ACEH ELECTRICITY POWER GENERATION IN-EFFICIENCY INDICATOR

GWH BY
DIESEL
ENERGY COAL % COST % DIESEL
FUEL STATE LOSS RECOMMENDATION TO IMPROVE POWER
YEAR TOTAL PLANT DIESEL ENERGY (TRILLION RP)
(GWH)
(KILO-
FUEL MIX GENERATION IN ACEH PROVINCE
LITER)
2010 509.64 - 130,937 100.0% 93.4% -1.72 1 REFURBISH COALPP NAGAN RAYA WITH SCHEME G TO G TRANSFER TECH
2011 794.16 30.4 206,651 100.0% 94.6% -1.37 2 BUILD COAL PP WITH PROVEN TECHNOLOGY EUROPE/JAPAN
2012 534.8 60.0 134,182 98.0% 91.2% -1.19 3 CAPACITY = 2 x 110 MW, ESTIMATE COST = Rp 8 TRILLION
2013 522.89 64.0 123,174 97.2% 85.7% -1.11 4 SCHEME IPP OR EPC - START 2016/2017
2014 582 63.3 138,495 95.4% 86.5% -1.06 5 NEW COAL PP WILL IN OPERATION 2020
-6.45 6 TOTAL 4x110 MW, SCHEME OPERATION = 2/2 OR 3/1
Kepres No 71/2006 7 BUILD SEA PORT/JETTY OF COAL STORAGE AND COAL SHELTER

START FINISH DISCUSSION OF COAL PP NAGAN RAYA 2 x 110 MW CFB TECHNOLOGY


1 CONTRACTOR SINOHYDRO, CHINA CFB TECHNOLOGY
2007 2,008.0 2009 2010 2011 2 ACCORDING TO RUPTL, CONSTRUCTION = 36-60 MONTH
3 IN TABEL, PRODUCTION UNTIL 2014 IS ONLY 63,3 GWH
GWH CF=0,8 4 CF= 4.1% AT 2014, INDICATED CFB HAD BIG PROBLEM
COAL PP NAGAN RAYA 36-60 MONTH
2 x 110 MW
1541.76 6 REQUIRES KEPRES TO REFURBISH COAL PP WITH SCHEME G TO G

Aceh- State loss of diesel operation 2010- 2014


% COST DIESEL FUEL IN-EFFICIENCY 0.00
2010 2011 2012 2013 2014
YEAR 2012 -0.20
105.0% COAL PP NAGAN RAYA
-0.40
100.0% 2x110 MW START
OPERATION -0.60
% ENERGY MIX

95.0% -0.80

TRILLIONRUPIAH
90.0% -1.00
85.0% -1.20
-1.40
80.0%
-1.60
75.0% -1.80
2010 2011 2012 2013 2014
-2.00