Sei sulla pagina 1di 11

Mobile: +9647729361222

E-mail: Eng.moh82ed@yahoo.com
Address: Iraq .Baghdad. Hay Aljamea

Engineer
Civil
Personal Information

Name: Mohammed Saeed Hamad.


Born: 8.12.1982
Marital Status: Married
Nationality: Iraqi

Qualifications

2000 -2004 :- (BSc.) of Civil Engineering, Anbar University, Engineering college, Anbar,
Iraq.
2013 -2016: (MSc.) of construction management, Sakarya university, Engineering
college, Sakarya, Turkey

Computer Skills
Skills:

Adobe Illustrator, Adobe Photoshop, Android, Art Design, AutoCAD, Backup


Management, C, C++, Client Server, Client Support, Configuration, Content
Management, Email, Engineering, Excel, FileMaker Pro, Hardware, Help Desk, HTML,
Implementation, Installation, Internet, iOS, iPhone, Linux, Java Javascript, Mac, Matlab,
Microsoft Excel, Microsoft Office, Microsoft Outlook, Microsoft Publisher, Microsoft
Word, Microsoft Visual, Mobile, Networks, Python, Software, Troubleshooting,
Windows, Word Processing.

Language:

Arabic Mother Tongue.


English (speaking, writing, reading) fluently.
Turkish (speaking, writing, reading) fluently.
Kurdish (speaking, writing, reading) good.
Personal statement

A bright degree qualified professional within civil engineering who holds chartered status,
and has a proactive approach along with an ability to adapt to changing scenarios. I acts in
a professional and responsible way at all times, and can maintain excellent working
relations with clients, designers, site managers, sub-contractors, suppliers and the general
public. My extensive experience allows me to structure and priorities work effectively
through close cooperation with other team members. I am now looking for a suitable
position with a company that offers excellent career development opportunities.

Areas of expertise

Logistic officer Recording information Thinking creatively Analyzing data


Scheduling work Building construction City planning Power generating
systems
Environmental engineering Decision making Shelter engineer Resolving conflicts

Employment history

Last Employer: Hasan Mert Inaat. San. Tic. A.. Company.


Company website: www.hasanmertinsaat.com
Position: Logistic Officer (Turkey- Sakarya)
October, 2012 October, 2016. (4 years).

Responsibilities:
My Logistic tasks
Logistic/Supply Management for the project
To ensure the supply for the project: receipt of orders, selection of the required
procedures, purchasing, packaging, transportation and delivery:
Establish and update purchasing plan/timelines, taking into consideration procurement
tables, operation timelines and contextual and procedural logistical constraints
Under supervision of the Logistic Manager:
receive, approve and process requests for quotations and internal order forms
determine the appropriate purchasing procedure regarding amount, company
guidelines, specific technical constraints, and specific policies
When necessary ensure the analysis of the offers (ad equation to the request, price,
liability, availability, payment condition, delivery condition), in collaboration with the
requesters.
Supervise the preparation of purchasing documents and draft the contracts in
coordination with the Logistic Manager.
Propose a selection of suppliers and negotiate prices, deadlines and delivery methods
Purchase of items whilst ensuring approval rules and procedures are observed.
Ensure that purchasing documents are complete and archived in keeping with
procedures.
Ensure that dealings with suppliers are monitored.
Carry out a purchasing environment analysis at the local level.
Update the price lists and supplier files.
Manage the purchase follow-up tools and the capitalization at project level.

Transportation / Vehicle Fleet Management


Negotiate vehicle rental contracts.
Establish vehicle movement schedules.
Ensure that a complete breakdown kit is available on board all vehicles.
Ensure that all drivers have received general training and regular checks.
Ensure that drivers are aware of their obligation to adhere to safety rules and procedures
Check that vehicle log books are in place and are used correctly
Monitor, consolidate, analyses and record fuel consumption and vehicle mileage
Prevent the misappropriation of fuel and spare parts.
Ensure that all vehicles have accompanying administrative documents and that these are
correctly filed and monitored.

Equipment Management
Update inventory in real time
Optimize distribution of materials according to task needs
Organize the installation, safe-guarding and monitoring of materials
Install communication means and ensure that they are regularly maintained
Implement backup and data-protection procedures
Ensure the maintenance and correct use of IT equipment
Storage Management
Ensure procedures are followed as stock is checked in and out
See that all documentation linked to stock is complete and correct
Proceed to monthly physical stock inventory
Base Maintenance (guesthouse/office)
Ensure the rental contract is compliant with process and manage interaction with the
owner
Ensure the regular order for the guesthouse (food, water, cleaning products)
Ensure the maintenance of the base/guest house (electricity, repairs). Depending on the
problem, fix it with or without the owner.
Safety and Security
ensure that security rules are implemented, understood and followed by the team (both
expat and national).
Ensure that safety rules are in place in all vehicle and premises (vehicle safety, Office and
safety etc.).
Facilitate the evacuation of field based teams if necessary
Ensure timely and accurate security.
5. Responsibilities
5.1. Team Management
Ensure strict application and respect of the Internal Regulation by my team members;
Define with my team members the action plan and deadlines for reaching goals;
Conduct bimonthly team meeting and weekly individual meeting;
Ensure formal feedback towards my team about any issues raised by them;
Ensure conflict resolution within my team with support of my Line-Manager.
5.2. Reporting
Provide regular reporting of my activities to my Line-Manager upon my solicitation.

Other past employment


Past Employment experiments
Experiments

Description of Date of
No Project Name Company Employer
work Project
1 Paving the inner area for Qasr Al- Remal Earthworks , sub-base Baghdad 2009
general police directorate in work 2 layer (50cm)
Baghdad as main contractor ,paving 10 cm stabilizer
layer
2 Rehabilitation Abu-Gareeb Al-Helaly Rehabilitation sewage Baghdad 2009
Sewage as main contractor network( 3 Km) and 4
pump station in Abu-
Greeb

3 Program coordinator Regular Estimating quantities and Islamic charity 2008


Employee costs of shelter materials, Association
equipment's, or labor to (ICA) in
determine project Fallujah
feasibility
Scheduling material and
4 Supply Concrete for pump AL- Supply thispurchases
equipment Project inand USACE 2007-
station ( F5) Project as Danoop 5000 m3
delivery. concrete 2008
subcontractor
5 West Water Treatment Plant in Baghdad Moon This Project according USACE 2007
Fallujah city many of big different
tank the base from
concrete and install
iron wall ( Aeration
tanks
,sedimentation tanks ,oil
tanks ,dry tanks , etc..)
and the quantity of
concrete fort the base of
this tank (25000)m3
6 Earthworks Project for west Al-Awsat Cutting , filling USACE 2007
water treatment plant (WWTP) (1,000,000
in Fallujah city ) M3 and leveling to
create WWTP Project on
7 Work in Omar abdualaziz Bridge Al- Muatase m same
400 mearth
Bridge over Ministry of 2006
in Anbar Ramadi as supervisor Euphrates river construct on
engineer with consulting Bureau and housing
of Baghdad university

8 Reconstruction railway house Al-Heba Rehabilitation 62 USACE 2005


and train station in Fallujah House and train station

9 Work in Fallujah Hospital (All Al-mrhej &Al Work site preparation Ministry of n first of
concrete Works ) only -Hamed , dewatering, sub-base construction 2005 for 3
Works , foundation and housing month only
Works .

10 Water network in Takya in Zamwa Create water network Kurdistan(KRG) 2004


north of Iraq by using polyethylene
pipes DIM(10-60 ) Mm.
Length 6000 M.L

11 Sewage works in Kalar in North Zamwa Construction network Kurdistan(KRG) 2004


of Iraq sewage by using
concrete pipe DIM(60-
120)cm , length 5000
M.L
References

Name: Omer Faruq Mert.


Position: Manager of Sakarya Office
Company: Hasan Mert Inaat. San. Tic. A.. Company. Sakarya-Turkey.
Phone number: 00905327928347.

Email: Hassan_mert@yahoo.com.
Name: RYA Hussein Agha
Position: Deputy Manager of Sakarya Office
Company: Hasan Mert Inaat. San. Tic. A.. Company. Sakarya-Turkey.
Phone number: 00905380680921
Email: ruya.hussein@ogr.sakarya.edu.tr

Name: Jasim Mohamed Khairi.


Position: Manager of Baghdad Moon Company
Phone Number: 00962799999539
Email: Baghdad.Moon@gmail.com

Name: Khames Alshemary.


Position: Manager of Al-Awsat Company
Phone Number: 0096279997744
Email: Althare65@yahoo.com

Name: Falah Hasan Almehmdy


Position: Manager Of qaser AlRemal Company
Phone Number:009647809124203
Email: Eng_Falah_999@yahoo.com

Name: Donald.I.Nieman
Position: USACE Office Manager in Fallujha
Email: Donald.I.Nieman@tac01.Usace.army.mil

Name: Lavdim.Mhmeti
Position: KBR Office Manager in TAJI
Email: Lavdim.Mhmeti@Kbr.com
certificates

1- Turkish language certificate


2. Master Dagree Transcript
3. BSC. Official Transcript

Potrebbero piacerti anche