Following are the observations related to E, I &A scope of work as detailed out in TS No-
DGM/PCC/TK/2017/428 Dated 05.08.17, issued by MECON:
S. Page /Clause No As per TS BSPs Observations
No 1 P-27/07.02.VI . Contractor will May please clarify, as commissioning spares ensure that the make for free issue items is not in the scope of of commissioning contractor. spare for free issue items.. 2 P-51/07.16.58 contractor will May please clarify, in which tender discussion note that no major MOM this point is appearing. modification.. 3 P-51/07.16.62 ..However any Please refer pt. no-35 of pre bid clarification change in load issued to bidders and incorporate it as a list separate point under clause 07.16 as it is relevant for URM, BRM & FWPH areas. Pt no- 35 of pre bid clarification is quoted here as Please note that all the required MCC/PCC panels has been supplied based on the approved drive list by previous supplier (M/s MBE). However any change in drive list shall be suitably taken care by the bidder 4 P-122/08.03.02.02 Fire Fighting PHs In the tender document, column titled distance between source & FWPH and distance mentioned were not given. May please provide/clarify in which tender discussion MOM this point is appearing. 5 P-123/08.03.02.02 .Increase/Decrease This clause was not there in the tender in route length is document. May please provide/clarify in which required post order tender discussion MOM this point is appearing. stage.. 6 P-129/08.03.03.01 Total 30 nos. of Please mention PKG no. under which supply of telephone sets.. telephone sets is envisaged. 7 P-132/08.03.03.01 Interconnectivity This clause was not there in the tender of pump houses. document. May please provide/clarify in which tender discussion MOM this point is appearing. 9 P-133/08.03.03.01 ..However any Same observation as in pt no-3 above. change in load list 10 P-134/08.03.03.02 .Complete Please include cable bridges also as it is illumination.. appearing in MOM dtd 18.10 & 26.10.16 with other bidders. 11 P-136/08.03.03.02 Total 30 nos. of Same observation as in pt no-6 above telephone sets.. 12 P-140/08.03.03.03 Out of 20 nos. 16 Please correct the voltage rating vis--vis no. nos. are.. of VCBs. 13 P-146/Cable & .Further above Supply of copper cables of relevant cabling philosophy cables will be.. sizes for incomers of panels located in WTP-1 & 2 (MLDB & PDB only) and in WTP-5 area (MCC, MCP, and MLDB & PDB) is in the scope of TK contractor. Please note that laying, testing and commissioning of only 3.5 C x 240 sq mm. cu cable between WTP-7 & WTP- 5 (MCC & MCP only) is excluded from scope of work of TK contractor. (Refer Table C Annexure VI) & MECONs e-mail to party dated 17.12.16. Laying testing and termination of all other cables is in the scope of TK contractor. (Refer Table C Annexure VI) & MECONs e-mail to party dated 17.12.16 Supply of minimum 5100 meters of 3.5 C x 240 sq. mm. cu cable and supply of shortfall 3.5 C X120 sq mm cu. Cable is in the scope of TK contractor.
May please correct in CTS.
14 P-229/08.07.02 Sl. No- 8,9,10,11 Please note that power supply to the cranes mentioned under sl. no- 8, 9, 10, 11 shall be from PDB which is under scope of TK contractor. Extending power supply from this board to cranes shall also be scope of TK contractor, 15 P-231/08.07.02 Sl. No- 17,19,20 Same observation as point no- 14 above. 16 P-252/08.10.02 Web Based System As confirmed by M/s TPL vide e-mail dated 04.11.16, minimum 7 nos. of OPC servers & minimum 7 nos. of hardware firewall is considered. Please include minimum word in the given table. 17 P-513/ Table C Table To be removed as supply, erection, testing and Annexure VI pt no- commissioning of UPS, Battery & ACDB for 49 URM & BRM is in the scope of TK contractor. 18 P-163/08.03.13.01 One no plant wide Please mention PKG no. under which supply of network switch Ethernet switch is envisaged. 19 General Cooling Tower Scope of work related to electrics of cooling towers in URM & BRM is not covered in this CTS. May please clarify.
The above observations are to read in conjunction with the observations given by other disciplines and user department, if any.