OPEN DUMP
Disposal area wherein the solid wastes collection systems or convenient drop-off
are indiscriminately thrown or disposed locations for recyclable materials and
of without due planning and particularly for separated toxic components
consideration for environmental and of the waste stream like dry cell batteries
Health standards; and tires to ensure that they are not
incinerated or disposed of in a landfill.
RECYCLING
Treating of used or waste materials Upon effectivity of this Act, toxic materials
through a process of making them present in the waste stream should be
suitable for beneficial use and for other separated at source, collected separately
purposes and further screened and sent to
appropriate hazardous waste treatment and
SANITARY LANDFILL disposal plants, consistent with the
Waste disposal site designed, provisions of R.A. No. 6969.
constructed, operated and maintained
in a manner that exerts engineering PROHIBITION ON THE USE OF NON-
control over significant potential ENVIRONMENTALLY ACCEPTABLE
environment impacts arising from the PACKAGING
development and operation of the
facility No person owning, operating or conducting
a commercial establishment in the country
SEGREGATION shall sell or convey at retail or possess with
Solid waste management practice of the intent to sell or convey at retail any
separating different materials found in products that are placed, wrapped or
solid waste in order to promote packaged in or on packaging which is not
recycling and re-use of resources and environmentally acceptable
to reduce the volume of waste for packaging: Provided, That the Commission
collection and disposal shall determine a phase-out period after
proper consultation and hearing with the
WASTE DIVERSION stakeholders or with the sectors concerned.
Activities which reduce or eliminate the The presence in the commercial
amount of solid waste from waste establishment of non-environmentally
disposal facilities acceptable packaging shall constitute a
rebuttable presumption of intent to sell or
convey the same at retail to customers.
SEGREGATION OF WASTES
A violation of this Section shall be sufficient
RECLAMATION PROGRAMS AND BUY- grounds for the revocation, suspension,
BACK CENTERS FOR RECYCLABLES denial or non-renewal of any license for the
AND TOXICS establishment in which the violation occurs.
1. site selected must be consistent with (c) Gas control and recovery system - a
the overall land use plan of the LGU series of vertical wells or horizontal trenches
2. must be accessible from major containing permeable materials and
roadways or thoroughfares perforated piping placed in the landfill to
3. should have an adequate quantity of collect gas for treatment or productive use
earth cover material that is easily as an energy source;
handled and compacted;
4. chosen with regard for the (d) Groundwater monitoring well system
sensitivities of the community's wells placed at an appropriate location and
residents; depth for taking water that are
5. located in an area where the representative of ground water quality;
landfill's operation will not
detrimentally affect environmentally (e) Cover - two (2) forms of cover consisting
sensitive resources such as aquifer, of soil and geosynthetic materials to protect
groundwater reservoir or watershed the waste from long-term contact with the
area; environment:
(i) a daily cover placed over the waste at the environmental and ecological balance of
close of each day's operations, and; local communities can be implemented:
(1) prior consultation with the affected
(ii) a final cover, or cap, which is the local communities, and
material placed over the completed landfill (2) prior approval of the project by the
to control infiltration of water, gas emission appropriate sanggunian.
to the atmosphere, and erosion.
Absent either of these mandatory
(f) Closure procedure with the objectives
requirements, the projects implementation
of establishing low maintenance cover
is illegal.
systems and final cover that minimizes the
infiltration of precipitation into the waste.
Installation of the final cover must be
completed within six (6) months of the last
receipt of waste;
ISSUE:
Whether or not the consultation and
approval of the Province of Rizal and
municipality of San Mateo is needed before
the implementation of the project
HELD: