C. WORK PLAN
- The original work plan, revised after having completed
the analysis phase
- Task are the different activities under your selected
development model
- Duration is the ideal number of weeks needed to
complete the task
- Dependency is the task which you rely on to complete
the activity.
D. FEASIBILITY ANALYSIS
- A revised feasibility analysis, using the information from
the analysis phase
- Organizational Feasibility
- Economic Feasibility (include a cash flow that would
present a 4 year plan including development time)
-Technical Feasibility
GAP TABLE
E. REQUIREMENTS DEFINITION
- A list of the functional and nonfunctional business
requirements for the system
- Group the non-functional requirements into operational,
performance, security and cultural and political
requirements.
Functional Requirement
Non Functional Requirement
1.1 OPERATIONAL
1.2 PERFORMANCE
1.3 SECURITY
1.4 CULTURAL
Example:
F. BEHAVIORAL AND STRUCTURAL MODELS (Data Model, Process
Model)
a. Analysis of the Existing System
b. Analysis of the proposed system
c. Data Dictionary
d. Table of reports
- Data Model-using Unified Modeling Language
- Context level
- Level 1
G. RECOMMENDATION AND CONCLUSION
H. APPENDICES: survey results, interviews, industry reports, potential
design issues, etc.)
Note:
4. Use MS Visio for all diagrams and label it as Figure #, Figure Label