DESIGN OF BRIDGE DECK 1

= 2
8
By WSD Method
= +
= + 2(. )
= .
+3
= 1.20 Impact Load:
30
Dead Load: 15.24
= 0.30
+ 38
.
= (1)(23.50) = ( )

. = + +
= . (1)

Check Slab Thickness
= . + .
1 2
= 2 =
8

Live Load: = 0.40


A. Truck Load
=

= 1.219 + 0.06 2.10 +

.
= =1
3
18, = 72 1
=
2
13.50, = 54
Design of Main Reinforcement
1
=
4
=

B. Lane Load

B.1. Concentrated Load =


= 1000
2 =

18, = 80
Distribution of Perpendicular Reinf.
13.50, = 60
55
% . = 50%
1
=
4
= % . ( )
B.2. Uniform Load

=
=
2
1000
=
18, = 9.4

Temperature and Shrinkage Reinf.

13.50, = 7.1

(.) = 264 2
=
2

=
0.85 2
= (1 1 )
1000 0.85
=

600
Check Minimum Reinforcement = 0.851 ( )
600 +
= 0.70
= 0.75
1
= (1000)( 3 ) 1.4
12 =


= =

1.20 Same computations as in WSD

Check Fatigue Stress Limit DESIGN OF EDGE BEAM

Assume width of edge beam, b


= 145 0.33 + 55 ( )

Assume width of curb

= 3 Compute Total Height

Dead Load:
=

. = 23.50( )()

Assume Wt. of Railing
= ()2 + 2
= . + .

=1 1
3 = 2
8
(+)
= Live Load:

= 0.10

=
= +
= Same computations as in Design for Bridge
Deck Using WSD Method
>

By USD Method

Same computations as in WSD up to


Checking of Slab Thickness

Design of Main Reinforcement

, ,

= [ + ( + )]