Sei sulla pagina 1di 2

A Drain Maintenance

58+000 L B A(m2) PCC (m3) Pointing(m2) PCC(m3) Masonary Gabion CoverBlock (No)
to 12000 2.15 25800 330 20640 330 225 945 32
70+000

B Masonary Construction
68+000 25 4 2.25 225

C Gabion Construction
64+000 70 13.5 945

D Drain CoverBlock
61+000 16 32
62+000 16
E Pipe Culvert
58+000 3
64+000
Pipe Culvert (No)
3

Potrebbero piacerti anche