169

2310 4000 2000 2330 1 ) All Dimensions are in millimeters (mm) unless otherwise mentioned:
2 ) Bay sizes for Scaffolding not to exceed ________ , Unless otherwise mentioned:
3 ) Portions /Areas not covered by Scaffolding should be supported by the

2300 6900 Contractor as per site condition.

The Customer is responsible for ensuring that all structures are adequately braced
4125

and/or tied to carry the load and ensure stability as indicated on the drawing. No braces
or ties are to be removed with Manar concern

Temporary working platforms for erection or Dismantling purpose will be designed,


Supplied and fitted by customer. Customer is responsible to ensure that working

2000
platform or means of access necessary for safe access are provided whether shown
X5
on this drawing or not

a . Erection of Scaffolding should be as per the Drawing .

A-A
+6.15 b . Max distance ( Spacing ) Between Ledger to Ledger is 1.5m .
c . Manar does not supply labours or technical supervision . The responsibility of
Customer includes the method ,control and suitability of all sequencing, the time
checking, loading , striking, movement , lifting and Stripping of the temporary work and the

2670 design , supply and erection of any temporary working platform for erection & dismantling.

MAO a . Back propping may be required . Back propping is the responsibility of the

7690
Customer..

a . Loads on forms and falsework have been analyzed in accordance with the Guide for Formwork
+1.85 and BS 5975 & 5973 , Code of practice for False Work :
b . Loads are assumed as Uniformly Distributed.
c . Dead Load of structure has been considered in designing of Scaffolding, excluding of Finishing
loads.
d . For Removing (dismantling /unfixing) of Scaffolding, the contractor must check for cube
strength. This is the responsibility of contractor.

2000
e .This drawing is prepared based on the information Provided to us by the customer.

SECTION A - A
However, it is the responsibility of client to verify and check the requirements of loading
assumptions,details, dimensions, erection sequences etc. as as required.
TIMBER BEAM H 20 5.90m
TIMBER BEAM H 20 4.90m 1. For Slabs & Beams
4000

TIMBER BEAM H 20 3.90m Density Of Concrete 25.00 KN/m^3


TIMBER BEAM H 20 3.60m Weight of Formwork 0.48 KN/m^2
TIMBER BEAM H 20 3.30m Live Load ( BS 5975 ) _____ KN/m^2
2000

2000
TIMBER BEAM H 20 2.9m Total Load _____ KN/m^2
TIMBER BEAM H 20 2.45m 2. For Walls & Columns
TIMBER BEAM H 20 1.90m
Max Allow Load For Walls _____ KN/m^2
Max Allow Load For Columns _____ KN/m^2
X11 X9

500 MM
Max Design Wind Pressure _____KN/m^2
THICK.
+6.15

Raw-material properties used for fabrication of our Falsework are ,


+6.15
T.O.S

1690 5500 750 3750 I . Plywood


Thickness of plywood : 18 mm
Allowable Stresses :
Fb=1200 PSI= 8.27 N/mm2 , Fv= 53 PSI= 0.365 N/mm2
Fc =1.200,000 PSI or 8273.76 N/mm2, L/ 360 ( As per ACI )

AREA: 206.00 m II . Manar Alluminium Beam


Allowable Bending Moment 8.75 N/Sqm
Allowable Shear Force 45.11 N/Sqm
2000

+1.85 Quality,Satisfaction, Economy and safety are our main objectives. Therefore, if any
inconvenient with our offered design , our highly qualified and experienced design team
will work with you to reach your target and goal .

4000
This drawing is the property of MANAR AL OMRAN. Any unauthorized use of this
drawing is considered illegal and subject to legal action by MANAR. This drawing is

SECTION B - B NOT VALID UNLESS SIGNED AND STAMPED BY MANAR DESIGN DEPT.
4000

2000

2000

B1 B2 B3 B4 B5 B6 B7 B8 B9 B10 B11 B12 B13 B14 B15


Y7 Y9 Y10 Y11

Y8
Y12
X2

2000

2000
2000 980 3020 2000 2000 980
0 2000 3020

2105
4000
400 2000

4000
B10 2915 2000
2000

459
2000

2000

2000 2000
2000 4000 114

2000 2000
2000 2000
5

2000
2330
2000

5
1590 2000

2000
2000
9000
2000

2000
2000
500 3500 4000 4000 2500

4000
1575

2000

2000
598

2000
206
0
200
0 2000

2600

2000
2000

2000 2000

2000
0
B10 2000

2000
B4

2000
A-A Y13
0 X3

400
200

3
3390

2670
2000 MAO 2000 2000

3750
0 4000

4000
200

B43

2000
0 2000 2000 2000 2000 2000
2000 2000

400
200 2000

9000
2000

400
1
0 2000
3125 4750 400

4000
2000 2000

400

0
2000 4000

5250

5250

5250
B42
2950

1
4000 2000

400
0

800 3200
4000 4000

2000 2375

2000 2375

2000 2375

2330
20002000

2000 2000

24501550
0
B16
X4

750

750

750

750

750
391
2000 7690

5
2000 2000
3000 3000 500 MM

9000

B36
THICK.

6900
2950 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 +6.15 2000 2000 2000 2000

2000 2000
T.O.S

2390

2390
2000

2000

2000

2000

2000

2000

2000

2000

2000

2000

2000
X5

2300
4000

4000

4000

4000

4000

4000

4000

4000

4000

4000

4000

4000

4000

4000
4000 4000

9000

B40
2950 3000 3000

5500
2000 2000

3500
1690 2310
X6

1690

500
REV. DESCRIPTION DATE DESIGNED CHKD

4500
2000 4000
3000 3000 4125 2000
2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000
X6'

B40
2000 2000 2000 2000 2000 2000

4500

4000

4000

4000
4000

4000

4000

4000

4000

4000

4000

4000

4000
2000 2000

2000

2000

2000
2000

2000

X7
DRAWING STATUS

2000

2000

2000

2000

2000
2375

2375
B17

4000

4000

4000

4000

4000

4000

4000

4000
B40
2000 2000

LE
9000

2000 2000 2400 2020 FOR APPROVAL FOR CONSTRUCTION

B50
625 2625 4625 2000 2000
2000

2000 2000
2000 2000
2000 2000

2500
2000
This Drawing is for

1800
B-B This Drawing has been

G
MAO X8
B51 Technical Discussion ,

B66
issued for construction

5500
4 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000

B50
2000
Pricing and Approval
9000

B40

IN
B45

B-B
2000 4000
2000 7350 with acceptance of

4000

4000

4000

4000

4000

4000

4000

4000
by the Client. Unless

2000 2025
2000 2000

2380 2380
2000 2000
M
2000

2000

X9
issued and signed in client with respect to

2000

4000

4000

4000

4000

4000

4000

4000

W
2000 2000 4625 2625 Construction Status, design.

B39
A
2000 2000
9000

B18
2000 2000 2625 2000 2000 2000 2000
this drawing forms

4000
By______________

2000 2000

2000 2000
2000 2000

2750 1250
S

2000
MAO

RA
X10 no part of Agreement.

2200
DATE ____________

2500
+6.15

2625
C.L.
By ______________
875 3125 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 X10'
9000

DATE ____________

4000 4000

10875
2000 2000 2000 2000 1625 2375 2000 2000 2000 2000 2000 2000 2000 2000
2000 2000

4000

4000

4000

4000

4000

4000

4000
1175

2125
2000

2000

2000

2000

2000

2000

D
X11
FOR CONTINUTION REFER TO DWG

3875
4000

4000

4000

4000

4000

4000

4000

4000

4000

4000

4000

4000

4000
4825
B19

D14099-0100D-H-TD-SC-1-B101
9000

3325

4000
B64
700 MM X12

4000 4000

2000
THICK.
TYP. 2000

B63
2000 2000 2000 2000 20002000 2000 2000 1625 2375 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000
2000 2000 2000 2000 2000

B63
4625
9000

2625 B20
MANAR ALOMRAN

4000

4000

4000

4000

4000

4000

4000

4000

4000

4000

4000

4000

4000

4000
3875

3875
X13
FORMWORK & SCAFFOLDING

2125

2125
4000

4000

4000

4000

4000

4000

4000

4000

4000

4000

4000

4000

4000

4000
9000

HEAD OFFICE: ALDURRA TOWERS, #1007

B62
5800
2000

2000

B62
500 MM B21
THICK.
X14
TEL : 0 6 - 5 2 5 1 5 1 0
FAX : 0 6 - 5 5 6 5 9 4 3

2800

B62
B61
2000 4000 2000 2000
2625 2000 2000 2000 2000 3500 500 2000 2000 2000 11000 2000 2000 20002000 2000 2000
4200 9000 3400 P.O.BOX : 29368 SHARJAH, UAE
9120

2000 2000 2000 2000

4000
3375

3375

3375

3375
B22

4625

4625

4625

4625
B3 B2 B2 B2 B2 B2 B4 B5 B3 B2 B7 B1 B2

2625
X15
B1 B2 B2
900 MM
FOR RAMP LEVELS REFER

B61
B10
THICK. B23
TO ARCH. DRAWINGS +6.15
2000

2000

C.L.

B24
FOR TRENCH LOCATION REFER
TO ARCH. DRAWINGS

B25

B26
CLIENT:
4000 4000 AREA: 338.00 m B27 DHABI CONTRACTING
B28

B29
PROJECT TITLE:
4000 4000
+6.15

B30

SHOPPING MALL @ JUMEIRAH


C.L.

B31

B32

B33
DRAWING TITLE: PARTIAL BASEMENT (4 of 4)
2000

2000

SCALE TECHNICAL
4500 9000 9000 9000 9000 9000 4500 4500 4500 4500 9000 9000 9000 9000 9000 9000 9000 9000 9000 9000 9000 9000 18000 9000 9000

DRAWN DESIGNED DATE


MANAGER
A1 A2 A3 A4 A5 A6 A7 A8 A9 A10 A11 A12 A13 A14 A15 A16 A17 A18 A19 A20 A21 A22 A23 A24 A25 A26 A27

Engr. Santos Engr. Santos 23/10/2016 ENGR. SHAHID


PARTIAL AREA FOR SAMPLE
KEY PLAN - PARTIAL FIRST BASEMENT FLOOR PART 4 OF 4 DESIGN
DRAWING NUMBER REV. A
000

000

Potrebbero piacerti anche