Sei sulla pagina 1di 7

Curriculum Vitae

Qureshi, Islahuddin
PERSONAL DETAILS CONTACT INFORMATION
Fathers name: Fazal Ahmed House # G-85/842 Effandi Road Hyderabad
Religion: Islam Mobile: +923332625601
CNIC# 41303-1729567-7 E-mail: islahuddin.qureshi@gmail.com
Birth date: 16th-october-1986 Skype id: tipu_9958
Nationality: Pakistani
PEC #PETGAS/989
Passport #CC4915672

CAREER OBJECTIVE
To join a dynamic and progressive organization offering ample opportunities for diversified
experience. Seeking a position that will ensure continued professional growth, offered by a
competitive environment in which advancement is based on the strength of individual
contribution to the realization of organization goals.

CAREER PROFILE
I start my carrier as Project Engineer at JJVL the largest LPG production and marketing
company of Pakistan and after that I had been selected in the SSGCL as a trainee engineer and
carried out assignments regarding to the pipelines maintenance and operations and Liquid
Handling Facility. I also worked as a QA/AC inspector/Engineer at shutdowns with Plant
Services Department Descon Engineering Limited. I also worked as a Manager QA/QC on OMV
Field Development Projects. I also worked on AMPS (Al Iraq Al Muaser petroleum services as a
Manager QA/QC on West Qurna 1 M074 (Exxon-Saipem) Project. Now a day I am working as
Manager QA/QC on one of the Mega Projects of Pakistan in Miscellaneous Sectors i.e Oil / Gas
field Construction, Flow lines and Trunk Lines, Power generation Projects, Terminal Station,
Aviation Fueling & MEP. Furthermore, I had done my ASNT Levels in NDT Techniques, ISO
9001:2008 Certified Lead Auditor, IOSH Managing Safely Certification & Six Sigma Green Belt
Certification.

Expertise:
Pipelines Construction, corrosion prevention.
Quality Inspection for in-service equipments.
In service inspections.
MEP & HVAC Building Construction.
ASME Section 9.
ASME Section 5.
ASME Section 2.
Tanks construction and working and execution of API 650.
Internal Audit.

Interest:
Total Quality Management (TQM).
Management Sciences & Engineering.
Production Management.
Project QA/QC.
Quality Management.
Material Management.
Audit planning.
EXPERIENCE
Sr. Manager QA/QC ATL Pvt Limited
Projects
Ongoing:
PARCO MFM MOGAS PHASE-1
Package 6, Fuel Hydrant System, New Islamabad International Airport
Project.
SEPCO-3 660 MW COAL FIRED BOILER.
Oil Storage Tanks Construction & Repairing Projects at Pakistan
Refinery Limited.
APL Rehabilitation of Terminals.
Burshan Petroleum Oil Terminal Development Project.
Guddu 747 Gas Compression Project.

Completed:

ARL Upgradation Project ATOM, Hyundai-ARL Project.


China Harbour Engineering Tank Construction.
Pakistan Atomic Energy Cooling Tower Construction Project (PPW).
LaGuardia Petroleum Oil Depot Facility Construction.
KW&SB K-4 Pumping Station.
Mobilink tower Clifton (MEP & HVAC)

Working as a Manager QA/QC on multiple projects, dealing and managing overall Quality
Assurance & Quality Control scope. The assignments which had been come into my area of
execution are
Lead, Plan, organize & co-ordinate the team of QA/QC Teams on various Projects,
Engineers, Welding Inspectors, Piping Inspectors, Steel Structure Inspectors, NDT
inspectors, PWHT technicians and other Subcontractors.
Looking after the overall activities of QA/QC Department as per ATL Pvt Ltd Scope of
Work.
Implementation of Corporate Quality Management System and involve in internal Site
audits as per ISO 9001:2008 & project Specifications.
Nominated as a Quality Management Representative by Board of directors.
Conduct Management Review Meetings to meet the ISO requirements.
Supervision of Duct fabrications as per DW142 / SMACNA standards and its installation.
Assisting the QC engineers for preparing method statements, ITP and manuals.
Implementation of Plumbing code (IPC and National Plumbing Code).
Developing fire protection system as per Fire Protection system (NFPA).
Inspection of Conveying System(As per European Standard) and overall Building
services according to ASME B31.9 (ASME Code for Building Service Piping).
Involve in Technical Approvals of Sub contractors and vendors.
Attend progress review meetings with clients and take preventive measures to meet
the customers expectations.
Generating Quality Index of all the Projects.
Coordinating with Client on the Quality related issues.
Coordination with Client/Third party inspector / Suppliers for inspection requirements
of the project.
Supervision of all NDT & DT activities (RT / UT / PT / MT / PWHT / Hardness / PMI /
Pneumatic / hydro test).
Implementation of Project Quality Management System for continual improvement of
Project Deliverables.
Implementation & refer ration of International Codes and Standards such as B31.3,
ASME Section 9.
Generating, Monitoring and Reviewing the Quality Processes involved in Execution of
Project.
Preparation of Project Quality Plan (PQP), Inspection & testing Plan (ITP), and Working
procedures.
Review and provide guidelines to QC team in the work packages Preparation.
Review the Welder Performance and defect rate.
Monitoring the Calibration status of IMTE.
Review of MTCs, MSDS, and Batch certificates of consumable material procured for the
Ongoing Projects of ATL.
Involve in testing & Commissioning of the Fuel Hydrant System.
Evaluating inspection reports and test results as per International Standards/
Customers Standards / specs.
Review of Quality Records and As-Built data.
Supervise and guide the QC Team to prepare Quality Dossier/ Record Book.
Manager QA/QC AMPS Al Iraq Al Muaser Petroleum Services WQ1-M074
Exxon-Saipem Project (12-March-2014 25-Sept-2015)
As a Manager QA/QC, I am responsible for overall QA/QC Activities, the nature of job and my
core assignments are.
Draught the AMPS QMS and related documentation for the West Qurna I, OSBL water
and injection Pipelines system.
Implementation of Project QMS.
Review and Revise Project Quality Documents.
Involve in Project material management and release of positive material.
Draft and Run the semi-Automatic Welding Procedure & Other WPS/PQR related to the
Project.
Provide technical & managerial support to NDT crew.
Review of critical radio graphic films as Per API 1104.
Conduct Inspections of Dark room and film storage facility periodically.
Review the batch certificates and material data sheets of radiographic films & MPT
liquids.
Overall QA/QC Process and Progress Monitoring of QA/QC Personnel.
Conduct the trainings to the employees & Staff of ALMCO to maximize the quality
yield.
Evaluating the material supplied by AMPS on West Qurna I.
Conduct the internal QMS Audit for ISO 9001:2008 certification.
Conduct the audits of Suppliers and sub-contractors of ALMCO as Per ISO 9001:2008.
Perform as a main functionary in the Saipem-Exxon audit.
Monitor the Training and development activities of Project.
Design and develop the material and consumables management strategies.
Generate RFIs & Deviation request in order to overcome the issues.
Study & Analyze the quality threats and defect causes by using Six Sigma tools.
Monitoring the calibration status for control of measuring and inspection devices.
Supervise the In-House calibration process and provide technical support to the
Inspectors.
Construction of pipelines as per API 1104 and Exxon specifications.
Preparation of test packs involved in West Qurna I Project.
Preparation & Approval of Concrete Mix designs for underground and Above ground
concretes.
Manages the Civil Scope of work and Inspection control for civil activities.
Involved in E&I activities and Inspection control of E&I Activities.
Manage & Review the Inspection reports of overall activities.
Look after Quality Control of CP System Installation and Junction Box Commissioning.
Generate the quality record dossier of the Project after completing the mile stones.
Manager QA/QC (OMV-HARIS) Haris & Co. (Mar 2013 to 8-Mar-2014)
Projects:
1. TAJJAL 1 WELLHEAD COMPRESSION.
2. TAJJAL 4 WELLHEAD COMPRESSION.
3. TAJJAL FISCAL METERING.
4. TAJJAL 4 PHASE 2.
5. SAWAN ATA 2013 OMV PAKISTAN.
6. KADANWARI ATA 2013 OMV PAKISTAN.
7. FEC KADANWARI-MIANO RELOCATION PROJECT.

Worked as a Manager QA/QC in HARIS & CO, and carrying out assignments at OMV Field
Developments Projects at SAWAN, KADANWARI & REHMAT Gas fileds. My nature of Job is
Draft the Project Quality Plan PQP.
Look after the overall project quality including civil, and E&I.
Draft the project Method statements according to the OMV-Clough specification.
Draft the Quality Inspection Plan QIP for the tajjal 1 & 4 wellhead compression and
tajjal Metering Skid/ATA 2013 Shutdown project & KADANWARI FEC Project.
Construction of the PQR for the ASTM A 106 Gr. B, API 5l/X 52 for Haris & Co.
Develops and maintain the Material and consumable management strategies and
record.
Review of MTCs, MSDS of material procured for the projects.
Develops the welding plan maps and create the WPS and involved in Qualification of
welders.
Conduct the internal Audits of Kadanwari Site projects of haris & Co.
Evaluate the RT reports and sought out the dimension of defects in welding.
Daily Progress monitoring of production.
Test packs monitoring and reporting select the suitable criteria of test pack lines.
Construct the as built records of HARIS-OMV Projects.
Involved and lead the team on testing and commissioning activities of stationary as
well as rotary equipments.
Conduct the holiday test, hardness, hydrostatic test and pig for Flow lines.
Keep and construct the as built records for the projects.
Lead the Audit team on Project Quality Audits on the partial Completion of projects.
Working in trouble shooting of project management issues as a part of core
Management.
Handing over the final project quality dossier to the OMV.

DESCON ENGINEERING LIMITED JAN 2012 to FEB 2013


Worked as an Asst. Engineer QA/QC in the plant services department of Descon
Engineering Limited and carried out assignments in different turnarounds in the major
refineries and processing plants of Pakistan. The projects on which I carried out assignments
are as stated under further more had been involved in the internal audits of different projects.

Company : Descon Engineering Limited


Client : NRL
Designation : QA/QC Engineer
Duration : 1st November to 15 jan (2013)

Company : Descon Engineering Limited


Client : PPL ADHI
Designation : QA/QC Engineer
Duration : 20th August to 30th September (2012)

Company : Descon Engineering Limited


Client : OMV SAWAN
Designation : QA/QC Inspector
Duration : 20th April to 1st May (2012)

Company : Descon Engineering Limited


Client : PARCO
Designation : QA/QC Inspector
Duration : 15th March to 15th April (2012)

Nature Of Job:
On the different shutdowns I worked as QA/QC Inspector/Engineer and carried out the
following works.

Pre and post inspection of heat exchangers.


Coordination with client for the inspection and release of valves.
Inspection of sand blasting, painting activities and corrosion resistance coatings.
Inspection of internals of vessel, column, coolers, tubing, AFCs and CO2 hydro and
jetting.
NDE of PT impeller, gas turbines, process piping welding examination by RT.
Hydro testing of heat exchanger tubing and mechanical valves.
Arrangement and design the work scope.
Carry out and execute the BOQ designed by Client.
Time & quality management of the shutdown activities.
Coordination with client for the schedule, extra work and amendment in BOQ.

Sui Southern Gas Company Limited (Jan. 2011 to Nov. 2011)


Transmission department SSGC at Karachi pipeline terminal and Compressor Station.
Orientation on
MPL (INSTRUMENTATION).
Gas control system by SCADA.
Compressors (instrumentation and control).
Section 4 operations and maintenance.
Pipelines maintenance & operation.
Liquid handling facility at HQ3.

NATURE OF JOB
After completion of orientation at Karachi main pipeline terminal (transmission
department), I had placed at transmission head quarter 3 for my duties and assignment, HQ3
has compressor station, condensates treatment plant and operational activities with in its area.
Handling of hyderabad, jamshoro sales meter station.
Monitoring of main pipelines ILBP, Kadanwari, Sanghar and badin on hourly basis.
Carried out maintenance and routine works at ILBP, Kadanwari, badin and Sanghar
main pipeline under HQ3 region.
Maintaining instrument air pressure.
Monitoring of treatment plant parameters on hourly basis.
Carried out maintenance and operation works at condensates treatment plant.

JJVL (Jamshoro Joint Venture Limited) Nov 2009 to Dec 2010

As a Process Engineer in JJVL (Jamshoro Joint Venture Limited) 200 Metric Ton LPG Plant.
This project is the Largest LPG Extraction Plant in Pakistan Processing over. The plant produces
in excess of 200 Metric Tons of LPG and Metric Tons of NGL/ Day.
NATURE OF JOB:

Involved in Loop Checking and Commissioning activities of Plant.


Trouble Shooting and Maintenance of Instruments.
Gas Metering, Worked on Floboss.
Analyze Gas Chromatograph, Heating Values.
Working in Gas dehydration Plant and sweeting process
Caterpillar Engine for Gas Compressor Dresser Rand.
Micromotion Flow Tranmitter/Totalizer.
Work and execute API-2510, API-1102, API-616 and API-RP-551.
Worked on Utilities, Instrument Air Compressors, Plant Air Compressors, Fire Water
Pumps.
Calibration of Switches Pressure, Temperature, Level Etc. Overhauling, Maintenance
and Calibration of Control Valves Positioners, Converters I/P.
Plant Utilities like Instrument Air Compressors, Tank Forms and Fire Water Pumps etc.

ACADEMICS
B.Sc Engineering (2005-2009)
University of Engineering and Technology Lahore. (76.4% 1st division)
Formation Damage (Final Year Thesis).
Higher Secondary School Certificate (2002-2004)
Cadet College Petaro
Pre engineering 79% marks
Secondary School Certificate Session (2000-2002)
Cadet College Petaro
Pre engineering 84% marks

Memberships:
Society of Petroleum Engineers. (International).
Pakistan Engineering council.

Certifications:
IRCA ISO 9001:2008 QMS Lead Auditor.
Six Sigma Green Belt.
ASNT Level II for RT, UT, MPI,DPT.
IOSH MANAGING SAFELY.

COMPUTER SKILLS
MS WORD, EXCEL, POWER POINT.
Computer Languages C++ & object oriented programming.
Eclips for reservoir simulation.
SCADA
Pipe sum.
Oracle 11i.
Primavera Project Planner P3.

LANGUAGES
English (Read, write and speaking).
Urdu (Read, write and speaking).
Arabic (Read, write & speaking).
References will be furnished on demand.

Potrebbero piacerti anche