Sei sulla pagina 1di 20

PROPOSAL LIST

DATE: 26-May-17
CLIENT/ PROJECT

1 ALVENDIA

2 DONUTTIFICATION CORP.
3 DUNKIN DONUT/ GOLDEN TRI-BLOC, INC.
4 ECOCARE

5 JOLLIBEE HALCON

6 JOLLIBEE KALENTONG

7 JOLLIBEE MANALO

8 MASUMO FOOD INC.


9 MAXIM PHILS. OPERATING CORP.

10 NDC, CALOOCAN SPORTS COMPLEX

11 NDC, CUNETA ASTRODOME


12 NDC, CUYEGKENG MULTI-PURPOSE CENTER
13 NDC, DONA NENA HEALTH CENTER
14 NDC, MALIBAY ELEM SCHOOL
15 NDC, MALIBAY HEALTH CENTER

16 PEPSI - CAGAYAN DE ORO

17 PEPSI - CEBU

18 PEPSI - STO TOMAS , BATANGAS

19 PONTEFINO HOTEL
20 RITECHEM
21 ROSHAN COMMERCIAL

22 SHI MANUFACTURING & SERVICES

23 SILANGAN MINING CORPORATION


24 SPLENDIDO
25 TAAL VISTA HOTEL
26 UNILAB

27 USC, MONTESSORI ACADEMY


28 USC, NORTH CAMPUS

29 USC, SOUTH CAMPUS

30 KWASAKI MOTPR PHILS


PROPOSAL SUBJECT PROPOSAL DATE
Supply of anaerobic bacteria with biocanister for septic chamber
treatment. (Recommended Action Step-1).
Supply and installation of grease trap at kitchen sink area. 22-May-17
(Recommended Action Step-2)
Upgrade to electrolytic wastewater treatment systems. 3-Apr-17
Replacement of defective Recirculation Pump of the Electrolytic
Wastewater Treatment 24-May-17
Drying bed for papers 18-Mar-17
Supply of labor and materials, equipment for Tank cleaning of
underground process tank and assistance in prep of water proofing
activity for electrolytic wastewater treatment system. 26-Nov-16
Supply of technical personnel and consumables for the process tank
cleaning and water proofing.

Electrolytic wastewater treatment systems. 11-Apr-17

Electrolytic wastewater treatment systems. 3-Apr-17

Installation of Chemical and Electrolytic wastewater treatment systems. 16-May-17


Electrolytic wastewater treatment systems.
Construction and Installation of non-potable water storage and pumping 2-May-17
system
Electrolytic wastewater treatment systems. 9-Mar-17
Electrolytic wastewater treatment systems. 9-Mar-17
Electrolytic wastewater treatment systems. 9-Mar-17

Electrolytic wastewater treatment systems. 9-Mar-17


Wet Scrubber 12-May-17

12-May-17
Wet Scrubber

12-May-17
Wet Scrubber
Electrolytic wastewater treatment systems. 10-Feb-17
Electrolytic wastewater treatment systems. 3-Feb-17
Electrolytic wastewater treatment systems. 17-Mar-17
Electrolytic wastewater treatment systems.
Hydraulic Metal Compactor. 3-Apr-17, 10-Apr-17

Sewage Treatment Plant. 9-Jan-17


Rehabilitation of control panel and reprocess the treatment operation of
sequence batch reactor system. 15-Feb-17
Cleaning of kitchen exhaust food and fresh air blower system. 14-Feb-17
Advanced oxidation process wastewater treatment plant. 12-Jan-17
Installation of common effluent tank and interconnection of septic tank
effluents. 8-Feb-17
Installation of common effluent tank and interconnection of septic tank
effluents. 8-Feb-17

Installation of common effluent tank and interconnection of septic tank


effluents. 8-Feb-17
AMOUNT CONTACT PERSON CONTACT NO.

P 185,645.12 Mr. Vance Edric O. Ting (632) 571-9889

994,440.00 Ferdinand Salazar


4,001.25 Mr. Ronald Salindong 09178390903
504,400.00 Mr. Alvin Pullon

Mr. Joel Villanueva/ Mr.


171,295.00 (632) 477-6294
Renz Luquiron

Ms. Christin Gengania/


146,453.50
Lenard Cruz
Mr. Joel Villanueva 534-5926
146,453.50
Romy de Guzman 09297939387

6,657,000.00 Cristine

7,686,500.00 Engr. Aireen Martinez 09258645879

8,300,000.00 Engr. Dennis Bicomong 887-1951/ 889-4171


3,500,000.00 Engr. Dennis Bicomong 887-1951/ 889-4171
3,800,000.00 Engr. Dennis Bicomong 887-1951/ 889-4171
887-1951/ 889-4171
4,100,000.00 Engr. Dennis Bicomong 887-1951/ 889-4171
Max Pagkaliwangan 09178279297
1,823,976.00
Emil Pagkaliwangan 09778225033
Max Pagkaliwangan 09178279297
1,875,426.00
Emil Pagkaliwangan 09778225033
Max Pagkaliwangan 09178279297
1,908,501.00
Emil Pagkaliwangan 09778225033
6,273,350.00
283,006.25 Engr. Alvin Corpin
1,389,778.00 Mr. Lal Chatlani
(Option1) 5,712,616.86
Roy D. Yepes (043) 405-6263
(Option2) 5,427,833.86
8,408,000.00 Sandra Dy
(Option1) 173,981.50
Ms. Cecille Mendoza
(Option2) 273,981.50
109,581.00
4,171,598.00
(Option1) 1,726,746.00 Fr. Eleno P. Bucia 09088864933
(Option2) 1,589,496.00 Vicky Napisa 09175463059
(Option1) 2,545,513.00 Fr. Eleno P. Bucia 09088864933
(Option2) 2,364,999.00 Vicky Napisa 09175463059
(Option1) 3,081,902.00 Fr. Eleno P. Bucia 09088864933
(Option2) 2,851,922.00 Vicky Napisa 09175463059
GREENLEX SYSTEM SERVICES INC.
OVERTIME AUTHORIZATION

NAME: ___________________________
DATE: ______________ DATE OF OVERTIME: ____________________
REGULAR OVERTIME NIGHT DIFFERENTIAL
TOTAL TOTAL
PROECT/LOCATION EXPLANATION FROM TO HOURS FROM TO HOURS

Approved: _____
Disapproved: ___

GREENLEX SYSTEM SERVICES INC.


OVERTIME AUTHORIZATION

NAME: ___________________________
DATE: ______________ DATE OF OVERTIME: ____________________
REGULAR OVERTIME NIGHT DIFFERENTIAL
TOTAL TOTAL
PROECT/LOCATION EXPLANATION FROM TO HOURS FROM TO HOURS

Approved: _____
Disapproved: ___

GREENLEX SYSTEM SERVICES INC.


OVERTIME AUTHORIZATION

NAME: ___________________________
DATE: ______________ DATE OF OVERTIME: ____________________
REGULAR OVERTIME NIGHT DIFFERENTIAL
TOTAL TOTAL
PROECT/LOCATION EXPLANATION FROM TO HOURS FROM TO HOURS

Approved: _____
Disapproved: ___
SUPERVISOR
SIGNATURE

SUPERVISOR
SIGNATURE

SUPERVISOR
SIGNATURE
1 KG WATER AT 30 DEGREES CELSIUS TO EVAPORATE

SENSIBLE HEAT
Q = MCT

Q = 1 kg (4.2 kJ/kg/K) (100-30)


Q = 294 kJ

HEAT OF EVAPORATION:
Q = Lv

Q= 1kg (2,258kJ/kg)
Q = 2,258 kJ

TOTAL HEAT = 294 + 2258


= 2552 kJ
= 2,552,000 J

TO DRY 1 kg water IN 1 DAY

T = 24 HRS X 60 MIN X 60 SECS


= 86,400 SECS
86400
POWER = HEAT/SEC

POWER = 2,552,000/86,400
= 29 WATTS
29.537037037

POWER TO DRY 10,000 KGS WATER


= 10,000 kg (29 watts/kg/day)
= 290,000 watts/day
290000
48.3333333333
GREENLEX SYSTEM SERVICES INC.
OVERTIME AUTHORIZATION

NAME:
DATE: DATE OF OVERTIME:
REGULAR OVERTIME NIGHT DIFFERENTIAL
TOTAL TOTAL
PROJECT/LOCATION EXPLANATION FROM TO HOURS FROM TO HOURS

Approved: _____
Disapproved: ___

GREENLEX SYSTEM SERVICES INC.


OVERTIME AUTHORIZATION

NAME:
DATE: DATE OF OVERTIME:
REGULAR OVERTIME NIGHT DIFFERENTIAL
TOTAL TOTAL
PROJECT/LOCATION EXPLANATION FROM TO HOURS FROM TO HOURS

Approved: _____
Disapproved: ___

GREENLEX SYSTEM SERVICES INC.


OVERTIME AUTHORIZATION

NAME:
DATE: DATE OF OVERTIME:
REGULAR OVERTIME NIGHT DIFFERENTIAL
TOTAL TOTAL
PROJECT/LOCATION EXPLANATION FROM TO HOURS FROM TO HOURS

Approved: _____
Disapproved: ___
SUPERVISOR
SIGNATURE

SUPERVISOR
SIGNATURE

SUPERVISOR
SIGNATURE
GREENLEX SYSTEM SERVICES INC.
OVERTIME AUTHORIZATION

NAME: James Laplana


DATE: 17-Jul-17 DATE OF OVERTIME: 11-Jul-17
REGULAR OVERTIME NIGHT DIFFERENTIAL
TOTAL TOTAL
PROJECT/LOCATION EXPLANATION FROM TO HOURS FROM TO HOURS
Bel Mondo Italia Extended Manhours to meet 4:00 6:00 2
Corp. project deadline

Approved: _____
Disapproved: ___

GREENLEX SYSTEM SERVICES INC.


OVERTIME AUTHORIZATION

NAME: James Laplana


DATE: 17-Jul-17 DATE OF OVERTIME: 13-Jul-17
REGULAR OVERTIME NIGHT DIFFERENTIAL
TOTAL TOTAL
PROJECT/LOCATION EXPLANATION FROM TO HOURS FROM TO HOURS
Bel Mondo Italia Extended Manhours to meet 4:00 6:00 2
Corp. project deadline

Approved: _____
Disapproved: ___

GREENLEX SYSTEM SERVICES INC.


OVERTIME AUTHORIZATION

NAME: James Laplana


DATE: 17-Jul-17 DATE OF OVERTIME: 14-Jul-17
REGULAR OVERTIME NIGHT DIFFERENTIAL
TOTAL TOTAL
PROJECT/LOCATION EXPLANATION FROM TO HOURS FROM TO HOURS
Bel Mondo Italia Extended Manhours to meet 4:00 6:00 2
Corp. project deadline

Approved: _____
Disapproved: ___
GREENLEX SYSTEM SERVICES INC.
OVERTIME AUTHORIZATION

NAME: James Laplana


DATE: 17-Jul-17 DATE OF OVERTIME: 14-Jul-17
REGULAR OVERTIME NIGHT DIFFERENTIAL
TOTAL TOTAL
PROJECT/LOCATION EXPLANATION FROM TO HOURS FROM TO HOURS
Bel Mondo Italia Extended Manhours to meet 4:00 6:00 2
Corp. project deadline

Approved: _____
Disapproved: ___
SUPERVISOR
SIGNATURE

SUPERVISOR
SIGNATURE

SUPERVISOR
SIGNATURE
SUPERVISOR
SIGNATURE

Potrebbero piacerti anche