Sei sulla pagina 1di 9

A ISSUE FOR XXXXXXXX XX/XX/200X XXX XXX

REV. DESCRIPTION DATE BY CHK.

JOB: XXXXXXXXXXXXXXXXXX

TITLE: API Std 650 - STORAGE TANKS


TAG XXXXX
P&P FACILITIES DEPARTMENT DATA SHEET
SCALE DOCUMENT N: REVISIO
All the information contained in this
document is confidential and property
of Pluspetrol, and the totally or partial GRAL-100-HD-D-002 A
copy or reproduction of it is prohibited N/A
without previous authorization.
All the information contained in this
document is confidential and property
of Pluspetrol, and the totally or partial
copy or reproduction of it is prohibited N/A
without previous authorization. REPLACE: Page: 1 o
XXX XXX
CHK. APPD.

REVISION:

A
Page: 1 of 3
DOCUMENT No:
API Std 650 STORAGE TANK
GRAL-100-HD-D-002
TANK SERVICE XXXXX REVISION: A

TAG XXXXX Pages: 2 of 3


Item N TAG XXXXX
Location: Pisco Plant
DESIGN DATA
Type Fixed and internal floating roof MATERIALS (minimum quality)
Capacity (note 7) 12235 bbl
Inside Diameter 46 ft Shell A-36
Desing Pressure / Vacuum 0 psig 0 in H2O Roof A-36
MDMT / Design temperature 25 F 150 F Bottom A-36
Operating Pressure Internal/External 0 psig 0 psig Forgings A-105
Operating Temperature 120 F Nozzle Necks Pipe A-106 B
Liq Specific Gravity (@ Op temp / std) 0.67 0.696 External Studs/Nuts A-307/A-563
Lethal Content No Internal Bolts/Nuts A-193B7/A-1942H
Thickness: Roof / Shell / Bottom 1/4" / 1/4" to 3/8" / 5/16" Gaskets Garlock 3000
Corr All ("): Roof/Shell/Btm/Nozzle 0.0625 0.0625 0.0625 0.0625 Suspended Deck Aluminum
Code API-650 App E Certified Yes
Radiograph Per Code PWHT No
Fill Rate (In/Out) 1186 GPM 1800 GPM(max)
Anchor Bolts: Size/Number
Frangible Joint No
Wind Load See note 3 Earthquake See note 3
Sand Blast See note 2 Primer See note 2
Insulation Tk -- Insul Sup'ts
Manhole Cover with (Hinge/Davit/Handles) Davit
[x]Platform [ ]Floo Pit [ ]Grating [x]Galv [ ]Sandblast [ ]Prime NOZZLE SCHEDULE
[x]Lader [x]Spiral Stairway [ ]Galv [ ]Sandblast [ ]Prime Nozz Nozz Flg Flg Flg
[ ]Rim Rail ; Length [ ]Galv [ ]Sandblast [ ]Prime Ref Size Qty Rating Face Type Service
(One/Both) Both Side(s) of Ladder ["] [#]
Internal Floating Cover Required Yes MH1 24 1 API Plate Shell Manhole*
Foundation Type: Ringwall MH2 24 1 API Plate Shell Manhole*
Cathodic Protection: Yes MH3 24 1 API Plate Roff Manhole*
A 10 1 150 RF WN Liquid Inlet w / distrib pipe
Weight [ lb ] Empty 135000 Full of Water 5308800 B 12 1 150 RF WN Pump Suction
F 12 1 NA RF NA Mushroom Vent (Roof)
HHLL: 540 in G 8 1 150 RF WN High Level Switch
LLLL: 44 in H 8 1 150 RF WN LT Low
N 4 1 150 RF WN Drain w / Drawoff Sump**
V 20 5 NA NA NA Roof circulation Vent / Hatch
L 6 1 NA NA Plate Foam Chamber
K 8 1 150 RF WN Level Trans (Roof)***
Notes TW 2 1 300 RF WN Thermowell
FW1 6 1 150 RF WN Spray System Shell Riser (note 8)
1 See also: FW2 4 1 150 RF WN Spray System Roof Riser (note 8)
PCSE-100-ET-D-008 Storage Tanks Specification
PCSE-520-PL-Y-738 P&I - Pisco Plant Debutanizer Bottoms Surge 3

2 PCSE-100-ET-X-002 Selection and application of Protective Coatings

3 Earthquake (Pisco) IBC-06 SDS = 0,65 - SD1 = 0,37 - Category D


Wind (Pisco) ASCE 7-05 Velocity = 108 km/h - Exposure C

4 Instruments shall be supplied by others.

5 Weld examination per API 650


* Furnish blind flange, studs,nuts, and gasket
6 Leak testing per API 650 ** According API 650 Table 3-16 Fig 3-18.
*** 8" Nozzle with Still pipe 6" SS seamless, vertically aligned with 3/8"
7 Volume measured from LLLL to HHLL holes each 8", first hole as high as possible and reference
(see par 4.1.3 PCSE-100-ET-D-008) plate (by supplier)

8 Spray System shall cover shell and roof and


shall have individual risers.

9 Floating Roof must have a mechanical dispositive to prevent collapse


equivalent to vacuum/pressure valve.
DOCUMENT No:
API Std 650 STORAGE TANK
GRAL
TANK SERVICE XXXXX REVISION:

TAG XXXXX Pages:


Item N
TANK SKETCH
Location
CUMENT No:

GRAL-100-HD-D-002
A
ges: 3 of 3
Item N TAG XXXXX
Location: Pisco Plant