Compliance analysis and

comparison with baseline

28th April 2017

Prashan Perera
Senior Energy Consultant & LEED AP
EnergySolve International (Pvt) Ltd
info@energysolveinternational.com
www.energysolveinternational.com
Reference Standards

ASHRAE 90.1 2007 -

ASHRAE 62.1 2010


Base case Vs Proposed case

Proposed Building Performance Base Building Performance


Design model Identical model to design
Space use classification Same as proposed design
Schedules Occupancy, Lighting power , Same as proposed design
Misc equipment power , thermostat set
point ,fan schedule,
Building envelope - As per design ASHRAE 90.1 as specified
Lighting - As per design ASHRAE 90.1 LPD as specified
Thermal blocks zones Same as proposed design
HVAC systems - As per design ASHRAE 90.1 baseline system type
Receptacle and other Same as proposed design

Ventilation rates- ASHRAE 62.1 Ventilation rates- ASHRAE 62.1


Modeling

Importing CAD
Creating building foot print
Creating zones
Including windows /doors
Assigning zones /Zone merging
Assigning systems
Baseline and proposed case comparison
Output file analysis
Output File analysis
Cooling /heating Load hours - An unmet load hour occurs
when the HVAC system lacks the capacity to keep the design setpoint within the
throttling range for the duration of an hour.

Annual kWh generation


Cost Saving
Savings by applications
Zone performance
kWh generation