Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
PACKAGE J-3 : SUPPLY AND INSTALLATION OF 150 KV MILLENIUM SUBSTATION IN WEST JAVA
SCHEDULE No. 4 : INSTALLATION AND OTHER SERVICE
A. Installation Services (Erection), including Local Transportation
Date : 10-Sep-14
1. MILLENIUM 150 KV CONVENTIONAL SUBSTATION (NEW) Est. Ref. No. : 724
TOTAL SERVICES
ITEM DESCRIPTION WORK REMARKS
( IDR )
SUMMARY Page : 1 / 77
Bill Of Quantity (BoQ)
PACKAGE J-3 : SUPPLY AND INSTALLATION OF 150 KV MILLENIUM SUBSTATION IN WEST JAVA PT. GRAHA USAHA TEKNIK
Consisting of :
Post Steel Structure NA sets
Beam steel structure NA sets
Double busbar scheme 1 x ALMALEC 1140 sqmm and branch conductor to complete the
1.2 NA set
specified scope of work.
150 kV double tension string and single suspension insulators complete with fittings for
1.3 NA bays
installation of the main busbar as specified.
150 kV Post Insulators complete with supporting structure for installation of the main busbar
1,4 NA pcs
as specified.
Clamps, connectors and accessories for the installation of the main busbar to complete the
1.5 NA set
scope of work.
Conductor for shield wire and accessories for installation of the shield wire to complete the
1,6 NA set
scope of work.
Miscellaneous equipment and material to complete the scope of work for substation earthing
1,7 grid and earthing circuit required such as copper conductors, rods, clamps and connectors for NA set
connection to main substation earthing circuit and to individual item
Miscellaneous equipment and material to complete the scope of work for substation earthing
1,8 circuit required such as copper conductor, clamps and connectors for connection to main NA set
substation earthing circuit and to individual item of equipment and structur
150 kV 3 Phase disconnecting switch motor operated, 40 kA 1250 A without earthing switch,
2,4 NA unit
complete with clamps and supporting structure for 150/20 kV transformer bay.
150 kV 3 Phase SF6 circuit breaker 40 kA 1250 A, complete with clamps and supporting
2,5 NA unit
structure for 150/20 kV transformer bay.
150 kV Current Transformer for 150/20 kV transformer bay complete with clamps and
2,6 3 unit 5.320.955,00 15.962.865,00
supporting structure comprising:
Core 1 : 150-300/ 1 A, Class X for transformer biased differential protection and restricted earth
fault protection.
Core 2 : 150-300/ 1 A, 30 VA Class 5P20 + Class 1 for overcurrent protection, earth fault
protection, instrument and metering devices.
Core 3 Core 3 : 2000-1000/ 1 A, Class X for check bus zone protection.
Core 4 Core 4 : 2000-1000/ 1 A, Class X for main bus zone protection
2,7 150 kV Lightning Arrester, 10 kA, complete with clamp, supporting structure and surge counter. NA unit
2,8 Protection cubicle for 150/20 kV transformer comprising: 1 set 4.954.035,00 4.954.035,00
- Three pole biased differential protection including interposing CT and test facilities.
Three pole overcurrent and one pole earth fault protection with multi inverse
-
characteristic including instantaneous and time delay elements.
- Two trip circuit supervision relay
- Two restricted earth fault relays (1 for 150 kV & 1 for 20 kV side)
- One neutral earth fault overcurrent relay
- One tripping relay with reset
- Two master trip
- Two master trip with reset for each tripping circuit
Wiring, terminal block with switches, links, fuses, test facilities, auxiliary relays etc.., to
-
complete the scope of work.
2,9 Control cubicle for 150/20 kV transformer comprising: NA set
PATI Page : 2 / 77
Bill Of Quantity (BoQ)
PACKAGE J-3 : SUPPLY AND INSTALLATION OF 150 KV MILLENIUM SUBSTATION IN WEST JAVA PT. GRAHA USAHA TEKNIK
One set of wiring including connection to interface marshalling cubicle(s), terminal block
with switches,links, fuses, test facilities etc.., to complete the scope of work.
Note : Two group alarm annunciator shall be provided for transformer alarm and
transformer trip.
2,10 Transformer regulation panel installed at control room comprising: NA set
- One 20 kV voltmeter with 3 phase selector switch
- One set alarm annunciator
- One set transformer regulation relays and facilities
One set of wiring including connection to interface marshalling cubicle(s), terminal block
-
with switches, links, fuses, test facilities etc.., to complete the scope work.
One set of wiring including connection to interface marshalling cubicle(s), terminal block
-
with switches, links, fuses, test facilities etc.., to complete the scope work.
Note : Individual alarm and trip annunciator window for the transformer shall be
provided.
LV Power and Control Cable, power cable and necessary equipment to complete the specified
2,11 1 set 39.518.175,00 39.518.175,00
scope of work.
150/20 kV, 60 MVA 3-Phase Power Transformer complete with necessary accessories and
3,1 1 unit 269.212.076,00 269.212.076,00 Incl oil purification
supporting structure for mounting 150 kV and 20 kV NCT.
Single phase neutral CT for 20 kV Side Class X, 2000-1000/ 5 A complete with clamps for
3,2 restricted earth fault protection suitable for mounting outdoor on transformer tank or can be put 1 unit 2.752.517,00 2.752.517,00
inside the 20 kV neutral earthing resistor cubicle.
Single phase neutral CT for 20 kV side class 10P20, 1000/5 A complete with clamps for neutral
3,3 earth fault protection, suitable for mounting outdoor on transformer tank or can be put inside NA unit
the 20 kV neutral earthing resistor cubicle.
Single phase neutral CT for 150 kV Side Class X, 150-300/ 1 A complete with clamps for
3,4 1 unit 2.752.517,00 2.752.517,00
restricted earth fault protection, suitable for mounting outdoor on transformer tank.
3,5 20 kV Stainless steel neutral earthing resistor rated 12 Ohms, 30 Seconds. NA set
3,6 Transformer Blast and Fire Prevention equipment. 1 set - -
3,7 Dismantling power transformer, power cable, cubicle 20 kV etc. (if any) 1 lot 16.511.392,00 16.511.392,00
4 x 630 sqmm ALU 20 kV XLPE power cable/phase between 150/20 kV power transformer and
4,1 20 kV incoming cubicle, including cable support, 20 kV post insulators, metal bars, cable 1 sets 16.511.392,00 16.511.392,00
terminations and accessories, cable rack, etc to complete scope of work.
2 x 630 sqmm ALU black insulation LV cable to connect neutral of 150/20 kV power transformer
4,2 and neutral of 20 kV incoming cubicle, including cable support, 20 kV post insulators, metal 1 sets 5.503.798,00 5.503.798,00
bar, cable terminations and accessories, etc to complete scope of wor
PATI Page : 3 / 77
Bill Of Quantity (BoQ)
PACKAGE J-3 : SUPPLY AND INSTALLATION OF 150 KV MILLENIUM SUBSTATION IN WEST JAVA PT. GRAHA USAHA TEKNIK
- Interface cubicle without power cable connection facilities 1 unit 2.752.517,00 2.752.517,00
Including single rate tariff metering kwhmeter for incoming and outgoing
feeders.
4 x 20 kV XLPE 630 sqmm AL power cable / phase between bus-section cubicle and interface
4,5 cubicle, including cable terminations and accessories for connection between sets of 20 kV NA set
switchgear to complete the specified scope of work.
16 MISCELLANEOUS
16,2 Miscellaneous equipment and material required for completion the scope of work. 1 set 5.136.878,00 5.136.878,00
PATI Page : 4 / 77
Bill Of Quantity (BoQ)
PACKAGE J-3 : SUPPLY AND INSTALLATION OF 150 KV MILLENIUM SUBSTATION IN WEST JAVA PT. GRAHA USAHA TEKNIK
Consisting of :
Post Steel Structure NA sets
Beam steel structure NA sets
Double busbar scheme 1 x ALMALEC 1140 sqmm and branch conductor to complete the
1.2 NA set
specified scope of work.
150 kV double tension string and single suspension insulators complete with fittings for
1.3 NA bays
installation of the main busbar as specified.
150 kV Post Insulators complete with supporting structure for installation of the main busbar
1,4 NA pcs
as specified.
Clamps, connectors and accessories for the installation of the main busbar to complete the
1.5 NA set
scope of work.
Conductor for shield wire and accessories for installation of the shield wire to complete the
1,6 NA set
scope of work.
Miscellaneous equipment and material to complete the scope of work for substation earthing
1,7 grid and earthing circuit required such as copper conductors, rods, clamps and connectors for NA set
connection to main substation earthing circuit and to individual item
Miscellaneous equipment and material to complete the scope of work for substation earthing
1,8 circuit required such as copper conductor, clamps and connectors for connection to main NA set
substation earthing circuit and to individual item of equipment and structur
150 kV 3 Phase disconnecting switch motor operated, 40 kA 1250 A without earthing switch,
2,4 NA unit
complete with clamps and supporting structure for 150/20 kV transformer bay.
150 kV 3 Phase SF6 circuit breaker 40 kA 1250 A, complete with clamps and supporting
2,5 NA unit
structure for 150/20 kV transformer bay.
150 kV Current Transformer for 150/20 kV transformer bay complete with clamps and
2,6 3 unit 5.320.955,00 15.962.865,00
supporting structure comprising:
Core 1 : 150-300/ 1 A, Class X for transformer biased differential protection and restricted
earth fault protection.
Core 2 : 150-300/ 1 A, 30 VA Class 5P20 + Class 1 for overcurrent protection, earth fault
protection, instrument and metering devices.
Core 3 Core 3 : 2000-1000/ 1 A, Class X for check bus zone protection.
Core 4 Core 4 : 2000-1000/ 1 A, Class X for main bus zone protection
2,7 150 kV Lightning Arrester, 10 kA, complete with clamp, supporting structure and surge counter. NA unit
2,8 Protection cubicle for 150/20 kV transformer comprising: 1 set 4.954.035,00 4.954.035,00
- Three pole biased differential protection including interposing CT and test facilities.
Three pole overcurrent and one pole earth fault protection with multi inverse
-
characteristic including instantaneous and time delay elements.
- Two trip circuit supervision relay
- Two restricted earth fault relays (1 for 150 kV & 1 for 20 kV side)
- One neutral earth fault overcurrent relay
- One tripping relay with reset
- Two master trip
- Two master trip with reset for each tripping circuit
Wiring, terminal block with switches, links, fuses, test facilities, auxiliary relays etc.., to
-
complete the scope of work.
2,9 Control cubicle for 150/20 kV transformer comprising: 1 set 4.954.035,00 4.954.035,00
Bill Of Quantity (BoQ)
PACKAGE J-3 : SUPPLY AND INSTALLATION OF 150 KV MILLENIUM SUBSTATION IN WEST JAVA PT. GRAHA USAHA TEKNIK
One set of wiring including connection to interface marshalling cubicle(s), terminal block
with switches,links, fuses, test facilities etc.., to complete the scope of work.
Note : Two group alarm annunciator shall be provided for transformer alarm and
transformer trip.
2,10 Transformer regulation panel installed at control room comprising: 1 set 4.954.035,00 4.954.035,00
- One 20 kV voltmeter with 3 phase selector switch
- One set alarm annunciator
- One set transformer regulation relays and facilities
One set of wiring including connection to interface marshalling cubicle(s), terminal block
-
with switches, links, fuses, test facilities etc.., to complete the scope work.
One set of wiring including connection to interface marshalling cubicle(s), terminal block
-
with switches, links, fuses, test facilities etc.., to complete the scope work.
Note : Individual alarm and trip annunciator window for the transformer shall be
provided.
150/20 kV, 60 MVA 3-Phase Power Transformer complete with necessary accessories and
3,1 1 unit 269.212.076,00 269.212.076,00 Incl oil purification
supporting structure for mounting 150 kV and 20 kV NCT.
Single phase neutral CT for 20 kV Side Class X, 2000-1000/ 5 A complete with clamps for
3,2 restricted earth fault protection suitable for mounting outdoor on transformer tank or can be put 1 unit 2.752.517,00 2.752.517,00
inside the 20 kV neutral earthing resistor cubicle.
Single phase neutral CT for 20 kV side class 10P20, 1000/5 A complete with clamps for neutral
3,3 earth fault protection, suitable for mounting outdoor on transformer tank or can be put inside the NA unit
20 kV neutral earthing resistor cubicle.
Single phase neutral CT for 150 kV Side Class X, 150-300/ 1 A complete with clamps for
3,4 1 unit 2.752.517,00 2.752.517,00
restricted earth fault protection, suitable for mounting outdoor on transformer tank.
3,5 20 kV Stainless steel neutral earthing resistor rated 12 Ohms, 30 Seconds. NA set
3,6 Transformer Blast and Fire Prevention equipment. 1 set - -
3,7 Dismantling power transformer, power cable, cubicle 20 kV etc. (if any) 1 lot 16.511.392,00 16.511.392,00
4 x 630 sqmm ALU 20 kV XLPE power cable/phase between 150/20 kV power transformer and
4,1 20 kV incoming cubicle, including cable support, 20 kV post insulators, metal bars, cable 1 sets 16.511.392,00 16.511.392,00
terminations and accessories, cable rack, etc to complete scope of work.
16 MISCELLANEOUS
16,2 Miscellaneous equipment and material required for completion the scope of work. 1 lot 5.136.878,00 5.136.878,00
Consisting of :
Post Steel Structure NA sets
Beam steel structure NA sets
Double busbar scheme 1 x ALMALEC 1140 sqmm and branch conductor to complete the
1.2 NA set
specified scope of work.
150 kV double tension string and single suspension insulators complete with fittings for
1.3 NA bays
installation of the main busbar as specified.
150 kV Post Insulators complete with supporting structure for installation of the main busbar
1,4 NA pcs
as specified.
Clamps, connectors and accessories for the installation of the main busbar to complete the
1.5 NA set
scope of work.
Conductor for shield wire and accessories for installation of the shield wire to complete the
1,6 NA set
scope of work.
Miscellaneous equipment and material to complete the scope of work for substation earthing
1,7 grid and earthing circuit required such as copper conductors, rods, clamps and connectors NA set
for connection to main substation earthing circuit and to individual item
Miscellaneous equipment and material to complete the scope of work for substation earthing
1,8 circuit required such as copper conductor, clamps and connectors for connection to main 1 set 5.779.296,00 5.779.296,00
substation earthing circuit and to individual item of equipment and structur
150 kV 3 Phase SF6 circuit breaker 40 kA 1250 A, complete with clamps and supporting
2,5 NA unit
structure for 150/20 kV transformer bay.
150 kV Current Transformer for 150/20 kV transformer bay complete with clamps and
2,6 3 unit 5.320.955,00 15.962.865,00
supporting structure comprising:
Core 1 : 150-300/ 1 A, Class X for transformer biased differential protection and restricted
earth fault protection.
Core 2 : 150-300/ 1 A, 30 VA Class 5P20 + Class 1 for overcurrent protection, earth fault
protection, instrument and metering devices.
Core 3 Core 3 : 2000-1000/ 1 A, Class X for check bus zone protection.
Core 4 Core 4 : 2000-1000/ 1 A, Class X for main bus zone protection
150 kV Lightning Arrester, 10 kA, complete with clamp, supporting structure and surge
2,7 NA unit
counter.
2,8 Protection cubicle for 150/20 kV transformer comprising: 1 set 4.954.035,00 4.954.035,00
- Three pole biased differential protection including interposing CT and test facilities.
Three pole overcurrent and one pole earth fault protection with multi inverse
-
characteristic including instantaneous and time delay elements.
- Two trip circuit supervision relay
- Two restricted earth fault relays (1 for 150 kV & 1 for 20 kV side)
- One neutral earth fault overcurrent relay
- One tripping relay with reset
- Two master trip
- Two master trip with reset for each tripping circuit
Wiring, terminal block with switches, links, fuses, test facilities, auxiliary relays etc..,
-
to complete the scope of work.
2,9 Control cubicle for 150/20 kV transformer comprising: 1 set 4.954.035,00 4.954.035,00
Note : Two group alarm annunciator shall be provided for transformer alarm and
transformer trip.
2,10 Transformer regulation panel installed at control room comprising: 1 set 4.954.035,00 4.954.035,00
- One 20 kV voltmeter with 3 phase selector switch
- One set alarm annunciator
- One set transformer regulation relays and facilities
Note : Individual alarm and trip annunciator window for the transformer shall be
provided.
LV Power and Control Cable, power cable and necessary equipment to complete the
2,11 1 set 39.518.175,00 39.518.175,00
specified scope of work.
150/20 kV, 60 MVA 3-Phase Power Transformer complete with necessary accessories and
3,1 1 unit 269.212.076,00 269.212.076,00 Incl oil purification
supporting structure for mounting 150 kV and 20 kV NCT.
Single phase neutral CT for 20 kV Side Class X, 2000-1000/ 5 A complete with clamps for
3,2 restricted earth fault protection suitable for mounting outdoor on transformer tank or can be 1 unit 2.752.517,00 2.752.517,00
put inside the 20 kV neutral earthing resistor cubicle.
Single phase neutral CT for 20 kV side class 10P20, 1000/5 A complete with clamps for
3,3 neutral earth fault protection, suitable for mounting outdoor on transformer tank or can be put NA unit
inside the 20 kV neutral earthing resistor cubicle.
Single phase neutral CT for 150 kV Side Class X, 150-300/ 1 A complete with clamps for
3,4 1 unit 2.752.517,00 2.752.517,00
restricted earth fault protection, suitable for mounting outdoor on transformer tank.
3,5 20 kV Stainless steel neutral earthing resistor rated 12 Ohms, 30 Seconds. NA set
3,6 Transformer Blast and Fire Prevention equipment. 1 set - -
3,7 Dismantling power transformer, power cable, cubicle 20 kV etc. (if any) 1 lot 16.511.392,00 16.511.392,00
4 x 630 sqmm ALU 20 kV XLPE power cable/phase between 150/20 kV power transformer
4,1 and 20 kV incoming cubicle, including cable support, 20 kV post insulators, metal bars, cable 1 sets 16.511.392,00 16.511.392,00
terminations and accessories, cable rack, etc to complete scope of work.
2 x 630 sqmm ALU black insulation LV cable to connect neutral of 150/20 kV power
4,2 transformer and neutral of 20 kV incoming cubicle, including cable support, 20 kV post 1 sets 5.503.798,00 5.503.798,00
insulators, metal bar, cable terminations and accessories, etc to complete scope of wor
4 x 20 kV XLPE 630 sqmm AL power cable / phase between bus-section cubicle and
4,5 interface cubicle, including cable terminations and accessories for connection between sets 1 set 8.255.696,00 8.255.696,00
of 20 kV switchgear to complete the specified scope of work.
(Total cable length is approx. 4 x 3 x 25 metres)
16 MISCELLANEOUS
16,2 Miscellaneous equipment and material required for completion the scope of work. 1 lot 5.136.878,00 5.136.878,00
Consisting of :
Post Steel Structure NA sets
Beam steel structure NA sets
Double busbar scheme 1 x ALMALEC 1140 sqmm and branch conductor to complete the
1.2 NA set
specified scope of work.
150 kV double tension string and single suspension insulators complete with fittings for
1.3 NA bays
installation of the main busbar as specified.
150 kV Post Insulators complete with supporting structure for installation of the main busbar as
1,4 NA pcs
specified.
Clamps, connectors and accessories for the installation of the main busbar to complete the
1.5 NA set
scope of work.
Conductor for shield wire and accessories for installation of the shield wire to complete the
1,6 NA set
scope of work.
Miscellaneous equipment and material to complete the scope of work for substation earthing
1,7 grid and earthing circuit required such as copper conductors, rods, clamps and connectors for NA set
connection to main substation earthing circuit and to individual item
Miscellaneous equipment and material to complete the scope of work for substation earthing
1,8 circuit required such as copper conductor, clamps and connectors for connection to main 1 set 5.779.296,00 5.779.296,00
substation earthing circuit and to individual item of equipment and structur
150 kV 3 Phase disconnecting switch motor operated, 40 kA 1250 A without earthing switch,
2,4 NA unit
complete with clamps and supporting structure for 150/20 kV transformer bay.
150 kV 3 Phase SF6 circuit breaker 40 kA 1250 A, complete with clamps and supporting
2,5 NA unit
structure for 150/20 kV transformer bay.
150 kV Current Transformer for 150/20 kV transformer bay complete with clamps and
2,6 3 unit 5.320.955,00 15.962.865,00
supporting structure comprising:
Core 1 : 150-300/ 1 A, Class X for transformer biased differential protection and restricted earth
fault protection.
Core 2 : 150-300/ 1 A, 30 VA Class 5P20 + Class 1 for overcurrent protection, earth fault
protection, instrument and metering devices.
Core 3 Core 3 : 2000-1000/ 1 A, Class X for check bus zone protection.
Core 4 Core 4 : 2000-1000/ 1 A, Class X for main bus zone protection
2,7 150 kV Lightning Arrester, 10 kA, complete with clamp, supporting structure and surge counter. 6 unit 5.779.296,00 34.675.776,00
2,8 Protection for 150/20 kV transformer (install at existing cubicle) comprising: 1 lot 4.954.035,00 4.954.035,00
- Three pole biased differential protection including interposing CT and test facilities.
Three pole overcurrent and one pole earth fault protection with multi inverse
-
characteristic including instantaneous and time delay elements.
- Two restricted earth fault relays (1 for 150 kV & 1 for 20 kV side)
- One neutral earth fault overcurrent relay
2,9 Control cubicle for 150/20 kV transformer comprising: 1 lot 4.954.035,00 4.954.035,00
One set of wiring including connection to interface marshalling cubicle(s), terminal block
-
with switches,links, fuses, test facilities etc.., to complete the scope of work.
Note : Two group alarm annunciator shall be provided for transformer alarm and
transformer trip.
2,10 Transformer regulation panel installed at control room comprising: NA set
- One 20 kV voltmeter with 3 phase selector switch
- One set alarm annunciator
- One set transformer regulation relays and facilities
One set of wiring including connection to interface marshalling cubicle(s), terminal block
-
with switches, links, fuses, test facilities etc.., to complete the scope work.
One set of wiring including connection to interface marshalling cubicle(s), terminal block
-
with switches, links, fuses, test facilities etc.., to complete the scope work.
Note : Individual alarm and trip annunciator window for the transformer shall be
provided.
LV Power and Control Cable, power cable and necessary equipment to complete the specified
2,12 1 set 39.518.175,00 39.518.175,00
scope of work.
150/20 kV, 60 MVA 3-Phase Power Transformer complete with necessary accessories and
3,1 1 unit 269.212.076,00 269.212.076,00
supporting structure for mounting 150 kV and 20 kV NCT.
Single phase neutral CT for 20 kV Side Class X, 2000-1000/ 5 A complete with clamps for
3,2 restricted earth fault protection suitable for mounting outdoor on transformer tank or can be put 1 unit 2.752.517,00 2.752.517,00
inside the 20 kV neutral earthing resistor cubicle.
Single phase neutral CT for 20 kV side class 10P20, 1000/5 A complete with clamps for neutral
3,3 earth fault protection, suitable for mounting outdoor on transformer tank or can be put inside the NA unit
20 kV neutral earthing resistor cubicle.
Single phase neutral CT for 150 kV Side Class X, 150-300/ 1 A complete with clamps for
3,4 1 unit 2.752.517,00 2.752.517,00
restricted earth fault protection, suitable for mounting outdoor on transformer tank.
3,5 20 kV Stainless steel neutral earthing resistor rated 12 Ohms, 30 Seconds. NA set
3,6 Transformer Blast and Fire Prevention equipment. 1 set - -
3,7 Dismantling power transformer, power cable, cubicle 20 kV etc. (if any) 1 lot 16.511.392,00 16.511.392,00
4 x 630 sqmm ALU 20 kV XLPE power cable/phase between 150/20 kV power transformer and
4,1 20 kV incoming cubicle, including cable support, 20 kV post insulators, metal bars, cable 1 sets 16.511.392,00 16.511.392,00
terminations and accessories, cable rack, etc to complete scope of work.
2 x 630 sqmm ALU black insulation LV cable to connect neutral of 150/20 kV power transformer
4,2 and neutral of 20 kV incoming cubicle, including cable support, 20 kV post insulators, metal bar, 1 sets 5.503.798,00 5.503.798,00
cable terminations and accessories, etc to complete scope of wor
- Interface cubicle with power cable connection facilities. 1 unit 2.752.517,00 2.752.517,00
- Bus section without power cable connection facilities. NA unit
- Interface cubicle without power cable connection facilities NA unit
Including single rate tariff metering kwhmeter for incoming and outgoing feeders.
4 x 20 kV XLPE 630 sqmm AL power cable / phase between bus-section cubicle and interface
4,5 cubicle, including cable terminations and accessories for connection between sets of 20 kV 1 set 16.511.392,00 16.511.392,00
switchgear to complete the specified scope of work.
(Total cable length is approx. 4 x 3 x 50 metres)
16 MISCELLANEOUS
16,2 Miscellaneous equipment and material required for completion the scope of work. 1 lot 5.136.878,00 5.136.878,00
Consisting of :
Post Steel Structure NA sets
Beam steel structure NA sets
Double busbar scheme 1 x ALMALEC 1140 sqmm and branch conductor to complete the
1.2 NA set
specified scope of work.
150 kV double tension string and single suspension insulators complete with fittings for
1.3 NA bays
installation of the main busbar as specified.
150 kV Post Insulators complete with supporting structure for installation of the main busbar as
1,4 NA pcs
specified.
Clamps, connectors and accessories for the installation of the main busbar to complete the
1.5 NA set
scope of work.
Conductor for shield wire and accessories for installation of the shield wire to complete the
1,6 NA set
scope of work.
Miscellaneous equipment and material to complete the scope of work for substation earthing
1,7 grid and earthing circuit required such as copper conductors, rods, clamps and connectors for NA set
connection to main substation earthing circuit and to individual item
Miscellaneous equipment and material to complete the scope of work for substation earthing
1,8 circuit required such as copper conductor, clamps and connectors for connection to main 1 set 5.779.296,00 5.779.296,00
substation earthing circuit and to individual item of equipment and structur
150 kV 3 Phase disconnecting switch motor operated, 40 kA 1250 A without earthing switch,
2,4 NA unit
complete with clamps and supporting structure for 150/20 kV transformer bay.
150 kV 3 Phase SF6 circuit breaker 40 kA 1250 A, complete with clamps and supporting
2,5 NA unit
structure for 150/20 kV transformer bay.
150 kV Current Transformer for 150/20 kV transformer bay complete with clamps and
2,6 3 unit 5.320.955,00 15.962.865,00
supporting structure comprising:
Core 1 : 150-300/ 1 A, Class X for transformer biased differential protection and restricted earth
fault protection.
Core 2 : 150-300/ 1 A, 30 VA Class 5P20 + Class 1 for overcurrent protection, earth fault
protection, instrument and metering devices.
Core 3 Core 3 : 2000-1000/ 1 A, Class X for check bus zone protection.
Core 4 Core 4 : 2000-1000/ 1 A, Class X for main bus zone protection
2,7 150 kV Lightning Arrester, 10 kA, complete with clamp, supporting structure and surge counter. 6 unit 5.779.296,00 34.675.776,00
2,8 Protection for 150/20 kV transformer (install at existing cubicle) comprising: 1 lot 4.954.035,00 4.954.035,00
- Three pole biased differential protection including interposing CT and test facilities.
Three pole overcurrent and one pole earth fault protection with multi inverse
-
characteristic including instantaneous and time delay elements.
- Two restricted earth fault relays (1 for 150 kV & 1 for 20 kV side)
- One neutral earth fault overcurrent relay
2,9 Control cubicle for 150/20 kV transformer comprising: 1 lot 4.954.035,00 4.954.035,00
One set of wiring including connection to interface marshalling cubicle(s), terminal block
-
with switches,links, fuses, test facilities etc.., to complete the scope of work.
Note : Two group alarm annunciator shall be provided for transformer alarm and
transformer trip.
2,10 Transformer regulation panel installed at control room comprising: NA set
- One 20 kV voltmeter with 3 phase selector switch
- One set alarm annunciator
- One set transformer regulation relays and facilities
One set of wiring including connection to interface marshalling cubicle(s), terminal block
-
with switches, links, fuses, test facilities etc.., to complete the scope work.
One set of wiring including connection to interface marshalling cubicle(s), terminal block
-
with switches, links, fuses, test facilities etc.., to complete the scope work.
Note : Individual alarm and trip annunciator window for the transformer shall be
provided.
LV Power and Control Cable, power cable and necessary equipment to complete the specified
2,12 1 set 39.518.175,00 39.518.175,00
scope of work.
150/20 kV, 60 MVA 3-Phase Power Transformer complete with necessary accessories and
3,1 1 unit 269.212.076,00 269.212.076,00 Incl oil purification
supporting structure for mounting 150 kV and 20 kV NCT.
Single phase neutral CT for 20 kV Side Class X, 2000-1000/ 5 A complete with clamps for
3,2 restricted earth fault protection suitable for mounting outdoor on transformer tank or can be put 1 unit 2.752.517,00 2.752.517,00
inside the 20 kV neutral earthing resistor cubicle.
Single phase neutral CT for 20 kV side class 10P20, 1000/5 A complete with clamps for neutral
3,3 earth fault protection, suitable for mounting outdoor on transformer tank or can be put inside the NA unit
20 kV neutral earthing resistor cubicle.
Single phase neutral CT for 150 kV Side Class X, 150-300/ 1 A complete with clamps for
3,4 1 unit 2.752.517,00 2.752.517,00
restricted earth fault protection, suitable for mounting outdoor on transformer tank.
3,5 20 kV Stainless steel neutral earthing resistor rated 12 Ohms, 30 Seconds. NA set
3,6 Transformer Blast and Fire Prevention equipment. 1 set - -
3,7 Dismantling power transformer, power cable, cubicle 20 kV etc. (if any) 1 lot 16.511.392,00 16.511.392,00
4 x 630 sqmm ALU 20 kV XLPE power cable/phase between 150/20 kV power transformer and
4,1 20 kV incoming cubicle, including cable support, 20 kV post insulators, metal bars, cable 1 sets 16.511.392,00 16.511.392,00
terminations and accessories, cable rack, etc to complete scope of work.
2 x 630 sqmm ALU black insulation LV cable to connect neutral of 150/20 kV power transformer
4,2 and neutral of 20 kV incoming cubicle, including cable support, 20 kV post insulators, metal bar, 1 sets 5.503.798,00 5.503.798,00
cable terminations and accessories, etc to complete scope of wor
- Interface cubicle with power cable connection facilities. 1 unit 2.752.517,00 2.752.517,00
- Bus section without power cable connection facilities. NA unit
- Interface cubicle without power cable connection facilities NA unit
Including single rate tariff metering kwhmeter for incoming and outgoing feeders.
4 x 20 kV XLPE 630 sqmm AL power cable / phase between bus-section cubicle and interface
4,5 cubicle, including cable terminations and accessories for connection between sets of 20 kV 1 set 16.511.392,00 16.511.392,00
switchgear to complete the specified scope of work.
(Total cable length is approx. 4 x 3 x 50 metres)
16 MISCELLANEOUS
16,2 Miscellaneous equipment and material required for completion the scope of work. 1 lot 5.136.878,00 5.136.878,00
Consisting of :
Post Steel Structure NA sets
Beam steel structure NA sets
Double busbar scheme 1 x ALMALEC 1140 sqmm and branch conductor to complete the
1.2 NA set
specified scope of work.
150 kV double tension string and single suspension insulators complete with fittings for
1.3 NA bays
installation of the main busbar as specified.
150 kV Post Insulators complete with supporting structure for installation of the main busbar as
1,4 NA pcs
specified.
Clamps, connectors and accessories for the installation of the main busbar to complete the
1.5 NA set
scope of work.
Conductor for shield wire and accessories for installation of the shield wire to complete the
1,6 NA set
scope of work.
Miscellaneous equipment and material to complete the scope of work for substation earthing
1,7 grid and earthing circuit required such as copper conductors, rods, clamps and connectors for NA set
connection to main substation earthing circuit and to individual item
Miscellaneous equipment and material to complete the scope of work for substation earthing
1,8 circuit required such as copper conductor, clamps and connectors for connection to main NA set
substation earthing circuit and to individual item of equipment and structur
150 kV 3 Phase disconnecting switch motor operated, 40 kA 1250 A without earthing switch,
2,4 NA unit
complete with clamps and supporting structure for 150/20 kV transformer bay.
150 kV 3 Phase SF6 circuit breaker 40 kA 1250 A, complete with clamps and supporting
2,5 NA unit
structure for 150/20 kV transformer bay.
150 kV Current Transformer for 150/20 kV transformer bay complete with clamps and
2,6 3 unit 5.320.955,00 15.962.865,00
supporting structure comprising:
Core 1 : 150-300/ 1 A, Class X for transformer biased differential protection and restricted earth
fault protection.
Core 2 : 150-300/ 1 A, 30 VA Class 5P20 + Class 1 for overcurrent protection, earth fault
protection, instrument and metering devices.
Core 3 Core 3 : 2000-1000/ 1 A, Class X for check bus zone protection.
Core 4 Core 4 : 2000-1000/ 1 A, Class X for main bus zone protection
2,7 150 kV Lightning Arrester, 10 kA, complete with clamp, supporting structure and surge counter. NA unit
2,8 Protection cubicle for 150/20 kV transformer comprising: 1 set 4.954.035,00 4.954.035,00
- Three pole biased differential protection including interposing CT and test facilities.
Three pole overcurrent and one pole earth fault protection with multi inverse
-
characteristic including instantaneous and time delay elements.
- Two trip circuit supervision relay
- Two restricted earth fault relays (1 for 150 kV & 1 for 20 kV side)
- One neutral earth fault overcurrent relay
- One tripping relay with reset
- Two master trip
- Two master trip with reset for each tripping circuit
Wiring, terminal block with switches, links, fuses, test facilities, auxiliary relays etc.., to
-
complete the scope of work.
2,9 Control cubicle for 150/20 kV transformer comprising: 1 set 4.954.035,00 4.954.035,00
One set of wiring including connection to interface marshalling cubicle(s), terminal block
with switches,links, fuses, test facilities etc.., to complete the scope of work.
Note : Two group alarm annunciator shall be provided for transformer alarm and
transformer trip.
2,10 Transformer regulation panel installed at control room comprising: 1 set 4.954.035,00 4.954.035,00
- One 20 kV voltmeter with 3 phase selector switch
- One set alarm annunciator
- One set transformer regulation relays and facilities
One set of wiring including connection to interface marshalling cubicle(s), terminal block
-
with switches, links, fuses, test facilities etc.., to complete the scope work.
One set of wiring including connection to interface marshalling cubicle(s), terminal block
-
with switches, links, fuses, test facilities etc.., to complete the scope work.
Note : Individual alarm and trip annunciator window for the transformer shall be
provided.
LV Power and Control Cable, power cable and necessary equipment to complete the specified
2,13 1 set 39.518.175,00 39.518.175,00
scope of work.
150/20 kV, 60 MVA 3-Phase Power Transformer complete with necessary accessories and
3,1 1 unit 269.212.076,00 269.212.076,00
supporting structure for mounting 150 kV and 20 kV NCT.
Single phase neutral CT for 20 kV Side Class X, 2000-1000/ 5 A complete with clamps for
3,2 restricted earth fault protection suitable for mounting outdoor on transformer tank or can be put 1 unit 2.752.517,00 2.752.517,00
inside the 20 kV neutral earthing resistor cubicle.
Single phase neutral CT for 20 kV side class 10P20, 1000/5 A complete with clamps for neutral
3,3 earth fault protection, suitable for mounting outdoor on transformer tank or can be put inside the NA unit
20 kV neutral earthing resistor cubicle.
Single phase neutral CT for 150 kV Side Class X, 150-300/ 1 A complete with clamps for
3,4 1 unit 2.752.517,00 2.752.517,00
restricted earth fault protection, suitable for mounting outdoor on transformer tank.
3,5 20 kV Stainless steel neutral earthing resistor rated 12 Ohms, 30 Seconds. NA set
3,6 Transformer Blast and Fire Prevention equipment. 1 set - -
3,7 Dismantling power transformer, power cable, cubicle 20 kV etc. (if any) 1 lot 16.511.392,00 16.511.392,00
4 x 630 sqmm ALU 20 kV XLPE power cable/phase between 150/20 kV power transformer and
4,1 20 kV incoming cubicle, including cable support, 20 kV post insulators, metal bars, cable 1 sets 16.511.392,00 16.511.392,00
terminations and accessories, cable rack, etc to complete scope of work.
2 x 630 sqmm ALU black insulation LV cable to connect neutral of 150/20 kV power transformer
4,2 and neutral of 20 kV incoming cubicle, including cable support, 20 kV post insulators, metal bar, 1 sets 5.503.798,00 5.503.798,00
cable terminations and accessories, etc to complete scope of wor
Including single rate tariff metering kwhmeter for incoming and outgoing feeders.
4 x 20 kV XLPE 630 sqmm AL power cable / phase between bus-section cubicle and interface
4,5 cubicle, including cable terminations and accessories for connection between sets of 20 kV NA set
switchgear to complete the specified scope of work.
(Total cable length is approx. 4 x 3 x 50 metres)
16 MISCELLANEOUS
16,2 Miscellaneous equipment and material required for completion the scope of work. 1 lot 5.136.878,00 5.136.878,00
Consisting of :
Post Steel Structure NA sets
Beam steel structure NA sets
Double busbar scheme 1 x ALMALEC 1140 sqmm and branch conductor to complete the
1.2 NA set
specified scope of work.
150 kV double tension string and single suspension insulators complete with fittings for
1.3 NA bays
installation of the main busbar as specified.
150 kV Post Insulators complete with supporting structure for installation of the main busbar as
1,4 NA pcs
specified.
Clamps, connectors and accessories for the installation of the main busbar to complete the
1.5 NA set
scope of work.
Conductor for shield wire and accessories for installation of the shield wire to complete the
1,6 NA set
scope of work.
Miscellaneous equipment and material to complete the scope of work for substation earthing
1,7 grid and earthing circuit required such as copper conductors, rods, clamps and connectors for NA set
connection to main substation earthing circuit and to individual item
Miscellaneous equipment and material to complete the scope of work for substation earthing
1,8 circuit required such as copper conductor, clamps and connectors for connection to main NA set
substation earthing circuit and to individual item of equipment and structur
150 kV 3 Phase disconnecting switch motor operated, 40 kA 1250 A without earthing switch,
2,4 NA unit
complete with clamps and supporting structure for 150/20 kV transformer bay.
150 kV 3 Phase SF6 circuit breaker 40 kA 1250 A, complete with clamps and supporting
2,5 NA unit
structure for 150/20 kV transformer bay.
150 kV Current Transformer for 150/20 kV transformer bay complete with clamps and
2,6 3 unit 5.320.955,00 15.962.865,00
supporting structure comprising:
Core 1 : 150-300/ 1 A, Class X for transformer biased differential protection and restricted earth
fault protection.
Core 2 : 150-300/ 1 A, 30 VA Class 5P20 + Class 1 for overcurrent protection, earth fault
protection, instrument and metering devices.
Core 3 Core 3 : 2000-1000/ 1 A, Class X for check bus zone protection.
Core 4 Core 4 : 2000-1000/ 1 A, Class X for main bus zone protection
2,7 150 kV Lightning Arrester, 10 kA, complete with clamp, supporting structure and surge counter. NA unit
2,8 Protection cubicle for 150/20 kV transformer comprising: 1 set 4.954.035,00 4.954.035,00
- Three pole biased differential protection including interposing CT and test facilities.
Three pole overcurrent and one pole earth fault protection with multi inverse
-
characteristic including instantaneous and time delay elements.
- Two trip circuit supervision relay
- Two restricted earth fault relays (1 for 150 kV & 1 for 20 kV side)
- One neutral earth fault overcurrent relay
- One tripping relay with reset
- Two master trip
- Two master trip with reset for each tripping circuit
Wiring, terminal block with switches, links, fuses, test facilities, auxiliary relays etc.., to
-
complete the scope of work.
2,9 Control cubicle for 150/20 kV transformer comprising: 1 set 4.954.035,00 4.954.035,00
One set of wiring including connection to interface marshalling cubicle(s), terminal block
with switches,links, fuses, test facilities etc.., to complete the scope of work.
Note : Two group alarm annunciator shall be provided for transformer alarm and
transformer trip.
2,10 Transformer regulation panel installed at control room comprising: 1 set 4.954.035,00 4.954.035,00
- One 20 kV voltmeter with 3 phase selector switch
- One set alarm annunciator
- One set transformer regulation relays and facilities
One set of wiring including connection to interface marshalling cubicle(s), terminal block
-
with switches, links, fuses, test facilities etc.., to complete the scope work.
One set of wiring including connection to interface marshalling cubicle(s), terminal block
-
with switches, links, fuses, test facilities etc.., to complete the scope work.
Note : Individual alarm and trip annunciator window for the transformer shall be
provided.
LV Power and Control Cable, power cable and necessary equipment to complete the specified
2,13 1 set 39.518.175,00 39.518.175,00
scope of work.
150/20 kV, 60 MVA 3-Phase Power Transformer complete with necessary accessories and
3,1 1 unit 269.212.076,00 269.212.076,00 Incl oil purification
supporting structure for mounting 150 kV and 20 kV NCT.
Single phase neutral CT for 20 kV Side Class X, 2000-1000/ 5 A complete with clamps for
3,2 restricted earth fault protection suitable for mounting outdoor on transformer tank or can be put 1 unit 2.752.517,00 2.752.517,00
inside the 20 kV neutral earthing resistor cubicle.
Single phase neutral CT for 20 kV side class 10P20, 1000/5 A complete with clamps for neutral
3,3 earth fault protection, suitable for mounting outdoor on transformer tank or can be put inside the NA unit
20 kV neutral earthing resistor cubicle.
Single phase neutral CT for 150 kV Side Class X, 150-300/ 1 A complete with clamps for
3,4 1 unit 2.752.517,00 2.752.517,00
restricted earth fault protection, suitable for mounting outdoor on transformer tank.
3,5 20 kV Stainless steel neutral earthing resistor rated 12 Ohms, 30 Seconds. NA set
3,6 Transformer Blast and Fire Prevention equipment. 1 set - -
3,7 Dismantling power transformer, power cable, cubicle 20 kV etc. (if any) 1 lot 16.511.392,00 16.511.392,00
4 x 630 sqmm ALU 20 kV XLPE power cable/phase between 150/20 kV power transformer and
4,1 20 kV incoming cubicle, including cable support, 20 kV post insulators, metal bars, cable 1 sets 16.511.392,00 16.511.392,00
terminations and accessories, cable rack, etc to complete scope of work.
2 x 630 sqmm ALU black insulation LV cable to connect neutral of 150/20 kV power transformer
4,2 and neutral of 20 kV incoming cubicle, including cable support, 20 kV post insulators, metal bar, 1 sets 5.503.798,00 5.503.798,00
cable terminations and accessories, etc to complete scope of wor
Including single rate tariff metering kwhmeter for incoming and outgoing feeders.
4 x 20 kV XLPE 630 sqmm AL power cable / phase between bus-section cubicle and interface
4,5 cubicle, including cable terminations and accessories for connection between sets of 20 kV NA set
switchgear to complete the specified scope of work.
(Total cable length is approx. 4 x 3 x 50 metres)
16 MISCELLANEOUS
16,2 Miscellaneous equipment and material required for completion the scope of work. 1 lot 5.136.878,00 5.136.878,00
Consisting of :
Post Steel Structure NA sets
Beam steel structure NA sets
Double busbar scheme 1 x ALMALEC 1140 sqmm and branch conductor to complete the
1.2 NA set
specified scope of work.
150 kV double tension string and single suspension insulators complete with fittings for
1.3 NA bays
installation of the main busbar as specified.
150 kV Post Insulators complete with supporting structure for installation of the main busbar as
1,4 NA pcs
specified.
Clamps, connectors and accessories for the installation of the main busbar to complete the
1.5 NA set
scope of work.
Conductor for shield wire and accessories for installation of the shield wire to complete the
1,6 NA set
scope of work.
Miscellaneous equipment and material to complete the scope of work for substation earthing
1,7 grid and earthing circuit required such as copper conductors, rods, clamps and connectors for NA set
connection to main substation earthing circuit and to individual item
Miscellaneous equipment and material to complete the scope of work for substation earthing
1,8 circuit required such as copper conductor, clamps and connectors for connection to main NA set
substation earthing circuit and to individual item of equipment and structur
150 kV 3 Phase disconnecting switch motor operated, 40 kA 1250 A without earthing switch,
2,4 NA unit
complete with clamps and supporting structure for 150/20 kV transformer bay.
150 kV 3 Phase SF6 circuit breaker 40 kA 1250 A, complete with clamps and supporting
2,5 NA unit
structure for 150/20 kV transformer bay.
150 kV Current Transformer for 150/20 kV transformer bay complete with clamps and
2,6 NA unit
supporting structure comprising:
Core 1 : 150-300/ 1 A, Class X for transformer biased differential protection and restricted earth
fault protection.
Core 2 : 150-300/ 1 A, 30 VA Class 5P20 + Class 1 for overcurrent protection, earth fault
protection, instrument and metering devices.
Core 3 Core 3 : 2000-1000/ 1 A, Class X for check bus zone protection.
Core 4 Core 4 : 2000-1000/ 1 A, Class X for main bus zone protection
2,7 150 kV Lightning Arrester, 10 kA, complete with clamp, supporting structure and surge counter. NA unit
2,8 Protection cubicle for 150/20 kV transformer comprising: 1 set 4.954.035,00 4.954.035,00
- Three pole biased differential protection including interposing CT and test facilities.
Three pole overcurrent and one pole earth fault protection with multi inverse
-
characteristic including instantaneous and time delay elements.
- Two trip circuit supervision relay
- Two restricted earth fault relays (1 for 150 kV & 1 for 20 kV side)
- One neutral earth fault overcurrent relay
- One tripping relay with reset
- Two master trip
- Two master trip with reset for each tripping circuit
Wiring, terminal block with switches, links, fuses, test facilities, auxiliary relays etc.., to
-
complete the scope of work.
2,9 Control cubicle for 150/20 kV transformer comprising: 1 set 4.954.035,00 4.954.035,00
One set of wiring including connection to interface marshalling cubicle(s), terminal block
with switches,links, fuses, test facilities etc.., to complete the scope of work.
Note : Two group alarm annunciator shall be provided for transformer alarm and
transformer trip.
2,10 Transformer regulation panel installed at control room comprising: 1 set 4.954.035,00 4.954.035,00
- One 20 kV voltmeter with 3 phase selector switch
- One set alarm annunciator
- One set transformer regulation relays and facilities
One set of wiring including connection to interface marshalling cubicle(s), terminal block
-
with switches, links, fuses, test facilities etc.., to complete the scope work.
One set of wiring including connection to interface marshalling cubicle(s), terminal block
-
with switches, links, fuses, test facilities etc.., to complete the scope work.
Note : Individual alarm and trip annunciator window for the transformer shall be
provided.
LV Power and Control Cable, power cable and necessary equipment to complete the specified
2,13 1 set 39.518.175,00 39.518.175,00
scope of work.
150/20 kV, 60 MVA 3-Phase Power Transformer complete with necessary accessories and
3,1 1 unit 269.212.076,00 269.212.076,00
supporting structure for mounting 150 kV and 20 kV NCT.
Single phase neutral CT for 20 kV Side Class X, 2000-1000/ 5 A complete with clamps for
3,2 restricted earth fault protection suitable for mounting outdoor on transformer tank or can be put 1 unit 2.752.517,00 2.752.517,00
inside the 20 kV neutral earthing resistor cubicle.
Single phase neutral CT for 20 kV side class 10P20, 1000/5 A complete with clamps for neutral
3,3 earth fault protection, suitable for mounting outdoor on transformer tank or can be put inside the NA unit
20 kV neutral earthing resistor cubicle.
Single phase neutral CT for 150 kV Side Class X, 150-300/ 1 A complete with clamps for
3,4 1 unit 2.752.517,00 2.752.517,00
restricted earth fault protection, suitable for mounting outdoor on transformer tank.
3,5 20 kV Stainless steel neutral earthing resistor rated 12 Ohms, 30 Seconds. NA set
3,6 Transformer Blast and Fire Prevention equipment. 1 set - -
3,7 Dismantling power transformer, power cable, cubicle 20 kV etc. (if any) 1 lot 16.511.392,00 16.511.392,00
4 x 630 sqmm ALU 20 kV XLPE power cable/phase between 150/20 kV power transformer and
4,1 20 kV incoming cubicle, including cable support, 20 kV post insulators, metal bars, cable 1 sets 16.511.392,00 16.511.392,00
terminations and accessories, cable rack, etc to complete scope of work.
2 x 630 sqmm ALU black insulation LV cable to connect neutral of 150/20 kV power transformer
4,2 and neutral of 20 kV incoming cubicle, including cable support, 20 kV post insulators, metal bar, 1 sets 5.503.798,00 5.503.798,00
cable terminations and accessories, etc to complete scope of wor
Including single rate tariff metering kwhmeter for incoming and outgoing feeders.
4 x 20 kV XLPE 630 sqmm AL power cable / phase between bus-section cubicle and interface
4,5 cubicle, including cable terminations and accessories for connection between sets of 20 kV NA set
switchgear to complete the specified scope of work.
(Total cable length is approx. 4 x 3 x 50 metres)
16 MISCELLANEOUS
16,2 Miscellaneous equipment and material required for completion the scope of work. 1 lot 5.136.878,00 5.136.878,00
Consisting of :
Post Steel Structure NA sets
Beam steel structure NA sets
Double busbar scheme 1 x ALMALEC 1140 sqmm and branch conductor to complete the
1.2 NA set
specified scope of work.
150 kV double tension string and single suspension insulators complete with fittings for
1.3 NA bays
installation of the main busbar as specified.
150 kV Post Insulators complete with supporting structure for installation of the main busbar as
1,4 NA pcs
specified.
Clamps, connectors and accessories for the installation of the main busbar to complete the
1.5 NA set
scope of work.
Conductor for shield wire and accessories for installation of the shield wire to complete the
1,6 NA set
scope of work.
Miscellaneous equipment and material to complete the scope of work for substation earthing
1,7 grid and earthing circuit required such as copper conductors, rods, clamps and connectors for NA set
connection to main substation earthing circuit and to individual item
Miscellaneous equipment and material to complete the scope of work for substation earthing
1,8 circuit required such as copper conductor, clamps and connectors for connection to main NA set
substation earthing circuit and to individual item of equipment and structur
150 kV 3 Phase disconnecting switch motor operated, 40 kA 1250 A without earthing switch,
2,4 NA unit
complete with clamps and supporting structure for 150/20 kV transformer bay.
150 kV 3 Phase SF6 circuit breaker 40 kA 1250 A, complete with clamps and supporting
2,5 NA unit
structure for 150/20 kV transformer bay.
150 kV Current Transformer for 150/20 kV transformer bay complete with clamps and
2,6 NA unit
supporting structure comprising:
Core 1 : 150-300/ 1 A, Class X for transformer biased differential protection and restricted earth
fault protection.
Core 2 : 150-300/ 1 A, 30 VA Class 5P20 + Class 1 for overcurrent protection, earth fault
protection, instrument and metering devices.
Core 3 Core 3 : 2000-1000/ 1 A, Class X for check bus zone protection.
Core 4 Core 4 : 2000-1000/ 1 A, Class X for main bus zone protection
2,7 150 kV Lightning Arrester, 10 kA, complete with clamp, supporting structure and surge counter. NA unit
2,8 Protection cubicle for 150/20 kV transformer comprising: 1 set 4.954.035,00 4.954.035,00
- Three pole biased differential protection including interposing CT and test facilities.
Three pole overcurrent and one pole earth fault protection with multi inverse
-
characteristic including instantaneous and time delay elements.
- Two trip circuit supervision relay
- Two restricted earth fault relays (1 for 150 kV & 1 for 20 kV side)
- One neutral earth fault overcurrent relay
- One tripping relay with reset
- Two master trip
- Two master trip with reset for each tripping circuit
Wiring, terminal block with switches, links, fuses, test facilities, auxiliary relays etc.., to
-
complete the scope of work.
2,9 Control cubicle for 150/20 kV transformer comprising: 1 set 4.954.035,00 4.954.035,00
One set of wiring including connection to interface marshalling cubicle(s), terminal block
with switches,links, fuses, test facilities etc.., to complete the scope of work.
Note : Two group alarm annunciator shall be provided for transformer alarm and
transformer trip.
2,10 Transformer regulation panel installed at control room comprising: 1 set 4.954.035,00 4.954.035,00
- One 20 kV voltmeter with 3 phase selector switch
- One set alarm annunciator
- One set transformer regulation relays and facilities
One set of wiring including connection to interface marshalling cubicle(s), terminal block
-
with switches, links, fuses, test facilities etc.., to complete the scope work.
One set of wiring including connection to interface marshalling cubicle(s), terminal block
-
with switches, links, fuses, test facilities etc.., to complete the scope work.
Note : Individual alarm and trip annunciator window for the transformer shall be
provided.
LV Power and Control Cable, power cable and necessary equipment to complete the specified
2,13 1 set 39.518.175,00 39.518.175,00
scope of work.
150/20 kV, 60 MVA 3-Phase Power Transformer complete with necessary accessories and
3,1 1 unit 269.212.076,00 269.212.076,00 Incl oil purification
supporting structure for mounting 150 kV and 20 kV NCT.
Single phase neutral CT for 20 kV Side Class X, 2000-1000/ 5 A complete with clamps for
3,2 restricted earth fault protection suitable for mounting outdoor on transformer tank or can be put 1 unit 2.752.517,00 2.752.517,00
inside the 20 kV neutral earthing resistor cubicle.
Single phase neutral CT for 20 kV side class 10P20, 1000/5 A complete with clamps for neutral
3,3 earth fault protection, suitable for mounting outdoor on transformer tank or can be put inside the NA unit
20 kV neutral earthing resistor cubicle.
Single phase neutral CT for 150 kV Side Class X, 150-300/ 1 A complete with clamps for
3,4 1 unit 2.752.517,00 2.752.517,00
restricted earth fault protection, suitable for mounting outdoor on transformer tank.
3,5 20 kV Stainless steel neutral earthing resistor rated 12 Ohms, 30 Seconds. NA set
3,6 Transformer Blast and Fire Prevention equipment. 1 set - -
3,7 Dismantling power transformer, power cable, cubicle 20 kV etc. (if any) 1 lot 16.511.392,00 16.511.392,00
4 x 630 sqmm ALU 20 kV XLPE power cable/phase between 150/20 kV power transformer and
4,1 20 kV incoming cubicle, including cable support, 20 kV post insulators, metal bars, cable 1 sets 16.511.392,00 16.511.392,00
terminations and accessories, cable rack, etc to complete scope of work.
2 x 630 sqmm ALU black insulation LV cable to connect neutral of 150/20 kV power transformer
4,2 and neutral of 20 kV incoming cubicle, including cable support, 20 kV post insulators, metal bar, 1 sets 5.503.798,00 5.503.798,00
cable terminations and accessories, etc to complete scope of wor
Including single rate tariff metering kwhmeter for incoming and outgoing feeders.
4 x 20 kV XLPE 630 sqmm AL power cable / phase between bus-section cubicle and interface
4,5 cubicle, including cable terminations and accessories for connection between sets of 20 kV NA set
switchgear to complete the specified scope of work.
(Total cable length is approx. 4 x 3 x 50 metres)
16 MISCELLANEOUS
16,2 Miscellaneous equipment and material required for completion the scope of work. 1 lot 5.136.878,00 5.136.878,00
Consisting of :
Post Steel Structure 4 sets 11.735.966,00 46.943.864,00
Beam steel structure 2 sets 6.589.598,00 13.179.196,00
Double busbar scheme 1 x ALMALEC 1140 sqmm and branch conductor to complete the
1.2 NA set
specified scope of work.
150 kV double tension string and single suspension insulators complete with fittings for
1.3 NA bays
installation of the main busbar as specified.
150 kV Post Insulators complete with supporting structure for installation of the main busbar
1,4 1 pcs 5.779.296,00 5.779.296,00
as specified.
Clamps, connectors and accessories for the installation of the main busbar to complete the
1.5 NA set
scope of work.
Conductor for shield wire and accessories for installation of the shield wire to complete the
1,6 NA set
scope of work.
Miscellaneous equipment and material to complete the scope of work for substation earthing
1,7 grid and earthing circuit required such as copper conductors, rods, clamps and connectors for NA set
connection to main substation earthing circuit and to individual item
Miscellaneous equipment and material to complete the scope of work for substation earthing
1,8 circuit required such as copper conductor, clamps and connectors for connection to main 1 set 5.779.296,00 5.779.296,00
substation earthing circuit and to individual item of equipment and structur
2,1 3-phase conductor, clamp for transformer bay as specified. 1 set 5.396.209,00 5.396.209,00
150 kV Single Tension String and Single Suspension Insulators complete with fittings,
2,2 clamps and connectors, etc suitable for connecting the individual items of circuit to 1 set 2.388.277,00 2.388.277,00
complete the scope of work.
Conductor for shield wire and accessories for installation of transformer bay shield wire to
2,3 1 set 1.973.343,00 1.973.343,00
complete the scope of work.
150 kV 3 Phase disconnecting switch motor operated, 40 kA 1250 A without earthing switch,
2,4 2 unit 9.050.689,00 18.101.378,00
complete with clamps and supporting structure for 150/20 kV transformer bay.
150 kV 3 Phase SF6 circuit breaker 40 kA 1250 A, complete with clamps and supporting
2,5 1 unit 12.230.661,00 12.230.661,00
structure for 150/20 kV transformer bay.
150 kV Current Transformer for 150/20 kV transformer bay complete with clamps and
2,6 3 unit 5.320.955,00 15.962.865,00
supporting structure comprising:
Core 1 : 150-300/ 1 A, Class X for transformer biased differential protection and restricted
earth fault protection.
Core 2 : 150-300/ 1 A, 30 VA Class 5P20 + Class 1 for overcurrent protection, earth fault
protection, instrument and metering devices.
Core 3 Core 3 : 2000-1000/ 1 A, Class X for check bus zone protection.
Core 4 Core 4 : 2000-1000/ 1 A, Class X for main bus zone protection
2,7 150 kV Lightning Arrester, 10 kA, complete with clamp, supporting structure and surge counter. 3 unit 5.779.296,00 17.337.888,00
2,8 Protection cubicle for 150/20 kV transformer comprising: 1 set 4.954.035,00 4.954.035,00
- Three pole biased differential protection including interposing CT and test facilities.
Three pole overcurrent and one pole earth fault protection with multi inverse
-
characteristic including instantaneous and time delay elements.
- Two trip circuit supervision relay
- Two restricted earth fault relays (1 for 150 kV & 1 for 20 kV side)
- One neutral earth fault overcurrent relay
- One tripping relay with reset
- Two master trip
- Two master trip with reset for each tripping circuit
Wiring, terminal block with switches, links, fuses, test facilities, auxiliary relays etc.., to
-
complete the scope of work.
2,9 Control cubicle for 150/20 kV transformer comprising: 1 set 4.954.035,00 4.954.035,00
One set of wiring including connection to interface marshalling cubicle(s), terminal block
with switches,links, fuses, test facilities etc.., to complete the scope of work.
Note : Two group alarm annunciator shall be provided for transformer alarm and
transformer trip.
2,10 Transformer regulation panel installed at control room comprising: 1 set 4.954.035,00 4.954.035,00
- One 20 kV voltmeter with 3 phase selector switch
- One set alarm annunciator
- One set transformer regulation relays and facilities
One set of wiring including connection to interface marshalling cubicle(s), terminal block
-
with switches, links, fuses, test facilities etc.., to complete the scope work.
One set of wiring including connection to interface marshalling cubicle(s), terminal block
-
with switches, links, fuses, test facilities etc.., to complete the scope work.
Note : Individual alarm and trip annunciator window for the transformer shall be
provided.
2,11 Marshalling kiosk for 150/20 kV transformer bay. 1 set 3.822.390,00 3.822.390,00
2,12 Adaptation and interface with existing busbar protection, automation substation (if any). 1 set 3.271.393,00 3.271.393,00
LV Power and Control Cable, power cable and necessary equipment to complete the specified
2,13 1 set 39.518.175,00 39.518.175,00
scope of work.
150/20 kV, 60 MVA 3-Phase Power Transformer complete with necessary accessories and
3,1 1 unit 269.212.076,00 269.212.076,00 Incl oil purification
supporting structure for mounting 150 kV and 20 kV NCT.
Single phase neutral CT for 20 kV Side Class X, 2000-1000/ 5 A complete with clamps for
3,2 restricted earth fault protection suitable for mounting outdoor on transformer tank or can be put 1 unit 2.752.517,00 2.752.517,00
inside the 20 kV neutral earthing resistor cubicle.
Single phase neutral CT for 20 kV side class 10P20, 1000/5 A complete with clamps for
3,3 neutral earth fault protection, suitable for mounting outdoor on transformer tank or can be put NA unit
inside the 20 kV neutral earthing resistor cubicle.
Single phase neutral CT for 150 kV Side Class X, 150-300/ 1 A complete with clamps for
3,4 1 unit 2.752.517,00 2.752.517,00
restricted earth fault protection, suitable for mounting outdoor on transformer tank.
3,5 20 kV Stainless steel neutral earthing resistor rated 12 Ohms, 30 Seconds. NA set
3,6 Transformer Blast and Fire Prevention equipment. 1 set - -
3,7 Dismantling power transformer, power cable, cubicle 20 kV etc. (if any) 1 lot 16.511.392,00 16.511.392,00
4 x 630 sqmm ALU 20 kV XLPE power cable/phase between 150/20 kV power transformer and
4,1 20 kV incoming cubicle, including cable support, 20 kV post insulators, metal bars, cable 1 sets 16.511.392,00 16.511.392,00
terminations and accessories, cable rack, etc to complete scope of work.
2 x 630 sqmm ALU black insulation LV cable to connect neutral of 150/20 kV power transformer
4,2 and neutral of 20 kV incoming cubicle, including cable support, 20 kV post insulators, metal bar, 1 sets 5.503.798,00 5.503.798,00
cable terminations and accessories, etc to complete scope of wor
4 x 20 kV XLPE 630 sqmm AL power cable / phase between bus-section cubicle and interface
4,5 cubicle, including cable terminations and accessories for connection between sets of 20 kV 1 set 16.511.392,00 16.511.392,00
switchgear to complete the specified scope of work.
16 MISCELLANEOUS
16,2 Miscellaneous equipment and material required for completion the scope of work. 1 lot 5.136.878,00 5.136.878,00
Consisting of :
Post Steel Structure NA sets
Beam steel structure NA sets
Double busbar scheme 1 x ALMALEC 1140 sqmm and branch conductor to complete the
1.2 NA set
specified scope of work.
150 kV double tension string and single suspension insulators complete with fittings for
1.3 NA bays
installation of the main busbar as specified.
150 kV Post Insulators complete with supporting structure for installation of the main busbar
1,4 NA pcs
as specified.
Clamps, connectors and accessories for the installation of the main busbar to complete the
1.5 NA set
scope of work.
Conductor for shield wire and accessories for installation of the shield wire to complete the
1,6 NA set
scope of work.
Miscellaneous equipment and material to complete the scope of work for substation earthing
1,7 grid and earthing circuit required such as copper conductors, rods, clamps and connectors for NA set
connection to main substation earthing circuit and to individual item
Miscellaneous equipment and material to complete the scope of work for substation earthing
1,8 circuit required such as copper conductor, clamps and connectors for connection to main NA set
substation earthing circuit and to individual item of equipment and structur
2,1 3-phase conductor, clamp for transformer bay as specified. 1 set 5.396.209,00 5.396.209,00
150 kV Single Tension String and Single Suspension Insulators complete with fittings,
2,2 clamps and connectors, etc suitable for connecting the individual items of circuit to 1 set 2.388.277,00 2.388.277,00
complete the scope of work.
Conductor for shield wire and accessories for installation of transformer bay shield wire to
2,3 2 set 1.973.343,00 3.946.686,00
complete the scope of work.
150 kV 3 Phase disconnecting switch motor operated, 40 kA 1250 A without earthing switch,
2,4 1 unit 9.050.689,00 9.050.689,00
complete with clamps and supporting structure for 150/20 kV transformer bay.
150 kV 3 Phase SF6 circuit breaker 40 kA 1250 A, complete with clamps and supporting
2,5 3 unit 12.230.661,00 36.691.983,00
structure for 150/20 kV transformer bay.
150 kV Current Transformer for 150/20 kV transformer bay complete with clamps and
2,6 3 unit 5.320.955,00 15.962.865,00
supporting structure comprising:
Core 1 : 150-300/ 1 A, Class X for transformer biased differential protection and restricted
earth fault protection.
Core 2 : 150-300/ 1 A, 30 VA Class 5P20 + Class 1 for overcurrent protection, earth fault
protection, instrument and metering devices.
Core 3 Core 3 : 2000-1000/ 1 A, Class X for check bus zone protection.
Core 4 Core 4 : 2000-1000/ 1 A, Class X for main bus zone protection
2,7 150 kV Lightning Arrester, 10 kA, complete with clamp, supporting structure and surge counter. 3 unit 5.779.296,00 17.337.888,00
2,8 Protection cubicle for 150/20 kV transformer comprising: 1 set 4.954.035,00 4.954.035,00
- Three pole biased differential protection including interposing CT and test facilities.
Three pole overcurrent and one pole earth fault protection with multi inverse
-
characteristic including instantaneous and time delay elements.
- Two trip circuit supervision relay
- Two restricted earth fault relays (1 for 150 kV & 1 for 20 kV side)
- One neutral earth fault overcurrent relay
- One tripping relay with reset
- Two master trip
- Two master trip with reset for each tripping circuit
Wiring, terminal block with switches, links, fuses, test facilities, auxiliary relays etc.., to
-
complete the scope of work.
2,9 Control cubicle for 150/20 kV transformer comprising: 1 set 4.954.035,00 4.954.035,00
One set of wiring including connection to interface marshalling cubicle(s), terminal block
with switches,links, fuses, test facilities etc.., to complete the scope of work.
Note : Two group alarm annunciator shall be provided for transformer alarm and
transformer trip.
2,10 Transformer regulation panel installed at control room comprising: 1 set 4.954.035,00 4.954.035,00
- One 20 kV voltmeter with 3 phase selector switch
- One set alarm annunciator
- One set transformer regulation relays and facilities
One set of wiring including connection to interface marshalling cubicle(s), terminal block
-
with switches, links, fuses, test facilities etc.., to complete the scope work.
One set of wiring including connection to interface marshalling cubicle(s), terminal block
-
with switches, links, fuses, test facilities etc.., to complete the scope work.
Note : Individual alarm and trip annunciator window for the transformer shall be
provided.
2,11 Marshalling kiosk for 150/20 kV transformer bay. 1 set 3.822.390,00 3.822.390,00
2,12 Adaptation and interface with existing busbar protection, automation substation (if any). 1 set 3.271.393,00 3.271.393,00
LV Power and Control Cable, power cable and necessary equipment to complete the specified
2,13 1 set 39.518.175,00 39.518.175,00
scope of work.
150/20 kV, 60 MVA 3-Phase Power Transformer complete with necessary accessories and
3,1 1 unit 269.212.076,00 269.212.076,00 Incl oil purification
supporting structure for mounting 150 kV and 20 kV NCT.
Single phase neutral CT for 20 kV Side Class X, 2000-1000/ 5 A complete with clamps for
3,2 restricted earth fault protection suitable for mounting outdoor on transformer tank or can be put 1 unit 2.752.517,00 2.752.517,00
inside the 20 kV neutral earthing resistor cubicle.
Single phase neutral CT for 20 kV side class 10P20, 1000/5 A complete with clamps for
3,3 neutral earth fault protection, suitable for mounting outdoor on transformer tank or can be put NA unit
inside the 20 kV neutral earthing resistor cubicle.
Single phase neutral CT for 150 kV Side Class X, 150-300/ 1 A complete with clamps for
3,4 1 unit 2.752.517,00 2.752.517,00
restricted earth fault protection, suitable for mounting outdoor on transformer tank.
3,5 20 kV Stainless steel neutral earthing resistor rated 12 Ohms, 30 Seconds. NA set
3,6 Transformer Blast and Fire Prevention equipment. 1 set - -
3,7 Dismantling power transformer, power cable, cubicle 20 kV etc. (if any) NA lot
4 x 630 sqmm ALU 20 kV XLPE power cable/phase between 150/20 kV power transformer and
4,1 20 kV incoming cubicle, including cable support, 20 kV post insulators, metal bars, cable 1 sets 16.511.392,00 16.511.392,00
terminations and accessories, cable rack, etc to complete scope of work.
2 x 630 sqmm ALU black insulation LV cable to connect neutral of 150/20 kV power transformer
4,2 and neutral of 20 kV incoming cubicle, including cable support, 20 kV post insulators, metal bar, 1 sets 5.503.798,00 5.503.798,00
cable terminations and accessories, etc to complete scope of wor
4 x 20 kV XLPE 630 sqmm AL power cable / phase between bus-section cubicle and interface
4,5 cubicle, including cable terminations and accessories for connection between sets of 20 kV 1 set 16.511.392,00 16.511.392,00
switchgear to complete the specified scope of work.
16 MISCELLANEOUS
16,2 Miscellaneous equipment and material required for completion the scope of work. 1 lot 5.136.878,00 5.136.878,00
Consisting of :
Post Steel Structure NA sets
Beam steel structure NA sets
Double busbar scheme 1 x ALMALEC 1140 sqmm and branch conductor to complete the
1.2 NA set
specified scope of work.
150 kV double tension string and single suspension insulators complete with fittings for
1.3 NA bays
installation of the main busbar as specified.
150 kV Post Insulators complete with supporting structure for installation of the main busbar
1,4 NA pcs
as specified.
Clamps, connectors and accessories for the installation of the main busbar to complete the
1.5 NA set
scope of work.
Conductor for shield wire and accessories for installation of the shield wire to complete the
1,6 NA set
scope of work.
Miscellaneous equipment and material to complete the scope of work for substation earthing
1,7 grid and earthing circuit required such as copper conductors, rods, clamps and connectors for NA set
connection to main substation earthing circuit and to individual item
Miscellaneous equipment and material to complete the scope of work for substation earthing
1,8 circuit required such as copper conductor, clamps and connectors for connection to main NA set
substation earthing circuit and to individual item of equipment and structur
150 kV 3 Phase disconnecting switch motor operated, 40 kA 1250 A without earthing switch,
2,4 NA unit
complete with clamps and supporting structure for 150/20 kV transformer bay.
150 kV 3 Phase SF6 circuit breaker 40 kA 1250 A, complete with clamps and supporting
2,5 NA unit
structure for 150/20 kV transformer bay.
150 kV Current Transformer for 150/20 kV transformer bay complete with clamps and
2,6 NA unit
supporting structure comprising:
Core 1 : 150-300/ 1 A, Class X for transformer biased differential protection and restricted
earth fault protection.
Core 2 : 150-300/ 1 A, 30 VA Class 5P20 + Class 1 for overcurrent protection, earth fault
protection, instrument and metering devices.
Core 3 Core 3 : 2000-1000/ 1 A, Class X for check bus zone protection.
Core 4 Core 4 : 2000-1000/ 1 A, Class X for main bus zone protection
2,7 150 kV Lightning Arrester, 10 kA, complete with clamp, supporting structure and surge counter. 3 unit 5.779.296,00 17.337.888,00
2,8 Protection cubicle for 150/20 kV transformer comprising: 1 set 4.954.035,00 4.954.035,00
- Three pole biased differential protection including interposing CT and test facilities.
Three pole overcurrent and one pole earth fault protection with multi inverse
-
characteristic including instantaneous and time delay elements.
- Two trip circuit supervision relay
- Two restricted earth fault relays (1 for 150 kV & 1 for 20 kV side)
- One neutral earth fault overcurrent relay
- One tripping relay with reset
- Two master trip
- Two master trip with reset for each tripping circuit
Wiring, terminal block with switches, links, fuses, test facilities, auxiliary relays etc.., to
-
complete the scope of work.
2,9 Control cubicle for 150/20 kV transformer comprising: 1 set 4.954.035,00 4.954.035,00
One set of wiring including connection to interface marshalling cubicle(s), terminal block
with switches,links, fuses, test facilities etc.., to complete the scope of work.
Note : Two group alarm annunciator shall be provided for transformer alarm and
transformer trip.
2,10 Transformer regulation panel installed at control room comprising: 1 set 4.954.035,00 4.954.035,00
- One 20 kV voltmeter with 3 phase selector switch
- One set alarm annunciator
- One set transformer regulation relays and facilities
One set of wiring including connection to interface marshalling cubicle(s), terminal block
-
with switches, links, fuses, test facilities etc.., to complete the scope work.
One set of wiring including connection to interface marshalling cubicle(s), terminal block
-
with switches, links, fuses, test facilities etc.., to complete the scope work.
Note : Individual alarm and trip annunciator window for the transformer shall be
provided.
LV Power and Control Cable, power cable and necessary equipment to complete the specified
2,11 1 set 39.518.175,00 39.518.175,00
scope of work.
150/20 kV, 60 MVA 3-Phase Power Transformer complete with necessary accessories and
3,1 1 unit 269.212.076,00 269.212.076,00 Incl oil purification
supporting structure for mounting 150 kV and 20 kV NCT.
Single phase neutral CT for 20 kV Side Class X, 2000-1000/ 5 A complete with clamps for
3,2 restricted earth fault protection suitable for mounting outdoor on transformer tank or can be put 1 unit 2.752.517,00 2.752.517,00
inside the 20 kV neutral earthing resistor cubicle.
Single phase neutral CT for 20 kV side class 10P20, 1000/5 A complete with clamps for
3,3 neutral earth fault protection, suitable for mounting outdoor on transformer tank or can be put NA unit
inside the 20 kV neutral earthing resistor cubicle.
Single phase neutral CT for 150 kV Side Class X, 150-300/ 1 A complete with clamps for
3,4 1 unit 2.752.517,00 2.752.517,00
restricted earth fault protection, suitable for mounting outdoor on transformer tank.
3,5 20 kV Stainless steel neutral earthing resistor rated 12 Ohms, 30 Seconds. NA set
3,6 Transformer Blast and Fire Prevention equipment. 1 set - -
3,7 Dismantling power transformer, power cable, cubicle 20 kV etc. (if any) 1 lot 16.511.392,00 16.511.392,00
4 x 630 sqmm ALU 20 kV XLPE power cable/phase between 150/20 kV power transformer and
4,1 20 kV incoming cubicle, including cable support, 20 kV post insulators, metal bars, cable 1 sets 16.511.392,00 16.511.392,00
terminations and accessories, cable rack, etc to complete scope of work.
2 x 630 sqmm ALU black insulation LV cable to connect neutral of 150/20 kV power transformer
4,2 and neutral of 20 kV incoming cubicle, including cable support, 20 kV post insulators, metal bar, 1 sets 5.503.798,00 5.503.798,00
cable terminations and accessories, etc to complete scope of wor
4 x 20 kV XLPE 630 sqmm AL power cable / phase between bus-section cubicle and interface
4,5 cubicle, including cable terminations and accessories for connection between sets of 20 kV 1 set 16.511.392,00 16.511.392,00
switchgear to complete the specified scope of work.
16 MISCELLANEOUS
16,2 Miscellaneous equipment and material required for completion the scope of work. 1 lot 5.136.878,00 5.136.878,00
Consisting of :
Post Steel Structure NA sets
Beam steel structure NA sets
Double busbar scheme 1 x ALMALEC 1140 sqmm and branch conductor to complete the
1.2 NA set
specified scope of work.
150 kV double tension string and single suspension insulators complete with fittings for
1.3 NA bays
installation of the main busbar as specified.
150 kV Post Insulators complete with supporting structure for installation of the main busbar
1,4 NA pcs
as specified.
Clamps, connectors and accessories for the installation of the main busbar to complete the
1.5 NA set
scope of work.
Conductor for shield wire and accessories for installation of the shield wire to complete the
1,6 NA set
scope of work.
Miscellaneous equipment and material to complete the scope of work for substation earthing
1,7 grid and earthing circuit required such as copper conductors, rods, clamps and connectors for NA set
connection to main substation earthing circuit and to individual item
Miscellaneous equipment and material to complete the scope of work for substation earthing
1,8 circuit required such as copper conductor, clamps and connectors for connection to main NA set
substation earthing circuit and to individual item of equipment and structur
150 kV 3 Phase disconnecting switch motor operated, 40 kA 1250 A without earthing switch,
2,4 NA unit
complete with clamps and supporting structure for 150/20 kV transformer bay.
150 kV 3 Phase SF6 circuit breaker 40 kA 1250 A, complete with clamps and supporting
2,5 NA unit
structure for 150/20 kV transformer bay.
150 kV Current Transformer for 150/20 kV transformer bay complete with clamps and
2,6 3 unit 5.320.955,00 15.962.865,00
supporting structure comprising:
Core 1 : 150-300/ 1 A, Class X for transformer biased differential protection and restricted
earth fault protection.
Core 2 : 150-300/ 1 A, 30 VA Class 5P20 + Class 1 for overcurrent protection, earth fault
protection, instrument and metering devices.
Core 3 Core 3 : 2000-1000/ 1 A, Class X for check bus zone protection.
Core 4 Core 4 : 2000-1000/ 1 A, Class X for main bus zone protection
2,7 150 kV Lightning Arrester, 10 kA, complete with clamp, supporting structure and surge counter. NA unit
2,8 Protection cubicle for 150/20 kV transformer comprising: 1 set 4.954.035,00 4.954.035,00
- Three pole biased differential protection including interposing CT and test facilities.
Three pole overcurrent and one pole earth fault protection with multi inverse
-
characteristic including instantaneous and time delay elements.
- Two trip circuit supervision relay
- Two restricted earth fault relays (1 for 150 kV & 1 for 20 kV side)
- One neutral earth fault overcurrent relay
- One tripping relay with reset
- Two master trip
- Two master trip with reset for each tripping circuit
Wiring, terminal block with switches, links, fuses, test facilities, auxiliary relays etc.., to
-
complete the scope of work.
2,9 Control cubicle for 150/20 kV transformer comprising: 1 set 4.954.035,00 4.954.035,00
One set of wiring including connection to interface marshalling cubicle(s), terminal block
with switches,links, fuses, test facilities etc.., to complete the scope of work.
Note : Two group alarm annunciator shall be provided for transformer alarm and
transformer trip.
2,10 Transformer regulation panel installed at control room comprising: 1 set 4.954.035,00 4.954.035,00
- One 20 kV voltmeter with 3 phase selector switch
- One set alarm annunciator
- One set transformer regulation relays and facilities
One set of wiring including connection to interface marshalling cubicle(s), terminal block
-
with switches, links, fuses, test facilities etc.., to complete the scope work.
One set of wiring including connection to interface marshalling cubicle(s), terminal block
-
with switches, links, fuses, test facilities etc.., to complete the scope work.
Note : Individual alarm and trip annunciator window for the transformer shall be
provided.
LV Power and Control Cable, power cable and necessary equipment to complete the specified
2,11 1 set 39.518.175,00 39.518.175,00
scope of work.
150/20 kV, 60 MVA 3-Phase Power Transformer complete with necessary accessories and
3,1 1 unit 269.212.076,00 269.212.076,00 Incl oil purification
supporting structure for mounting 150 kV and 20 kV NCT.
Single phase neutral CT for 20 kV Side Class X, 2000-1000/ 5 A complete with clamps for
3,2 restricted earth fault protection suitable for mounting outdoor on transformer tank or can be put 1 unit 2.752.517,00 2.752.517,00
inside the 20 kV neutral earthing resistor cubicle.
Single phase neutral CT for 20 kV side class 10P20, 1000/5 A complete with clamps for
3,3 neutral earth fault protection, suitable for mounting outdoor on transformer tank or can be put NA unit
inside the 20 kV neutral earthing resistor cubicle.
Single phase neutral CT for 150 kV Side Class X, 150-300/ 1 A complete with clamps for
3,4 1 unit 2.752.517,00 2.752.517,00
restricted earth fault protection, suitable for mounting outdoor on transformer tank.
3,5 20 kV Stainless steel neutral earthing resistor rated 12 Ohms, 30 Seconds. NA set
3,6 Transformer Blast and Fire Prevention equipment. 1 set - -
3,7 Dismantling power transformer, power cable, cubicle 20 kV etc. (if any) 1 lot 16.511.392,00 16.511.392,00
4 x 630 sqmm ALU 20 kV XLPE power cable/phase between 150/20 kV power transformer and
4,1 20 kV incoming cubicle, including cable support, 20 kV post insulators, metal bars, cable 1 sets 16.511.392,00 16.511.392,00
terminations and accessories, cable rack, etc to complete scope of work.
2 x 630 sqmm ALU black insulation LV cable to connect neutral of 150/20 kV power transformer
4,2 and neutral of 20 kV incoming cubicle, including cable support, 20 kV post insulators, metal bar, 1 sets 5.503.798,00 5.503.798,00
cable terminations and accessories, etc to complete scope of wor
4 x 20 kV XLPE 630 sqmm AL power cable / phase between bus-section cubicle and interface
4,5 cubicle, including cable terminations and accessories for connection between sets of 20 kV 1 set 16.511.392,00 16.511.392,00
switchgear to complete the specified scope of work.
16 MISCELLANEOUS
16,2 Miscellaneous equipment and material required for completion the scope of work. 1 lot 5.136.878,00 5.136.878,00
Consisting of :
Post Steel Structure NA sets
Beam steel structure NA sets
Double busbar scheme 1 x ALMALEC 1140 sqmm and branch conductor to complete the
1.2 NA set
specified scope of work.
150 kV double tension string and single suspension insulators complete with fittings for
1.3 NA bays
installation of the main busbar as specified.
150 kV Post Insulators complete with supporting structure for installation of the main busbar as
1,4 NA pcs
specified.
Clamps, connectors and accessories for the installation of the main busbar to complete the
1.5 NA set
scope of work.
Conductor for shield wire and accessories for installation of the shield wire to complete the
1,6 NA set
scope of work.
Miscellaneous equipment and material to complete the scope of work for substation earthing
1,7 grid and earthing circuit required such as copper conductors, rods, clamps and connectors for NA set
connection to main substation earthing circuit and to individual item
Miscellaneous equipment and material to complete the scope of work for substation earthing
1,8 circuit required such as copper conductor, clamps and connectors for connection to main NA set
substation earthing circuit and to individual item of equipment and structur
(Note : The substation earthing grid already exists)
2,1 3-phase conductor, clamp for transformer bay as specified. 1 set 5.396.209,00 5.396.209,00
150 kV Single Tension String and Single Suspension Insulators complete with fittings,
2,2 clamps and connectors, etc suitable for connecting the individual items of circuit to 1 set 2.388.277,00 2.388.277,00
complete the scope of work.
Conductor for shield wire and accessories for installation of transformer bay shield wire to
2,3 1 set 1.973.343,00 1.973.343,00
complete the scope of work.
150 kV 3 Phase disconnecting switch motor operated, 40 kA 1250 A without earthing switch,
2,4 2 unit 9.050.689,00 18.101.378,00
complete with clamps and supporting structure for 150/20 kV transformer bay.
150 kV 3 Phase SF6 circuit breaker 40 kA 1250 A, complete with clamps and supporting
2,5 1 unit 12.230.661,00 12.230.661,00
structure for 150/20 kV transformer bay.
150 kV Current Transformer for 150/20 kV transformer bay complete with clamps and
2,6 3 unit 5.320.955,00 15.962.865,00
supporting structure comprising:
Core 1 : 150-300/ 1 A, Class X for transformer biased differential protection and restricted
earth fault protection.
Core 2 : 150-300/ 1 A, 30 VA Class 5P20 + Class 1 for overcurrent protection, earth fault
protection, instrument and metering devices.
Core 3Core 3 : 2000-1000/ 1 A, Class X for check bus zone protection.
Core 4Core 4 : 2000-1000/ 1 A, Class X for main bus zone protection
2,7 150 kV Lightning Arrester, 10 kA, complete with clamp, supporting structure and surge counter. 3 unit 5.779.296,00 17.337.888,00
2,8 Protection cubicle for 150/20 kV transformer comprising: 1 set 4.954.035,00 4.954.035,00
- Three pole biased differential protection including interposing CT and test facilities.
Three pole overcurrent and one pole earth fault protection with multi inverse
-
characteristic including instantaneous and time delay elements.
- Two trip circuit supervision relay
- Two restricted earth fault relays (1 for 150 kV & 1 for 20 kV side)
- One neutral earth fault overcurrent relay
- One tripping relay with reset
- Two master trip
- Two master trip with reset for each tripping circuit
Wiring, terminal block with switches, links, fuses, test facilities, auxiliary relays etc.., to
-
complete the scope of work.
2,9 Control cubicle for 150/20 kV transformer comprising: 1 set 4.954.035,00 4.954.035,00
One set of wiring including connection to interface marshalling cubicle(s), terminal block
with switches,links, fuses, test facilities etc.., to complete the scope of work.
Note : Two group alarm annunciator shall be provided for transformer alarm
and transformer trip.
2,10 Transformer regulation panel installed at control room comprising: 1 set 4.954.035,00 4.954.035,00
- One 20 kV voltmeter with 3 phase selector switch
- One set alarm annunciator
- One set transformer regulation relays and facilities
One set of wiring including connection to interface marshalling cubicle(s), terminal block
-
with switches, links, fuses, test facilities etc.., to complete the scope work.
- One set transformer regulation relays and facilities
One set of wiring including connection to interface marshalling cubicle(s), terminal block
-
with switches, links, fuses, test facilities etc.., to complete the scope work.
Note : Individual alarm and trip annunciator window for the transformer shall
be provided.
2,11 Marshalling kiosk for 150/20 kV transformer bay. 1 set 3.822.390,00 3.822.390,00
2,12 Adaptation and interface with existing busbar protection, automation substation (if any). 1 set 3.271.393,00 3.271.393,00
LV Power and Control Cable, power cable and necessary equipment to complete the specified
2,13 1 set 39.518.175,00 39.518.175,00
scope of work.
150/20 kV, 60 MVA 3-Phase Power Transformer complete with necessary accessories and
3,1 1 unit 269.212.076,00 269.212.076,00 Incl oil purification
supporting structure for mounting 150 kV and 20 kV NCT.
Single phase neutral CT for 20 kV Side Class X, 2000-1000/ 5 A complete with clamps for
3,2 restricted earth fault protection suitable for mounting outdoor on transformer tank or can be put 1 unit 2.752.517,00 2.752.517,00
inside the 20 kV neutral earthing resistor cubicle.
Single phase neutral CT for 20 kV side class 10P20, 1000/5 A complete with clamps for neutral
3,3 earth fault protection, suitable for mounting outdoor on transformer tank or can be put inside the NA unit
20 kV neutral earthing resistor cubicle.
Single phase neutral CT for 150 kV Side Class X, 150-300/ 1 A complete with clamps for
3,4 1 unit 2.752.517,00 2.752.517,00
restricted earth fault protection, suitable for mounting outdoor on transformer tank.
3,5 20 kV Stainless steel neutral earthing resistor rated 12 Ohms, 30 Seconds. NA set
3,6 Transformer Blast and Fire Prevention equipment. 1 set - -
3,7 Dismantling power transformer, power cable, cubicle 20 kV etc. (if any) NA lot
4 x 630 sqmm ALU 20 kV XLPE power cable/phase between 150/20 kV power transformer and
4,1 20 kV incoming cubicle, including cable support, 20 kV post insulators, metal bars, cable 1 sets 16.511.392,00 16.511.392,00
terminations and accessories, cable rack, etc to complete scope of work.
Consisting of :
Post Steel Structure 5 sets 11.735.966,00 58.679.830,00
Beam steel structure 6 sets 6.589.598,00 39.537.588,00
Double busbar scheme 1 x ALMALEC 1140 sqmm and branch conductor to complete the
1.2 2 set 19.840.066,00 39.680.132,00
specified scope of work.
150 kV double tension string and single suspension insulators complete with fittings for
1.3 2 bays 10.150.179,00 20.300.358,00
installation of the main busbar as specified.
150 kV Post Insulators complete with supporting structure for installation of the main busbar as
1,4 N/A pcs
specified.
Clamps, connectors and accessories for the installation of the main busbar to complete the
1.5 2 set 2.277.284,00 4.554.568,00
scope of work.
Conductor for shield wire and accessories for installation of the shield wire to complete the
1,6 2 set 1.973.343,00 3.946.686,00
scope of work.
Miscellaneous equipment and material to complete the scope of work for substation earthing
1,7 grid and earthing circuit required such as copper conductors, rods, clamps and connectors for 2 set 19.681.628,00 39.363.256,00
connection to main substation earthing circuit and to individual item
Miscellaneous equipment and material to complete the scope of work for substation earthing
1,8 circuit required such as copper conductor, clamps and connectors for connection to main NA set
substation earthing circuit and to individual item of equipment and structur
(Note : The substation earthing grid already exists)
2,1 3-phase conductor, clamp for transformer bay as specified. 1 set 5.396.209,00 5.396.209,00
150 kV Single Tension String and Single Suspension Insulators complete with fittings,
2,2 clamps and connectors, etc suitable for connecting the individual items of circuit to 1 set 2.388.277,00 2.388.277,00
complete the scope of work.
Conductor for shield wire and accessories for installation of transformer bay shield wire to
2,3 1 set 1.973.343,00 1.973.343,00
complete the scope of work.
150 kV 3 Phase disconnecting switch motor operated, 40 kA 1250 A without earthing switch,
2,4 2 unit 9.050.689,00 18.101.378,00
complete with clamps and supporting structure for 150/20 kV transformer bay.
150 kV 3 Phase SF6 circuit breaker 40 kA 1250 A, complete with clamps and supporting
2,5 1 unit 12.230.661,00 12.230.661,00
structure for 150/20 kV transformer bay.
150 kV Current Transformer for 150/20 kV transformer bay complete with clamps and
2,6 3 unit 5.320.955,00 15.962.865,00
supporting structure comprising:
Core 1 : 150-300/ 1 A, Class X for transformer biased differential protection and restricted
earth fault protection.
Core 2 : 150-300/ 1 A, 30 VA Class 5P20 + Class 1 for overcurrent protection, earth fault
protection, instrument and metering devices.
Core 3Core 3 : 2000-1000/ 1 A, Class X for check bus zone protection.
Core 4Core 4 : 2000-1000/ 1 A, Class X for main bus zone protection
2,7 150 kV Lightning Arrester, 10 kA, complete with clamp, supporting structure and surge counter. 3 unit 5.779.296,00 17.337.888,00
2,8 Protection cubicle for 150/20 kV transformer comprising: 2 set 4.954.035,00 9.908.070,00
- Three pole biased differential protection including interposing CT and test facilities.
Three pole overcurrent and one pole earth fault protection with multi inverse
-
characteristic including instantaneous and time delay elements.
- Two trip circuit supervision relay
- Two restricted earth fault relays (1 for 150 kV & 1 for 20 kV side)
- One neutral earth fault overcurrent relay
- One tripping relay with reset
- Two master trip
- Two master trip with reset for each tripping circuit
Wiring, terminal block with switches, links, fuses, test facilities, auxiliary relays etc.., to
-
complete the scope of work.
2,9 Control cubicle for 150/20 kV transformer comprising: NA set
One set of wiring including connection to interface marshalling cubicle(s), terminal block
with switches,links, fuses, test facilities etc.., to complete the scope of work.
Note : Two group alarm annunciator shall be provided for transformer alarm
and transformer trip.
2,10 Transformer regulation panel installed at control room comprising: 2 set 4.954.035,00 9.908.070,00
- One 20 kV voltmeter with 3 phase selector switch
- One set alarm annunciator
- One set transformer regulation relays and facilities
One set of wiring including connection to interface marshalling cubicle(s), terminal block
-
with switches, links, fuses, test facilities etc.., to complete the scope work.
- One set transformer regulation relays and facilities
One set of wiring including connection to interface marshalling cubicle(s), terminal block
-
with switches, links, fuses, test facilities etc.., to complete the scope work.
Note : Individual alarm and trip annunciator window for the transformer shall
be provided.
2,9 Marshalling kiosk for 150/20 kV transformer bay. 1 set 3.822.390,00 3.822.390,00
2,10 Adaptation and interface with existing busbar protection, automation substation (if any). 1 set 3.271.393,00 3.271.393,00
LV Power and Control Cable, power cable and necessary equipment to complete the specified
2,11 1 set 39.518.175,00 39.518.175,00
scope of work.
150/20 kV, 60 MVA 3-Phase Power Transformer complete with necessary accessories and
3,1 1 unit 269.212.076,00 269.212.076,00 Incl oil purification
supporting structure for mounting 150 kV and 20 kV NCT.
Single phase neutral CT for 20 kV Side Class X, 2000-1000/ 5 A complete with clamps for
3,2 restricted earth fault protection suitable for mounting outdoor on transformer tank or can be put 1 unit 2.752.517,00 2.752.517,00
inside the 20 kV neutral earthing resistor cubicle.
Single phase neutral CT for 20 kV side class 10P20, 1000/5 A complete with clamps for neutral
3,3 earth fault protection, suitable for mounting outdoor on transformer tank or can be put inside the NA unit
20 kV neutral earthing resistor cubicle.
Single phase neutral CT for 150 kV Side Class X, 150-300/ 1 A complete with clamps for
3,4 1 unit 2.752.517,00 2.752.517,00
restricted earth fault protection, suitable for mounting outdoor on transformer tank.
3,5 20 kV Stainless steel neutral earthing resistor rated 12 Ohms, 30 Seconds. NA set
3,6 Transformer Blast and Fire Prevention equipment. 1 set - -
3,7 Dismantling power transformer, power cable, cubicle 20 kV etc. (if any) NA lot
4 x 630 sqmm ALU 20 kV XLPE power cable/phase between 150/20 kV power transformer and
4,1 20 kV incoming cubicle, including cable support, 20 kV post insulators, metal bars, cable 1 sets 16.511.392,00 16.511.392,00
terminations and accessories, cable rack, etc to complete scope of work.
Consisting of :
Post Steel Structure NA sets
Beam steel structure NA sets
Double busbar scheme 1 x ALMALEC 1140 sqmm and branch conductor to complete the
1.2 NA set
specified scope of work.
150 kV double tension string and single suspension insulators complete with fittings for
1.3 NA bays
installation of the main busbar as specified.
150 kV Post Insulators complete with supporting structure for installation of the main busbar as
1,4 NA pcs
specified.
Clamps, connectors and accessories for the installation of the main busbar to complete the
1.5 NA set
scope of work.
Conductor for shield wire and accessories for installation of the shield wire to complete the
1,6 NA set
scope of work.
Miscellaneous equipment and material to complete the scope of work for substation earthing
1,7 grid and earthing circuit required such as copper conductors, rods, clamps and connectors for NA set
connection to main substation earthing circuit and to individual item
Miscellaneous equipment and material to complete the scope of work for substation earthing
1,8 circuit required such as copper conductor, clamps and connectors for connection to main NA set
substation earthing circuit and to individual item of equipment and structur
(Note : The substation earthing grid already exists)
150 kV 3 Phase disconnecting switch motor operated, 40 kA 1250 A without earthing switch,
2,4 NA unit
complete with clamps and supporting structure for 150/20 kV transformer bay.
150 kV 3 Phase SF6 circuit breaker 40 kA 1250 A, complete with clamps and supporting
2,5 NA unit
structure for 150/20 kV transformer bay.
150 kV Current Transformer for 150/20 kV transformer bay complete with clamps and
2,6 NA unit
supporting structure comprising:
Core 1 : 150-300/ 1 A, Class X for transformer biased differential protection and restricted
earth fault protection.
Core 2 : 150-300/ 1 A, 30 VA Class 5P20 + Class 1 for overcurrent protection, earth fault
protection, instrument and metering devices.
Core 3Core 3 : 2000-1000/ 1 A, Class X for check bus zone protection.
Core 4Core 4 : 2000-1000/ 1 A, Class X for main bus zone protection
2,7 150 kV Lightning Arrester, 10 kA, complete with clamp, supporting structure and surge counter. NA unit
One set of wiring including connection to interface marshalling cubicle(s), terminal block
with switches,links, fuses, test facilities etc.., to complete the scope of work.
Note : Two group alarm annunciator shall be provided for transformer alarm
and transformer trip.
2,10 Transformer regulation panel installed at control room comprising: 1 set 4.954.035,00 4.954.035,00
- One 20 kV voltmeter with 3 phase selector switch
- One set alarm annunciator
- One set transformer regulation relays and facilities
One set of wiring including connection to interface marshalling cubicle(s), terminal block
-
with switches, links, fuses, test facilities etc.., to complete the scope work.
- One set transformer regulation relays and facilities
One set of wiring including connection to interface marshalling cubicle(s), terminal block
-
with switches, links, fuses, test facilities etc.., to complete the scope work.
Note : Individual alarm and trip annunciator window for the transformer shall
be provided.
150/20 kV, 60 MVA 3-Phase Power Transformer complete with necessary accessories and
3,1 1 unit 269.212.076,00 269.212.076,00 Incl oil purification
supporting structure for mounting 150 kV and 20 kV NCT.
Single phase neutral CT for 20 kV Side Class X, 2000-1000/ 5 A complete with clamps for
3,2 restricted earth fault protection suitable for mounting outdoor on transformer tank or can be put 1 unit 2.752.517,00 2.752.517,00
inside the 20 kV neutral earthing resistor cubicle.
Single phase neutral CT for 20 kV side class 10P20, 1000/5 A complete with clamps for neutral
3,3 earth fault protection, suitable for mounting outdoor on transformer tank or can be put inside the NA unit
20 kV neutral earthing resistor cubicle.
Single phase neutral CT for 150 kV Side Class X, 150-300/ 1 A complete with clamps for
3,4 1 unit 2.752.517,00 2.752.517,00
restricted earth fault protection, suitable for mounting outdoor on transformer tank.
3,5 20 kV Stainless steel neutral earthing resistor rated 12 Ohms, 30 Seconds. NA set
3,6 Transformer Blast and Fire Prevention equipment. 1 set - -
3,7 Dismantling power transformer, power cable, cubicle 20 kV etc. (if any) 1 lot 16.511.392,00 16.511.392,00
4 x 630 sqmm ALU 20 kV XLPE power cable/phase between 150/20 kV power transformer and
4,1 20 kV incoming cubicle, including cable support, 20 kV post insulators, metal bars, cable 1 sets 24.767.088,00 24.767.088,00
terminations and accessories, cable rack, etc to complete scope of work.
Consisting of :
Post Steel Structure NA sets
Beam steel structure NA sets
Double busbar scheme 1 x ALMALEC 1140 sqmm and branch conductor to complete the
1.2 NA set
specified scope of work.
150 kV double tension string and single suspension insulators complete with fittings for
1.3 NA bays
installation of the main busbar as specified.
150 kV Post Insulators complete with supporting structure for installation of the main busbar as
1,4 NA pcs
specified.
Clamps, connectors and accessories for the installation of the main busbar to complete the
1.5 NA set
scope of work.
Conductor for shield wire and accessories for installation of the shield wire to complete the
1,6 NA set
scope of work.
Miscellaneous equipment and material to complete the scope of work for substation earthing
1,7 grid and earthing circuit required such as copper conductors, rods, clamps and connectors for NA set
connection to main substation earthing circuit and to individual item
Miscellaneous equipment and material to complete the scope of work for substation earthing
1,8 circuit required such as copper conductor, clamps and connectors for connection to main 1 set 5.779.296,00 5.779.296,00
substation earthing circuit and to individual item of equipment and structur
(Note : The substation earthing grid already exists)
150 kV 3 Phase disconnecting switch motor operated, 40 kA 1250 A without earthing switch,
2,4 NA unit
complete with clamps and supporting structure for 150/20 kV transformer bay.
150 kV 3 Phase SF6 circuit breaker 40 kA 1250 A, complete with clamps and supporting
2,5 NA unit
structure for 150/20 kV transformer bay.
150 kV Current Transformer for 150/20 kV transformer bay complete with clamps and
2,6 3 unit 5.320.955,00 15.962.865,00
supporting structure comprising:
Core 1 : 150-300/ 1 A, Class X for transformer biased differential protection and restricted
earth fault protection.
Core 2 : 150-300/ 1 A, 30 VA Class 5P20 + Class 1 for overcurrent protection, earth fault
protection, instrument and metering devices.
Core 3Core 3 : 2000-1000/ 1 A, Class X for check bus zone protection.
Core 4Core 4 : 2000-1000/ 1 A, Class X for main bus zone protection
2,7 150 kV Lightning Arrester, 10 kA, complete with clamp, supporting structure and surge counter. NA unit
2,8 Protection cubicle for 150/20 kV transformer comprising: 2 set 4.954.035,00 9.908.070,00
- Three pole biased differential protection including interposing CT and test facilities.
Three pole overcurrent and one pole earth fault protection with multi inverse
-
characteristic including instantaneous and time delay elements.
- Two trip circuit supervision relay
- Two restricted earth fault relays (1 for 150 kV & 1 for 20 kV side)
- One neutral earth fault overcurrent relay
- One tripping relay with reset
- Two master trip
- Two master trip with reset for each tripping circuit
Wiring, terminal block with switches, links, fuses, test facilities, auxiliary relays etc.., to
-
complete the scope of work.
2,9 Control cubicle for 150/20 kV transformer comprising: NA set
One set of wiring including connection to interface marshalling cubicle(s), terminal block
with switches,links, fuses, test facilities etc.., to complete the scope of work.
Note : Two group alarm annunciator shall be provided for transformer alarm
and transformer trip.
2,10 Transformer regulation panel installed at control room comprising: 2 set 4.954.035,00 9.908.070,00
- One 20 kV voltmeter with 3 phase selector switch
- One set alarm annunciator
- One set transformer regulation relays and facilities
One set of wiring including connection to interface marshalling cubicle(s), terminal block
-
with switches, links, fuses, test facilities etc.., to complete the scope work.
- One set transformer regulation relays and facilities
One set of wiring including connection to interface marshalling cubicle(s), terminal block
-
with switches, links, fuses, test facilities etc.., to complete the scope work.
Note : Individual alarm and trip annunciator window for the transformer shall
be provided.
150/20 kV, 60 MVA 3-Phase Power Transformer complete with necessary accessories and
3,1 2 unit 269.212.076,00 538.424.152,00 Incl oil purification
supporting structure for mounting 150 kV and 20 kV NCT.
Single phase neutral CT for 20 kV Side Class X, 2000-1000/ 5 A complete with clamps for
3,2 restricted earth fault protection suitable for mounting outdoor on transformer tank or can be put 2 unit 2.752.517,00 5.505.034,00
inside the 20 kV neutral earthing resistor cubicle.
Single phase neutral CT for 20 kV side class 10P20, 1000/5 A complete with clamps for neutral
3,3 earth fault protection, suitable for mounting outdoor on transformer tank or can be put inside the NA unit
20 kV neutral earthing resistor cubicle.
Single phase neutral CT for 150 kV Side Class X, 150-300/ 1 A complete with clamps for
3,4 2 unit 2.752.517,00 5.505.034,00
restricted earth fault protection, suitable for mounting outdoor on transformer tank.
3,5 20 kV Stainless steel neutral earthing resistor rated 12 Ohms, 30 Seconds. NA set
3,6 Transformer Blast and Fire Prevention equipment. 2 set - -
3,7 Dismantling power transformer, power cable, cubicle 20 kV etc. (if any) 2 lot 16.511.392,00 33.022.784,00
4 x 630 sqmm ALU 20 kV XLPE power cable/phase between 150/20 kV power transformer and
4,1 20 kV incoming cubicle, including cable support, 20 kV post insulators, metal bars, cable 2 sets 16.511.392,00 33.022.784,00
terminations and accessories, cable rack, etc to complete scope of work.
Consisting of :
Post Steel Structure 6 sets 11.735.966,00 70.415.796,00
Beam steel structure 5 sets 6.589.598,00 32.947.990,00
Double busbar scheme 1 x ALMALEC 1140 sqmm and branch conductor to complete the
1.2 1 set 19.840.066,00 19.840.066,00
specified scope of work.
150 kV double tension string and single suspension insulators complete with fittings for
1.3 1 bays 10.150.179,00 10.150.179,00
installation of the main busbar as specified.
150 kV Post Insulators complete with supporting structure for installation of the main busbar as
1,4 N/A pcs
specified.
Clamps, connectors and accessories for the installation of the main busbar to complete the
1.5 1 set 2.277.284,00 2.277.284,00
scope of work.
Conductor for shield wire and accessories for installation of the shield wire to complete the
1,6 1 set 1.973.343,00 1.973.343,00
scope of work.
Miscellaneous equipment and material to complete the scope of work for substation earthing
1,7 grid and earthing circuit required such as copper conductors, rods, clamps and connectors for 1 set 19.681.628,00 19.681.628,00
connection to main substation earthing circuit and to individual item
Miscellaneous equipment and material to complete the scope of work for substation earthing
1,8 circuit required such as copper conductor, clamps and connectors for connection to main NA set
substation earthing circuit and to individual item of equipment and structur
(Note : The substation earthing grid already exists)
2,1 3-phase conductor, clamp for transformer bay as specified. 1 set 5.396.209,00 5.396.209,00
150 kV Single Tension String and Single Suspension Insulators complete with fittings,
2,2 clamps and connectors, etc suitable for connecting the individual items of circuit to NA set
complete the scope of work.
Conductor for shield wire and accessories for installation of transformer bay shield wire to
2,3 1 set 1.973.343,00 1.973.343,00
complete the scope of work.
150 kV 3 Phase disconnecting switch motor operated, 40 kA 1250 A without earthing switch,
2,4 2 unit 9.050.689,00 18.101.378,00
complete with clamps and supporting structure for 150/20 kV transformer bay.
150 kV 3 Phase SF6 circuit breaker 40 kA 1250 A, complete with clamps and supporting
2,5 1 unit 12.230.661,00 12.230.661,00
structure for 150/20 kV transformer bay.
150 kV Current Transformer for 150/20 kV transformer bay complete with clamps and
2,6 3 unit 5.320.955,00 15.962.865,00
supporting structure comprising:
Core 1 : 150-300/ 1 A, Class X for transformer biased differential protection and restricted
earth fault protection.
Core 2 : 150-300/ 1 A, 30 VA Class 5P20 + Class 1 for overcurrent protection, earth fault
protection, instrument and metering devices.
Core 3Core 3 : 2000-1000/ 1 A, Class X for check bus zone protection.
Core 4Core 4 : 2000-1000/ 1 A, Class X for main bus zone protection
2,7 150 kV Lightning Arrester, 10 kA, complete with clamp, supporting structure and surge counter. 3 unit 5.779.296,00 17.337.888,00
2,8 Protection cubicle for 150/20 kV transformer comprising: 1 set 4.954.035,00 4.954.035,00
- Three pole biased differential protection including interposing CT and test facilities.
Three pole overcurrent and one pole earth fault protection with multi inverse
-
characteristic including instantaneous and time delay elements.
- Two trip circuit supervision relay
- Two restricted earth fault relays (1 for 150 kV & 1 for 20 kV side)
- One neutral earth fault overcurrent relay
- One tripping relay with reset
- Two master trip
- Two master trip with reset for each tripping circuit
Wiring, terminal block with switches, links, fuses, test facilities, auxiliary relays etc.., to
-
complete the scope of work.
2,9 Control cubicle for 150/20 kV transformer comprising: 1 set 4.954.035,00 4.954.035,00
One set of wiring including connection to interface marshalling cubicle(s), terminal block
with switches,links, fuses, test facilities etc.., to complete the scope of work.
Note : Two group alarm annunciator shall be provided for transformer alarm
and transformer trip.
2,10 Transformer regulation panel installed at control room comprising: 1 set 4.954.035,00 4.954.035,00
- One 20 kV voltmeter with 3 phase selector switch
- One set alarm annunciator
- One set transformer regulation relays and facilities
One set of wiring including connection to interface marshalling cubicle(s), terminal block
-
with switches, links, fuses, test facilities etc.., to complete the scope work.
- One set transformer regulation relays and facilities
One set of wiring including connection to interface marshalling cubicle(s), terminal block
-
with switches, links, fuses, test facilities etc.., to complete the scope work.
Note : Individual alarm and trip annunciator window for the transformer shall
be provided.
2,9 Marshalling kiosk for 150/20 kV transformer bay. 1 set 3.822.390,00 3.822.390,00
2,10 Adaptation and interface with existing busbar protection, automation substation (if any). 1 set 3.271.393,00 3.271.393,00
LV Power and Control Cable, power cable and necessary equipment to complete the specified
2,11 1 set 39.518.175,00 39.518.175,00
scope of work.
150/20 kV, 60 MVA 3-Phase Power Transformer complete with necessary accessories and
3,1 1 unit 269.212.076,00 269.212.076,00 Incl oil purification
supporting structure for mounting 150 kV and 20 kV NCT.
Single phase neutral CT for 20 kV Side Class X, 2000-1000/ 5 A complete with clamps for
3,2 restricted earth fault protection suitable for mounting outdoor on transformer tank or can be put 1 unit 2.752.517,00 2.752.517,00
inside the 20 kV neutral earthing resistor cubicle.
Single phase neutral CT for 20 kV side class 10P20, 1000/5 A complete with clamps for neutral
3,3 earth fault protection, suitable for mounting outdoor on transformer tank or can be put inside the NA unit
20 kV neutral earthing resistor cubicle.
Single phase neutral CT for 150 kV Side Class X, 150-300/ 1 A complete with clamps for
3,4 1 unit 2.752.517,00 2.752.517,00
restricted earth fault protection, suitable for mounting outdoor on transformer tank.
3,5 20 kV Stainless steel neutral earthing resistor rated 12 Ohms, 30 Seconds. NA set
3,6 Transformer Blast and Fire Prevention equipment. 1 set - -
3,7 Dismantling power transformer, power cable, cubicle 20 kV etc. (if any) 1 lot 16.511.392,00 16.511.392,00
4 x 630 sqmm ALU 20 kV XLPE power cable/phase between 150/20 kV power transformer and
4,1 20 kV incoming cubicle, including cable support, 20 kV post insulators, metal bars, cable 1 sets 16.511.392,00 16.511.392,00
terminations and accessories, cable rack, etc to complete scope of work.
Consisting of :
Post Steel Structure NA sets
Beam steel structure NA sets
Double busbar scheme 1 x ALMALEC 1140 sqmm and branch conductor to complete the
1.2 NA set
specified scope of work.
150 kV double tension string and single suspension insulators complete with fittings for
1.3 NA bays
installation of the main busbar as specified.
150 kV Post Insulators complete with supporting structure for installation of the main busbar as
1,4 NA pcs
specified.
Clamps, connectors and accessories for the installation of the main busbar to complete the
1.5 NA set
scope of work.
Conductor for shield wire and accessories for installation of the shield wire to complete the
1,6 NA set
scope of work.
Miscellaneous equipment and material to complete the scope of work for substation earthing
1,7 grid and earthing circuit required such as copper conductors, rods, clamps and connectors for NA set
connection to main substation earthing circuit and to individual item
Miscellaneous equipment and material to complete the scope of work for substation earthing
1,8 circuit required such as copper conductor, clamps and connectors for connection to main NA set
substation earthing circuit and to individual item of equipment and structur
(Note : The substation earthing grid already exists)
2,1 3-phase conductor, clamp for transformer bay as specified. 1 set 5.396.209,00 5.396.209,00
150 kV Single Tension String and Single Suspension Insulators complete with fittings,
2,2 clamps and connectors, etc suitable for connecting the individual items of circuit to 1 set 2.388.277,00 2.388.277,00
complete the scope of work.
Conductor for shield wire and accessories for installation of transformer bay shield wire to
2,3 NA set
complete the scope of work.
150 kV 3 Phase disconnecting switch motor operated, 40 kA 1250 A without earthing switch,
2,4 NA unit
complete with clamps and supporting structure for 150/20 kV transformer bay.
150 kV 3 Phase SF6 circuit breaker 40 kA 1250 A, complete with clamps and supporting
2,5 NA unit
structure for 150/20 kV transformer bay.
150 kV Current Transformer for 150/20 kV transformer bay complete with clamps and
2,6 3 unit 5.320.955,00 15.962.865,00
supporting structure comprising:
Core 1 : 150-300/ 1 A, Class X for transformer biased differential protection and restricted
earth fault protection.
Core 2 : 150-300/ 1 A, 30 VA Class 5P20 + Class 1 for overcurrent protection, earth fault
protection, instrument and metering devices.
Core 3Core 3 : 2000-1000/ 1 A, Class X for check bus zone protection.
Core 4Core 4 : 2000-1000/ 1 A, Class X for main bus zone protection
2,7 150 kV Lightning Arrester, 10 kA, complete with clamp, supporting structure and surge counter. 3 unit 5.779.296,00 17.337.888,00
2,8 Protection cubicle for 150/20 kV transformer comprising: 1 set 4.954.035,00 4.954.035,00
- Three pole biased differential protection including interposing CT and test facilities.
Three pole overcurrent and one pole earth fault protection with multi inverse
-
characteristic including instantaneous and time delay elements.
- Two trip circuit supervision relay
- Two restricted earth fault relays (1 for 150 kV & 1 for 20 kV side)
- One neutral earth fault overcurrent relay
- One tripping relay with reset
- Two master trip
- Two master trip with reset for each tripping circuit
Wiring, terminal block with switches, links, fuses, test facilities, auxiliary relays etc.., to
-
complete the scope of work.
2,9 Control cubicle for 150/20 kV transformer comprising: 1 set 4.954.035,00 4.954.035,00
One set of wiring including connection to interface marshalling cubicle(s), terminal block
with switches,links, fuses, test facilities etc.., to complete the scope of work.
Note : Two group alarm annunciator shall be provided for transformer alarm
and transformer trip.
2,10 Transformer regulation panel installed at control room comprising: 1 set 4.954.035,00 4.954.035,00
- One 20 kV voltmeter with 3 phase selector switch
- One set alarm annunciator
- One set transformer regulation relays and facilities
One set of wiring including connection to interface marshalling cubicle(s), terminal block
-
with switches, links, fuses, test facilities etc.., to complete the scope work.
- One set transformer regulation relays and facilities
One set of wiring including connection to interface marshalling cubicle(s), terminal block
-
with switches, links, fuses, test facilities etc.., to complete the scope work.
Note : Individual alarm and trip annunciator window for the transformer shall
be provided.
150/20 kV, 60 MVA 3-Phase Power Transformer complete with necessary accessories and
3,1 1 unit 269.212.076,00 269.212.076,00 Incl oil purification
supporting structure for mounting 150 kV and 20 kV NCT.
Single phase neutral CT for 20 kV Side Class X, 2000-1000/ 5 A complete with clamps for
3,2 restricted earth fault protection suitable for mounting outdoor on transformer tank or can be put 1 unit 2.752.517,00 2.752.517,00
inside the 20 kV neutral earthing resistor cubicle.
Single phase neutral CT for 20 kV side class 10P20, 1000/5 A complete with clamps for neutral
3,3 earth fault protection, suitable for mounting outdoor on transformer tank or can be put inside the NA unit
20 kV neutral earthing resistor cubicle.
Single phase neutral CT for 150 kV Side Class X, 150-300/ 1 A complete with clamps for
3,4 1 unit 2.752.517,00 2.752.517,00
restricted earth fault protection, suitable for mounting outdoor on transformer tank.
3,5 20 kV Stainless steel neutral earthing resistor rated 12 Ohms, 30 Seconds. NA set
3,6 Transformer Blast and Fire Prevention equipment. 1 set - -
3,7 Dismantling power transformer, power cable, cubicle 20 kV etc. (if any) 1 lot 16.511.392,00 16.511.392,00
4 x 630 sqmm ALU 20 kV XLPE power cable/phase between 150/20 kV power transformer and
4,1 20 kV incoming cubicle, including cable support, 20 kV post insulators, metal bars, cable 1 sets 16.511.392,00 16.511.392,00
terminations and accessories, cable rack, etc to complete scope of work.
Consisting of :
Post Steel Structure NA sets
Beam steel structure NA sets
Double busbar scheme 1 x ALMALEC 1140 sqmm and branch conductor to complete the
1.2 NA set
specified scope of work.
150 kV double tension string and single suspension insulators complete with fittings for
1.3 NA bays
installation of the main busbar as specified.
150 kV Post Insulators complete with supporting structure for installation of the main busbar as
1,4 NA pcs
specified.
Clamps, connectors and accessories for the installation of the main busbar to complete the
1.5 NA set
scope of work.
Conductor for shield wire and accessories for installation of the shield wire to complete the
1,6 NA set
scope of work.
Miscellaneous equipment and material to complete the scope of work for substation earthing
1,7 grid and earthing circuit required such as copper conductors, rods, clamps and connectors for NA set
connection to main substation earthing circuit and to individual item
Miscellaneous equipment and material to complete the scope of work for substation earthing
1,8 circuit required such as copper conductor, clamps and connectors for connection to main 1 set 5.779.296,00 5.779.296,00
substation earthing circuit and to individual item of equipment and structur
(Note : The substation earthing grid already exists)
2,1 3-phase conductor, clamp for transformer bay as specified. 1 set 5.396.209,00 5.396.209,00
150 kV Single Tension String and Single Suspension Insulators complete with fittings,
2,2 clamps and connectors, etc suitable for connecting the individual items of circuit to 1 set 2.388.277,00 2.388.277,00
complete the scope of work.
Conductor for shield wire and accessories for installation of transformer bay shield wire to
2,3 1 set 1.973.343,00 1.973.343,00
complete the scope of work.
150 kV 3 Phase disconnecting switch motor operated, 40 kA 1250 A without earthing switch,
2,4 2 unit 9.050.689,00 18.101.378,00
complete with clamps and supporting structure for 150/20 kV transformer bay.
150 kV 3 Phase SF6 circuit breaker 40 kA 1250 A, complete with clamps and supporting
2,5 1 unit 12.230.661,00 12.230.661,00
structure for 150/20 kV transformer bay.
150 kV Current Transformer for 150/20 kV transformer bay complete with clamps and
2,6 3 unit 5.320.955,00 15.962.865,00
supporting structure comprising:
Core 1 : 150-300/ 1 A, Class X for transformer biased differential protection and restricted
earth fault protection.
Core 2 : 150-300/ 1 A, 30 VA Class 5P20 + Class 1 for overcurrent protection, earth fault
protection, instrument and metering devices.
Core 3Core 3 : 2000-1000/ 1 A, Class X for check bus zone protection.
Core 4Core 4 : 2000-1000/ 1 A, Class X for main bus zone protection
2,7 150 kV Lightning Arrester, 10 kA, complete with clamp, supporting structure and surge counter. 3 unit 5.779.296,00 17.337.888,00
2,8 Protection cubicle for 150/20 kV transformer comprising: 1 set 4.954.035,00 4.954.035,00
- Three pole biased differential protection including interposing CT and test facilities.
Three pole overcurrent and one pole earth fault protection with multi inverse
-
characteristic including instantaneous and time delay elements.
- Two trip circuit supervision relay
- Two restricted earth fault relays (1 for 150 kV & 1 for 20 kV side)
- One neutral earth fault overcurrent relay
- One tripping relay with reset
- Two master trip
- Two master trip with reset for each tripping circuit
Wiring, terminal block with switches, links, fuses, test facilities, auxiliary relays etc.., to
-
complete the scope of work.
2,9 Control cubicle for 150/20 kV transformer comprising: 1 set 4.954.035,00 4.954.035,00
One set of wiring including connection to interface marshalling cubicle(s), terminal block
with switches,links, fuses, test facilities etc.., to complete the scope of work.
Note : Two group alarm annunciator shall be provided for transformer alarm
and transformer trip.
2,10 Transformer regulation panel installed at control room comprising: 1 set 4.954.035,00 4.954.035,00
- One 20 kV voltmeter with 3 phase selector switch
- One set alarm annunciator
- One set transformer regulation relays and facilities
One set of wiring including connection to interface marshalling cubicle(s), terminal block
-
with switches, links, fuses, test facilities etc.., to complete the scope work.
- One set transformer regulation relays and facilities
One set of wiring including connection to interface marshalling cubicle(s), terminal block
-
with switches, links, fuses, test facilities etc.., to complete the scope work.
Note : Individual alarm and trip annunciator window for the transformer shall
be provided.
2,9 Marshalling kiosk for 150/20 kV transformer bay. 1 set 3.822.390,00 3.822.390,00
2,10 Adaptation and interface with existing busbar protection, automation substation (if any). 1 set 3.271.393,00 3.271.393,00
LV Power and Control Cable, power cable and necessary equipment to complete the specified
2,11 1 set 39.518.175,00 39.518.175,00
scope of work.
150/20 kV, 60 MVA 3-Phase Power Transformer complete with necessary accessories and
3,1 1 unit 269.212.076,00 269.212.076,00 Incl oil purification
supporting structure for mounting 150 kV and 20 kV NCT.
Single phase neutral CT for 20 kV Side Class X, 2000-1000/ 5 A complete with clamps for
3,2 restricted earth fault protection suitable for mounting outdoor on transformer tank or can be put 1 unit 2.752.517,00 2.752.517,00
inside the 20 kV neutral earthing resistor cubicle.
Single phase neutral CT for 20 kV side class 10P20, 1000/5 A complete with clamps for neutral
3,3 earth fault protection, suitable for mounting outdoor on transformer tank or can be put inside the NA unit
20 kV neutral earthing resistor cubicle.
Single phase neutral CT for 150 kV Side Class X, 150-300/ 1 A complete with clamps for
3,4 1 unit 2.752.517,00 2.752.517,00
restricted earth fault protection, suitable for mounting outdoor on transformer tank.
3,5 20 kV Stainless steel neutral earthing resistor rated 12 Ohms, 30 Seconds. NA set
3,6 Transformer Blast and Fire Prevention equipment. 1 set - -
3,7 Dismantling power transformer, power cable, cubicle 20 kV etc. (if any) NA lot
4 x 630 sqmm ALU 20 kV XLPE power cable/phase between 150/20 kV power transformer and
4,1 20 kV incoming cubicle, including cable support, 20 kV post insulators, metal bars, cable 1 sets 16.511.392,00 16.511.392,00
terminations and accessories, cable rack, etc to complete scope of work.
Consisting of :
Post Steel Structure NA sets
Beam steel structure NA sets
Double busbar scheme 1 x ALMALEC 1140 sqmm and branch conductor to complete the
1.2 NA set
specified scope of work.
150 kV double tension string and single suspension insulators complete with fittings for
1.3 NA bays
installation of the main busbar as specified.
150 kV Post Insulators complete with supporting structure for installation of the main busbar as
1,4 NA pcs
specified.
Clamps, connectors and accessories for the installation of the main busbar to complete the
1.5 NA set
scope of work.
Conductor for shield wire and accessories for installation of the shield wire to complete the
1,6 NA set
scope of work.
Miscellaneous equipment and material to complete the scope of work for substation earthing
1,7 grid and earthing circuit required such as copper conductors, rods, clamps and connectors for NA set
connection to main substation earthing circuit and to individual item
Miscellaneous equipment and material to complete the scope of work for substation earthing
1,8 circuit required such as copper conductor, clamps and connectors for connection to main 1 set 5.779.296,00 5.779.296,00
substation earthing circuit and to individual item of equipment and structur
(Note : The substation earthing grid already exists)
2,1 3-phase conductor, clamp for transformer bay as specified. 1 set 5.396.209,00 5.396.209,00
150 kV Single Tension String and Single Suspension Insulators complete with fittings,
2,2 clamps and connectors, etc suitable for connecting the individual items of circuit to 1 set 2.388.277,00 2.388.277,00
complete the scope of work.
Conductor for shield wire and accessories for installation of transformer bay shield wire to
2,3 1 set 1.973.343,00 1.973.343,00
complete the scope of work.
150 kV 3 Phase disconnecting switch motor operated, 40 kA 1250 A without earthing switch,
2,4 2 unit 9.050.689,00 18.101.378,00
complete with clamps and supporting structure for 150/20 kV transformer bay.
150 kV 3 Phase SF6 circuit breaker 40 kA 1250 A, complete with clamps and supporting
2,5 1 unit 12.230.661,00 12.230.661,00
structure for 150/20 kV transformer bay.
150 kV Current Transformer for 150/20 kV transformer bay complete with clamps and
2,6 3 unit 5.320.955,00 15.962.865,00
supporting structure comprising:
Core 1 : 150-300/ 1 A, Class X for transformer biased differential protection and restricted
earth fault protection.
Core 2 : 150-300/ 1 A, 30 VA Class 5P20 + Class 1 for overcurrent protection, earth fault
protection, instrument and metering devices.
Core 3Core 3 : 2000-1000/ 1 A, Class X for check bus zone protection.
Core 4Core 4 : 2000-1000/ 1 A, Class X for main bus zone protection
2,7 150 kV Lightning Arrester, 10 kA, complete with clamp, supporting structure and surge counter. 3 unit 5.779.296,00 17.337.888,00
2,8 Protection cubicle for 150/20 kV transformer comprising: 1 set 4.954.035,00 4.954.035,00
- Three pole biased differential protection including interposing CT and test facilities.
Three pole overcurrent and one pole earth fault protection with multi inverse
-
characteristic including instantaneous and time delay elements.
- Two trip circuit supervision relay
- Two restricted earth fault relays (1 for 150 kV & 1 for 20 kV side)
- One neutral earth fault overcurrent relay
- One tripping relay with reset
- Two master trip
- Two master trip with reset for each tripping circuit
Wiring, terminal block with switches, links, fuses, test facilities, auxiliary relays etc.., to
-
complete the scope of work.
2,9 Control cubicle for 150/20 kV transformer comprising: 1 set 4.954.035,00 4.954.035,00
One set of wiring including connection to interface marshalling cubicle(s), terminal block
with switches,links, fuses, test facilities etc.., to complete the scope of work.
Note : Two group alarm annunciator shall be provided for transformer alarm
and transformer trip.
2,10 Transformer regulation panel installed at control room comprising: 1 set 4.954.035,00 4.954.035,00
- One 20 kV voltmeter with 3 phase selector switch
- One set alarm annunciator
- One set transformer regulation relays and facilities
One set of wiring including connection to interface marshalling cubicle(s), terminal block
-
with switches, links, fuses, test facilities etc.., to complete the scope work.
- One set transformer regulation relays and facilities
One set of wiring including connection to interface marshalling cubicle(s), terminal block
-
with switches, links, fuses, test facilities etc.., to complete the scope work.
Note : Individual alarm and trip annunciator window for the transformer shall
be provided.
2,9 Marshalling kiosk for 150/20 kV transformer bay. 1 set 3.822.390,00 3.822.390,00
2,10 Adaptation and interface with existing busbar protection, automation substation (if any). 1 set 3.271.393,00 3.271.393,00
LV Power and Control Cable, power cable and necessary equipment to complete the specified
2,11 1 set 39.518.175,00 39.518.175,00
scope of work.
150/20 kV, 60 MVA 3-Phase Power Transformer complete with necessary accessories and
3,1 1 unit 269.212.076,00 269.212.076,00 Incl oil purification
supporting structure for mounting 150 kV and 20 kV NCT.
Single phase neutral CT for 20 kV Side Class X, 2000-1000/ 5 A complete with clamps for
3,2 restricted earth fault protection suitable for mounting outdoor on transformer tank or can be put 1 unit 2.752.517,00 2.752.517,00
inside the 20 kV neutral earthing resistor cubicle.
Single phase neutral CT for 20 kV side class 10P20, 1000/5 A complete with clamps for neutral
3,3 earth fault protection, suitable for mounting outdoor on transformer tank or can be put inside the NA unit
20 kV neutral earthing resistor cubicle.
Single phase neutral CT for 150 kV Side Class X, 150-300/ 1 A complete with clamps for
3,4 1 unit 2.752.517,00 2.752.517,00
restricted earth fault protection, suitable for mounting outdoor on transformer tank.
3,5 20 kV Stainless steel neutral earthing resistor rated 12 Ohms, 30 Seconds. NA set
3,6 Transformer Blast and Fire Prevention equipment. 1 set - -
3,7 Dismantling power transformer, power cable, cubicle 20 kV etc. (if any) NA lot
4 x 630 sqmm ALU 20 kV XLPE power cable/phase between 150/20 kV power transformer and
4,1 20 kV incoming cubicle, including cable support, 20 kV post insulators, metal bars, cable 1 sets 24.767.088,00 24.767.088,00
terminations and accessories, cable rack, etc to complete scope of work.
Consisting of :
Post Steel Structure NA sets
Beam steel structure NA sets
Double busbar scheme 1 x ALMALEC 1140 sqmm and branch conductor to complete the
1.2 NA set
specified scope of work.
150 kV double tension string and single suspension insulators complete with fittings for
1.3 NA bays
installation of the main busbar as specified.
150 kV Post Insulators complete with supporting structure for installation of the main busbar as
1,4 NA pcs
specified.
Clamps, connectors and accessories for the installation of the main busbar to complete the
1.5 NA set
scope of work.
Conductor for shield wire and accessories for installation of the shield wire to complete the
1,6 NA set
scope of work.
Miscellaneous equipment and material to complete the scope of work for substation earthing
1,7 grid and earthing circuit required such as copper conductors, rods, clamps and connectors for NA set
connection to main substation earthing circuit and to individual item
Miscellaneous equipment and material to complete the scope of work for substation earthing
1,8 circuit required such as copper conductor, clamps and connectors for connection to main NA set
substation earthing circuit and to individual item of equipment and structur
(Note : The substation earthing grid already exists)
150 kV 3 Phase disconnecting switch motor operated, 40 kA 1250 A without earthing switch,
2,4 NA unit
complete with clamps and supporting structure for 150/20 kV transformer bay.
150 kV 3 Phase SF6 circuit breaker 40 kA 1250 A, complete with clamps and supporting
2,5 NA unit
structure for 150/20 kV transformer bay.
150 kV Current Transformer for 150/20 kV transformer bay complete with clamps and
2,6 3 unit 5.320.955,00 15.962.865,00
supporting structure comprising:
Core 1 : 150-300/ 1 A, Class X for transformer biased differential protection and restricted
earth fault protection.
Core 2 : 150-300/ 1 A, 30 VA Class 5P20 + Class 1 for overcurrent protection, earth fault
protection, instrument and metering devices.
Core 3Core 3 : 2000-1000/ 1 A, Class X for check bus zone protection.
Core 4Core 4 : 2000-1000/ 1 A, Class X for main bus zone protection
2,7 150 kV Lightning Arrester, 10 kA, complete with clamp, supporting structure and surge counter. NA unit
One set of wiring including connection to interface marshalling cubicle(s), terminal block
with switches,links, fuses, test facilities etc.., to complete the scope of work.
Note : Two group alarm annunciator shall be provided for transformer alarm
and transformer trip.
2,10 Transformer regulation panel installed at control room comprising: 1 set 4.954.035,00 4.954.035,00
- One 20 kV voltmeter with 3 phase selector switch
- One set alarm annunciator
- One set transformer regulation relays and facilities
One set of wiring including connection to interface marshalling cubicle(s), terminal block
-
with switches, links, fuses, test facilities etc.., to complete the scope work.
- One set transformer regulation relays and facilities
One set of wiring including connection to interface marshalling cubicle(s), terminal block
-
with switches, links, fuses, test facilities etc.., to complete the scope work.
Note : Individual alarm and trip annunciator window for the transformer shall
be provided.
150/20 kV, 60 MVA 3-Phase Power Transformer complete with necessary accessories and
3,1 1 unit 269.212.076,00 269.212.076,00 Incl oil purification
supporting structure for mounting 150 kV and 20 kV NCT.
Single phase neutral CT for 20 kV Side Class X, 2000-1000/ 5 A complete with clamps for
3,2 restricted earth fault protection suitable for mounting outdoor on transformer tank or can be put 1 unit 2.752.517,00 2.752.517,00
inside the 20 kV neutral earthing resistor cubicle.
Single phase neutral CT for 20 kV side class 10P20, 1000/5 A complete with clamps for neutral
3,3 earth fault protection, suitable for mounting outdoor on transformer tank or can be put inside the NA unit
20 kV neutral earthing resistor cubicle.
Single phase neutral CT for 150 kV Side Class X, 150-300/ 1 A complete with clamps for
3,4 1 unit 2.752.517,00 2.752.517,00
restricted earth fault protection, suitable for mounting outdoor on transformer tank.
3,5 20 kV Stainless steel neutral earthing resistor rated 12 Ohms, 30 Seconds. NA set
3,6 Transformer Blast and Fire Prevention equipment. 1 set - -
3,7 Dismantling power transformer, power cable, cubicle 20 kV etc. (if any) 1 lot 16.511.392,00 16.511.392,00
4 x 630 sqmm ALU 20 kV XLPE power cable/phase between 150/20 kV power transformer and
4,1 20 kV incoming cubicle, including cable support, 20 kV post insulators, metal bars, cable 1 sets 24.767.088,00 24.767.088,00
terminations and accessories, cable rack, etc to complete scope of work.
Consisting of :
Post Steel Structure NA sets
Beam steel structure NA sets
Double busbar scheme 1 x ALMALEC 1140 sqmm and branch conductor to complete the
1.2 NA set
specified scope of work.
150 kV double tension string and single suspension insulators complete with fittings for
1.3 NA bays
installation of the main busbar as specified.
150 kV Post Insulators complete with supporting structure for installation of the main busbar as
1,4 NA pcs
specified.
Clamps, connectors and accessories for the installation of the main busbar to complete the
1.5 NA set
scope of work.
Conductor for shield wire and accessories for installation of the shield wire to complete the
1,6 NA set
scope of work.
Miscellaneous equipment and material to complete the scope of work for substation earthing
1,7 grid and earthing circuit required such as copper conductors, rods, clamps and connectors for NA set
connection to main substation earthing circuit and to individual item
Miscellaneous equipment and material to complete the scope of work for substation earthing
1,8 circuit required such as copper conductor, clamps and connectors for connection to main 1 set 5.779.296,00 5.779.296,00
substation earthing circuit and to individual item of equipment and structur
(Note : The substation earthing grid already exists)
150 kV 3 Phase disconnecting switch motor operated, 40 kA 1250 A without earthing switch,
2,4 NA unit
complete with clamps and supporting structure for 150/20 kV transformer bay.
150 kV 3 Phase SF6 circuit breaker 40 kA 1250 A, complete with clamps and supporting
2,5 NA unit
structure for 150/20 kV transformer bay.
150 kV Current Transformer for 150/20 kV transformer bay complete with clamps and
2,6 3 unit 5.320.955,00 15.962.865,00
supporting structure comprising:
Core 1 : 150-300/ 1 A, Class X for transformer biased differential protection and restricted
earth fault protection.
Core 2 : 150-300/ 1 A, 30 VA Class 5P20 + Class 1 for overcurrent protection, earth fault
protection, instrument and metering devices.
Core 3Core 3 : 2000-1000/ 1 A, Class X for check bus zone protection.
Core 4Core 4 : 2000-1000/ 1 A, Class X for main bus zone protection
2,7 150 kV Lightning Arrester, 10 kA, complete with clamp, supporting structure and surge counter. NA unit
2,8 Protection cubicle for 150/20 kV transformer comprising: 1 set 4.954.035,00 4.954.035,00
- Three pole biased differential protection including interposing CT and test facilities.
Three pole overcurrent and one pole earth fault protection with multi inverse
-
characteristic including instantaneous and time delay elements.
- Two trip circuit supervision relay
- Two restricted earth fault relays (1 for 150 kV & 1 for 20 kV side)
- One neutral earth fault overcurrent relay
- One tripping relay with reset
- Two master trip
- Two master trip with reset for each tripping circuit
Wiring, terminal block with switches, links, fuses, test facilities, auxiliary relays etc.., to
-
complete the scope of work.
2,9 Control cubicle for 150/20 kV transformer comprising: NA set
One set of wiring including connection to interface marshalling cubicle(s), terminal block
with switches,links, fuses, test facilities etc.., to complete the scope of work.
Note : Two group alarm annunciator shall be provided for transformer alarm
and transformer trip.
2,10 Transformer regulation panel installed at control room comprising: 1 set 4.954.035,00 4.954.035,00
- One 20 kV voltmeter with 3 phase selector switch
- One set alarm annunciator
- One set transformer regulation relays and facilities
One set of wiring including connection to interface marshalling cubicle(s), terminal block
-
with switches, links, fuses, test facilities etc.., to complete the scope work.
- One set transformer regulation relays and facilities
One set of wiring including connection to interface marshalling cubicle(s), terminal block
-
with switches, links, fuses, test facilities etc.., to complete the scope work.
Note : Individual alarm and trip annunciator window for the transformer shall
be provided.
150/20 kV, 60 MVA 3-Phase Power Transformer complete with necessary accessories and
3,1 1 unit 269.212.076,00 269.212.076,00 Incl oil purification
supporting structure for mounting 150 kV and 20 kV NCT.
Single phase neutral CT for 20 kV Side Class X, 2000-1000/ 5 A complete with clamps for
3,2 restricted earth fault protection suitable for mounting outdoor on transformer tank or can be put 1 unit 2.752.517,00 2.752.517,00
inside the 20 kV neutral earthing resistor cubicle.
Single phase neutral CT for 20 kV side class 10P20, 1000/5 A complete with clamps for neutral
3,3 earth fault protection, suitable for mounting outdoor on transformer tank or can be put inside the NA unit
20 kV neutral earthing resistor cubicle.
Single phase neutral CT for 150 kV Side Class X, 150-300/ 1 A complete with clamps for
3,4 1 unit 2.752.517,00 2.752.517,00
restricted earth fault protection, suitable for mounting outdoor on transformer tank.
3,5 20 kV Stainless steel neutral earthing resistor rated 12 Ohms, 30 Seconds. NA set
3,6 Transformer Blast and Fire Prevention equipment. 1 set - -
3,7 Dismantling power transformer, power cable, cubicle 20 kV etc. (if any) 1 lot 16.511.392,00 16.511.392,00
4 x 630 sqmm ALU 20 kV XLPE power cable/phase between 150/20 kV power transformer and
4,1 20 kV incoming cubicle, including cable support, 20 kV post insulators, metal bars, cable 1 sets 24.767.088,00 24.767.088,00
terminations and accessories, cable rack, etc to complete scope of work.
Consisting of :
Post Steel Structure NA sets
Beam steel structure NA sets
Double busbar scheme 1 x ALMALEC 1140 sqmm and branch conductor to complete the
1.2 NA set
specified scope of work.
150 kV double tension string and single suspension insulators complete with fittings for
1.3 NA bays
installation of the main busbar as specified.
150 kV Post Insulators complete with supporting structure for installation of the main busbar as
1,4 NA pcs
specified.
Clamps, connectors and accessories for the installation of the main busbar to complete the
1.5 NA set
scope of work.
Conductor for shield wire and accessories for installation of the shield wire to complete the
1,6 NA set
scope of work.
Miscellaneous equipment and material to complete the scope of work for substation earthing
1,7 grid and earthing circuit required such as copper conductors, rods, clamps and connectors for NA set
connection to main substation earthing circuit and to individual item
Miscellaneous equipment and material to complete the scope of work for substation earthing
1,8 circuit required such as copper conductor, clamps and connectors for connection to main 1 set 5.779.296,00 5.779.296,00
substation earthing circuit and to individual item of equipment and structur
(Note : The substation earthing grid already exists)
150 kV 3 Phase disconnecting switch motor operated, 40 kA 1250 A without earthing switch,
2,4 NA unit
complete with clamps and supporting structure for 150/20 kV transformer bay.
150 kV 3 Phase SF6 circuit breaker 40 kA 1250 A, complete with clamps and supporting
2,5 NA unit
structure for 150/20 kV transformer bay.
150 kV Current Transformer for 150/20 kV transformer bay complete with clamps and
2,6 3 unit 5.320.955,00 15.962.865,00
supporting structure comprising:
Core 1 : 150-300/ 1 A, Class X for transformer biased differential protection and restricted
earth fault protection.
Core 2 : 150-300/ 1 A, 30 VA Class 5P20 + Class 1 for overcurrent protection, earth fault
protection, instrument and metering devices.
Core 3Core 3 : 2000-1000/ 1 A, Class X for check bus zone protection.
Core 4Core 4 : 2000-1000/ 1 A, Class X for main bus zone protection
2,7 150 kV Lightning Arrester, 10 kA, complete with clamp, supporting structure and surge counter. NA unit
2,8 Protection cubicle for 150/20 kV transformer comprising: 1 set 4.954.035,00 4.954.035,00
- Three pole biased differential protection including interposing CT and test facilities.
Three pole overcurrent and one pole earth fault protection with multi inverse
-
characteristic including instantaneous and time delay elements.
- Two trip circuit supervision relay
- Two restricted earth fault relays (1 for 150 kV & 1 for 20 kV side)
- One neutral earth fault overcurrent relay
- One tripping relay with reset
- Two master trip
- Two master trip with reset for each tripping circuit
Wiring, terminal block with switches, links, fuses, test facilities, auxiliary relays etc.., to
-
complete the scope of work.
2,9 Control cubicle for 150/20 kV transformer comprising: NA set
One set of wiring including connection to interface marshalling cubicle(s), terminal block
with switches,links, fuses, test facilities etc.., to complete the scope of work.
Note : Two group alarm annunciator shall be provided for transformer alarm
and transformer trip.
2,10 Transformer regulation panel installed at control room comprising: 1 set 4.954.035,00 4.954.035,00
- One 20 kV voltmeter with 3 phase selector switch
- One set alarm annunciator
- One set transformer regulation relays and facilities
One set of wiring including connection to interface marshalling cubicle(s), terminal block
-
with switches, links, fuses, test facilities etc.., to complete the scope work.
- One set transformer regulation relays and facilities
One set of wiring including connection to interface marshalling cubicle(s), terminal block
-
with switches, links, fuses, test facilities etc.., to complete the scope work.
Note : Individual alarm and trip annunciator window for the transformer shall
be provided.
150/20 kV, 60 MVA 3-Phase Power Transformer complete with necessary accessories and
3,1 1 unit 269.212.076,00 269.212.076,00 Incl oil purification
supporting structure for mounting 150 kV and 20 kV NCT.
Single phase neutral CT for 20 kV Side Class X, 2000-1000/ 5 A complete with clamps for
3,2 restricted earth fault protection suitable for mounting outdoor on transformer tank or can be put 1 unit 2.752.517,00 2.752.517,00
inside the 20 kV neutral earthing resistor cubicle.
Single phase neutral CT for 20 kV side class 10P20, 1000/5 A complete with clamps for neutral
3,3 earth fault protection, suitable for mounting outdoor on transformer tank or can be put inside the NA unit
20 kV neutral earthing resistor cubicle.
Single phase neutral CT for 150 kV Side Class X, 150-300/ 1 A complete with clamps for
3,4 1 unit 2.752.517,00 2.752.517,00
restricted earth fault protection, suitable for mounting outdoor on transformer tank.
3,5 20 kV Stainless steel neutral earthing resistor rated 12 Ohms, 30 Seconds. NA set
3,6 Transformer Blast and Fire Prevention equipment. 1 set - -
3,7 Dismantling power transformer, power cable, cubicle 20 kV etc. (if any) NA lot
4 x 630 sqmm ALU 20 kV XLPE power cable/phase between 150/20 kV power transformer and
4,1 20 kV incoming cubicle, including cable support, 20 kV post insulators, metal bars, cable 1 sets 24.767.088,00 24.767.088,00
terminations and accessories, cable rack, etc to complete scope of work.
Consisting of :
Post Steel Structure NA sets
Beam steel structure NA sets
Double busbar scheme 1 x ALMALEC 1140 sqmm and branch conductor to complete the
1.2 NA set
specified scope of work.
150 kV double tension string and single suspension insulators complete with fittings for
1.3 NA bays
installation of the main busbar as specified.
150 kV Post Insulators complete with supporting structure for installation of the main busbar as
1,4 NA pcs
specified.
Clamps, connectors and accessories for the installation of the main busbar to complete the
1.5 NA set
scope of work.
Conductor for shield wire and accessories for installation of the shield wire to complete the
1,6 NA set
scope of work.
Miscellaneous equipment and material to complete the scope of work for substation earthing
1,7 grid and earthing circuit required such as copper conductors, rods, clamps and connectors for NA set
connection to main substation earthing circuit and to individual item
Miscellaneous equipment and material to complete the scope of work for substation earthing
1,8 circuit required such as copper conductor, clamps and connectors for connection to main NA set
substation earthing circuit and to individual item of equipment and structur
(Note : The substation earthing grid already exists)
150 kV 3 Phase disconnecting switch motor operated, 40 kA 1250 A without earthing switch,
2,4 NA unit
complete with clamps and supporting structure for 150/20 kV transformer bay.
150 kV 3 Phase SF6 circuit breaker 40 kA 1250 A, complete with clamps and supporting
2,5 NA unit
structure for 150/20 kV transformer bay.
150 kV Current Transformer for 150/20 kV transformer bay complete with clamps and
2,6 NA unit
supporting structure comprising:
Core 1 : 150-300/ 1 A, Class X for transformer biased differential protection and restricted
earth fault protection.
Core 2 : 150-300/ 1 A, 30 VA Class 5P20 + Class 1 for overcurrent protection, earth fault
protection, instrument and metering devices.
Core 3Core 3 : 2000-1000/ 1 A, Class X for check bus zone protection.
Core 4Core 4 : 2000-1000/ 1 A, Class X for main bus zone protection
2,7 150 kV Lightning Arrester, 10 kA, complete with clamp, supporting structure and surge counter. NA unit
2,8 Protection cubicle for 150/20 kV transformer comprising: 1 set 4.954.035,00 4.954.035,00
- Three pole biased differential protection including interposing CT and test facilities.
Three pole overcurrent and one pole earth fault protection with multi inverse
-
characteristic including instantaneous and time delay elements.
- Two trip circuit supervision relay
- Two restricted earth fault relays (1 for 150 kV & 1 for 20 kV side)
- One neutral earth fault overcurrent relay
- One tripping relay with reset
- Two master trip
- Two master trip with reset for each tripping circuit
Wiring, terminal block with switches, links, fuses, test facilities, auxiliary relays etc.., to
-
complete the scope of work.
2,9 Control cubicle for 150/20 kV transformer comprising: 1 set 4.954.035,00 4.954.035,00
One set of wiring including connection to interface marshalling cubicle(s), terminal block
with switches,links, fuses, test facilities etc.., to complete the scope of work.
Note : Two group alarm annunciator shall be provided for transformer alarm
and transformer trip.
2,10 Transformer regulation panel installed at control room comprising: 1 set 4.954.035,00 4.954.035,00
- One 20 kV voltmeter with 3 phase selector switch
- One set alarm annunciator
- One set transformer regulation relays and facilities
One set of wiring including connection to interface marshalling cubicle(s), terminal block
-
with switches, links, fuses, test facilities etc.., to complete the scope work.
- One set transformer regulation relays and facilities
One set of wiring including connection to interface marshalling cubicle(s), terminal block
-
with switches, links, fuses, test facilities etc.., to complete the scope work.
Note : Individual alarm and trip annunciator window for the transformer shall
be provided.
150/20 kV, 60 MVA 3-Phase Power Transformer complete with necessary accessories and
3,1 1 unit 269.212.076,00 269.212.076,00 Incl oil purification
supporting structure for mounting 150 kV and 20 kV NCT.
Single phase neutral CT for 20 kV Side Class X, 2000-1000/ 5 A complete with clamps for
3,2 restricted earth fault protection suitable for mounting outdoor on transformer tank or can be put 1 unit 2.752.517,00 2.752.517,00
inside the 20 kV neutral earthing resistor cubicle.
Single phase neutral CT for 20 kV side class 10P20, 1000/5 A complete with clamps for neutral
3,3 earth fault protection, suitable for mounting outdoor on transformer tank or can be put inside the NA unit
20 kV neutral earthing resistor cubicle.
Single phase neutral CT for 150 kV Side Class X, 150-300/ 1 A complete with clamps for
3,4 1 unit 2.752.517,00 2.752.517,00
restricted earth fault protection, suitable for mounting outdoor on transformer tank.
3,5 20 kV Stainless steel neutral earthing resistor rated 12 Ohms, 30 Seconds. NA set
3,6 Transformer Blast and Fire Prevention equipment. 1 set - -
3,7 Dismantling power transformer, power cable, cubicle 20 kV etc. (if any) NA lot
4 x 630 sqmm ALU 20 kV XLPE power cable/phase between 150/20 kV power transformer and
4,1 20 kV incoming cubicle, including cable support, 20 kV post insulators, metal bars, cable 1 sets 16.511.392,00 16.511.392,00
terminations and accessories, cable rack, etc to complete scope of work.