Sei sulla pagina 1di 4

CURRICULUM VITAE

PERSONAL DETAILS

Name : Fajar Ario Prayoga


Place/Date of Birth : Gresik, 23 April 1989
Address : Lingkungan Nenggala Dalegan, RT 003/ RW
002, Panceng Gresik
Religion : Moslem
Gender : Male
Citizen : Indonesia
Cellphone : 0856-5511-0837
E-mail : fajarramadhan45@gmail.com

EDUCATION
1995-2001 : State Elementary School Dalegan Panceng
Gresik
2001-2004 : State Junior High School 1 Panceng
2004-2008 : State Junior High School 1 Sidayu
2008-2014 : Geodetic engineering, Malang Technology
Institute

SKILL
Software Skill :
Computer Application: Microsoft Office
Application GIS : ArcGIS, ArcView and AutoCAD Map, Land Development
Application GPS : GARMIN
Measuring Instrument Skill:
Waterpass, Theodolite, Total Station, GPS.

FOREIGN LANGUAGES
English :
Oral : active
Writing : active

JOB EXPERIENCES

2016
Project : Survey Of Coal Point Exploration (Stake Out)
Location : Jambi
Company : PT. Intitirta Primasakti
Position Assignment : Surveyor
Status : Freelance

2015
Project : Topographic Mapping
Location : Bali
Company : Kubon Intaran Geosurvey Architecture and Landscape
Position Assignment : Surveyor
Status : Freelance

2014
Project : Topographic Mapping For The Opening Of Industrial Land
Location : Purwakarta District
Company : PT. Golden Buana Lestari
Position Assignment : Surveyor
Status : Contract

2012
Project : Interpretasi dan digitasi citra
Location : Housing Permata Jingga Malang
Company : PT. Batuville Internasional
Position Assignment : Surveyor
Status : Freelance

2012

Project : Measurement Of Clean Water Pipeline (PDAM)

Location : Gresik District Lamongan District


Company : CV. ADI HUTAMA
Job Description : Coordinate Technical Surveys Of Topographic Measurement,
Long/Cross Section. Process The Data And Present The Results
Position Assignment : Surveyor
Status : Freelance

2012
Project :Validasi Pemetaan Tanah Eks Bengkok
Location : Blitar City
Company : PT DATA TERRA SURVAITAMA,
Job Description : Conducting Measurement And Mapping Of Blitar City Government
Assets. Process The Data And Present The Results
Position Assignment : Field Coordinator
Status : Freelance

2011
Project :SID Countermeasures Damage Mount Semeru
Location : Lumajang District
Company : PT. Raya Konsultan
Job Description : Coordinate Technical Survey On Typography Measurement,
Long/Cross Section. Process the Data and Present the Results
Position Assignment : Surveyor
Status : Freelance

2011
Project : SID Improvement of Pond Water Treatment Network
Location : Bangil District and Kraton Pasuruan District
Company : PT. Puser Bumi
Job Description : Coordinate Technical Survey On Typography Measurement,
Long/Cross Section. Process the Data and Present the Results.
Position Assignment : Surveyor
Status: : Freelance

Fajar Ario Prayoga

Potrebbero piacerti anche