Project AVL
S.NO. PROJECT ID PROJECT TITLE
Details
Design and analysis of integrally and riveted stiffened View
1. B03-STW001
metallic panel
Study & analysis of resin infusion process for thick curved View
3. B03-STW003
panel
4.
B03-STW004 Compounding of EPDM with aramid fibers View
View
15. B03-RIW002 Wireless data transmission (multi channel)
21. B03-SEW002 Multi-body flexible analysis of solar panel and hinge View
View
27. B03-SARW004 Satellite based water quality assessment
UP
PROJECT TITLE DESIGN AND ANALYSIS OF INTEGRALLY AND RIVETED
(B03-STW001) STIFFENED METALLIC PANEL.
Determine the Stress Intensity Factor (SIF) for integrally and riveted
OBJECTIVES
stiffened metallic panel using Finite Element Method.
PROJECT TITLE UP
DESIGN OF A FUEL TANK FOR SPACE VEHICLE
(B03-STW002)
PROJECT TITLE DESIGN AND ANALYSIS OF INTEGRALLY AND RIVETED
(B03-STW001) STIFFENED METALLIC PANEL.
Space vehicles need a thrust generation element for its attitude control
and maneuvering. This thrust is normally generated by expanding a
3-D finite element modeling of both types of stiffened panel would be
pressurized fuel, gas or it combustion/decomposed products through
carried in ANSYS and then detailed FEA would be performed. SIF would
PROJECT OUTLINE thruster nozzles. The pressurized fuel or gas is stored in a fuel tank.
be calculated for both types of panels using ANSYS. Crack growth
PROJECT OUTLINE In this project, i) a spherical flange-type fuel tank is to be designed for
characteristic of both types of stiffened panel would be compared and
10litre capacity with MEOP of 35bars and ii) Detailed FEA of designed
finally load bearing capability of both types of stiffened panel would be
fuel tank is to be carried out on any available FEA solver.
calculated.
PROJECT TITLE STUDY & ANALYSIS OF RESIN INFUSION PROCESS FOR THICK
(B03-STW003) CURVED PANEL. UP
PROJECT TITLE UP
COMPOUNDING OF EPDM WITH ARAMID FIBERS
(B03-STW004 )
MAJOR EQUIPMENT & Rubber Mixing Mill, Rubber curing facility, Tensile Testing Machine,
SOFTWARE REQUIRED MDR,
UP
Detailed Report
Analysis Results / Properties, Pictures, Movie/Clip of project and
DELIVERABLES
Presentation
Comprehensive report
Design and analysis data, Pictures, Movie/Clip of project and
DELIVERABLES
Presentation
UP
PROJECT TITLE AERO-THERMAL MODELING AND ANALYSIS OF SATELLITE
(B03-STW007) FAIRINGS IN CONTINUUM REGION
UP
PROJECT TITLE MEASUREMENT CAPABILITY STUDY TO EVALUATE
(B03-STW010) REPEATABILITY & REPRODUCIBILITY ERRORS
Literature review
Sample selection
Data collection
PROJECT OUTLINE
Experimentation
Data Analysis
Results & Conclusion
UP
PROJECT TITLE SYNTHESIS OF SUBSTITUTED HEXAGONAL NANO
(B03-STW011) FERRITES
1. Literature review
2. Selection of suitable metal cation for substitution
PROJECT OUTLINE 3. Synthesis of ferrite by wet chemical route
4. Characterization of synthesized ferrites
5. Study of electrical and magnetic properties
ESTIMATED
One year
DURATION
STUDENT PROJECTS (Batch-3, 2014-15)
UP
PROJECT TITLE SATELLITE ORBIT COMPUTATION USING GPS OBSERVABLES
(B03-STW012) (CODE OR PSEUDORANGES)
The GPS observables (code and phase) can be used to compute the
orbits of low earth orbiting (LEO) satellites employing kinematic
approach of orbit determination, which is based on GPS satellite to
satellite tracking. In this project, data from any available source (like
PROJECT OUTLINE
CHAMP) can be utilized to compute the satellite orbit in Earth centered
Earth fixed (ECEF) frame. ECEF coordinates then can be transformed to
compute geodetic coordinates (latitude, longitude and altitude) of
satellite.
UP
PROJECT TITLE
DEVELOPMENT OF LOW SHEAR MODULUS RUBBER
(B03-STW013)
UP
STUDENT PROJECTS (Batch-3, 2014-15)
PROJECT TITLE
RC PWM ELECTRONIC DRIVE WITH VARIABLE FREQUENCY
(B03-RIW001)
ESTIMATED
60 working days
DURATION
UP
STUDENT PROJECTS (Batch-3, 2014-15)
PROJECT TITLE
WIRELESS DATA TRANSMISSION (MULTI CHANNEL)
(B03-RIW002)
Project hardware
Design report, Pictures, Movie/Clip of project and Presentation
DELIVERABLES
ESTIMATED
60 working days
DURATION
UP
STUDENT PROJECTS (Batch-3, 2014-15)
PROJECT TITLE
DESIGNING OF CLINOSTAT
(B03-RIW003)
The main objective of this project is to design and fabricate the 2D/3D
OBJECTIVES
Clinostat
MAJOR EQUIPMENT
Electrical Motors, Bearings, Frames, Motor RPM Controller Matlab, MS
& SOFTWARE
Office
REQUIRED
ESTIMATED 6 Months
DURATION
UP
STUDENT PROJECTS (Batch-3, 2014-15)
UP
STUDENT PROJECTS (Batch-3, 2014-15)
MAJOR EQUIPMENT
Unmanned Ground Vehicle Platform, Cameras, Onboard Embedded
& SOFTWARE
System/ Computer, C++/ C Sharp/ MATLAB
REQUIRED
ESTIMATED
DURATION 1 Year
UP
STUDENT PROJECTS (Batch-3, 2014-15)
MAJOR EQUIPMENT
& SOFTWARE Robotic Toolbox/MATLAB
REQUIRED
ESTIMATED
1 year
DURATION
UP
STUDENT PROJECTS (Batch-3, 2014-15)
UP
STUDENT PROJECTS (Batch-3, 2014-15)
PROJECT TITLE
Multi-body flexible analysis of solar panel and hinge
(B03-SEW002)
Hinges are used for the deployment of solar panels which are
essentially used for the collection of energy. The deflections and
flexible modes for the solar panels and hinges during deployment
PROJECT OUTLINE
will be calculated using FEM + Dynamics software. The analysis
results will be used for structural verification of the solar panel
and hinge models designed by SUPARCO.
Hardware required:
Computer
MAJOR EQUIPMENT &
SOFTWARE REQUIRED
Software Required:
UP
STUDENT PROJECTS (Batch-3, 2014-15)
MAJOR EQUIPMENT & FPGA kit, fault injection circuits, logic analyzers,
SOFTWARE REQUIRED Xilinx ISE, verilog,
UP
STUDENT PROJECTS (Batch-3, 2014-15)
UP
STUDENT PROJECTS (Batch-3, 2014-15)
MAJOR EQUIPMENT & Smartphone including Android, iOS, Symbian and Windows and
SOFTWARE REQUIRED suitable IDE for programming
UP
STUDENT PROJECTS (Batch-3, 2014-15)
Urban sprawl has been a big problem for most of the metropolitan
cities. The utilities / resource management, environmental impact
assessment and the risk analysis have always been the priorities of
urban planning.
PROJECT OUTLINE
In the research, the project objectives would be divided among the
student that would aggregately able to identify the risks and might be
able to come up with a solution
ArcGIS 10.1
MAJOR EQUIPMENT &
Extension : CommunityViz
SOFTWARE REQUIRED
SPOT 5 Satellite Images (2.5 meter) or higher
UP
STUDENT PROJECTS (Batch-3, 2014-15)
PROJECT TITLE
MAPPING OF GLACIERS FOR INDUS RIVER BASIN
(B03-SARW003)
Literature review
Identification and acquisition of required satellite data
Satellite data processing using different softwares
PROJECT OUTLINE Mapping of glaciers and Glacial Lakes
Field Survey Verification
Final Report Submission
UP
STUDENT PROJECTS (Batch-3, 2014-15)
PROJECT TITLE
SATELLITE BASED WATER QUALITY ASSESSMENT
(B03-SARW004)
Literature review
Acquisition of Required Satellite Data
Preprocessing of satellite data using image processing software
Development of methodology
PROJECT OUTLINE Spatio-temporal mapping of lakes for water quality
assessment
In-situ verification and validation
Final Report Submission
UP
STUDENT PROJECTS (Batch-3, 2014-15)
PROJECT TITLE
STATUS OF BANNED PESTICIDES IN PAKISTAN
(B03-SARW005)
Literature review
Identification of areas of pesticides application
Samples collection and analysis
PROJECT OUTLINE
Data interpretation
Final Report Submission
UP