Semen warKg 0.013 15,700.00 204.1
- Pekerja Oh 0.25 42,000.00 10,500.00
- Tukang batOh 0.12 65,000.00 7,800.00
- Kepala tukOh 0.012 75,000.00 900
- Mandor Oh 0.0125 80,000.00 1,000.00
Jumlah ###
Dibulatkan ###
I-16 1 M2 Lantai Keramik corak 40 x 40 cm Setara Roman
- Keramik com2 1 77,000.00 77,000.00
- Semen porKg 8 1,406.00 11,248.00
- Pasir pasa M3 0.0215 ### 5,018.10
- Semen warKg 0.013 15,700.00 204.1
- Pekerja Oh 0.25 42,000.00 10,500.00
- Tukang batOh 0.12 65,000.00 7,800.00
- Kepala tukOh 0.012 75,000.00 900
- Mandor Oh 0.0125 80,000.00 1,000.00
Jumlah ###
Dibulatkan ###
I-17 1 M2 Lantai Marmer
- Marmer m2 1.06 ### ###
- Semen porKg 8.19 1,406.00 11,515.14
- Pasir pasa M3 0.045 ### 10,503.00
- Semen warKg 0.65 15,700.00 10,205.00
- Pekerja Oh 0.7 42,000.00 29,400.00
- Tukang batOh 0.35 65,000.00 22,750.00
- Kepala tukOh 0.035 75,000.00 2,625.00
- Mandor Oh 0.035 80,000.00 2,800.00
Jumlah ###
Dibulatkan ###
I-18 1 M2 Lantai Parquet Jati
- Parquet jatM2 1.05 ### ###
- Lem vinyl Kg 0.6 44,000.00 26,400.00
- Pekerja Oh 0.65 42,000.00 27,300.00
- Tukang Oh 0.35 65,000.00 22,750.00
- Kepala tukOh 0.035 75,000.00 2,625.00
- Mandor Oh 0.0325 80,000.00 2,600.00
Jumlah ###
Dibulatkan ###
enghitung biaaya penutup lantai per meter persegi, seperti lantai keramik, lantai marmer dll.
Analisa Harga Satuan Pekerjaan Kayu - AHS SNI 2011

Berikut adalah penggalan analisa harga satuan pekerjaan kayu, untuk menghitung harga satuan pekerjaan kayu per m
J. ANALISA HARGA SATUAN PEKERJAAN KAYU
No. URAIAN SATUAN VOLUME HARGA SAHARGA
J-01 1 M3 Kusen Pintu & jendela kayu Kamper Samarinda
- Kayu Balo m3 1.2 ### ###
- Pekerja Oh 6 42,000.00 ###
- Tukang Ka Oh 18 65,000.00 ###
- Kepala TukOh 2 75,000.00 ###
- Mandor Oh 0.3 80,000.00 24,000.00
Jumlah ###
Dibulatkan ###
J-02 1 M3 Kusen Pintu & jendela kayu Kamper Medan/Kruing
- Kayu Balo M3 1.2 ### ###
- Pekerja Oh 6 42,000.00 ###
- Tukang Ka Oh 18 65,000.00 ###
- Kepala TukOh 2 75,000.00 ###
- Mandor Oh 0.3 80,000.00 24,000.00
Jumlah ###
Dibulatkan ###
J-03 1 M3 Kusen Pintu & jendela kayu Borneo Super
- Kayu BorneM3 1.2 ### ###
- Pekerja Oh 6 42,000.00 ###
- Tukang Ka Oh 18 65,000.00 ###
- Kepala TukOh 2 75,000.00 ###
- Mandor Oh 0.3 80,000.00 24,000.00
Jumlah ###
Dibulatkan ###
J-04 1 M2 Pintu Panel Kayu Kamper Samarinda
- Kayu Papa M3 0.04 ### ###
- Paku BiasaKg 0.05 23,400.00 1,170.00
- Pekerja Oh 1 42,000.00 42,000.00
- Tukang Ka Oh 2.5 65,000.00 ###
- Kepala TukOh 0.25 75,000.00 18,750.00
- Mandor Oh 0.05 80,000.00 4,000.00
Jumlah ###
Dibulatkan ###
J-05 1 M2 Pintu Panel Kayu Kamper Medan/Kruing
- Kayu Papa M3 0.04 ### ###
- Paku BiasaKg 0.05 23,400.00 1,170.00
- Pekerja Oh 1 42,000.00 42,000.00
- Tukang Ka Oh 2.5 65,000.00 ###
- Kepala TukOh 0.25 75,000.00 18,750.00
- Mandor Oh 0.05 80,000.00 4,000.00
Jumlah ###
Dibulatkan ###
J-06 1 M2 Pintu & Jendela Kaca Kayu Kamper Medan
- Kayu Papa M3 0.035 ### ###
- Pekerja Oh 0.8 42,000.00 33,600.00
- Tukang Ka Oh 2 65,000.00 ###
- Kepala TukOh 0.2 75,000.00 15,000.00
- Mandor Oh 0.04 80,000.00 3,200.00
Jumlah ###
Dibulatkan ###
J-07 1 M2 Pintu & Jendela Kaca Kayu Borneo
- Kayu PapanM3 0.035 ### ###
- Pekerja Oh 0.8 42,000.00 33,600.00
- Tukang Ka Oh 2 65,000.00 ###
- Kepala TukOh 0.2 75,000.00 15,000.00
- Mandor Oh 0.04 80,000.00 3,200.00
Jumlah ###
Dibulatkan ###
J-08 1 M2 Pintu & Jendela Jalusi Kayu Kamper Medan
- Kayu Papa M3 0.064 ### ###
- Pekerja Oh 1 42,000.00 42,000.00
- Tukang Ka Oh 3 65,000.00 ###
- Kepala TukOh 0.3 75,000.00 22,500.00
- Mandor Oh 0.5 80,000.00 40,000.00
Jumlah ###
Dibulatkan ###
J-09 1 M2 Pintu Triplek Rangkap, Rangka Tertutup Kayu Kamper Medan
- Kayu Papa M3 0.0196 ### ###
- Paku BiasaKg 0.03 23,800.00 714
- Lem Kayu Ltr 0.3 23,900.00 7,170.00
- Triplek 120Lbr 1 64,400.00 64,400.00
- Pekerja Oh 0.6 42,000.00 25,200.00
- Tukang Ka Oh 2 65,000.00 ###
- Kepala TukOh 0.2 75,000.00 15,000.00
- Mandor Oh 0.03 80,000.00 2,400.00
Jumlah ###
Dibulatkan ###
J-10 1 M2 Jalusi Mati Kusen Kayu kamper Medan
- Kayu Papa M3 0.06 ### ###
- Paku BiasaKg 0.15 23,800.00 3,570.00
- Pekerja Oh 0.5 42,000.00 21,000.00
- Tukang Ka Oh 2 65,000.00 ###
- Kepala TukOh 0.2 75,000.00 15,000.00
- Mandor Oh 0.025 80,000.00 2,000.00
Jumlah ###
Dibulatkan ###
J-11 1 M2 Pintu Triplek Rangkap, Rangka Kayu Borneo Super
- Kayu PapanM3 0.0196 ### ###
- Paku BiasaKg 0.03 23,800.00 714
- Lem Kayu Ltr 0.3 23,900.00 7,170.00
- Triplek 120Lbr 1 64,400.00 64,400.00
- Pekerja Oh 0.6 42,000.00 25,200.00
- Tukang Ka Oh 2 65,000.00 ###
- Kepala TukOh 0.2 75,000.00 15,000.00
- Mandor Oh 0.03 80,000.00 2,400.00
Jumlah ###
Dibulatkan ###
J-12 1 M2 Pintu Teakwood Rangkap, rangka Kayu Kamper Medan
- Kayu Papa M3 0.0196 ### ###
- Paku BiasaKg 0.3 23,800.00 7,140.00
- Lem Kayu Ltr 0.3 23,900.00 7,170.00
- Teakwood Lbr 1 ### ###
- Pekerja Oh 0.6 42,000.00 25,200.00
- Tukang Ka Oh 2 65,000.00 ###
- Kepala TukOh 0.2 75,000.00 15,000.00
- Mandor Oh 0.03 80,000.00 2,400.00
Jumlah ###
Dibulatkan ###
J-13 1 M2 Pintu Triplek & Formika, Rangka Kayu Kamper Medan
- Kayu Papa M3 0.0196 ### ###
- Paku BiasaKg 0.3 23,800.00 7,140.00
- Lem Kayu Ltr 0.8 23,900.00 19,120.00
- Triplek 120Lbr 1 64,400.00 64,400.00
- Formica 3"Lbr 0.5 ### 66,450.00
- Pekerja Oh 0.8 42,000.00 33,600.00
- Tukang Ka Oh 2.5 65,000.00 ###
- Kepala TukOh 0.25 75,000.00 18,750.00
- Mandor Oh 0.04 80,000.00 3,200.00
Jumlah ###
Dibulatkan ###
J-14 1 M2 Pintu Teakwood & Formika, Rangka Kayu Kamper Medan (dipolitur)
- Kayu Papa M3 0.0196 ### ###
- Paku BiasaKg 0.3 23,800.00 7,140.00
- Lem Kayu Ltr 0.8 23,900.00 19,120.00
- Teakwood L1br 1 ### ###
- Formica 4"Lbr 0.5 ### ###
- Pekerja Oh 0.8 42,000.00 33,600.00
- Tukang Ka Oh 2.5 65,000.00 ###
- Kepala TukOh 0.25 75,000.00 18,750.00
- Mandor Oh 0.04 80,000.00 3,200.00
Jumlah ###
Dibulatkan ###
J-15 1 M3 Kuda-kuda Kayu Kamper Medan
- Kayu Balo M3 1.1 ### ###
- Besi Strip Kg 15 26,800.00 ###
- Paku BiasaKg 0.8 23,800.00 19,040.00
- Pekerja Oh 4 42,000.00 ###
- Tukang Ka Oh 12 65,000.00 ###
- Kepala TukOh 1.2 75,000.00 90,000.00
- Mandor Oh 0.2 80,000.00 16,000.00
Jumlah ###
Dibulatkan ###
J-16 1 M3 Kuda-kuda Kayu Borneo Super
- Kayu balokM3 1.1 ### ###
- Besi Strip Kg 15 26,800.00 ###
- Paku BiasaKg 0.8 23,800.00 19,040.00
- Pekerja Oh 4 42,000.00 ###
- Tukang Ka Oh 12 65,000.00 ###
- Kepala TukOh 1.2 75,000.00 90,000.00
- Mandor Oh 0.2 80,000.00 16,000.00
Jumlah ###
Dibulatkan ###
J-17 1 M2 Kaso + Reng Genteng Plentong Kayu Borneo Super
- Kayu balokm3 0.012 ### 63,360.00
- Paku BiasaKg 0.15 23,800.00 3,570.00
- Pekerja Oh 0.1 42,000.00 4,200.00
- Tukang Ka Oh 0.1 65,000.00 6,500.00
- Kepala TukOh 0.01 75,000.00 750
- Mandor Oh 0.005 80,000.00 400
Jumlah 78,780.00
Dibulatkan 78,780.00
J-18 1 M2 Kaso + Reng Genteng Beton Kayu Borneo Super
- Kayu balokM3 0.014 ### 73,920.00
- Paku BiasaKg 0.15 23,800.00 3,570.00
- Pekerja Oh 0.1 42,000.00 4,200.00
- Tukang Ka Oh 0.1 65,000.00 6,500.00
- Kepala TukOh 0.01 75,000.00 750
- Mandor Oh 0.005 80,000.00 400
Jumlah 89,340.00
Dibulatkan 89,340.00
J-19 1 M' Lisplang uk (3x20)cm, Kayu Kamper Medan
- Kayu Papa M3 0.0072 ### 41,928.48
- Paku BiasaKg 0.05 23,800.00 1,190.00
- Pekerja Oh 0.1 42,000.00 4,200.00
- Tukang Ka Oh 0.2 65,000.00 13,000.00
- Kepala TukOh 0.02 75,000.00 1,500.00
- Mandor Oh 0.005 80,000.00 400
Jumlah 62,218.48
Dibulatkan 62,218.00
J-20 1 M' Lisplang uk (3x30)cm, Kayu Kamper Medan
- Kayu Papa M3 0.011 ### 62,618.60
- Paku BiasaKg 0.05 23,800.00 1,190.00
- Pekerja Oh 0.11 42,000.00 4,620.00
- Tukang Ka Oh 0.22 65,000.00 14,300.00
- Kepala TukOh 0.022 75,000.00 1,650.00
- Mandor Oh 0.005 80,000.00 400
Jumlah 84,778.60
Dibulatkan 84,779.00
J-21 1 M List Plafond + kayu Profil 10 cm
- Kayu Profi M' 1.05 29,400.00 30,870.00
- Pekerja Oh 0.021 42,000.00 882
- Tukang Ka Oh 0.021 65,000.00 1,365.00
- Kepala TukOh 0.002 75,000.00 150
- Mandor Oh 0.001 80,000.00 80
Jumlah 33,347.00
Dibulatkan 33,347.00
arga satuan pekerjaan kayu per m3, seperti pekerjaan kusen dan jendela, pekerjaan plapond, dan pekerjaan atap.
Analisa Harga Satuan Pekerjaan Penutup Besi dan Aluminium

Analisa Harga Satuan Pekerjaan Penutup Besi dan Aluminium

Diposkan : 01 Juni 2014


Oleh : Endang Kusman

No. URAIAN SAT VOLUME HARGA SATHARGA


(Rp) (Rp)
K-01 1 Kg Besi profil
- Besi profil Kg 1.1 24,000.00 26,400.00
- Meni besi Kg 0.08 30,400.00 2,432.00
- Pekerja Oh 0.06 42,000.00 2,520.00
- Tukang besOh 0.006 65,000.00 390
- Kepala tukOh 0.006 75,000.00 450
- Mandor Oh 0.0003 80,000.00 24
Jumlah 32,216.00
Dibulatkan 32,216.00
K-02 1 Kg Perakitan baja
- Solar m' 0.01 7,150.00 71.5
- Minyak pem' 0.001 55,000.00 55
- Sewa alat jam 0.008 ### 800
- Pekerja Oh 0.001 42,000.00 42
- Tukang besOh 0.00001 65,000.00 0.65
- Kepala tukOh 0.00001 75,000.00 0.75
- Mandor Oh 0.00005 80,000.00 4
Jumlah 973.9
Dibulatkan 974
K-03 1 Cm Pengelasan dengan las listrik
- kawat las kg 0.04 23,600.00 944
- Solar ltr 0.03 7,150.00 214.5
- Minyak peltr 0.004 55,000.00 220
- Sewa alat jam 0.017 ### 1,700.00
- Pekerja org 0.004 42,000.00 168
- Tukang org 0.002 65,000.00 130
- Kepala Tukorg 0.0002 75,000.00 15
- Mandor org 0.0002 80,000.00 16
Jumlah 2,463.50
Dibulatkan 2,464.00
K-04 1 m2 Pintu Rolling Door
- Rolling dooM2 1 ### ###
- Pekerja Oh 1.05 42,000.00 44,100.00
- Tukang besOh 1.5 65,000.00 97,500.00
- Kepala tukOh 0.105 75,000.00 7,875.00
- Mandor Oh 0.0052 80,000.00 416
Jumlah ###
Dibulatkan ###
K-05 1 m2 Pintu Alluminium Natural
- Pintu allu m2 1 ### ###
- Pekerja Oh 1.05 42,000.00 44,100.00
- Tukang besOh 1.05 65,000.00 68,250.00
- Kepala tukOh 0.105 75,000.00 7,875.00
- Mandor Oh 0.0052 80,000.00 416
Jumlah ###
Dibulatkan ###
K-06 1 m2 Terali Besi
- Besi strip 2m' 11.5 5,500.00 63,250.00
- Pekerja Oh 1.2 42,000.00 50,400.00
- Tukang lasOh 1.2 65,000.00 78,000.00
- Kepala tukOh 0.012 75,000.00 900
- Mandor Oh 0.0006 80,000.00 48
Jumlah ###
Dibulatkan ###
K-07 1 m2 Kawat Harmonika 4 cm
- Kawat har M2 1.1 35,900.00 39,490.00
- Paku biasakg 0.02 23,800.00 476
- Papan kay M2 0.0018 ### 10,246.68
- Pekerja Oh 0.1 42,000.00 4,200.00
- Tukang kayOh 0.1 65,000.00 6,500.00
- Kepala tukOh 0.01 75,000.00 750
- Mandor Oh 0.005 80,000.00 400
Jumlah 62,062.68
Dibulatkan 62,063.00
K-08 1 m' Talang Datar, Seng BJLS 28 lebar 90 cm
- Seng plat 3m' 1.05 20,801.00 21,841.05
- Paku biasaKg 0.015 23,800.00 357
- Kayu papanM3 0.0096 ### 53,719.68
- Flincote / Kg 0.25 30,400.00 7,600.00
- Pekerja Oh 0.15 42,000.00 6,300.00
- Tukang kayOh 0.4 65,000.00 26,000.00
- Kepala tukOh 0.025 75,000.00 1,875.00
- Mandor Oh 0.0013 80,000.00 104
Jumlah ###
Dibulatkan ###
K-09 1 m' Talang Miring, Seng BJLS 28 lebar 90 cm
- Seng plat 3m' 1.05 20,801.00 21,841.05
- Paku biasaKg 0.015 23,800.00 357
- Kayu papanM3 0.019 ### ###
- Flincote / Kg 0.3 30,400.00 9,120.00
- Pekerja Oh 0.2 42,000.00 8,400.00
- Tukang kayOh 0.4 65,000.00 26,000.00
- Kepala tukOh 0.025 75,000.00 1,875.00
- Mandor Oh 0.0013 80,000.00 100
Jumlah ###
Dibulatkan ###
K-10 1 m' Talang 1/2 lingkaran D-15 cm, seng pelat BJLS 28 lebar 90 cm
- Seng plat 3m' 1.05 20,801.00 21,841.05
- Paku biasaKg 0.1 23,800.00 2,380.00
- Kayu papankg 0.019 ### ###
- Besi strip Kg 0.5 26,800.00 13,400.00
- Pekerja Oh 0.15 42,000.00 6,300.00
- Tukang kayOh 0.3 65,000.00 19,500.00
- Kepala tukOh 0.03 75,000.00 2,250.00
- Mandor Oh 0.008 80,000.00 640
Jumlah ###
Dibulatkan ###
K-11 1 m' Pasang kusen pintu/jendela alluminium natural 4"
- Alumuniumm' 1.1 ### ###
- Skrup fixerbh 2 250 500
- Sealant m' 1 7,500.00 7,500.00
- Pekerja Oh 0.043 42,000.00 1,806.00
- Tukang kayOh 0.043 65,000.00 2,795.00
- Kepala tukOh 0.0043 75,000.00 322.5
- Mandor Oh 0.0021 80,000.00 168
Jumlah ###
Dibulatkan ###
K-12 1 m' Pasang kusen pintu/jendela alluminium warna 4"
- Alumuniumm' 1.1 ### ###
- Skrup fixerbh 2 250 500
- Sealant m' 1 7,500.00 7,500.00
- Pekerja Oh 0.043 42,000.00 1,806.00
- Tukang kayOh 0.043 65,000.00 2,795.00
- Kepala tukOh 0.0043 75,000.00 322.5
- Mandor Oh 0.0021 80,000.00 168
Jumlah ###
Dibulatkan ###
K-13 1 m' Pasang kusen pintu/jendela alluminium natural 3"
- Alumuniumm' 1.1 81,000.00 89,100.00
- Skrup fixerbh 2 250 500
- Sealant m' 1 7,500.00 7,500.00
- Pekerja Oh 0.043 42,000.00 1,806.00
- Tukang kayOh 0.043 65,000.00 2,795.00
- Kepala tukOh 0.0043 75,000.00 322.5
- Mandor Oh 0.0021 80,000.00 168
Jumlah ###
Dibulatkan ###
K-14 1 m' Pasang kusen pintu/jendela alluminium warna 3"
- Alumuniumm' 1.1 ### ###
- Skrup fixerbh 2 250 500
- Sealant m' 1 7,500.00 7,500.00
- Pekerja Oh 0.043 42,000.00 1,806.00
- Tukang kayOh 0.043 65,000.00 2,795.00
- Kepala tukOh 0.0043 75,000.00 322.5
- Mandor Oh 0.0021 80,000.00 168
Jumlah ###
Dibulatkan ###
K-15 1 m2 Pintu alluminium strip lebar 8 cm
- Alumuniumm' 4.4 ### ###
- Alumuniumm2 1.05 ### ###
- Pekerja Oh 0.085 42,000.00 3,570.00
- Tukang kayOh 0.085 65,000.00 5,525.00
- Kepala tukOh 0.0085 75,000.00 637.5
- Mandor Oh 0.0042 80,000.00 336
Jumlah ###
Dibulatkan ###
K-16 1 m2 Pintu/jendela kaca rangka alluminium natural 4"
- Alumuniumm' 4.4 ### ###
- Profil allu m' 4.5 12,200.00 54,900.00
- Sealant tube 0.27 7,500.00 2,025.00
- Pekerja Oh 0.085 42,000.00 3,570.00
- Tukang kayOh 0.085 65,000.00 5,525.00
- Kepala tukOh 0.0085 75,000.00 637.5
- Mandor Oh 0.005 80,000.00 400
Jumlah ###
Dibulatkan ###
K-17 1 m2 Pintu/jendela kaca rangka alluminium warna 4"
- Alumuniumm' 4.4 ### ###
- Profil allu m' 4.5 12,200.00 54,900.00
- Sealant tube 0.27 7,500.00 2,025.00
- Pekerja Oh 0.085 42,000.00 3,570.00
- Tukang kayOh 0.085 65,000.00 5,525.00
- Kepala tukOh 0.0085 75,000.00 637.5
- Mandor Oh 0.005 80,000.00 400
Jumlah ###
Dibulatkan ###
K-18 1 m2 Jendela nako & teralis (10 klips)
- Jendela nam2 1.1 ### ###
- Paku skrupbh 10 250 2,500.00
- Besi strip m' 7 5,500.00 38,500.00
- Pekerja Oh 0.2 42,000.00 8,400.00
- Tukang kayOh 0.2 65,000.00 13,000.00
- Kepala tukOh 0.02 75,000.00 1,500.00
- Mandor Oh 0.001 80,000.00 80
Jumlah ###
Dibulatkan ###
K-19 1 m2 Pintu pelat baja tebal 2mm rangkap, rangka baja siku
- Besi siku L Kg 15 24,000.00 ###
- Baja pelat Kg 32.8 24,000.00 ###
- kawat las Kg 0.05 23,600.00 1,180.00
- Pekerja Oh 0.2 42,000.00 8,400.00
- Tukang kayOh 0.2 65,000.00 13,000.00
- Kepala tukOh 0.02 75,000.00 1,500.00
- Mandor Oh 0.001 80,000.00 80
Jumlah ###
Dibulatkan ###
K-20 1 m2 Rangka jendela besi square tube (5 x 5) cm
- Besi squar M 4.76 7,300.00 34,748.00
- Besi lis ka Kg 4.522 24,000.00 ###
- Pengelasa Cm 20 2,464.00 49,280.00
- Pekerja Oh 0.65 42,000.00 27,300.00
- Tukang kayOh 0.65 65,000.00 42,250.00
- Kepala tukOh 0.065 75,000.00 4,875.00
- Mandor Oh 0.032 80,000.00 2,560.00
Jumlah ###
Dibulatkan ###
K-21 1 m2 Pintu lipat (folding door) bahan besi
- Pintu lipat M2 1 ### ###
- Pekerja Oh 1.05 42,000.00 44,100.00
- Tukang kayOh 1.05 65,000.00 68,250.00
- Kepala tukOh 0.105 75,000.00 7,875.00
- Mandor Oh 0.0052 80,000.00 416
Jumlah ###
Dibulatkan ###
K-22 1 m2 Tirai (venetions blinds and vertical blinds)
- Tirai M2 1 ### ###
- Pekerja Oh 0.35 42,000.00 14,700.00
- Tukang kayOh 0.35 65,000.00 22,750.00
- Kepala tukOh 0.035 75,000.00 2,625.00
- Mandor Oh 0.0018 80,000.00 144
Jumlah ###
Dibulatkan ###

Potrebbero piacerti anche