PROGRESS BILLING FOR RECTIFICATION OF WIRING INSTALLATION WORKS

Item I SUMMARY OF ACCOMPLISHMENTS DETAILS AN


No. FINDINGS AND RECOMMENDATION CATEGORY
1 Replacement of Main Panel 60A,2P to 125A,3P with 5 branches Main Distribution Panel
2 Replacing 100A,3P ECB to 30A,3P @ ECB -W20 Enclosed Ckt Breaker
3 Replace 60A,3P ECB to 40A,3P,22KAIC with 2 Branches(1-20A,2P, 1-15A,2P) @ ECB -W30 Enclosed Ckt Breaker
4 Replace 60A,3P to 30A,3P+G,22KAIC(ECB) @ ECB -W18 Enclosed Ckt Breaker
5 Replacing 100A,3P ECB to 200A,3P,22KAIC with 5 Branches @ ECB -W13,W14,W11 and W10 connection Main Distribution Panel
6 Installation of 30A,3P,22KAIC with 3 Branches Area @ ECB S5 Main Distribution Panel
7 Installation of 100A,3P,22KAIC with 6 Branches @ ECB W3-ECB W6 Main Distribution Panel
8 Installation of New Panel Board 100A,3P,22KAIC with 4 Branches @ SF-8 Main Distribution Panel
9 Replacing of New Panel Board 125A,3P,22KAIC with 2 Branches @ Roofdeck Elevator Main Distribution Panel
10 Installation of New Panel Board 100A,Main,3P+G,22KAIC w/ 4 Branches @ ECB W24,W25,W23 Main Distribution Panel
11 Replace ECB 60A,3P to 60A,3P+G Main w/ 4 Branches @ 2nd Floor Wayan ECB W34 Main Distribution Panel

Item II OTHERS UNIT


1 WORKFORCE LABOR AND SUPERVISION LOT
2 VALUE ADDED TAX (VAT) 12% LOT
TOTAL

TOTAL COST OF THE PROJECT ITEM I + ITEM II + ITEM III

Notes:

1 Attached details of Rectification and Single Line Diagram for reference


2 Re-Wiring installation works of open wirings is not Included

Prepared By:

ENGR. NESTOR T. RIVERA -AER, ACPER


PROFESSIONAL ELECTRICAL ENGINEER
ATION WORKS
DETAILS AND COST
LOCATION AMOUNT
Admin Building 25,421.00
2nd Floor Wayan Building 5,370.00
2nd Floor Wayan Building 10,680.00
2nd Floor Wayan Building 4,670.00
Ground Floor Wayan Building 17,711.00
2nd Floor Wayan Building 15,750.00
Ground Floor Wayan Building 27,505.00
2nd Floor Storage Area 17,345.00
5th Floor Wayan Building 13,350.00
2nd Floor Wayan Building 24,620.00
2nd Floor Wayan Building 13,005.00
TOTAL 175,427.00

AMOUNT
400,679.16
159,898.94
560,578.10

EM II + ITEM III GRAND TOTAL