BAGAN ALIR

RENCANA TEKNIK AKHIR PEMBANGUNAN JALAN TOL RUAS BAKAUHENI - TERBANGGI BESAR PAKET 4,
METRO TERBANGGI BESAR (STA.109+000 - STA.140+938)
Earth
Reinforcement
Earth Work A1 cut, fill,
Slider

Typical X-Sect

X-Section

Traffic Review/ Interchange Interchange +


Analysis Analysis Required Access + at
Grade int.

Geometric Parking Bay


Evaluation Review Superstructure

Determination Access + Office On/Off Rest.


Design Area
area survey

Evaluation Review
Emergency
Geoteknik Geotechs survey/ Lane
soil investigation

Geotechc
Analysis/Design Detour Plan
Evaluation Review Geotechs case
Structure up., Ovp., Topography
Viaduct, Tunnel Box Survey Structure Analysis/
Design
Underpass
Draft-draft plan/
Profile Alignment Structure Location
Evaluation Review Topography
Overpass
Geodetic Survey
Landscape Final/Detail
Collecting Analysis/Design Design
Secondary Data
Viaduct
Hydrology Hydrology
Evaluation Review Drainage Analisis
Hydroligist/ Drainage Survey Design
Drainage Geometric Drainage
General Field Analysis/Design Structure Structure
Start Survey
Reconnaissance
Yes Utilities Survey Analysis Ret. Wall
Evaluation Review Design
Adjusted to
Facilities Revise
Adjacent section
Adjusment Full Stake Out

Check Basic Micsc. Struct.


Design
Evaluation Review Rest area/Other
Topo survey
Interchange in No Architecture/
Basic Design Facilities Analysis
- Design Toll gate
Plaza, Toll Office

Realigned Site Dicth


Evaluation Review
Environmental

Median Dicth
Mechanical &
Electrical Analysis/

toll plaza, rest area, Concept Drainage Crossing Drain


parking bay Determination

Sub Drain
Construction
Const. Method Schedule
Document Tender
Preparation
Special Drain

Quantity

Unit Price Analysis Misc.


Full Topo Survey
Main Road
EE Road Sign
Others
Road Mark.

Lighting & ME

Rest. Area

Toll Gate/
Plaza, Office

Landscape

Parking Bay